CN208605200U - A kind of tension device for tunneling shield section of jurisdiction ring - Google Patents

A kind of tension device for tunneling shield section of jurisdiction ring Download PDF

Info

Publication number
CN208605200U
CN208605200U CN201821213503.7U CN201821213503U CN208605200U CN 208605200 U CN208605200 U CN 208605200U CN 201821213503 U CN201821213503 U CN 201821213503U CN 208605200 U CN208605200 U CN 208605200U
Authority
CN
China
Prior art keywords
section
jurisdiction ring
jurisdiction
tension device
interconnecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821213503.7U
Other languages
Chinese (zh)
Inventor
王炜
王宁
张旭彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway Electrification Engineering Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821213503.7U priority Critical patent/CN208605200U/en
Application granted granted Critical
Publication of CN208605200U publication Critical patent/CN208605200U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of tension device for tunneling shield section of jurisdiction ring, including fixation kit, connection component;Fixation kit includes the hoisting head for being mounted on each section of jurisdiction ring inner wall, and the lifting cephalic par is equipped with interconnecting piece;Connection component includes two connecting rods between two hoisting heads, and the mutually separate one end of two connecting rods is connected with hoisting head interconnecting piece, and the adjusting component for adjusting adjacent two section of jurisdiction czermak space is also equipped between two connecting rods.The section of jurisdiction ring that tension device provided by the utility model for tunneling shield section of jurisdiction ring can be laid with tunnel is efficiently tensed, compared to the mounting means of traditional bar shaped channel steel, tension device provided by the present application is small in size, light, simple to install, convenient disassembly, reusable, practicability with higher is widely portable in tunnel construction field.

