CN208603075U - Construction site cement storage pot - Google Patents
Construction site cement storage pot Download PDFInfo
- Publication number
- CN208603075U CN208603075U CN201821197982.8U CN201821197982U CN208603075U CN 208603075 U CN208603075 U CN 208603075U CN 201821197982 U CN201821197982 U CN 201821197982U CN 208603075 U CN208603075 U CN 208603075U
- Authority
- CN
- China
- Prior art keywords
- top cover
- container
- tank body
- tube
- filter bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Construction site cement storage pot, container including being in rectangular shape, container base four corners are respectively arranged with a supporting leg, tank body is provided in container, tank body lower part is in up big and down small pyramidal structure, tank body lower end is provided with the discharge port for stretching out container base, is provided with discharge valve at discharge port;Container top is provided with the top cover for sealed shell of tank, and feed inlet and charging exhaust apparatus are provided on top cover, automatic feed sealing device is arranged at feed inlet, container upper lateral part is provided with discharging booster body.The utility model has reasonable in design, charging and discharging convenient and efficient, with good leakproofness, the finished ground cement that bulk cement carrier transports can be directly dumped into the tank body of the utility model, bulk cement carrier is liberated, make bulk cement carrier that can repeatedly transport cement, the utility model can be placed into construction site, can also be placed on engineering transportation vehicle.
Description
Technical field
The utility model belongs to transport development technical field, and in particular to a kind of construction site cement storage pot.
Background technique
A large amount of finished ground cement is needed during constructing highway, the transport of cement generally uses bulk cement carrier vehicle to transport
Defeated, bulk cement carrier is followed by the overall process of construction operation in work progress at the scene, this not only influences the transport of bulk cement carrier
Efficiency, and often finished ground cement has more surplus after one section of engineering of constructing, and bulk cement carrier can be the powder of these surplus
It is dumped into construction site, finished ground cement is easy to produce fugitive dust to the wind on construction ground, and easy absorption vapor is hardened, therefore
Highway construction scene needs a cement storage pot that can efficiently access, be readily transported.
Utility model content
The utility model provides a kind of efficient storage, convenient transportation, avoids to solve shortcoming in the prior art
Finished ground cement generates fugitive dust and hardened construction site cement storage pot.
In order to solve the above technical problems, the utility model adopts the following technical solution: construction site cement storage pot, including
In the container of rectangular shape, container base four corners are respectively arranged with a supporting leg, are provided with tank body, tank in container
Body lower part is in up big and down small pyramidal structure, and tank body lower end is provided with the discharge port for stretching out container base, is arranged at discharge port
There is discharge valve;Container top is provided with the top cover for sealed shell of tank, and feed inlet and charging exhaust apparatus are provided on top cover,
Automatic feed sealing device is set at feed inlet, and container upper lateral part is provided with discharging booster body.
Charging exhaust apparatus is provided with 2-5, and each charging exhaust apparatus includes the exhaust tube of cylindrical shape, exhaust
The center line of cylinder is arranged in vertical, and exhaust tube lower end is fixedly connected on top cover, and exhaust tube inner wall is fixedly installed installation
Frame is fixedly installed first filter bag an of electric pushrod He several bottoms opening, adjacent first filter bag on mounting rack
Between have gap, the first filter bag lower end is fixedly connected on top cover, offers on top cover and the first filter bag lower port pair
The gas vent that should be connected to, electric pushrod is arranged vertically downward to be fixed on mounting rack, the center line of electric pushrod and exhaust
The center line of cylinder is overlapped, and the lower end of electric pushrod is passed down through top cover and is fixedly connected with for blocking the stifled of all gas vents
Plate.
Automatic feed sealing device includes feeding cylinder, sealing plate and spring, and the center line of feeding cylinder is arranged in vertical,
The lower end of feeding cylinder is fixedly connected on top cover, and the feed opening inside feeding cylinder is offered on top cover, and sealing plate side is logical
The downside that hinge is hinged on top cover is crossed, hinge is adjacent to feed opening and positioned at the left side of feed opening, the upper surface setting of sealing plate
There is rubber pad, both ends of the spring is connect with the inner wall of sealing plate upper side and feeding cylinder respectively, the junction position of spring and feeding cylinder
In the right side of feed opening.
Discharging booster body includes horizontally disposed U-tube and U-shaped bar, and U-tube is located at the surface of U-shaped bar, U-tube with
The protruding tank body in the both ends of U-shaped bar and container, are evenly arranged with several the second filter bags between U-tube and U-shaped bar,
Second filter bag is respectively positioned in tank body, and the upper end of the second filter bag is open and is connected to U-tube, and the both ends of U-tube are connected with one
Root high pressure gas distribution pipe.
