CN208649828U - A kind of water collection border stone - Google Patents

A kind of water collection border stone Download PDF

Info

Publication number
CN208649828U
CN208649828U CN201821231707.3U CN201821231707U CN208649828U CN 208649828 U CN208649828 U CN 208649828U CN 201821231707 U CN201821231707 U CN 201821231707U CN 208649828 U CN208649828 U CN 208649828U
Authority
CN
China
Prior art keywords
hole
gully
kerbstone
cavity
terrace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821231707.3U
Other languages
Chinese (zh)
Inventor
张园
崔冬艳
孔德滕
闫亚东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821231707.3U priority Critical patent/CN208649828U/en
Application granted granted Critical
Publication of CN208649828U publication Critical patent/CN208649828U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a kind of water collection border stones, its structure includes kerbstone ontology, this body section of kerbstone is L shape, it is internally provided with cavity, higher first level step surface is equipped on the top of kerbstone ontology, lower second horizontal platform terrace and the vertical stand terrace for connecting first level step surface and the second horizontal platform terrace, upper layer gully-hole is provided on first level step surface, lower layer's gully-hole is provided on the second horizontal platform terrace, side gully-hole is provided on vertical stand terrace, water outlet is provided in the lower end of the trailing flank of kerbstone ontology, upper layer gully-hole, cavity is all connected by lower layer's gully-hole and side gully-hole and water outlet with the external world.Cavity is dug out from one end of kerbstone, then uses sprue identical with cavity cross section shape by end part seal.The utility model appearance looks elegant, is not easy to plug, and drainage effect is good, safety durable, is suitable for different geographical.

Description

A kind of water collection border stone
Technical field
The utility model relates to a kind of highway bridge pumping equipment, specifically a kind of water collection border stone.
Background technique
It needs to be laid with pumping equipment on highway bridge, in the prior art, is generally laid with drainage hole on road surface or roadside, Bore dia 10cm, spacing 3cm are drained, draining bore dia is too big, it appears that unsightly and there are security risks.And it is miscellaneous to fall leaves Object is easy to be deposited in the drain aperture of recess, is not easily cleaned, and reduces the drainability of drainage hole.Captation wall also is thin Cavity is big, and intensity is inadequate, is easy by vehicle damage.And traditional sump disadvantage is obvious, it is not beautiful enough, the well lid of sump with Surrounding road surface is easy to be destroyed by vehicular traffic in conjunction with insecure, causes security risk to the pedestrian that passes by one's way, and water inlet is lower than road surface It is easy to be blocked, causes to drain after raining in torrents serious unsmooth.
Utility model content
The purpose of this utility model is just to provide a kind of water collection border stone, to solve existing highway bridge pumping equipment not Enough beautiful, easy blockings and not safe enough problem.
The utility model is realized in this way: a kind of water collection border stone, including kerbstone ontology, the kerbstone ontology are cut Face is L shape, is internally provided with cavity, is equipped with higher first level step surface, lower on the top of the kerbstone ontology The vertical stand terrace of second horizontal platform terrace and connection the first level step surface and the second horizontal platform terrace, described the It is provided with upper layer gully-hole on one horizontal platform terrace, is provided with lower layer's gully-hole on the second horizontal platform terrace, described vertical It is provided with side gully-hole on step surface, is provided with water outlet in the lower end of the trailing flank of the kerbstone ontology, the upper layer is catchmented The cavity is all connected by hole, lower layer's gully-hole, side gully-hole and water outlet with the external world.
The cavity is dug out from one end of the kerbstone, then uses sprue identical with cavity cross section shape by end Sealing.
The upper layer gully-hole, lower layer's gully-hole and side gully-hole respectively have it is a row or multi-row, and along the kerbstone Body length direction is uniformly distributed.
The bottom surface of the cavity is the inclined-plane that the front is high and the back is low.
The utility model makes the utility model can not only by the way that highway bridge pumping equipment is combined as a whole with kerbstone Enough play the role of kerbstone protection roadside away from combining sump, the appearance of the utility model and other curbs The appearance of stone is consistent, so that road surface is kept neat appearance, and inlet surfacing, is not easy to be blocked, easy to clean, can be layered Draining.The volume of the utility model is big, inner cavity and hole it is small in size, can guarantee that enough intensity makes it be not easy to be destroyed.It is empty Chamber both ends are all sealings, will not generate leakage.According to the difference of different geographical rainfall, flexibly increase and decrease the number of water collection border stone Amount, can reach requirement of the different regions to displacement.
The utility model appearance looks elegant, is not easy to plug, and drainage effect is good, safety durable, is suitable for different geographical.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the main view of the utility model.
Fig. 3 is the A-A direction view of Fig. 2.
In figure: 1, kerbstone ontology, 2, cavity, 3, first level step surface, 4, vertical stand terrace, the 5, second horizontal bench Face, 6, upper layer gully-hole, 7, side gully-hole, 8, lower layer's gully-hole, 9, water outlet, 10, sprue.
Specific embodiment
As shown in Figure 1, Figure 2 and shown in Fig. 3, the shape of the utility model and common L shape kerbstone are essentially identical, including road Kerb ontology 1, the section of kerbstone ontology 1 are L shape, and the top of kerbstone ontology 1 is step surface, and step surface includes higher First level step surface 3, lower second horizontal platform terrace 5 and connection first level step surface 3 and the second horizontal platform terrace 5 Vertical stand terrace 4.It is provided with cavity 2 in the inside of kerbstone ontology 1, upper layer gully-hole is provided on first level step surface 3 6, it is provided with lower layer's gully-hole 8 on the second horizontal platform terrace 5,4 are provided with side gully-hole 7 on vertical stand terrace, in kerbstone The lower end of the trailing flank of ontology 1 is provided with water outlet 9, upper layer gully-hole 6, lower layer's gully-hole 8, side gully-hole 7 and water outlet 9 All cavity 2 is connected with the external world.Wherein the radius of water outlet 9 is greater than each gully-hole, makes to enter in cavity 2 by each gully-hole The enough discharges in time of water energy, will not accumulate.
Cavity 2 on kerbstone ontology 1 is to dig out from one end, is sealed the end port sprue 10 after digging out, sprue 10 Shape it is identical as the cross sectional shape of cavity 2, being installed on behind port will be between sprue 10 and kerbstone ontology 1 using engineering glue Gap sealing, guarantee gap will not leak.Gully-hole 6, lower layer's gully-hole 8 and side gully-hole 7 can be each at the middle and upper levels for it There is a row that can also have multiple rows of, and is uniformly distributed along 1 length direction of kerbstone ontology.The radius of each gully-hole should not be too large, and one As be 2 ~ 4cm, the intensity to avoid kerbstone ontology 1 is inadequate, so as to cause being more easily damaged.The bottom surface of its hollow cavity 2 is best For the inclined-plane that the front is high and the back is low, the bottom of water outlet 9 and the lowest part of 2 bottom surface of cavity flow into cavity 2 in same level in this way Interior water will be flowed from the lower one end of trend, then flowed out from water outlet 9, enhanced the drainage performance of the utility model.
The utility model can be used alone, and multiple can also use side by side, and the utility model is laid on common road Between kerb, each side is aligned with the respective side with kerbstone, while the second horizontal platform terrace 5 is also concordant with road surface, because It is essentially identical for the appearance and common kerbstone of the utility model, it will not seem lofty, maintain the whole of road surface two sides kerbstone Body is beautiful, smooth, and is not required to re-lay drainage hole or sump on road surface, ensure that the beauty on road surface.Because second is horizontal Step surface 5 is concordant with road surface, and the dust and sundries on road surface will not be gathered at gully-hole, and rain when rainwater bring sundries All gully-hole will not all be blocked with fallen leaves etc., guarantee that the utility model being capable of proper drainage.
The both ends of the utility model cavity 2 are all sealings, when two neighboring water collection border stone is connected with each other, need to only be made Seam crossing is poured with cement, if 2 both ends of cavity do not seal, is needed when in use by adjacent water collection border stone end face Alignment, and cemented using glue, this method implements relatively difficult, it is difficult to ensure that seam crossing will not leak.When the two of cavity 2 After end all seals, each piece of water collection border stone is all independent pumping equipment, and rainwater can only be drained by its internal channel, with It will not influence each other between other water collection border stones, can avoid leaking well.
When water level when road surface is not high, water can enter cavity from lower layer's gully-hole 8 can be under when water level increases Layer gully-hole 8 and side gully-hole 7 drain together, and uppermost upper layer gully-hole 6 can be used as gas vent use, instantly big sudden and violent When rainwater position is very high suddenly, lower layer's gully-hole 8, side gully-hole 7 and upper layer gully-hole 6 can drain together.Three layers of gully-hole can The case where sufficiently to cope with different water levels.There is individual water outlet 9 behind each water collection border stone, highway bridge can be accessed The drainage system of beam when multiple water collection border stones are used in conjunction with, can increase drainage efficiency, the cavity 2 inside kerbstone ontology 1 It is communicated with the outside, the water outlet 9 of multiple water collection border stones is interconnected using pipeline, and collect by subsequent water outlet 9 To bridge or the drainpipe of highway, the function of whole drainage system is realized.In different regions according to amount of rainfall and drainage level Requirement, determine the quantity of continuous laying water collection border stone.
The length of the utility model is about 1m, and the diameter of gully-hole is smaller, and spacing is larger, and internal cavity 2 is also not It is very big, it is ensured that the intensity requirement of the utility model, guarantee will not be easily damaged when in use.

Claims (4)

1. a kind of water collection border stone, including kerbstone ontology, which is characterized in that described this body section of kerbstone is L shape, inside Equipped with cavity, higher first level step surface, lower second horizontal platform terrace are equipped on the top of the kerbstone ontology And the vertical stand terrace of connection the first level step surface and the second horizontal platform terrace, on the first level step surface It is provided with upper layer gully-hole, is provided with lower layer's gully-hole on the second horizontal platform terrace, is provided with side on the vertical stand terrace Face gully-hole is provided with water outlet in the lower end of the trailing flank of the kerbstone ontology, the upper layer gully-hole, lower layer's gully-hole, The cavity is all connected by side gully-hole and water outlet with the external world.
2. water collection border stone according to claim 1, which is characterized in that dig out the sky from one end of the kerbstone Then chamber uses sprue identical with cavity cross section shape by end part seal.
3. water collection border stone according to claim 1, which is characterized in that the upper layer gully-hole, lower layer's gully-hole and Side gully-hole respectively has a row or multi-row, and is uniformly distributed along the kerbstone body length direction.
4. water collection border stone according to claim 1, which is characterized in that the bottom surface of the cavity is oblique for what the front is high and the back is low Face.
CN201821231707.3U 2018-08-01 2018-08-01 A kind of water collection border stone Expired - Fee Related CN208649828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821231707.3U CN208649828U (en) 2018-08-01 2018-08-01 A kind of water collection border stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821231707.3U CN208649828U (en) 2018-08-01 2018-08-01 A kind of water collection border stone

Publications (1)

Publication Number Publication Date
CN208649828U true CN208649828U (en) 2019-03-26

Family

ID=65788103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821231707.3U Expired - Fee Related CN208649828U (en) 2018-08-01 2018-08-01 A kind of water collection border stone

Country Status (1)

Country Link
CN (1) CN208649828U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095394A (en) * 2020-07-29 2020-12-18 宁波市政工程建设集团股份有限公司 Composite pavement with excellent drainage function and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095394A (en) * 2020-07-29 2020-12-18 宁波市政工程建设集团股份有限公司 Composite pavement with excellent drainage function and construction method thereof

Similar Documents

Publication Publication Date Title
CN104005316B (en) A kind of road kerb that there is draining and cut dirty function
CN108193758B (en) Sponge urban road storing and draining structure
CN205100360U (en) Urban road rainwater holds stagnant structure
CN206090587U (en) School dropout's attitude system of watering is gathered to side slope
CN213508818U (en) Face-row type waterlogging-preventing urban drainage system
CN105862548B (en) The system for preventing surface gathered water and city rain-flood resources from reclaiming and recycling
CN205839928U (en) A kind of grass planting ditch for sponge city
CN106320433A (en) Urban road rainwater collection structure
CN109372077A (en) Has the water storage structure of Anti-spill for sponge city
CN109403181A (en) A kind of porous pavement
CN106320494B (en) The construction method of sponge engineering system based on existing urban road and drainage condition
CN208649828U (en) A kind of water collection border stone
CN111809475A (en) Ecological town road in sponge city
CN105297645A (en) System pipe fitting for impounding, percolating, utilizing and draining sponge urban rainwater and construction method of system pipe fitting
CN106087648A (en) A kind of urban road special Quick drainage system
CN206887669U (en) Water storage module, drainage structure and water-storing device
CN206971036U (en) Lawn watering system for sponge city
CN205804797U (en) A kind of unclosed stair drainage system
CN208733766U (en) A kind of Rain Garden of residential area
CN104145673B (en) Based on water drainage and the integrated form greenbelt system of water conservation and water drainage and water-retaining method
CN207210904U (en) One kind oozes backwater tree well construction
CN206843889U (en) A kind of irrigation canals and ditches greening type kerbstone
CN105839771B (en) One kind is dammed type rain perforaled strainer
CN205529776U (en) Infiltration structure of waterproof road in road surface
CN209307989U (en) One kind save land efficient rectangle field irrigation and draining integrated plastic channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190326

Termination date: 20200801