Description

A kind of tension device for tunneling shield section of jurisdiction ring
Technical field
The utility model relates to tunnel construction technical fields, and in particular to a kind of tension dress for tunneling shield section of jurisdiction ring It sets.
Background technique
Shield machine is a kind of rock tunnel(ling) machine using shield method.The construction method of shield is development machine paving while driving If its " shield " of tunnel (the shield duct piece ring for referring to supportive), section of jurisdiction ring are the main mounting structures of shield-tunneling construction, be tunnel most Internal layer barrier carries the effect for resisting earth pressure, groundwater pressure and some special loads, influences the waterproofness in tunnel Energy and endurance quality.When shield machine enters tunnel, it is laid on tunnel inner wall since shield machine front resistance is insufficient to allow Compressed between adjacent section of jurisdiction ring, easily cause the corresponding section of jurisdiction ring of shield drive end unit and loosen so that section of jurisdiction ring and ring it Between gap widened, faulting of slab ends is prominent, causes leak or leakage mud phenomenon.
In order to avoid section of jurisdiction czermak space widens, therefore in shield host into needing shield before tunnel using section of jurisdiction ring tension device Structure machine carries out connection tension into 10 ring range inner tube loop of tunnel location.
Yongfeng south is marked into the prosperous section in northwest in No. 16 lines 06 of Beijing Metro, and tension device mainly uses 14b channel steel to cooperate Mounting head carries out longitudinal tension to the last 10 endless tube piece in tunnel respectively.Specifically, vertical along tunnel using 12 meters long 14b channel steel 4 are tensed in vault, and in the reserved hole for hoist of the preformed hole and section of jurisdiction ring that mounting head is screwed into channel steel, per pass channel steel is tensed Device is fastened using 5 mounting heads, and channel steel processing is as shown in Figure 1.The shortcomings that being tensed using channel steel with section of jurisdiction ring: One, 12 meters long of 14b channel steel weighs 200 kilograms, needs 5 people resultant force that could hold up, location and installation is very difficult.2, channel steel Hole location is difficult to accurately reserve, and many times needs to cut hole or reaming again.It 3, can only be in shield machine since channel steel is an entirety Host completely into hole and section of jurisdiction ring be all installed after can just be installed, lose the meaning of installation.
Utility model content
For the defects in the prior art, the utility model provides a kind of novel tension dress for tunneling shield section of jurisdiction ring It sets, section of jurisdiction ring adjacent in tunnel can be tensed, and facilitate operation.
The technical scheme adopted by the utility model is a kind of tension device for tunneling shield section of jurisdiction ring, including it is solid Determine component, connection component;The fixation kit includes the hoisting head for being mounted on each section of jurisdiction ring inner wall, and the lifting cephalic par is set There is interconnecting piece;The connection component includes two connecting rods between two hoisting heads, and two connecting rods are mutually separate One end be connected with hoisting head interconnecting piece, be also equipped between two connecting rods adjust adjacent two section of jurisdiction czermak space adjusting component.
In the technical program, the section of jurisdiction ring that the tension device for tunneling shield section of jurisdiction ring can be laid with tunnel is drawn Tightly, it avoids shield machine from increasing because resistance is too small gap between the ring of section of jurisdiction when entering tunnel, prevent leak or leaks mud Phenomenon.
Specifically, the mountable inner wall in each section of jurisdiction ring tensed of the hoisting head of fixation kit, each to hang The end for filling head is equipped with interconnecting piece, can be used for installing connection component, and connection component is two adjacent to hang using rigid connecting rod It fills and arranges two connecting rods between head, two mutually separate ends of connecting rod are attached to the interconnecting piece of the hoisting head of corresponding one end On, the adjusting component installed between two connecting rods is able to carry out tension and adjusts, so that two section of jurisdiction rings can adjust component Adjusting under reduce gap, to avoid the gap between the ring of section of jurisdiction excessive.
Compared to the mounting means of traditional bar shaped channel steel, the technical program provide tension device it is small in size, it is light, installation Simply, convenient disassembly, reusable, effectively can reliably tense each section of jurisdiction ring, it is ensured that the sealing waterproof of section of jurisdiction ring is imitated Fruit, the problems such as avoiding the section of jurisdiction ring occurred in tunnel relaxation, percolating water.In practical applications, it is filled using the tension of this skill scheme It sets and applies subway No. three lines five in Suzhou mark what hill path and Suzhou Amusement Park station, significantly improve the tension effect of section of jurisdiction ring, and Reduce manual labor amount, practical value with higher.
Further, the component that adjusts includes the flower basket bolt between two neighboring connecting rod, is screwed onto gaily decorated basket spiral shell The pull rod at bolt both ends is connected with the connection boom end of corresponding one end respectively.