By adopting the above technical scheme, the specific work process of the utility model are as follows:
When feeding into tank body, bulk cement carrier connects feeding cylinder by discharge nozzle, in finished ground cement to the pressure of sealing plate
Under, spring is in tensional state, and sealing plate is rotated down centered on hinge and is opened.In fill process, need tank body
Interior air discharge, keeps tank body internal and external pressure balance, therefore in charging, and electric pushrod elongation pushes down on closure plate, arranges
Stomata is opened, and air and the intracorporal finished ground cement of tank enter in the first filter bag, filter bag finished ground cement is filtered after under
It falls in tank body, air is discharged by the first filter bag.After charging, sealing plate is close by feed opening by springs return
Envelope, sealing plate clashes top plate when rubber pad plays the role of improving sealing effect and buffer spring pull-up sealing plate, electronic
Push rod driving closure plate, which moves up, blocks gas vent.
When the intracorporal finished ground cement of tank discharges, the discharge valve at discharge port is opened, (air compressor machine is that construction is existing using air compressor machine
The common equipment in field, can be onboard) it is pressurized into tank body, air compressor machine is specifically passed through into high-pressure air pipe and high pressure gas distribution pipe
Connection, the high pressure draught that air compressor machine generates are entered in the second filter bag by high pressure gas distribution pipe, U-tube, several second
Filter bag uniformly injects high pressure gas into tank body, and the intracorporal air pressure of tank is increased, and finished ground cement is in self gravity and anticyclonic
Pass through discharge port discharging under collective effect.Second filter bag had both played the role of uniform high pressure draught, and played and avoid cement
Powder enters the effect of blocking Pressure channel in the second filter bag.
Supporting leg plays the role of convenient for placing container, and the upper outside of container is additionally provided with lifting lug, is convenient for container
It is lifted on transport vehicle and is transported, to adapt to the demand of construction of the highway.
In conclusion the utility model has reasonable in design, charging and discharging convenient and efficient, have good close
Feng Xing, the finished ground cement that bulk cement carrier transports can directly be dumped into the tank body of the utility model, liberate bulk cement carrier, made
Bulk cement carrier can repeatedly transport cement, and the utility model can be placed into construction site, can also be placed on engineering transportation vehicle.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the top view of Fig. 1
Fig. 3 is the enlarged drawing in Fig. 1 at A;
Fig. 4 is the enlarged drawing in Fig. 1 at B;
Fig. 5 is the enlarged drawing in Fig. 2 at C.
Specific embodiment
As Figure 1-Figure 5, the construction site cement storage pot of the utility model, the container including being in rectangular shape
1, be respectively arranged with a supporting leg 2 at 1 bottom four corners of container, be provided with tank body 3 in container 1,3 lower part of tank body present it is big under
Small pyramidal structure, 3 lower end of tank body are provided with the discharge port 4 for stretching out 1 bottom of container, are provided with discharge valve 5 at discharge port 4;
It is provided with the top cover 6 for sealed shell of tank 3 at the top of container 1, feed inlet and charging exhaust apparatus 7, charging are provided on top cover 6
Automatic feed sealing device 8 is set at mouthful, and 1 upper lateral part of container is provided with discharging booster body.
Charging exhaust apparatus 7 is provided with 2-5, and each charging exhaust apparatus 7 includes the exhaust tube 9 of cylindrical shape,
The center line of exhaust tube 9 is arranged in vertical, and 9 lower end of exhaust tube is fixedly connected on top cover 6, and the fixation of 9 inner wall of exhaust tube is set
It is equipped with mounting rack 10, first filter bag an of electric pushrod 11 He several bottoms opening is fixedly installed on mounting rack 10
12, there is gap, 12 lower end of the first filter bag is fixedly connected on top cover 6, opens up on top cover 6 between adjacent first filter bag 12
There is the gas vent 13 of connection corresponding with 12 lower port of the first filter bag, electric pushrod 11 is arranged vertically downward is fixed at installation
On frame 10, the center line of electric pushrod 11 is overlapped with the center line of exhaust tube 9, and the lower end of electric pushrod 11 is passed down through top cover 6
And it is fixedly connected with the closure plate 14 for blocking all gas vents 13.
