CN208649915U - A kind of double free cantilever erection equipment of steel truss girder - Google Patents

A kind of double free cantilever erection equipment of steel truss girder Download PDF

Info

Publication number
CN208649915U
CN208649915U CN201721262719.8U CN201721262719U CN208649915U CN 208649915 U CN208649915 U CN 208649915U CN 201721262719 U CN201721262719 U CN 201721262719U CN 208649915 U CN208649915 U CN 208649915U
Authority
CN
China
Prior art keywords
steel
girder
internode
starting
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721262719.8U
Other languages
Chinese (zh)
Inventor
唐启
李有为
马勇
韩治忠
唐震
王建斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201721262719.8U priority Critical patent/CN208649915U/en
Application granted granted Critical
Publication of CN208649915U publication Critical patent/CN208649915U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of double free cantilever erection equipment of steel truss girder, are related to science of bridge building field, including bridge pier, bracket, starting internode girder steel and tower crane, and starting internode girder steel is set to bridge pier and cradle top, and tower crane is arranged in inside starting internode steel girder frame.The utility model can be substantially reduced tower crane and hang width and elevating capacity requirement, reduce construction risk, and obtain significant economic benefit in smaller all standing of the realization to pier top region steel truss girder starting internode under hanging web state.

Description

A kind of double free cantilever erection equipment of steel truss girder
Technical field
The double cantilevers of bracket progress are set up in girder steel the utility model relates to science of bridge building field, in particular to one kind symmetrically to spell Equipment arragement construction during dress.
Background technique
Girder steel symmetric double free cantilever erection construction technology is widely used in current bridge construction field, and general construction method is, Pier top starting internode (two internodes or four internode girder steels) is lifted into branch by equipment such as tower crane, crane barges by the mounting bracket by pier Carry out assembled on frame, then, girder steel is toward both direction symmetric double free cantilever erection.
Internode is originated for pier top girder steel, in the case where depth condition has, it is contemplated that directly lift using crane barge.But , crane barge unapproachable region insufficient for land-based area area or depth condition, or because pier shaft height is larger, crane barge installation is obvious not Daylight saving time, the method installed frequently with tower crane.
In conventional method, tower crane is typically disposed in outside Steel truss structure, and general setting and girder steel direction across bridge side, at this Under arrangement states, tower crane need it is biggish hang width could by pier top region originate all standing of internode girder steel, thus need using compared with The tower crane of big elevating capacity, it is less economical.
Utility model content
The purpose of this utility model is that: in view of the deficienciess of the prior art, proposing a kind of double free cantilever erections of steel truss girder Equipment arragement construction can be substantially reduced in smaller all standing of the realization to pier top region steel truss girder starting internode under hanging web state Tower crane hangs width and elevating capacity requirement, reduces construction risk, and obtain significant economic benefit.
The purpose of this utility model is realized by following technical proposals:
A kind of double free cantilever erection equipment of steel truss girder, including bridge pier, bracket, starting internode girder steel, tower crane and steel girder erection are made Industry face, bridge pier and bracket are fixed in steel girder erection work surface, and starting internode girder steel is set to bridge pier and cradle top, tower crane arrangement Inside starting internode steel girder frame, the tower body bottom of tower crane is fixed in steel girder erection work surface, and the tower body of tower crane is through bracket Inside is stretched out inside starting internode steel girder frame, and the crane arm of tower crane is located above starting internode girder steel.
The aforementioned main scheme of the utility model and its each further selection scheme can be freely combined to form multiple schemes, It can be used for the utility model and claimed scheme;And the utility model, (each non conflicting selection) selection between and It can also be freely combined between other selections.Those skilled in the art are after understanding the present invention program according to the prior art and public affairs Know that common sense can be illustrated there are many combination, is the claimed technical solution of the utility model, does not do exhaustion herein.
The utility model has the beneficial effects that the characteristics of the utility model utilizes Steel truss structure to be frame structure, utilizes steel The space layout tower crane of trusses lower portion can be realized under web state in smaller hang to the complete of pier top region steel truss girder starting internode Covering is substantially reduced tower crane and hangs width and elevating capacity requirement, reduces construction risk, and obtain significant economic benefit.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure of the utility model embodiment;
Fig. 2 is the planar structure schematic diagram of the utility model embodiment;
In figure, 1 is bridge pier, and 2 be bracket, and 3 be starting internode girder steel, and 4 be tower crane, and 42 be tower body, and 41 be crane arm.
Specific embodiment
The utility model is further described with attached drawing combined with specific embodiments below.
By taking 112m at certain bridge pier is across steel girder erection as an example, steel truss girder is three main truss structures, and 10 are often arranged altogether across girder steel A internode, steel truss girder transverse direction main truss center spacing are 14.5m, and longitudinal crossbeam spacing is 10.8m or 11m, during steel truss girder is assembled, The frame structure formed by lateral three pieces main truss and longitudinal crossbeam is formed, lower portion is open space.
Because the pier is located at reclaimed land area, large-scale floating crane can not enter interior, construction period, one girder steel of setting at the bridge pier Work surface is set up, bracket is set by pier, four internodes of pier top are lifted to progress assembly on bracket by tower crane and utilized thereafter Tower crane is set a roof beam in place in the installation of four internode girder steel top surface of pier top with erection crane, from erection crane toward two sides symmetric double free cantilever erection remaining Internode steel truss girder.
For tower crane arrangement, according to conventional method, tower crane is arranged on the outside of steel truss girder, then farthest rod piece is hung away from reaching 42.5m calculates according to about 30 tons of weight, needs 1300 tons of above tower cranes of rice of elevating capacity.
In work progress, innovation is arranged in scheme in steel truss girder frame cavity using by tower crane:
With reference to shown in Fig. 1,2, a kind of double free cantilever erection equipment arragement constructions of steel truss girder, including bridge pier 1, bracket 2, starting section Between girder steel 3 and tower crane 4, starting internode girder steel 3 is set to bridge pier 1 and the top of bracket 2, and tower crane 4 is arranged in starting 3 frame of internode girder steel It is internal.Through stretching out inside bracket 2 from starting 3 lower portion of internode girder steel, the crane arm 41 of tower crane 4 is located at the tower body 42 of tower crane 4 Originate 3 top of internode girder steel.
The program is actually farthest hung away from 35m, can meet construction demand using 1050 tons of above tower cranes of rice, when practice of construction Using 1100 tons of rice tower cranes, steel truss erection task is completed safely, high-quality.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (1)

1. a kind of double free cantilever erection equipment of steel truss girder, it is characterised in that: including bridge pier, bracket, starting internode girder steel, tower crane and steel Erection work surface, bridge pier and bracket are fixed in steel girder erection work surface, and starting internode girder steel is set to bridge pier and cradle top, Tower crane is arranged in inside starting internode steel girder frame, and the tower body bottom of tower crane is fixed in steel girder erection work surface, the tower of tower crane Body stretches out inside starting internode steel girder frame through internal stent, and the crane arm of tower crane is located above starting internode girder steel.
CN201721262719.8U 2017-09-28 2017-09-28 A kind of double free cantilever erection equipment of steel truss girder Expired - Fee Related CN208649915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721262719.8U CN208649915U (en) 2017-09-28 2017-09-28 A kind of double free cantilever erection equipment of steel truss girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721262719.8U CN208649915U (en) 2017-09-28 2017-09-28 A kind of double free cantilever erection equipment of steel truss girder

Publications (1)

Publication Number Publication Date
CN208649915U true CN208649915U (en) 2019-03-26

Family

ID=65768817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721262719.8U Expired - Fee Related CN208649915U (en) 2017-09-28 2017-09-28 A kind of double free cantilever erection equipment of steel truss girder

Country Status (1)

Country Link
CN (1) CN208649915U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447684A (en) * 2017-09-28 2017-12-08 中交二航局第四工程有限公司 A kind of double free cantilever erection equipment arrangements of steel truss girder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447684A (en) * 2017-09-28 2017-12-08 中交二航局第四工程有限公司 A kind of double free cantilever erection equipment arrangements of steel truss girder

Similar Documents

Publication Publication Date Title
CN107700360B (en) A kind of assembling method of truss bridge section
CN106522101A (en) Construction method of superlong cable beam-free sections of cable-stayed bridge
CN202658590U (en) Integral assembled drilling platform
CN208649915U (en) A kind of double free cantilever erection equipment of steel truss girder
CN106193284B (en) The installation method and mounting structure of large span space drop level continuous truss frame
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN106592446A (en) Assembling construction method of precast segmental balanced cantilever with side-span wet joints
CN206693061U (en) A kind of hoisting device for main cable saddle of suspension bridge lifting
CN109594554A (en) Steel reinforcement cage for marine drilling pile grouting hangs system
CN203238646U (en) Casing box with built-in bottom board
CN203187288U (en) Box girder hanger
CN206233120U (en) Folding shape steel web continuous box girder jenny mould bases cantilever structure
CN209260578U (en) Longitudinal temporary connecting structure of suspension bridge concrete stiffening girder installation
CN107447684A (en) A kind of double free cantilever erection equipment arrangements of steel truss girder
CN205114881U (en) Gantry crane for shipbuilding
CN109371848A (en) The longitudinal temporary connecting structure and method of suspension bridge concrete stiffening girder installation
CN104790300A (en) Flexible pier-side girder erecting platform and construction method thereof
CN106481967B (en) A kind of installation method of rubber diaphragm gas chamber
CN104085832A (en) Flexible component lifting device and lifting method thereof
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN206070380U (en) A kind of device that can improve bottom concrete bearing capacity
CN106522234B (en) A kind of the underwater grouting formwork structure and its construction method of pole section increasing
CN208870038U (en) The suspension system of steel sheet-pile cofferdam
CN205617565U (en) Upper assembling type steel corbel of thermal power factory structure
CN204873511U (en) Embedded trolley frame of two roof beam hoists

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190326

Termination date: 20210928