CN208599241U - A kind of cyclone sediment sludge is removed contamination station - Google Patents

A kind of cyclone sediment sludge is removed contamination station Download PDF

Info

Publication number
CN208599241U
CN208599241U CN201821243108.3U CN201821243108U CN208599241U CN 208599241 U CN208599241 U CN 208599241U CN 201821243108 U CN201821243108 U CN 201821243108U CN 208599241 U CN208599241 U CN 208599241U
Authority
CN
China
Prior art keywords
sludge
sludge pump
borehole wall
pump
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821243108.3U
Other languages
Chinese (zh)
Inventor
段汝健
段景尧
杨光武
徐有亮
贾鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201821243108.3U priority Critical patent/CN208599241U/en
Application granted granted Critical
Publication of CN208599241U publication Critical patent/CN208599241U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model is that a kind of cyclone sediment sludge is removed contamination work of standing, whirling well storehouse is set in shield well, the sludge pump borehole wall and sludge pump chamber, sludge pump motor and the sludge pump housing, the sludge pump borehole wall and sludge pump chamber are placed among whirling well storehouse, it is supported by pump chamber support construction, sludge pump motor and the sludge pump housing are placed in sludge pump room, sludge pump lower part connects sludge pumping dirt pipe, ground is led in the sludge pipe outlet of sludge pumping dirt pipe, there is pneumatic pumping sandpipe by eddy flow borehole wall side, pneumatic pumping sandpipe import is in eddy flow borehole wall lower part, pneumatic pumping sandpipe outlet is outside ground, there is spoiler in the other side by the eddy flow borehole wall, shield well two sides have into sewage pipe and sewage pipe out, into sewage pipe in shield well side middle and lower part, sewage pipe is in shield well side middle and upper part out, there are transfer sump and management control room on ground.It reduces flow velocity by circular cyclone centrifuge separation, spoiler and precipitates, with sludge pump and pneumatic pumping sandpipe, the sludge transfer pond that sludge and sand setting, gravelstone etc. are discharged to the outside.