Automatic feed sealing device 8 includes feeding cylinder 15, sealing plate 16 and spring 17, and the center line of feeding cylinder 15 is along vertical
Direction setting, the lower end of feeding cylinder 15 are fixedly connected on top cover 6, and the charging inside feeding cylinder 15 is offered on top cover 6
Hole 18,16 side of sealing plate are hinged on the downside of top cover 6 by hinge 19, and hinge 19 is adjacent to feed opening 18 and is located at feed opening
18 left side, the upper surface of sealing plate 16 are provided with rubber pad 20,17 both ends of spring respectively with 16 upper side of sealing plate and charging
The junction of the inner wall connection of cylinder 15, spring 17 and feeding cylinder 15 is located at the right side of feed opening 18.
Discharging booster body includes horizontally disposed U-tube 21 and U-shaped bar 22, U-tube 21 be located at U-shaped bar 22 just on
Side, the protruding tank body 3 in the both ends of U-tube 21 and U-shaped bar 22 and container 1, uniformly set between U-tube 21 and U-shaped bar 22
Several the second filter bags 23 are equipped with, the second filter bag 23 is respectively positioned in tank body 3, the upper end opening and and U of the second filter bag 23
Type pipe 21 is connected to, and the both ends of U-tube 21 are connected with a high pressure gas distribution pipe 24.
The specific work process of the utility model are as follows:
When feeding into tank body 3, bulk cement carrier connects feeding cylinder 15 by discharge nozzle, in finished ground cement to sealing plate 16
Under pressure, spring 17 is in tensional state, and sealing plate 16 is rotated down centered on hinge 19 and is opened.In fill process,
It needs the air discharge in tank body 3 keeping 3 internal and external pressure balance of tank body, therefore in charging, the elongation of electric pushrod 11 will block up
Plate 14 pushes down on, and gas vent 13 is opened, and the finished ground cement in air and tank body 3 enters in the first filter bag 12, filtering
Bag finished ground cement is filtered after under fall in tank body 3, air is discharged by the first filter bag 12.After charging, sealing
Plate 16 is retracted by spring 17 and seals feed opening 18, and rubber pad 20, which plays, improves sealing effect and the pull-up sealing plate of buffer spring 17
Sealing plate 16 clashes the effect of top plate when 16, and electric pushrod 11 drives closure plate 14 to move up and blocks gas vent 13.
When finished ground cement in tank body 3 discharges, the discharge valve 5 at discharge port 4 is opened, is increased using air compressor machine into tank body 3
Air compressor machine is specifically connect by high-pressure air pipe with high pressure gas distribution pipe 24 by pressure, and the high pressure draught that air compressor machine generates passes through height
Distribution pipe of calming the anger 24, U-tube 21 enter in the second filter bag 23, several second filter bags 23 are uniformly injected into tank body 3
High pressure gas, the air pressure in tank body 3 are increased, and finished ground cement passes through discharge port 4 under self gravity and anticyclonic collective effect
Discharging.Second filter bag 23 had both played the role of uniform high pressure draught, and played and finished ground cement is avoided to enter the second filtering
The effect of blocking Pressure channel in bag 23.
Supporting leg 2 plays the role of convenient for placing container 1, and the upper outside of container 1 is additionally provided with lifting lug, is convenient for packaging
Case 1 is lifted on transport vehicle and is transported, to adapt to the demand of construction of the highway.
The present embodiment not makes any form of restriction the shape of the utility model, material, structure etc., all foundations
The technical essence of the utility model any simple modification, equivalent change and modification to the above embodiments, belong to this reality
With the protection scope of new technique scheme.
Claims (4)
1. construction site cement storage pot, it is characterised in that: the container including being in rectangular shape, container base four corners
It is respectively arranged with a supporting leg, tank body is provided in container, tank body lower part is in up big and down small pyramidal structure, and tank body lower end is set
It is equipped with the discharge port for stretching out container base, is provided with discharge valve at discharge port;Container top is provided with for sealed shell of tank
Top cover, feed inlet and charging exhaust apparatus are provided on top cover, automatic feed sealing device is set at feed inlet, on container
Side is provided with discharging booster body.
2. construction site cement storage pot according to claim 1, it is characterised in that: charging exhaust apparatus is provided with 2-5
A, each charging exhaust apparatus includes the exhaust tube of cylindrical shape, and the center line of exhaust tube is arranged in vertical, and is vented
Cylinder lower end be fixedly connected on top cover, exhaust tube inner wall is fixedly installed mounting rack, be fixedly installed on mounting rack one it is electronic
First filter bag of push rod and several bottoms opening, has gap between adjacent first filter bag, and the first filter bag lower end is solid
Surely be connected on top cover, offer the gas vent of connection corresponding with the first filter bag lower port on top cover, electric pushrod vertically to
Lower setting is fixed on mounting rack, and the center line of electric pushrod is overlapped with the center line of exhaust tube, the lower end of electric pushrod
It is passed down through top cover and is fixedly connected with the closure plate for blocking all gas vents.
3. construction site cement storage pot according to claim 1, it is characterised in that: automatic feed sealing device include into
The center line of barrel, sealing plate and spring, feeding cylinder is arranged in vertical, and the lower end of feeding cylinder is fixedly connected on top cover,
The feed opening inside feeding cylinder is offered on top cover, sealing plate side is hinged on the downside of top cover, hinge by hinge
Neighbouring feed opening and the left side for being located at feed opening, the upper surface of sealing plate are provided with rubber pad, both ends of the spring respectively with sealing plate
The junction of the connection of the inner wall of upper side and feeding cylinder, spring and feeding cylinder is located at the right side of feed opening.
4. construction site cement storage pot according to claim 1, it is characterised in that: discharging booster body is set including level
The U-tube set and U-shaped bar, U-tube are located at the surface of U-shaped bar, the protruding tank body in the both ends of U-tube and U-shaped bar and collection
Vanning, is evenly arranged with several the second filter bags, the second filter bag is respectively positioned in tank body, the second mistake between U-tube and U-shaped bar
The upper end of filter bag is open and is connected to U-tube, and the both ends of U-tube are connected with a high pressure gas distribution pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821197982.8U CN208603075U (en) | 2018-07-27 | 2018-07-27 | Construction site cement storage pot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821197982.8U CN208603075U (en) | 2018-07-27 | 2018-07-27 | Construction site cement storage pot |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208603075U true CN208603075U (en) | 2019-03-15 |
Family
ID=65671151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821197982.8U Active CN208603075U (en) | 2018-07-27 | 2018-07-27 | Construction site cement storage pot |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208603075U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108820609A (en) * | 2018-07-27 | 2018-11-16 | 河南省交通建设工程有限公司 | Construction site cement storage pot |
-
2018
- 2018-07-27 CN CN201821197982.8U patent/CN208603075U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108820609A (en) * | 2018-07-27 | 2018-11-16 | 河南省交通建设工程有限公司 | Construction site cement storage pot |
CN108820609B (en) * | 2018-07-27 | 2024-01-23 | 河南省交通建设工程有限公司 | Cement storage tank for construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109335051A (en) | A kind of pharmacist of traditional Chinese medicine's Chinese medicine weighing packing apparatus | |
CN208603075U (en) | Construction site cement storage pot | |
CN108945849A (en) | Highway construction scene anti-clogging transports tank without fugitive dust formula cement | |
CN108820609A (en) | Construction site cement storage pot | |
CN208603067U (en) | Highway construction scene anti-clogging transports tank without fugitive dust formula cement | |
CN208603063U (en) | Charging avoids the finished ground cement holding vessel of fugitive dust | |
CN208302993U (en) | A kind of grinding device with auto feed function | |
CN216205714U (en) | Full-automatic production line for carbon dioxide phase change expansion excitation tube | |
CN213974539U (en) | Be applied to fertilizer packagine machine of organic compound fertile production | |
CN206069349U (en) | A kind of slurry conveying device | |
CN213254144U (en) | Energy-saving powder homogenization equipment | |
CN211595075U (en) | A medicament blowing device for printing and dyeing reclaimed water recovery system | |
CN208603062U (en) | The easy unloading type cement temporary storage tank of highway construction scene | |
CN208648227U (en) | A kind of tealeaves storage facilities pass heap machine | |
CN206748834U (en) | A kind of automatic screening bottle baling press | |
CN209008906U (en) | A kind of cement feeding device of lowering energy-saving | |
CN217707704U (en) | Discharging device for bulk cement car loader | |
CN217348516U (en) | Packaging system for compound fertilizer production | |
CN219821813U (en) | Degassing type lithium battery powder ton bag packaging machine | |
CN205931324U (en) | Powder packagine machine | |
CN213301796U (en) | Landfill gas collecting device | |
CN218429315U (en) | Closed feeding device for polyester slurry preparation tank | |
CN208828736U (en) | Bucket lifting device | |
CN215475858U (en) | Automatic change tealeaves vanning device | |
CN218723151U (en) | A closing cap device for feed bin charging hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |