CN208619163U - A kind of vertical sand warehouse bottom funnel structure that can effectively reduce sand export abrasion - Google Patents
A kind of vertical sand warehouse bottom funnel structure that can effectively reduce sand export abrasion Download PDFInfo
- Publication number
- CN208619163U CN208619163U CN201820830856.5U CN201820830856U CN208619163U CN 208619163 U CN208619163 U CN 208619163U CN 201820830856 U CN201820830856 U CN 201820830856U CN 208619163 U CN208619163 U CN 208619163U
- Authority
- CN
- China
- Prior art keywords
- sand
- spare
- pipe
- warehouse bottom
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Air Transport Of Granular Materials (AREA)
Abstract
The utility model discloses the vertical sand warehouse bottom funnel structures that one kind can effectively reduce sand export abrasion, including the short tube that shakes out, wear-resisting partition, metal-ceramic composite tube, main sand pipe control valve, main sand pipe, spare cleaning pipe, spare sand pipe control valve, spare sand developing tube, spare sand pipe, vertical sand warehouse bottom funnel, the short tube that shakes out is set at the bottom discharge port of vertical sand warehouse bottom funnel;Metal-ceramic composite tube is arranged in the inside of the short tube that shakes out;Wear-resisting partition is arranged between short tube and vertical sand warehouse bottom funnel in described shake out;Main sand pipe is arranged in the lower section of the short tube that shakes out;Main sand pipe control valve is arranged in described shake out between short tube and main sand pipe;Spare sand developing tube and spare sand pipe are not arranged for the end portion of vertical sand warehouse bottom funnel;Spare sand pipe control valve is set in the spare sand pipe;Spare cleaning pipe is set on the spare sand pipe control valve.The utility model can be reduced the abrasion of vertical sand warehouse bottom funnel sand export.
Description
Technical field
The utility model belongs to mining equiment technical field, further belongs to mining with stowing equipment technical field, specifically relates to
And a kind of structure is simple, and it is easy to maintenance, using reliable, the vertical sand warehouse bottom infundibular ganglion of sand export abrasion can be effectively reduced
Structure.
Background technique
In mining, the method for mining by the way of filling is more common mining methods.Mining with stowing artificial supporting mining codes owned by France.
In mineral building or nugget, with the propulsion of stope, it is sent into filler to goaf, to carry out underground pressure management, control
Country rock avalanche and surface movement, and back production is carried out in the obturation of formation or under its protection.The advantages of filling method is to adapt to
Property it is strong, ore recovery rate is high, and the rate of dilution is low, and operation is safer, can utilize industrial waste, protect earth's surface etc.;The disadvantage is that technique is multiple
Miscellaneous, at high cost, labor productivity and nugget production capacity are all lower.In the technique filled to goaf, vertical sand warehouse
It is main equipment.Vertical sand warehouse be the 1980s occur a kind of main units for hydraulic filling, usually by
8 ~ 10m of diameter, 18 ~ 20m of height cylinder with and bottom hemisphere or cone with certain cone angle form.Vertical sand warehouse can connect
The mortar (weight concentration 60~70%) for equably releasing higher concentration continuously is convenient for the filling of underground high-concentration ore slurry, sand warehouse
Dischargeable capacity is big, and effective rate of utilization is up to 70~80%.Keep vertical sand warehouse tailing-filled and obtains more and more extensive answer in mine
With.But current vertical sand warehouse has the disadvantage that
1, vertical sand warehouse bottom funnel serious wear.Tailings is sunk by self weight, and gravity haulage passes through sand bar bottom funnel
It is put into the filling system of lower end, the tailings ore pulp at concentrations up to 70% or more has extremely strong abrasive forces, sand bar bottom funnel steel plate
(δ=20mm) passes through use in 3.5 years, is washed abrasion, thickness is less than 10mm.
2, since main sand pipe uses common seamless steel pipe, and main sand pipe upper end and vertical sand warehouse bottom funnel
Feed opening welding, causes main sand pipe serious wear.
3, due to the bell mouth of vertical sand warehouse bottom and main sand pipe serious wear, often there is needle-like injection sand leakage, deposit
In the risk largely leaked.
It is easy to maintenance for this purpose, it is simple to research and develop a kind of structure, using reliable, sand export abrasion can be effectively reduced
Vertical sand warehouse bottom funnel structure is the key that solve the problems, such as this.
Utility model content
It is easy to maintenance the purpose of this utility model is to provide a kind of structure is simple, using reliable, can effectively reduce out
The vertical sand warehouse bottom funnel structure of sand mouth abrasion.
The purpose of this utility model is achieved in that including the short tube that shakes out, wear-resisting partition, metal-ceramic composite tube, master
It is sand pipe control valve, main sand pipe, spare cleaning pipe, spare sand pipe control valve, spare sand developing tube, spare sand pipe, vertical
Sand bar bottom funnel, setting is shaked out short tube at the bottom discharge port of the vertical sand warehouse bottom funnel;The short tube that shakes out
Inside be arranged metal-ceramic composite tube;Wear-resisting partition is arranged between short tube and vertical sand warehouse bottom funnel in described shaking out;Institute
Main sand pipe is arranged in the lower section for the short tube that shakes out stated;Main sand pipe control is arranged in described shaking out between short tube and main sand pipe
Valve;Spare sand developing tube and spare sand pipe are not arranged for the end portion of the vertical sand warehouse bottom funnel;It is described spare to put
Spare sand pipe control valve is set on sandpipe;Spare cleaning pipe is set on the spare sand pipe control valve.
The short tube that shakes out, the inside for the short tube that shakes out is arranged in the utility model at the bottom discharge port of vertical sand warehouse bottom funnel
Metal-ceramic composite tube is set, and metal-ceramic composite tube has very strong abrasion resistance, long service life;In the short tube and vertical of shaking out
Wear-resisting partition is set between formula sand bar bottom funnel, to the bottommost of isolated vertical sand bar bottom funnel, makes vertical sand warehouse bottom
The bottommost of portion's funnel forms vacuum area, avoids the erosive wear of tailings;In the lower section for the short tube that shakes out, main sand pipe is set,
It shakes out and main sand pipe control valve is set between short tube and main sand pipe, put sand channel as normal;It is leaked in vertical sand warehouse bottom
Spare sand developing tube is arranged in the lower end of bucket, to the portion of residual tailings cleaned in the funnel of vertical sand warehouse bottom, avoids tailings solid
Knot is in sand bar bottom;In vertical sand warehouse bottom, spare sand pipe is arranged in the lower end of funnel, and spare put is arranged in spare sand pipe
Spare cleaning pipe is arranged in sandpipe control valve on spare sand pipe control valve, and effect is tailings in the spare sand pipe of cleaning, prevents
Only tailings is fixedly arranged in pipeline, and spare cleaning pipe uses after each sand off.
The utility model is effectively reduced the abrasion of vertical sand warehouse bottom funnel, main sand pipe, avoids tailings leakage,
Environmental pollution caused by tailings leakage is contained;Meanwhile reducing maintenance, maintenance frequency in production, improve production efficiency.This
Utility model structure is simple, easy to maintenance, using reliable, can effectively reduce the abrasion of vertical sand warehouse bottom funnel sand export.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the working state schematic representation of the utility model;
In figure: 1- shakes out short tube, the wear-resisting partition of 2-, 3- metal-ceramic composite tube, the main sand pipe control valve of 4-, and 5- master puts sand
Pipe, the spare cleaning pipe of 6-, the spare sand pipe control valve of 7-, the spare sand developing tube of 8-, the spare sand pipe of 9-, 10- vertical sand warehouse bottom
Funnel, 11- vertical sand warehouse main body, 12- vertical sand bulkhead seat, 13- main-supply, the main air supply pipe of 14-.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing, but is not limited in any way the utility model
System instructs made any transformation based on the utility model, each falls within scope of protection of the utility model.
As shown in Fig. 1~2, the utility model includes the short tube 1 that shakes out, wear-resisting partition 2, and metal-ceramic composite tube 3 is led and puts sand
Pipe control valve 4, main sand pipe 5, spare cleaning pipe 6, spare sand pipe control valve 7, spare sand developing tube 8, spare sand pipe 9 are stood
Formula sand bar bottom funnel 10, setting is shaked out short tube 1 at the bottom discharge port of the vertical sand warehouse bottom funnel 10;Described goes out
Metal-ceramic composite tube 3 is arranged in the inside of sand short tube 1;Described shaking out is arranged between short tube 1 and vertical sand warehouse bottom funnel 10
Wear-resisting partition 2;Main sand pipe 5 is arranged in the lower section of the short tube 1 that shakes out;Described shaking out is set between short tube 1 and main sand pipe 5
Set main sand pipe control valve 4;Spare sand developing tube 8 is not arranged and spare puts for the end portion of the vertical sand warehouse bottom funnel 10
Sandpipe 9;Spare sand pipe control valve 7 is set in the spare sand pipe 9;It is arranged on the spare sand pipe control valve 7
Spare cleaning pipe 6.
The short tube 1 that shakes out protrudes into vertical sand warehouse bottom funnel 10, and the length of dip section is 100~200mm.
The outer diameter of the short tube 1 that shakes out is φ 273, wall thickness 20mm.
Described shaking out is welded between short tube 1 and vertical sand warehouse bottom funnel 10 using wear resistance electrode.
The material of the wear-resisting partition 2 is Q345-B.
The wear-resisting partition 2 with a thickness of 30mm~45mm.
The wear-resisting partition 2 and shaking out is welded between short tube 1 and vertical sand warehouse bottom funnel 10 using wear resistance electrode.
The outer diameter of the spare cleaning pipe 6 is φ 89mm.
The nominal diameter of the spare sand pipe 9 is DN125mm~DN150mm.
The spare sand pipe 9 is composite bimetal pipe.
The working principle and the course of work of the utility model:
The short tube 1 that shakes out is arranged in the utility model at the bottom discharge port of vertical sand warehouse bottom funnel 10, and shake out short tube 1
Inside setting metal-ceramic composite tube 3, metal-ceramic composite tube 3 have very strong abrasion resistance, long service life;It is short shaking out
Wear-resisting partition 2 is set between pipe 1 and vertical sand warehouse bottom funnel 10, to the bottommost of isolated vertical sand bar bottom funnel 10,
So that the bottommost of vertical sand warehouse bottom funnel 10 is formed vacuum area, avoids the erosive wear of tailings;Under the short tube 1 that shakes out
Main sand pipe 5 is arranged in side, shakes out and main sand pipe control valve 4 is arranged between short tube 1 and main sand pipe 5, logical as sand is normally put
Road;In vertical sand warehouse bottom, spare sand developing tube 8 is arranged in the lower end of funnel 10, to clean in vertical sand warehouse bottom funnel 10
Portion of residual tailings, avoids tailings from being fixedly arranged at sand bar bottom;In vertical sand warehouse bottom, the lower end setting of funnel 10 is spare puts sand
Pipe 9 is arranged spare sand pipe control valve 7 in spare sand pipe 9, spare cleaning pipe 6 is arranged on spare sand pipe control valve 7,
It is tailings in the spare sand pipe 9 of cleaning that it, which is acted on, prevents tailings to be fixedly arranged in pipeline, spare cleaning pipe 6 is in each sand off
After use.
Claims (10)
1. one kind can effectively reduce sand export abrasion vertical sand warehouse bottom funnel structure, including the short tube that shakes out (1), it is wear-resisting every
Plate (2), main sand pipe control valve (4), main sand pipe (5), spare cleaning pipe (6), spare puts sand at metal-ceramic composite tube (3)
Pipe control valve (7), spare sand developing tube (8), spare sand pipe (9), vertical sand warehouse bottom funnel (10), it is characterized in that: described
Short tube (1) is shaked out in setting at the bottom discharge port of vertical sand warehouse bottom funnel (10);The inside of the short tube that shakes out (1) is arranged
Metal-ceramic composite tube (3);Wear-resisting partition (2) are set between the short tube that shakes out (1) and vertical sand warehouse bottom funnel (10);
Main sand pipe (5) is arranged in the lower section of the short tube that shakes out (1);It is arranged between the short tube that shakes out (1) and main sand pipe (5)
Main sand pipe control valve (4);Spare sand developing tube (8) and standby is not arranged for the end portion of the vertical sand warehouse bottom funnel (10)
With sand pipe (9);Spare sand pipe control valve (7) is set in the spare sand pipe (9);The spare sand pipe control
Spare cleaning pipe (6) are set on valve (7).
2. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
Be: the short tube that shakes out (1) protrudes into vertical sand warehouse bottom funnel (10), and the length of dip section is 100~200mm.
3. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
Be: the outer diameter of the short tube that shakes out (1) is φ 273, wall thickness 20mm.
4. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
It is: is welded between the short tube that shakes out (1) and vertical sand warehouse bottom funnel (10) using wear resistance electrode.
5. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
Be: the material of the wear-resisting partition (2) is Q345-B.
6. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
Be: the wear-resisting partition (2) with a thickness of 30mm~45mm.
7. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
It is: is welded between the wear-resisting partition (2) and the short tube that shakes out (1) and vertical sand warehouse bottom funnel (10) using wear resistance electrode.
8. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
Be: the outer diameter of the spare cleaning pipe (6) is φ 89mm.
9. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
Be: the nominal diameter of the spare sand pipe (9) is DN125mm~DN150mm.
10. the vertical sand warehouse bottom funnel structure according to claim 1 that sand export abrasion can be effectively reduced, feature
Be: the spare sand pipe (9) is composite bimetal pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820830856.5U CN208619163U (en) | 2018-05-31 | 2018-05-31 | A kind of vertical sand warehouse bottom funnel structure that can effectively reduce sand export abrasion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820830856.5U CN208619163U (en) | 2018-05-31 | 2018-05-31 | A kind of vertical sand warehouse bottom funnel structure that can effectively reduce sand export abrasion |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208619163U true CN208619163U (en) | 2019-03-19 |
Family
ID=65700879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820830856.5U Active CN208619163U (en) | 2018-05-31 | 2018-05-31 | A kind of vertical sand warehouse bottom funnel structure that can effectively reduce sand export abrasion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208619163U (en) |
-
2018
- 2018-05-31 CN CN201820830856.5U patent/CN208619163U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108915765B (en) | Underground full tailing-waste stone paste filling system and filling method | |
CN106050300B (en) | A kind of Tight filling method for owing to adopt to route superelevation on | |
WO2020062432A1 (en) | Underground mining, sorting, and filling coordinated mining method for close-range coal seam cluster | |
CN205089360U (en) | Large aperture collecting space area pipe laying gas drainage device | |
CN101165317B (en) | Filling device and method for filling down-hole goaf by same | |
CN108825298B (en) | Roof connecting method for stope filling | |
CN102606190A (en) | Method and device for using downward crossing hole to eliminate outburst in mining of coal mine | |
CN101566072A (en) | Large vertical depth solid feeding system and large vertical depth solid feeding process for filling extracted coal | |
CN201412180Y (en) | Large vertical depth solid charging system with filling technology in coal mining | |
CN203925502U (en) | The system that a kind of hydraulic coal mining and filling are synchronously carried out | |
CN109209491A (en) | A kind of waste filling method | |
CN201560795U (en) | Apparatus for controlling dust with wind as medium during boring construction for gas drainage | |
CN104763467B (en) | Obturation and its placement method and system for Hazard in Deep Metal Mines goaf | |
CN208619163U (en) | A kind of vertical sand warehouse bottom funnel structure that can effectively reduce sand export abrasion | |
CN212154858U (en) | A cup joint formula underground conveyor for tailing lotion fills | |
CN113217094A (en) | Weak cementation strong expansion high water-rich soft rock degradation effect control method | |
CN114109491A (en) | Goaf mixed filling method and device for selecting reserved roadway | |
CN114183193A (en) | Goaf filling method and pipeline through-string type porous filling device | |
CN110529118B (en) | Method for treating abandoned open-pit basin of mine by long-distance pipeline conveying mortar | |
CN102367725A (en) | Large-aperture spiral deep hole drill | |
CN111173560A (en) | Filling replacement mining method for 'three lower' coal pressing area | |
CN111456806A (en) | A cup joint formula underground conveyor for tailing lotion fills | |
CN212272289U (en) | Filling replacement mining equipment for 'three lower' coal pressing area | |
CN214660339U (en) | Device for cleaning blockage of underground filling pipeline by filling and drilling | |
CN117738731B (en) | Coal gangue-self-compacting slurry-prop cooperative self-adaptive goaf filling process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |