CN208635573U - A kind of alloy melting intermediate frequency furnace cooling circulating water system device - Google Patents

A kind of alloy melting intermediate frequency furnace cooling circulating water system device Download PDF

Info

Publication number
CN208635573U
CN208635573U CN201820123132.7U CN201820123132U CN208635573U CN 208635573 U CN208635573 U CN 208635573U CN 201820123132 U CN201820123132 U CN 201820123132U CN 208635573 U CN208635573 U CN 208635573U
Authority
CN
China
Prior art keywords
cooling
water
intermediate frequency
frequency furnace
alloy melting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820123132.7U
Other languages
Chinese (zh)
Inventor
周立华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Chuanglin New Material Technology Co., Ltd.
Original Assignee
ZHUZHOU CHUANGLIN ALLOY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUZHOU CHUANGLIN ALLOY CO Ltd filed Critical ZHUZHOU CHUANGLIN ALLOY CO Ltd
Priority to CN201820123132.7U priority Critical patent/CN208635573U/en
Application granted granted Critical
Publication of CN208635573U publication Critical patent/CN208635573U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

A kind of alloy melting intermediate frequency furnace cooling circulating water system device, including alloy melting intermediate frequency furnace and cooling system, temperature sensor is set in alloy melting intermediate frequency furnace, the temperature in alloy melting intermediate frequency furnace is detected by temperature sensor, and start circulating water cooling system when needing cooling, cooling water circulating cooling is carried out to alloy melting intermediate frequency furnace by circulating water pipeline;Circulating water pipeline enters from alloy melting intermediate frequency furnace bottom, and the cooling cycle pond of cooling system is entered after coming out from top;Circulating water cooling system includes cooling cycle pond, cooling cycle control system, cooling circulating water water replanishing device and cooling cycle water-level control apparatus;Cooling cycle water level control system is monitored recirculated water water level in cooling cycle pond, cooling circulating water water replanishing device and cooling cycle water-level control apparatus are equipped in cooling cycle pond, when water level is reduced to set position, cooling circulating water water charging system carries out moisturizing to alloy melting intermediate frequency furnace cooling cycle pond.

Description

A kind of alloy melting intermediate frequency furnace cooling circulating water system device
Technical field
The utility model relates to arrive a kind of alloy melting intermediate frequency furnace cooling circulating water and water-replenishing control device, and in particular to arrive A kind of control of alloy melting intermediate frequency furnace cooling temperature of circulating water and pond automatic water replenishing controller, are mainly used for alloy melting In intermediate frequency furnace circulating cooling system.Belong to alloy melting intermediate frequency furnace technical field of temperature control.
Background technique
In alloy melting intermediate frequency furnace smelting process, furnace temperature is excessively high in order to prevent, needs constantly to carry out cooling place to stove Reason is typically all to carry out cooling control by recirculated cooling water now for the control in alloy melting intermediate frequency furnace smelting process System, but present alloy melting intermediate frequency furnace recirculated cooling water is only simple to carry out circulation temperature lowering, and not up to just really controlling Effect lacks effective monitoring especially in terms of whether having suitable recirculated water, easilys lead to intermediate frequency furnace in this way and lacks Water, under exsiccosis, intermediate frequency furnace can burn out subelement because of overtemperature, it is necessary to improve this.
The patent literature report for not finding there is with the utility model same technique by patent retrieval, has with the utility model The patent of certain relationship mainly has following:
1, the utility model of Patent No. CN201020598075.1, entitled " automatic water compensation device of circulating pond " are special Benefit, which disclose a kind of automatic water compensation device of circulating pond, including immersible pump, valve, filter, circulating water pool and control Device, the output end of immersible pump connect one end of filter by valve, and the other end of filter passes through valve and circulating water pool phase Connection.The circulating water pool is equipped with water level sensor, which is electrically connected with the controller;The valve is electronic Valve is electrically connected with the controller and is controlled by the controller.
2, number of patent application CN201520349682.7, entitled " automatic water compensation device of circulating pond " utility model Patent, which disclose a kind of automatic water compensation device of circulating pond;It include that circulating water pool is divided into intake pool and discharge bay Water-stop sheet, the water inlet pipe and outlet pipe of circulating water pool be located at intake pool and discharge bay, be provided on water-stop sheet intercommunicating pore, under Intercommunicating pore and the upper and lower valve in closed communication hole, the height of upper and lower intercommunicating pore are the highest of discharge bay setting, minimum level, Water supply pipe is provided in discharge bay, which is equipped with floating ball valve of rehydration, and the closed position of the floating ball valve of rehydration is located at It is more than the minimum level in pond.
3, the invention of Patent No. CN201510979034.4, entitled " a kind of automatic water compensation device of circulating pond " are special Benefit, which disclose a kind of automatic water compensation device of circulating pond, including suction pump, filter and circulating water pool, suction pump warps Inlet pipeline is connected to circulating water pool, and inlet pipeline is equipped with the first valve, and filter is arranged on inlet pipeline, circulating water pool Interior to be equipped with the adjustable water-stop sheet in position, circulating water pool is divided into water entering section and outlet part by water-stop sheet, and water-stop sheet is equipped with intercommunicating pore, The second valve is equipped at intercommunicating pore, water entering section is equipped with the water inlet connecting with inlet pipeline, and outlet part is equipped with water outlet, water outlet It is connect with outlet pipeline, water level sensor is equipped in outlet part, water level sensor is electrically connected with the controller, controller control first The open and close of valve and the second valve.
Although some has been related to automatic water-replenishing device to these above-mentioned patents, it was also proposed that some improved technology schemes, but By reading over discovery, technical solution disclosed in these patents is not related to following in alloy melting intermediate frequency furnace smelting process The control technology improvement project of ring water, therefore the control of recirculated water is asked in mentioned-above alloy melting intermediate frequency furnace smelting process Topic still has, and needs further to be studied.
Utility model content
The purpose of this utility model is that the control for recirculated water in existing alloy melting intermediate frequency furnace smelting process is deposited The problem of, propose a kind of new control device for being suitable for recirculated water in alloy melting intermediate frequency furnace smelting process, the new alloy The control device of recirculated water can effectively solve to recycle in alloy melting intermediate frequency furnace smelting process in melting intermediate frequency furnace smelting process The control problem of water guarantees the proper temperature in alloy melting intermediate frequency furnace smelting process.
In order to reach this purpose, the utility model provides a kind of alloy melting intermediate frequency furnace cooling circulating water system dress It sets, including alloy melting intermediate frequency furnace and cooling system, temperature sensor is set in alloy melting intermediate frequency furnace, passes through temperature sensing Device detects the temperature in alloy melting intermediate frequency furnace in due course, and starts circulating water cooling system when needing cooling, passes through recirculated water Pipeline carries out cooling water circulating cooling to alloy melting intermediate frequency furnace;Circulating water pipeline enters from alloy melting intermediate frequency furnace bottom, from Top enters the cooling cycle pond of cooling system after coming out;Circulating water cooling system includes cooling cycle pond, cooling cycle Control system, cooling circulating water water replanishing device and cooling cycle water-level control apparatus;Cooling cycle water level control system is to cooling Recirculated water water level is monitored in circulating water pool, and cooling circulating water water replanishing device and cooling cycle are equipped in cooling cycle pond Water-level control apparatus, when water level is reduced to set position, signal of water shortage is uploaded to cold by cooling cycle water-level control apparatus But cyclic control system, cooling cycle control system start cooling circulating water water charging system to alloy melting intermediate frequency furnace cooling cycle Pond carries out moisturizing, prevents alloy melting intermediate frequency furnace cooling cycle pond water shortage from influencing water circulating cooling.