Description

A kind of cyclone sediment sludge is removed contamination station
Technical field
The utility model belongs to the sewage network pollution clean-up technology field in municipal plumbing, and in particular to a kind of cyclone sediment Sludge is removed contamination station.
Background technique
The length of municipal sewage pipe network happens occasionally phenomena such as constantly lengthening, causing line clogging due to sludgd deposition, To affect the operation of municipal sewage pipe network, the especially development of Pipes Buried Deep Underground technology enters deep tunnel to Pipes Buried Deep Underground In sludgd deposition problem can protrude very much.The utility model adds negative flowing plate to reduce stream using circular cyclone centrifuge separation precipitating Speed accelerates the principle of precipitating, makes full use of tubular service well, pipeline construction shield well, and push pipe well is reconstructed, and it is heavy to form eddy flow Shallow lake well, then sludge pump is used, the pneumatic mode for taking out sandpipe, mud and silt sand after precipitating is discharged etc. form perfect eddy flow Precipitating sludge is removed contamination assembly of standing, and the sludge in pipeline is cleared up in time according to precipitation status, to effectively prevent sludgd deposition in pipe It results in blockage in road, improves the pollution discharge capability of pipeline, also have no relevant report in document at home.
Summary of the invention
It removes contamination station the purpose of the utility model is to provide a kind of cyclone sediment sludge, can effectively prevent sludgd deposition in pipeline In result in blockage, improve the pollution discharge capability of pipeline.
The utility model reduces the precipitating principle of flow velocity with centrifugal force and spoiler, and the flowing sludge in pipeline is subject to Deposition, then with sludge pump and pneumatic sand pump layering discharge sludge and deposition sandstone, form cyclone sediment sludge remove contamination stand always At.
A kind of station the specific technical proposal is: cyclone sediment sludge is removed contamination of the utility model is constituted: being arranged in shield well Whirling well storehouse, the sludge pump borehole wall and sludge pump chamber, sludge pump motor and the sludge pump housing, the sludge pump borehole wall and sludge pump chamber are placed in rotation It among the storehouse Liu Jing, is supported by pump chamber support construction, sludge pump motor and the sludge pump housing are placed in sludge pump room, and sludge pump lower part connects Sludge pumping dirt pipe is connect, the sludge pipe outlet of sludge pumping dirt pipe leads to ground, has pneumatic pumping sandpipe, wind by eddy flow borehole wall side Dynamic to take out sandpipe import in eddy flow borehole wall lower part, outside ground, there is spoiler in the other side by the eddy flow borehole wall for pneumatic pumping sandpipe outlet, Shield well two sides have into sewage pipe and sewage pipe out, and into sewage pipe in shield well side middle and lower part, sewage pipe is in shield well side out Transfer sump and management control room are arranged on ground at top.
Working principle:
1) sewage stream in the duct forms centrifugal force, bulk density is big into shield well along circular cyclone well rotational flow Sludge be discharged to surrounding, under the action of spoiler, flow velocity decline is layered and gos deep into lower part dredge pump region to form deposition, To form sludge pump operating condition;
2) after sludge pump pump drainage sludge, part sand, stone deposit to the sharp position in bottom, after forming certain deposition, using wind Sedimentation is discharged in dynamic sandpipe of taking out, to form the system evacuation ability of sludge, sand setting (gravelstone);
3) Electronic control of mechanism works according to the emission behaviour of sludge pump to determine whether to open pneumatic pumping sandpipe, and According to the pneumatic pump drainage situation for taking out sandpipe, the working time is determined.
The good effect of the utility model:
1, the timely cleaning for effectively realizing sludge in pipeline, depositing sandstone forms one to preventing pipeline siltation from handling A cleaning station, is of great significance;
2, sludge settling processing is carried out by the way of the heart, spoiler using eddy flow, greatlys save cost, operability By force;
3, our station is arranged in the shield well, push pipe well or inspection shaft of pipeline construction, and land occupation is few, takes full advantage of space, Economical and practical, less energy consumption has extensive application value.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, for ordinary skill people For member, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is that the cyclone sediment sludge of the utility model is removed contamination station structure schematic diagram.
Fig. 2 is the cyclone sediment well profile schematic diagram of the utility model.
In figure: 1- is into sewage pipe, and 2-spoilers, 3-whirling well storehouses, the 4-sludge pump boreholes wall, 5-sludge pump chambers, 6-is dirty Dredge pump motor, the 7-sludge pump housings, 8-sludge pumping dirt pipes, the outlet of 9- sludge pipe, 10- pump chamber support construction, 11- take out sand Pipe outlet, the ground 12-, the 13- eddy flow borehole wall, the pneumatic pumping sandpipe of 14-, the pneumatic pumping sandpipe import of 15-, 16- go out sewage pipe, in 17- Turn sump, 18- shield (push pipe) well, 19- shield (push pipe) borehole wall, 20- management control room.
Specific embodiment
As shown in Figure 1, a kind of cyclone sediment sludge of the utility model is removed contamination, station is constituted are as follows: in shield (push pipe) well 18 Whirling well storehouse 3, the sludge pump borehole wall 4 and sludge pump chamber 5, sludge pump motor 6 and the sludge pump housing 7, the sludge pump borehole wall 4 and sludge are set Pump chamber 5 is placed among whirling well storehouse 3, is supported by pump chamber support construction 10, and sludge pump motor 6 and the sludge pump housing 7 are placed in sludge pump In room 5, sludge pump lower part connects sludge pumping dirt pipe 8, and the sludge pipe outlet 9 of sludge pumping dirt pipe 8 leads to ground 12, leans on eddy flow There is pneumatic pumping sandpipe 14 in 13 side of the borehole wall, and the pneumatic pneumatic pumping sandpipe import of import for taking out sandpipe 14 is in 13 lower part of the eddy flow borehole wall, wind There is spoiler 3 in the dynamic pumping sandpipe outlet 11 for taking out sandpipe 14 by the other side of the eddy flow borehole wall, shield well two sides have into dirt outside ground Water pipe 1 and out sewage pipe 16, into sewage pipe 1 in shield well side middle and lower part, sewage pipe 16 is on shield well side middle and upper part, ground out There are transfer sump 17 and management control room 20.
The support of pump chamber support construction 10 forms splayed support for four rod pieces.
The sludge pump chamber is circle, and internal diameter 2.5m-4.0m, pump chamber bottom is away from precipitating bottom 2.4- 3.2m, the sludge pump borehole wall with a thickness of 0.3-0.4m, lower part cone is the double-deck steel lining design, interior filling concrete.
The transfer sump is reinforced concrete structure, wall thickness having a size of net long 6-8m, clear span 4m, net depth 1.8-2.8m According to geology condition design.Position ground configuration within the scope of cyclone sediment well periphery diameter 50m, special circumstances can optionally cloth It sets, but overall blowdown pump power is added and subtracted.
The management control room concrete function is that administrative staff work and control equipment cabinet, electrical source of power and distribution Room, air compressor room composition, location arrangements ground within the scope of cyclone sediment well periphery diameter 50m.Main function is to provide Power supply, distribution, unit operation control, the air feed of pneumatic sand pump, administrative staff are on duty.
Working principle:
Sewage stream in the duct, into after shield well (push pipe well or inspection shaft), along circular cyclone sedimentation rotating flow It is dynamic, it forms centrifugal force, the big sludge of bulk density is discharged to surrounding, under the action of spoiler, flow velocity decline, so that deposition is formed, Lower part dredge pump region is goed deep into layering, to form sludge pump operating condition;After sludge pump pump drainage sludge, part sand, stone deposition To bottom sharp portion position, after forming certain deposition, sedimentation is discharged using pneumatic pumping sandpipe, so that it is (small to form sludge, sand setting Stone) system evacuation ability.
The Electronic control of mechanism works, and root according to the emission behaviour of sludge pump to determine whether to open pneumatic pumping sandpipe According to the pneumatic pump drainage situation for taking out sandpipe, the working time is determined.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, these various changes and improvements fall within the scope of the claimed invention.The utility model requires protection scope It is defined by the appending claims and its equivalent thereof.

Claims (6)

  1. The station 1. a kind of cyclone sediment sludge is removed contamination, it is characterised in that: whirling well storehouse, the sludge pump borehole wall and dirt are set in shield well Dredge pump room, sludge pump motor and the sludge pump housing, the sludge pump borehole wall and sludge pump chamber are placed among whirling well storehouse, are supported and are tied by pump chamber Structure support, sludge pump motor and the sludge pump housing are placed in sludge pump room, and sludge pump lower part connects sludge pumping dirt pipe, sludge pumping Ground is led in the sludge pipe outlet of dirty pipe, has pneumatic pumping sandpipe by eddy flow borehole wall side, pneumatic pumping sandpipe import is in the eddy flow borehole wall There are a spoiler in lower part, the outlet of pneumatic pumping sandpipe outside ground, by the other side of the eddy flow borehole wall, shield well two sides have into sewage pipe and Sewage pipe out, into sewage pipe in shield well side middle and lower part, sewage pipe has transfer sump on shield well side middle and upper part, ground out With management control room.
  2. The station 2. cyclone sediment sludge according to claim 1 is removed contamination, it is characterised in that: the pump chamber support construction 10 Support forms splayed support for two rod pieces.
  3. The station 3. cyclone sediment sludge according to claim 1 is removed contamination, it is characterised in that: the sludge pump chamber is circle, Internal diameter is 2.5m-4.0m, and away from precipitating bottom 2.4-3.2m, lower part cone is the double-deck steel lining-, interior filling for pump chamber bottom Concrete.
  4. The station 4. cyclone sediment sludge according to claim 1 is removed contamination, it is characterised in that: the thickness of the sludge pump borehole wall For 0.3-0.4m.
  5. The station 5. cyclone sediment sludge according to claim 1 is removed contamination, it is characterised in that: the transfer dirt collection pool size ruler Very little is net long 6-8m, clear span 4m, and net depth 1.8-2.8m, is reinforced concrete structure, position is in cyclone sediment well periphery diameter 50m range Interior ground configuration.
  6. The station 6. cyclone sediment sludge according to claim 1 is removed contamination, it is characterised in that: the management control room is to provide Power supply, distribution, unit operation control, the air feed of pneumatic sand pump, administrative staff are on duty, and location arrangements are on cyclone sediment well periphery Ground within the scope of diameter 50m.
CN201821243108.3U 2018-08-03 2018-08-03 A kind of cyclone sediment sludge is removed contamination station Active CN208599241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821243108.3U CN208599241U (en) 2018-08-03 2018-08-03 A kind of cyclone sediment sludge is removed contamination station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821243108.3U CN208599241U (en) 2018-08-03 2018-08-03 A kind of cyclone sediment sludge is removed contamination station

Publications (1)

Publication Number Publication Date
CN208599241U true CN208599241U (en) 2019-03-15

Family

ID=65670191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821243108.3U Active CN208599241U (en) 2018-08-03 2018-08-03 A kind of cyclone sediment sludge is removed contamination station

Country Status (1)

Country Link
CN (1) CN208599241U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108744617A (en) * 2018-08-03 2018-11-06 中国水利水电第十四工程局有限公司 A kind of cyclone sediment sludge is removed contamination station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108744617A (en) * 2018-08-03 2018-11-06 中国水利水电第十四工程局有限公司 A kind of cyclone sediment sludge is removed contamination station

Similar Documents

Publication Publication Date Title
CN104532947A (en) Underground open-type storage pond
CN104929684A (en) Underground rain sewage pre-treatment station connected to deep layer tunnel drainage system
CN202273314U (en) Rainwater drainage well
CN103374965A (en) Venturi self-circulation negative-pressure drainage system of refuse landfill
CN208599241U (en) A kind of cyclone sediment sludge is removed contamination station
CN206188573U (en) It collects and SBR sewage treatment in energy -conserving anti -pollution system of an organic whole to collect vacuum sewage
CN208685753U (en) A kind of municipal box culvert sewage converging system
CN108625461A (en) A kind of shutoff type shunting well on combined sewerage system
CN112897722A (en) Hydraulic cyclone sewage interception device
CN205472961U (en) Filler belt cleaning device for constructed wetland
CN107558571A (en) Municipal drainage pipeline
CN201485959U (en) On-line vacuum drainage system
CN203989986U (en) Eddy flow labyrinth combined cistern settling pit
CN108744617A (en) A kind of cyclone sediment sludge is removed contamination station
CN204401774U (en) Underground open type storage pond
CN206438508U (en) Split type quick hole cleaning device
CN206069524U (en) Integrate vacuum sewage and collect the energy-conservation pollution treatment system with artificial wetland treatment
CN109183720A (en) A kind of irrigation canals and ditches anti-clogging recharge filter device
CN213060631U (en) Washing water preparation and recycling equipment for ditch dredging sludge treatment
CN210021267U (en) Novel grit chamber for water treatment
CN211773801U (en) A strainer well for foundation ditch well casing precipitation construction
CN210718172U (en) Partitioned recharge type middle-deep geothermal energy collecting well
CN210331937U (en) Waste water recycling system
CN112281775A (en) Water surface floating garbage treatment device