In this way, the spacing between two connecting rods can be adjusted by flower basket bolt, thus realize to two section of jurisdiction rings it Between distance adjustment, flower basket bolt by with left and right rotation screw thread adjusting rod and two pull rods form, two pull rods are screwed onto tune The left and right ends of pole, adjusting rod revolution can be such that two pull rods relatively move, rotate adjusting rod with specific purpose tool when use, utilize biography Dynamic screw rod principle control pull rod screws the screwing length into adjusting rod, makes pull rod that connecting rod can be pulled mobile, realizes that tension is adjusted.
Further, one end periphery of the separate interconnecting piece of the hoisting head is equipped with and is installed into section of jurisdiction in a manner of being spirally connected The external screw thread of ring inner wall.
In this way, the mode that hoisting head can be connected through a screw thread, which is fixed on section of jurisdiction, changes inner wall, not only pacified by the way of being spirally connected Dress is stablized, and detachably recycles after use.
Further, the periphery of the interconnecting piece is equipped with the link slot being radially recessed.
In this way, the interconnecting piece of connecting rod is mountable in link slot, link slot can prevent interconnecting piece from falling off from hoisting head, To improve the stability of connection.
Further, the interconnecting piece periphery is provided with the pre- tieholen for radially arranging and running through interconnecting piece along interconnecting piece.
In this way, hoisting head passes through pre- tieholen when being installed into section of jurisdiction ring inner wall, using tools such as sleeves, lifting is tightened Head, makes to install more labor-saving, and installation effectiveness is higher.
Further, the both ends of the connecting rod are equipped with the connecting hook that can be connected with hoisting head and flower basket bolt.
In this way, connecting rod can be installed into the link slot of hoisting head by the connecting hook of end, or pass through connecting hook and flower The adjusting rod of basket bolt end is connected, and the more convenient operation installation of connecting hook improves installation effectiveness.
The beneficial effects of the utility model are: the tension device provided by the utility model for tunneling shield section of jurisdiction ring The section of jurisdiction ring that can be laid with to tunnel efficiently be tensed, compared to the mounting means of traditional bar shaped channel steel, the offer of the application Tension device is small in size, light, simple to install, convenient disassembly, reusable, effectively can reliably draw each section of jurisdiction ring Tightly, it is ensured that the sealed waterproof effect of section of jurisdiction ring, the problems such as avoiding the section of jurisdiction ring occurred in tunnel relaxation, percolating water.This is practical new Type is structurally reasonable, easy to use, and practicability with higher is widely portable in tunnel construction field.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all the appended drawings, similar Element or part are generally identified by similar appended drawing reference.In attached drawing, each element or part might not be according to actual ratios It draws.
Fig. 1 is the perspective view for the tension device for tunneling shield section of jurisdiction ring that the utility model specific embodiment 1 provides Installation diagram.
Fig. 2 is the top view for the tension device for tunneling shield section of jurisdiction ring that the utility model specific embodiment 1 provides.
Appended drawing reference: 1- connecting rod, 101- connecting hook, 2- hoisting head, 201- interconnecting piece, 2011- link slot, 2012- are pre- Tieholen, 3- flower basket bolt, 301- pull rod, 302- adjusting rod, the section of jurisdiction 4- ring.
Specific embodiment
Here, it is to be noted that, the utility model relates to function, method etc. be only the prior art conventional adaptation Using.Therefore, improvement of the utility model for the prior art, the connection relationship being substantially between hardware, rather than it is directed to function Can, although method itself namely the utility model be related to some functions, method, but and do not include and propose to function, method itself Improvement.Description of the utility model for function, method is in order to better illustrate the utility model, preferably to manage Solve the utility model.
It is described in detail below in conjunction with embodiment of the attached drawing to technical solutions of the utility model.Following embodiment is only For clearly illustrating the technical solution of the utility model, therefore it is only used as example, and it is originally practical to cannot be used as a limitation limitation Novel protection scope.
It should be noted that unless otherwise indicated, technical term or scientific term used in this application should be this reality The ordinary meaning understood with novel one of ordinary skill in the art.
Fig. 1 and Fig. 2, a kind of tension device for tunneling shield section of jurisdiction ring 4 provided in this embodiment are please referred to, including is consolidated Determine component, connection component;The section of jurisdiction ring 4 that tension device for tunneling shield section of jurisdiction ring 4 can be laid with tunnel tenses, and keeps away The phenomenon that exempting to make when shield machine enters tunnel because resistance is too small gap between section of jurisdiction ring 4 to increase, preventing leak or leakage mud.
As depicted in figs. 1 and 2, fixation kit includes the hoisting head 2 for being mounted on each 4 inner wall of section of jurisdiction ring, the hoisting head 2 End is equipped with interconnecting piece 201;The connection component includes two connecting rods 1 between two hoisting heads 2, two companies The mutually separate one end of extension bar 1 is connected with 2 interconnecting piece 201 of hoisting head, is also equipped between two connecting rods 1 and adjusts adjacent two section of jurisdiction ring The adjusting component in 4 gaps.The mountable inner wall in each section of jurisdiction ring 4 tensed of the hoisting head 2 of fixation kit, it is each The end of hoisting head 2 is equipped with interconnecting piece 201, can be used for installing connection component, connection component using rigidity connecting rod 1, two Two connecting rods 1 are arranged between adjacent hoisting head 2, two mutually separate ends of connecting rod 1 are attached to hanging for corresponding one end On the interconnecting piece 201 for filling head 2, the adjusting component installed between two connecting rods 1 is able to carry out tension and adjusts, so that two pipes Loop 4 can reduce gap under the adjusting for adjusting component, to avoid the gap between section of jurisdiction ring 4 excessive.
As depicted in figs. 1 and 2, adjusting component includes the flower basket bolt 3 between two neighboring connecting rod 1, gaily decorated basket spiral shell The pull rod 301 at 3 both ends of bolt is connected to 1 end of connecting rod for being located at corresponding one end respectively.Spacing between two connecting rods 1 can pass through Flower basket bolt 3 is adjusted, and adjusts to realize to the distance between two section of jurisdiction rings 4, flower basket bolt 3 with left and right by revolving The adjusting rod 302 of screw thread and two pull rods 301 form, and two pull rods 301 are screwed onto the left and right ends of adjusting rod 302, adjusting rod 302 Revolution can be such that two pull rods 301 relatively move, and rotate adjusting rod 302 with specific purpose tool when use, utilize the control of drive lead screw principle Pull rod 301 screws the screwing length into adjusting rod 302, makes pull rod 301 that connecting rod 1 can be pulled mobile, realizes and tense adjusting.
It is installed into a manner of being spirally connected as shown in Figure 1, one end periphery of the separate interconnecting piece 201 of hoisting head 2 is equipped with The external screw thread of 4 inner wall of section of jurisdiction ring.The mode that hoisting head 2 can be connected through a screw thread is fixed on section of jurisdiction and changes inner wall, using the side being spirally connected Formula not only installs stabilization, and detachably recycles after use.
As shown in Figure 1, the periphery of interconnecting piece 201 is equipped with the link slot 2011 being radially recessed.The connection of connecting rod 1 Portion 201 is mountable in link slot 2011, and link slot 2011 can prevent interconnecting piece 201 from falling off from hoisting head 2, to improve connection Stability.
201 periphery of interconnecting piece as shown in Figure 1 is provided with along the radial preload arranged and run through interconnecting piece 201 of interconnecting piece 201 Hole 2012.Hoisting head 2 passes through pre- tieholen 2012 when being installed into section of jurisdiction 4 inner wall of ring, using tools such as sleeves, tightens hoisting head 2, make to install more labor-saving, installation effectiveness is higher.
As shown in Figure 1, the both ends of connecting rod 1 are equipped with the connecting hook 101 that can be connected with hoisting head 2 and flower basket bolt 3.Connection Bar 1 can be installed into the link slot 2011 of hoisting head 2 by the connecting hook 101 of end, or pass through connecting hook 101 and flower basket bolt The adjusting rod 302 of 3 ends is connected, and the more convenient operation of connecting hook 101 installation improves installation effectiveness.
In the description of the present application, it is to be understood that the term in the application is used for description purposes only, and cannot be understood For indication or suggestion relative importance or implicitly indicate the quantity of indicated technical characteristic.In the description of the utility model In, the meaning of " plurality " is two or more, unless otherwise specifically defined.
In this application unless specifically defined or limited otherwise, the terms such as term " connected ", " connection ", " fixation " are answered It is interpreted broadly, for example, it may be being fixedly connected, may be a detachable connection, or is integral;It can be electrical connection;It can be with It is to be connected directly, the connection inside two elements or the phase of two elements can also be can be indirectly connected through an intermediary Interaction relationship.For the ordinary skill in the art, it can understand that above-mentioned term is practical at this as the case may be Concrete meaning in novel.
In the specification of the utility model, numerous specific details are set forth.It is to be appreciated, however, that the reality of the utility model Applying example can practice without these specific details.In some instances, well known method is not been shown in detail, is System and technology, so as not to obscure the understanding of this specification.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, system, material or spy described in conjunction with this embodiment or example Point is contained at least one embodiment or example of the utility model.In the present specification, to the schematic table of above-mentioned term It states and is necessarily directed to identical embodiment or example.Moreover, specific features, system, material or the feature of description can be with It can be combined in any suitable manner in any one or more of the embodiments or examples.In addition, without conflicting with each other, this field Technical staff can by the feature of different embodiments or examples described in this specification and different embodiments or examples into Row combination and combination.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type, should all cover in the claim of the utility model and the range of specification.

Claims (6)

1. a kind of tension device for tunneling shield section of jurisdiction ring, it is characterised in that: including fixation kit, connection component;
The fixation kit includes the hoisting head (2) for being mounted on each section of jurisdiction ring inner wall, and hoisting head (2) end is equipped with connection Portion (201);
The connection component includes two connecting rods (1) between two hoisting heads (2), two connecting rod (1) phases Separate one end is connected with the interconnecting piece (201) of hoisting head (2), is also equipped between two connecting rods (1) and adjusts adjacent two section of jurisdiction The adjusting component of czermak space.
2. the tension device according to claim 1 for tunneling shield section of jurisdiction ring, it is characterised in that:
The component that adjusts includes the flower basket bolt (3) between two neighboring connecting rod (1), is screwed onto flower basket bolt (3) The pull rod (301) at both ends is connected with the connecting rod of corresponding one end (1) end respectively.
3. the tension device according to claim 1 for tunneling shield section of jurisdiction ring, it is characterised in that:
One end periphery of the separate interconnecting piece (201) of the hoisting head (2) is equipped with and is installed into section of jurisdiction ring in a manner of being spirally connected The external screw thread of inner wall.
4. the tension device according to claim 1 for tunneling shield section of jurisdiction ring, it is characterised in that:
The periphery of the interconnecting piece (201) is equipped with the link slot (2011) being radially recessed.
5. the tension device according to claim 1 for tunneling shield section of jurisdiction ring, it is characterised in that:
Interconnecting piece (201) periphery is provided with the pre- tieholen for radially arranging and running through interconnecting piece (201) along interconnecting piece (201) (2012)。
6. the tension device according to claim 1 for tunneling shield section of jurisdiction ring, it is characterised in that:
The both ends of the connecting rod (1) are equipped with the connecting hook (101) that can be connected with hoisting head (2) and flower basket bolt (3).
CN201821213503.7U 2018-07-27 2018-07-27 A kind of tension device for tunneling shield section of jurisdiction ring Expired - Fee Related CN208605200U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821213503.7U CN208605200U (en) 2018-07-27 2018-07-27 A kind of tension device for tunneling shield section of jurisdiction ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821213503.7U CN208605200U (en) 2018-07-27 2018-07-27 A kind of tension device for tunneling shield section of jurisdiction ring

Publications (1)

Publication Number Publication Date
CN208605200U true CN208605200U (en) 2019-03-15

Family

ID=65671482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821213503.7U Expired - Fee Related CN208605200U (en) 2018-07-27 2018-07-27 A kind of tension device for tunneling shield section of jurisdiction ring

Country Status (1)

Country Link
CN (1) CN208605200U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173277A (en) * 2019-05-28 2019-08-27 中铁隧道集团二处有限公司 A kind of improved method for tensing and removing for the adjacent section of jurisdiction connection in tunnel
CN111271081A (en) * 2020-02-27 2020-06-12 华中科技大学 Pre-tightening type buckle duct piece system suitable for shield tunnel construction and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173277A (en) * 2019-05-28 2019-08-27 中铁隧道集团二处有限公司 A kind of improved method for tensing and removing for the adjacent section of jurisdiction connection in tunnel
CN111271081A (en) * 2020-02-27 2020-06-12 华中科技大学 Pre-tightening type buckle duct piece system suitable for shield tunnel construction and construction method

Similar Documents

Publication Publication Date Title
CN208605200U (en) A kind of tension device for tunneling shield section of jurisdiction ring
CN207727589U (en) Internal support of foundation pit device
CN203092062U (en) Auxiliary supporting device for pipeline welding
CN105676388A (en) Optical cable manufacturing method
CN204876609U (en) Foundation ditch sleet system of shielding
CN208815540U (en) Deep foundation pit support structure
CN208735148U (en) A kind of driving face in coal mine rotating laser bracket
CN206442052U (en) A kind of super-pressure and UHV transmission line change conductor spacer portable aid
CN216277966U (en) Temporary support device used during tunneling
CN207278640U (en) A kind of fix bar arranges
CN211018131U (en) Building electrical construction fixed knot constructs
CN107565491A (en) One kind strengthens fixed power pipe
CN206327994U (en) A kind of cable wrapping machine of vertical type telescopic
CN208986510U (en) The antifouling improvement construction cable of water environment is buried support device
CN205919087U (en) Survey and drawing A -frame who easily carries
CN211145585U (en) Oil pipeline supporting frame for oil exploration and exploitation
CN204852858U (en) Installation component and wall -hanging display device of wall -hanging display screen
CN207309320U (en) Crossbeam tool for assembling
CN207179397U (en) A kind of Tunnel Lamp mounting bracket
CN205092014U (en) Mark automatic machine that hangs of tablet
CN206834685U (en) Light current well lines arrangement
CN204066649U (en) The extension fixture of the convertible LED display of a kind of superelevation
CN105201259B (en) Anti-seismic house construction structure
CN207974299U (en) A kind of interconnecting piece of wallboard and agent structure
CN205383344U (en) Pipe strap is fixed in cable conductor piping erection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190611

Address after: Room 202, No. 139, Fengtai intersection, Fengtai District, Beijing 100071

Patentee after: CHINA RAILWAY ELECTRIFICATION BUREAU (GROUP) Co.,Ltd.

Address before: Room 1006, Huabao Building, Haidian District, Beijing

Patentee before: Wang Ning

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190315