Further, the temperature sensor is thermocouple, and the installation of TC is in alloy melting intermediate frequency furnace hearth outer wall Outside bonds together with electromagnetic heating coil clay, acquires the temperature signal of alloy melting intermediate frequency furnace in due course by thermocouple, And cooling cycle control system is sent by temperature signal, cooling cycle control system is controlled according to the temperature of setting, when When temperature is more than setting value, starts the cooling circulating water system of alloy melting intermediate frequency furnace, pass through the circulation of cooling water recirculation system Cooling water cools down alloy melting intermediate frequency furnace, when starting cooling circulating water system is still not enough to reduce alloy melting intermediate frequency furnace Temperature when, starting alarm system is alarmed, and judges whether to cause due to water shortage by cooling cycle water-level control apparatus Cooling system failure such as belongs to and lacks starting cooling circulating water water replanishing device progress moisturizing.
Further, where alloy melting intermediate frequency furnace is arranged in the cooling cycle pond outside the wall in workshop, Cooling circulating water water replanishing device and cooling cycle water-level control apparatus are installed on cooling cycle pond, and are equipped with circulating water pipeline Entrance and exit, combine to form alloy melting intermediate frequency furnace cooling water recirculation system with circulating water pipeline.
Further, the cooling cycle water-level control apparatus is pacified in alloy melting intermediate frequency furnace cooling cycle pond Liquid level monitoring device is filled, the water level in alloy melting intermediate frequency furnace cooling cycle pond is monitored by liquid level monitoring device.
Further, the liquid level monitoring device is floating ball type liquid level monitor, molten by the buoyancy control alloy of floating ball Refine the liquid level in intermediate frequency furnace cooling cycle pond.
Further, under the floating ball type liquid level monitor is mounted in alloy melting intermediate frequency furnace cooling cycle pond Portion position judges water level by the change of pressure.
Further, the cooling circulating water water replanishing device is mounted on the upper space position in cooling cycle pond, cold But circulating cooling make-up water device is equipped with solenoid electric valve, is controlled by cooling cycle control system.
Further, the cooling cycle control system is mounted on station, is filled respectively to cooling circulating water moisturizing It sets, cooling cycle water-level control apparatus and temperature sensor are controlled.
Further, the cooling cycle control system is equipped with warning device, and warning device is mounted in control cabinet, reports Alarm device and power switch link, and when warning device alarm time-out, will automatically cut off the power still without processing, and prevent accident from sending out It is raw.
Utility model has the advantages that
The utility model is followed by timely monitor to alloy melting intermediate frequency furnace temperature and the cooling of alloy melting intermediate frequency furnace The water level monitoring in ring pond has effectively reached the control to alloy melting intermediate frequency furnace temperature.Have the advantages that so the following:
1, pass through timely monitor to alloy melting intermediate frequency furnace temperature and alloy melting intermediate frequency furnace cooling cycle pond Water level monitoring can effectively overcome alloy melting intermediate frequency furnace temperature is excessively high the phenomenon that scaling loss occur;
2, pass through timely monitor to alloy melting intermediate frequency furnace temperature and alloy melting intermediate frequency furnace cooling cycle pond The dual control of water level monitoring monitors, and can prevent set of device failure and lead to accident occur;
3, it can be alarmed by warning device, and can be automatically cut off the power under invalid situation of alarming in due course, be prevented Only accident occurs.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
It is further described the utility model in the following with reference to the drawings and specific embodiments.
Embodiment one
Attached drawing gives the utility model one embodiment, it can be seen in the drawings that the utility model relates to a kind of conjunctions Golden melting intermediate frequency furnace cooling water circulation controller, including alloy melting intermediate frequency furnace 1 and cooling system 2, in alloy melting intermediate frequency Temperature sensor 3 is set in furnace, detects the temperature in alloy melting intermediate frequency furnace in due course by temperature sensor 3, and cold in needs Start circulating water cooling system 2 when but, cooling water circulating cooling is carried out to alloy melting intermediate frequency furnace 1 by circulating water pipeline 4;It follows Ring waterpipe 4 enters from 1 bottom of alloy melting intermediate frequency furnace, and the cooling cycle pond 5 of cooling system 2 is entered after coming out from top; Circulating water cooling system 2 includes cooling cycle pond 5, cooling cycle control system 6, cooling circulating water water replanishing device 7 and cooling Recycle water-level control apparatus 8;Cooling cycle water-level control apparatus 8 is monitored the water level of recirculated water in cooling cycle pond; Cooling circulating water water replanishing device 7 and cooling cycle water-level control apparatus 8 are equipped in cooling cycle pond 5, when water level is reduced to When set position, signal of water shortage is uploaded to cooling cycle control system 6, cooling cycle by cooling cycle water-level control apparatus 8 Control system 6 starts cooling circulating water water charging system 7 and carries out moisturizing to cooling cycle pond 5, prevents alloy melting intermediate frequency furnace 5 water shortage of cooling cycle pond influences water circulating cooling.
Further, the temperature sensor 3 is thermocouple, and the installation of TC is outside alloy melting intermediate frequency furnace burner hearth 9 It outside wall, bonds together with electromagnetic heating coil clay, acquires the temperature letter of alloy melting intermediate frequency furnace in due course by thermocouple Number, and cooling cycle control system is sent by temperature signal, cooling cycle control system is controlled according to the temperature of setting, When temperature is more than setting value, starts the cooling circulating water system of alloy melting intermediate frequency furnace, pass through following for cooling water recirculation system Ring cooling water cools down alloy melting intermediate frequency furnace, when starting cooling circulating water system is still not enough to reduce alloy melting intermediate frequency When the temperature of furnace, starting alarm system is alarmed, and judge whether to make due to water shortage by cooling cycle water-level control apparatus It fails at cooling system, such as belongs to and lack starting cooling circulating water water replanishing device progress moisturizing.
Further, 10 outside of wall in workshop where alloy melting intermediate frequency furnace is arranged in the cooling cycle pond 5, Cooling circulating water water replanishing device 7 and cooling cycle water-level control apparatus 8 are installed on cooling cycle pond, and are equipped with recirculated water The entrance and exit of pipeline 4 combines to form alloy melting intermediate frequency furnace cooling water recirculation system with circulating water pipeline 4.
Further, the cooling cycle water-level control apparatus 8 is in alloy melting intermediate frequency furnace cooling cycle pond Liquid level monitoring device is installed, the water level in alloy melting intermediate frequency furnace cooling cycle pond is monitored by liquid level monitoring device.
Further, the liquid level monitoring device is floating ball type liquid level monitor, molten by the buoyancy control alloy of floating ball Refine the liquid level in intermediate frequency furnace cooling cycle pond.
Further, under the floating ball type liquid level monitor is mounted in alloy melting intermediate frequency furnace cooling cycle pond Portion position judges water level by the change of pressure.
Further, the cooling circulating water water replanishing device 7 is mounted on the upper space position in cooling cycle pond, cold But circulating cooling make-up water device is equipped with solenoid electric valve 13, is controlled by cooling cycle control system.
Further, the cooling cycle control system 6 is mounted on station 11, respectively to cooling circulating water moisturizing Device, cooling cycle water-level control apparatus and temperature sensor are controlled.
Further, the cooling cycle control system 6 is equipped with warning device 12, and warning device is mounted on control cabinet On, warning device and power switch link, and when warning device alarm time-out, will automatically cut off the power still without processing, and prevent thing Therefore occur.
Embodiment two
Embodiment two and the structure of embodiment one are essentially the same, and only structure is different, in another alloy melting Temperature is arranged in frequency furnace cooling water circulation controller, including alloy melting intermediate frequency furnace and cooling system in alloy melting intermediate frequency furnace Sensor is spent, detects the temperature in alloy melting intermediate frequency furnace, and the starting circulation when needing cooling in due course by temperature sensor Water cooling system, it is cooling to alloy melting intermediate frequency furnace;And recirculated water water is set in alloy melting intermediate frequency furnace cooling cycle pond Position monitoring device, is monitored the water level in alloy melting intermediate frequency furnace cooling cycle pond, when water level is reduced to set position When, starting water replanishing device carries out moisturizing to alloy melting intermediate frequency furnace cooling cycle pond, prevents the cooling of alloy melting intermediate frequency furnace from following Ring pond water shortage influences water circulating cooling.
Further, the temperature sensor is thermocouple, and the installation of TC is outer among alloy melting intermediate frequency furnace Beside wall, the temperature signal of alloy melting intermediate frequency furnace is acquired in due course by thermocouple, and send control cabinet for temperature signal, control Case processed is controlled according to the temperature of setting, when temperature is more than setting value, starts alloy melting intermediate frequency furnace cooling cycle water system System, is cooled down by cooling water cyclic involution gold melting intermediate frequency furnace, when starting golden intermediate frequency furnace melting cooling circulating water system still When being not enough to reduce the temperature of alloy melting intermediate frequency furnace, starting alarm system is alarmed, and judges whether to cause due to water shortage Cooling system failure such as belongs to and lacks starting water charging system progress moisturizing.
Further, in the alloy melting intermediate frequency furnace cooling cycle pond be arranged recirculated water water level monitor device be Liquid level monitoring device is installed in alloy melting intermediate frequency furnace cooling cycle pond, it is cooling to alloy melting intermediate frequency furnace by liquid level monitoring device Water level in circulating water pool is monitored.
Further, the liquid level monitoring device is floating ball type liquid level monitor, molten by the buoyancy control alloy of floating ball Refine the liquid level in intermediate frequency furnace cooling cycle pond.
Further, the floating ball type liquid level monitor is mounted on the bottom in alloy melting intermediate frequency furnace cooling cycle pond Position judges water level by the change of pressure.
Further, the warning device is mounted in control cabinet, and warning device and power switch link, when alarm fills Alarm time-out is set, will be automatically cut off the power still without processing, and prevent accident.
Above-mentioned listed embodiment, only carries out clear, complete description to the technical solution of the utility model in conjunction with attached drawing; Obviously, described embodiment is only a part of the embodiment of the utility model, instead of all the embodiments.Based on this reality It is obtained by those of ordinary skill in the art without making creative efforts all other with the embodiment in novel Embodiment is fallen within the protection scope of the utility model.
Utility model has the advantages that
The utility model is followed by timely monitor to alloy melting intermediate frequency furnace temperature and the cooling of alloy melting intermediate frequency furnace The water level monitoring in ring pond has effectively reached the control to alloy melting intermediate frequency furnace temperature.Have the advantages that so the following:
1, pass through timely monitor to alloy melting intermediate frequency furnace temperature and alloy melting intermediate frequency furnace cooling cycle pond Water level monitoring can effectively overcome alloy melting intermediate frequency furnace temperature is excessively high the phenomenon that scaling loss occur;
2, pass through timely monitor to alloy melting intermediate frequency furnace temperature and alloy melting intermediate frequency furnace cooling cycle pond The dual control of water level monitoring monitors, and can prevent set of device failure and lead to accident occur;
3, it can be alarmed by warning device, and can be automatically cut off the power under invalid situation of alarming in due course, be prevented Only accident occurs.

Claims (8)

1. a kind of alloy melting intermediate frequency furnace cooling circulating water system device, it is characterised in that: including alloy melting intermediate frequency furnace and cold But temperature sensor is arranged in alloy melting intermediate frequency furnace in system, detects alloy melting intermediate frequency furnace in due course by temperature sensor In temperature, and start circulating water cooling system when needing cooling, alloy melting intermediate frequency furnace carried out by circulating water pipeline Cooling water circulating cooling;Circulating water pipeline enters from alloy melting intermediate frequency furnace bottom, enters cooling system after coming out from top Cooling cycle pond;Circulating water cooling system includes cooling cycle pond, cooling cycle control system, cooling circulating water moisturizing dress It sets and cooling cycle water-level control apparatus;Cooling cycle water level control system supervises recirculated water water level in cooling cycle pond Control is equipped with cooling circulating water water replanishing device and cooling cycle water-level control apparatus, when water level is reduced in cooling cycle pond When set position, signal of water shortage is uploaded to cooling cycle control system, cooling cycle control by cooling cycle water-level control apparatus System starting cooling circulating water water charging system processed carries out moisturizing to alloy melting intermediate frequency furnace cooling cycle pond, prevents alloy melting Intermediate frequency furnace cooling cycle pond water shortage influences water circulating cooling.
2. alloy melting intermediate frequency furnace cooling circulating water system device as described in claim 1, it is characterised in that: the cooling Where alloy melting intermediate frequency furnace is arranged in circulating water pool outside the wall in workshop, cooling cycle is installed on cooling cycle pond Water water replanishing device and cooling cycle water-level control apparatus, and it is equipped with the entrance and exit of circulating water pipeline, with circulating water pipeline group Conjunction forms alloy melting intermediate frequency furnace cooling water recirculation system.
3. alloy melting intermediate frequency furnace cooling circulating water system device as described in claim 1, it is characterised in that: the cooling Circulation water-level control apparatus is the installation liquid level monitoring device in alloy melting intermediate frequency furnace cooling cycle pond, passes through liquid level monitoring device Water level in alloy melting intermediate frequency furnace cooling cycle pond is monitored.
4. alloy melting intermediate frequency furnace cooling circulating water system device as claimed in claim 3, it is characterised in that: the liquid level Monitor is floating ball type liquid level monitor, passes through the liquid level in the buoyancy control alloy melting intermediate frequency furnace cooling cycle pond of floating ball.
5. alloy melting intermediate frequency furnace cooling circulating water system device as claimed in claim 4, it is characterised in that: the floating ball Formula liquid level monitoring device is mounted on the middle and lower part position in alloy melting intermediate frequency furnace cooling cycle pond, is judged by the change of pressure Water level.
6. alloy melting intermediate frequency furnace cooling circulating water system device as described in claim 1, it is characterised in that: the cooling Circulating cooling make-up water device is mounted on the upper space position in cooling cycle pond, and cooling circulating water water replanishing device is equipped with Electromagnetic Control Valve is controlled by cooling cycle control system.
7. alloy melting intermediate frequency furnace cooling circulating water system device as described in claim 1, it is characterised in that: the cooling Cyclic control system is mounted on station, respectively to cooling circulating water water replanishing device, cooling cycle water-level control apparatus and temperature Degree sensor is controlled.
8. alloy melting intermediate frequency furnace cooling circulating water system device as claimed in claim 7, it is characterised in that: the cooling Cyclic control system is equipped with warning device, and warning device is mounted in control cabinet, and warning device and power switch link, and works as alarm Device alarm time-out, will automatically cut off the power still without processing, and prevent accident.
CN201820123132.7U 2018-01-25 2018-01-25 A kind of alloy melting intermediate frequency furnace cooling circulating water system device Active CN208635573U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820123132.7U CN208635573U (en) 2018-01-25 2018-01-25 A kind of alloy melting intermediate frequency furnace cooling circulating water system device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820123132.7U CN208635573U (en) 2018-01-25 2018-01-25 A kind of alloy melting intermediate frequency furnace cooling circulating water system device

Publications (1)

Publication Number Publication Date
CN208635573U true CN208635573U (en) 2019-03-22

Family

ID=65730939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820123132.7U Active CN208635573U (en) 2018-01-25 2018-01-25 A kind of alloy melting intermediate frequency furnace cooling circulating water system device

Country Status (1)

Country Link
CN (1) CN208635573U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112629144A (en) * 2020-12-09 2021-04-09 浙江晨浩智能科技有限公司 Control method of industrial circulating cooling water system
CN113028830A (en) * 2021-03-30 2021-06-25 韶关格美机械有限公司 Explosion-proof protection device
CN114166034A (en) * 2021-11-30 2022-03-11 贵州华星冶金有限公司 Blast furnace cooling circulation system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112629144A (en) * 2020-12-09 2021-04-09 浙江晨浩智能科技有限公司 Control method of industrial circulating cooling water system
CN113028830A (en) * 2021-03-30 2021-06-25 韶关格美机械有限公司 Explosion-proof protection device
CN114166034A (en) * 2021-11-30 2022-03-11 贵州华星冶金有限公司 Blast furnace cooling circulation system
CN114166034B (en) * 2021-11-30 2023-09-29 贵州华星冶金有限公司 Blast furnace cooling circulation system

Similar Documents

Publication Publication Date Title
CN208635573U (en) A kind of alloy melting intermediate frequency furnace cooling circulating water system device
US9151506B2 (en) Water heater having a waterway changeover control apparatus and method for operating the same
CN101694351B (en) Intelligent industrial circulation water-cooling system
CN102145550B (en) Energy-saving cooling device
WO2011134176A1 (en) High-efficiency continuous casting-rolling method for forming magnesium alloy plate
CN204058565U (en) For the refrigerating unit of vacuum consumable electrode arc furnace water jacket type crystallizer
CN200941032Y (en) Circulation water coolant apparatus
CN105157046B (en) A kind of pulp water overtemperature processing system and control method
CN206944459U (en) A kind of Quick-heating type water-boiling device
CN209085042U (en) A kind of electric pole type hot-water boiler module
CN207456001U (en) A kind of technical cooling water system
CN206135813U (en) Fire alarm alarm system for offshore oil field
CN104386686A (en) Activated carbon production facility
CN203754780U (en) Smelting solution precipitation front bed
CN217057514U (en) Returning charge separator ash discharging and cooling device
CN103528040B (en) Quick boiler starting system and method
CN101752869A (en) Ac MgO electric smelting furnace power supply system based on power saving operation
CN109297311B (en) A kind of energy-saving oxygen-enriched combusting furnace and its application method
CN108287006B (en) Slight leakage monitoring method of valve cooling system based on temperature compensation and least square method
CN110254980A (en) A kind of energy-saving heat preserving oil tank
CN221123008U (en) Thermal state direct reduced iron conveying system
CN205318140U (en) Electric heater intelligence control system
CN214665984U (en) Electric furnace and aluminum melting system
CN213400695U (en) Electrode paste cooling forming device
CN219841810U (en) Progressive heat pipe heat-taking device of graphitizing furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 412000 Lukou Economic Development Zone, Wan Tang Village, Lukou Town, Zhuzhou, Zhuzhou, Hunan (Chuang Lin Road No. 1)

Patentee after: Hunan Chuanglin New Material Technology Co., Ltd.

Address before: 412000 Lukou Economic Development Zone, Wan Tang Village, Lukou Town, Zhuzhou, Zhuzhou, Hunan (Chuang Lin Road No. 1)

Patentee before: Zhuzhou Chuanglin Alloy Co.,Ltd.

CP01 Change in the name or title of a patent holder