CN208587893U - A kind of pure steam preparation system - Google Patents

A kind of pure steam preparation system Download PDF

Info

Publication number
CN208587893U
CN208587893U CN201820910192.3U CN201820910192U CN208587893U CN 208587893 U CN208587893 U CN 208587893U CN 201820910192 U CN201820910192 U CN 201820910192U CN 208587893 U CN208587893 U CN 208587893U
Authority
CN
China
Prior art keywords
fixedly connected
plate
fixed
size
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820910192.3U
Other languages
Chinese (zh)
Inventor
钱志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dejia Electrical And Mechanical Technology Co Ltd
Original Assignee
Jiangsu Dejia Electrical And Mechanical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Dejia Electrical And Mechanical Technology Co Ltd filed Critical Jiangsu Dejia Electrical And Mechanical Technology Co Ltd
Priority to CN201820910192.3U priority Critical patent/CN208587893U/en
Application granted granted Critical
Publication of CN208587893U publication Critical patent/CN208587893U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to steam manufacturing equipment technical field more particularly to a kind of pure steam preparation systems.The technical problems to be solved in the utility model is that worker can waste a large amount of time when overhauling the heater of water tank bottom.In order to solve the above-mentioned technical problem, the utility model provides a kind of pure steam preparation system, including support sleeve, hermatic door is hinged with by hinge at the movable mouth of the support sleeve front surface, it is fixedly connected with heat-conducting plate at the top of the support sleeve, water tank is fixedly connected at the top of the heat-conducting plate, the water inlet of the tank top is fixedly connected with inlet valve, exhaust valve is fixedly connected at the gas outlet of the tank top, the inlet valve is fixedly connected with water inlet pipe far from one end of water tank.The pure steam preparation system, electric heater can quickly be taken off and be overhauled when overhauling to electric heater by worker, to keep worker more convenient when overhauling to electric heater.

Description

A kind of pure steam preparation system
Technical field
The utility model relates to steam manufacturing equipment technical field, specially a kind of pure steam preparation system.
Background technique
Steam is also known as vapor, the classification according to pressure and temperature to various steam are as follows: saturated vapor and superheated steam, Steam main application has heating and humidification, can also generate power, as machine driving etc., using high parameter superheated steam energy Thickened oil recovery efficiency is enough greatly improved, reduces energy consumption, therefore will use a large amount of steam during oil recovery.
Vapor is usually all that the water inside heating water tank is fabricated, and manufactures the device of vapor by water tank and adds Hot device composition heats the water inside water tank using heater, so that it is generated vapor, but heater is working for a long time After be easily damaged, current heater is all that the bottom of water tank is directly fixed on by structures such as bolts, during maintenance Needing to waste a large amount of time could be removed, therefore it is a large amount of to cause worker that can waste when overhauling the heater of water tank bottom Time.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of pure steam preparation system, solves worker and is examining The problem of a large amount of time can be wasted when repairing the heater of water tank bottom.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of pure steam preparation system, including support It covers, hermatic door is hinged with by hinge at the movable mouth of the support sleeve front surface, is fixedly connected at the top of the support sleeve Heat-conducting plate is fixedly connected with water tank at the top of the heat-conducting plate, and the water inlet of the tank top is fixedly connected with inlet valve, institute It states and is fixedly connected with exhaust valve at the gas outlet of tank top, the inlet valve is fixedly connected with far from one end of water tank into water Pipe, the exhaust valve are fixedly connected with escape pipe far from one end of tank top, consolidate respectively at two flowing water mouths of the water tank Surely it is connected with the first outlet pipe and the second outlet pipe, described second is discharged at the top of the water outlet and the first outlet pipe of bottom of the tube It is fixedly connected between water outlet by glass tube.
The inside of the support sleeve is fixedly connected with fixed plate, is fixedly connected at the top of the fixed plate there are two spring, The top of two springs is fixedly connected by movable plate, is fixedly connected at the top of the movable plate there are two fixed column, two The equal movable sleeve in outside of a fixed column is connected to annulus column, and the corresponding side of two annulus column outer walls is solid by connecting plate It is fixed to connect, it is fixedly connected with supporting block at the top of the connecting plate, support plate is fixedly connected at the top of the supporting block, it is described It is fixedly connected with electric heater at the top of support plate, fixing sleeve is fixedly connected in the middle part of the fixed plate inner cavity, it is described solid Surely the internal activity covered is socketed with pulling plate, the bottom of movable plate is fixedly connected at the top of the pulling plate, the pulling plate is far from living One end of movable plate runs through the inner cavity of fixed plate and extends to the bottom of fixed plate.
Preferably, the front surface of the hermatic door is fixedly connected with handle, the size of the handle and the size of hermatic door It is adapted.
Preferably, the front surface of the glass tube is fixedly connected with scale strip, the size of the scale strip and glass tube Size is adapted.
Preferably, the bottom of the movable plate is fixedly connected with limit telescopic bar, and the limit telescopic bar is far from movable plate One end be fixedly connected on the top of fixed plate, and the quantity of limit telescopic bar is two, and two limit telescopic bars are symmetrical It is distributed in the two sides of fixing sleeve.
Preferably, the bottom of the pulling plate is fixedly connected with knob, and the size of the knob is adapted with the size of pulling plate.
Preferably, the size of the fixed column is adapted with the size of annulus column, the size of the fixing sleeve and pulling plate Size is adapted.
(3) beneficial effect
The utility model provides a kind of pure steam preparation system.Have it is following the utility model has the advantages that
(1), pure steam preparation system, due to being provided with fixed plate, spring, movable plate, fixed column, annulus column and company Fishplate bar closes the power supply of electric heater, then moving active plate when needing to overhaul electric heater, makes electronic The top of heater is separated with heat-conducting plate, then up mobile connection plate, moves up annulus column, when annulus column and fixed column After separation, just connecting plate, supporting block, support plate and electric heating plate can be taken off, such worker is to electric heater When being overhauled, quickly electric heater can be taken off and overhauled, so that worker be made to carry out to electric heater It is more convenient when maintenance.
(2), pure steam preparation system, due to being provided with the first outlet pipe, the second outlet pipe, glass tube and scale Item, the water known inside water tank that can be will be apparent that avoid so that worker be allow intuitively to know the water inside water tank Water inside water tank is too low, and water tank and heat-conducting plate is caused to be burned.
Detailed description of the invention
Fig. 1 is the positive structure diagram of the utility model;
Fig. 2 is the front cross-sectional structural schematic diagram of support sleeve in the utility model Fig. 1;
Fig. 3 is partial enlargement diagram at the A in the utility model Fig. 2.
In figure: 1 support sleeve, 2 hermatic doors, 3 handles, 4 heat-conducting plates, 5 water tanks, 6 inlet valves, 7 exhaust valves, 8 water inlet pipes, 9 go out Tracheae, 10 first outlet pipes, 11 second outlet pipes, 12 glass tubes, 13 scale strips, 14 fixed plates, 15 springs, 16 movable plates, 17 Fixed column, 18 annulus columns, 19 connecting plates, 20 supporting blocks, 21 support plates, 22 electric heaters, 23 limit telescopic bars, 24 are fixed Set, 25 pulling plates, 26 knobs.
Specific embodiment
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of pure steam preparation system, including support sleeve 1, hermatic door 2 is hinged with by hinge at the movable mouth of 1 front surface of support sleeve, makes hermatic door 2 can be in support sleeve 1 in this way Outside is rotated, and the front surface of hermatic door 2 is fixedly connected with handle 3, and the size of handle 3 is adapted with the size of hermatic door 2, Make worker more convenient laborsaving when opening and closing hermatic door 2 in this way, the top of support sleeve 1 is fixedly connected with thermally conductive Plate 4, the top of heat-conducting plate 4 are fixedly connected with water tank 5, then heat-conducting plate 4 is fixedly connected on water tank 5 by the bottom cover removal of water tank 5 Bottom, and guarantee that between water tank 5 and heat-conducting plate 4 be not in gap, guarantee the leakproofness between heat-conducting plate 4 and water tank 5, water The water inlet at 5 top of case is fixedly connected with inlet valve 6, and inlet valve 6 facilitates people to add water to the inside of water tank 5,5 top of water tank Exhaust valve 7 is fixedly connected at gas outlet so that it is convenient to control the vapor inside water tank 5, inlet valve 6 is far from water tank 5 one end is fixedly connected with water inlet pipe 8, and exhaust valve 7 is fixedly connected with escape pipe 9 far from the one end at 5 top of water tank, water tank 5 The first outlet pipe 10 and the second outlet pipe 11 are fixedly connected at two flowing water mouths respectively, 11 bottom of the second outlet pipe goes out It is fixedly connected between the mouth of a river and the water outlet at 10 top of the first outlet pipe by glass tube 12, due to being provided with the first outlet pipe 10, the second outlet pipe 11, glass tube 12 and scale strip 13, what can be will be apparent that knows the water inside water tank 5, to make Worker can intuitively know the water inside water tank 5, avoid the water inside water tank 5 too low, lead to water tank 5 and heat-conducting plate 4 are burned, and the front surface of glass tube 12 is fixedly connected with scale strip 13, and the size of scale strip 13 is mutually fitted with the size of glass tube 12 With so that it is convenient to which people observe the water of the inside of water tank 5.
The inside of support sleeve 1 is fixedly connected with fixed plate 14, and the top of fixed plate 14 is fixedly connected with that there are two springs 15, can To pass through the elastic force of spring 15, applies upward thrust to movable plate 16, so that movable plate 16 is pushed up connecting plate 19, then connect Fishplate bar 19 pushes up electric heater 22, is fitted in the fire end of electric heater 22 and the bottom of heat-conducting plate 4 closely Together, heat electric heater 22 quickly to the water at 4 top of heat-conducting plate 4 and heat-conducting plate, two springs 15 Top be fixedly connected by movable plate 16, the bottom of movable plate 16 is fixedly connected with limit telescopic bar 23, limit telescopic bar 23 One end far from movable plate 16 is fixedly connected on the top of fixed plate 14, and the quantity of limit telescopic bar 23 is two, two limits Position telescopic rod 23 is symmetrically distributed in the two sides of fixing sleeve 24, and limit telescopic bar 23 can limit the moving direction of movable plate 16, protects Card movable plate 16 carries out always vertically move up and down, shake movable plate 16 will not in the process of moving, movable plate 16 Top is fixedly connected there are two fixed column 17, and the equal movable sleeve in the outside of two fixed columns 17 is connected to annulus column 18, fixed column 17 Size is adapted with the size of annulus column 18, and the size of fixing sleeve 24 is adapted with the size of pulling plate 25, in this way can be stable Annulus column 18 is fixed, guarantees that annulus column 18 will not shake, to make connecting plate 19, supporting block 20 and support plate 21 It will not shake, allow electric heater 22 is stable to be contacted with heat-conducting plate 4, the corresponding side of two 18 outer walls of annulus column It is fixedly connected by connecting plate 19, the top of connecting plate 19 is fixedly connected with supporting block 20, and the top of supporting block 20 is fixedly connected There is support plate 21, the top of support plate 21 is fixedly connected with electric heater 22, the fire end and heat-conducting plate 4 of electric heater 22 Bottom fit, due to be provided with fixed plate 14, spring 15, movable plate 16, fixed column 17, annulus column 18 and connecting plate 19, when needing to overhaul electric heater 22, the power supply of electric heater 22 is closed, then moving active plate 16, make The top of electric heater 22 is separated with heat-conducting plate 4, then up mobile connection plate 19, is moved up annulus column 18, is worked as circle After annulated column 18 is separated with fixed column 17, just connecting plate 19, supporting block 20, support plate 21 and electric heating plate 22 can be removed Coming, electric heater 22 can quickly be taken off and be overhauled when overhauling to electric heater 22 by such worker, To keep worker more convenient when overhauling to electric heater 22, electric heating is to convert electrical energy into thermal energy Process, electric heater 22 in real life often it is seen, for example, life used in electromagnetic oven and hot-water bottle it is sharp The principle has been used, therefore it is not disclosed further herein, fixed plate is fixedly connected in the middle part of 14 inner cavity Fixing sleeve 24, the internal activity of fixing sleeve 24 are socketed with pulling plate 25, make pulling plate 25 more stable when moving down in this way, Guarantee that pulling plate 25 will not shake in the process of moving, the top of pulling plate 25 is fixedly connected on the bottom of movable plate 16, pulling plate 25 One end far from movable plate 16 runs through the inner cavity of fixed plate 14 and extends to the bottom of fixed plate 14, and the bottom of pulling plate 25 is fixed It is connected with knob 26,26 size of shaking hands is adapted with the size of pulling plate 25, makes people that pulling plate 25 pulled to move in this way When it is more convenient.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating current, and main controller can be meter Calculation machine etc. plays the conventionally known equipment of control.
Working principle: when needing to overhaul electric heater 22, hermatic door 2 is opened, knob 26 is then pulled, makes 26 drive pulling plate 25 of knob moves down, so that movable plate 16 be made to drive connecting plate 19, supporting block 20 and support plate 21 downward It is mobile, separate electric heater 22 with heat-conducting plate 4, and increase the distance between electric heater 22 and heat-conducting plate 4, then Pull up connecting plate 19, separate the annulus column 18 of 19 two sides of connecting plate with fixed column 17, thus can by connecting plate 19, Supporting block 20, support plate 21 and electric heater 22 are taken off, and after maintenance, pull downward on pulling plate 25, make movable plate 16 to Lower movement increases the distance between movable plate 16 and heat-conducting plate 4, then will fix or new electric heater 22 is fixed on In support plate 21, the annulus column 18 of 19 two sides of connecting plate is then socketed in the outside of fixed column 17 respectively, then decontrols pulling plate 25, using the elastic force of spring 15, movable plate 16 is made to drive connecting plate 19, supporting block 20, support plate 21 and electric heater 22 It moves up, the fire end of electric heater 22 is made closely to fit together with heat-conducting plate 4.

Claims (6)

1. a kind of pure steam preparation system, including support sleeve (1), it is characterised in that: the movable mouth of support sleeve (1) front surface Place is hinged with hermatic door (2) by hinge, is fixedly connected with heat-conducting plate (4), the heat-conducting plate at the top of the support sleeve (1) (4) it is fixedly connected at the top of water tank (5), the water inlet at the top of the water tank (5) is fixedly connected with inlet valve (6), the water It is fixedly connected at gas outlet at the top of case (5) exhaust valve (7), the inlet valve (6) is fixedly connected far from the one end of water tank (5) Have water inlet pipe (8), the exhaust valve (7) is fixedly connected with escape pipe (9) far from one end at the top of water tank (5), the water tank (5) Two flowing water mouths at be fixedly connected with the first outlet pipe (10) and the second outlet pipe (11), second outlet pipe respectively (11) it is fixedly connected between the water outlet of bottom and the water outlet at the top of the first outlet pipe (10) by glass tube (12);
The inside of the support sleeve (1) is fixedly connected with fixed plate (14), is fixedly connected with two at the top of the fixed plate (14) The top of a spring (15), two springs (15) is fixedly connected by movable plate (16), the top of the movable plate (16) It being fixedly connected there are two fixed column (17), the equal movable sleeve in outside of two fixed columns (17) is connected to annulus column (18), and two The corresponding side of annulus column (18) outer wall is fixedly connected by connecting plate (19), and the top of the connecting plate (19) is fixed to be connected It is connected to supporting block (20), is fixedly connected with support plate (21) at the top of the supporting block (20), the top of the support plate (21) It is fixedly connected with electric heater (22), is fixedly connected with fixing sleeve (24) in the middle part of fixed plate (14) inner cavity, it is described solid The internal activity of fixed set (24) is socketed with pulling plate (25), and the bottom of movable plate (16) is fixedly connected at the top of the pulling plate (25) Portion, the pulling plate (25) run through the inner cavity of fixed plate (14) far from the one end of movable plate (16) and extend to the bottom of fixed plate (14) Portion.
2. pure steam preparation system according to claim 1, it is characterised in that: the front surface of the hermatic door (2) is fixed It is connected with handle (3), the size of the handle (3) is adapted with the size of hermatic door (2).
3. pure steam preparation system according to claim 1, it is characterised in that: the front surface of the glass tube (12) is fixed It is connected with scale strip (13), the size of the scale strip (13) is adapted with the size of glass tube (12).
4. pure steam preparation system according to claim 1, it is characterised in that: the bottom of the movable plate (16) is fixed to be connected It is connected to limit telescopic bar (23), the limit telescopic bar (23) is fixedly connected on fixed plate (14) far from the one end of movable plate (16) Top, and the quantity of limit telescopic bar (23) be two, two limit telescopic bars (23) are symmetrically distributed in fixing sleeve (24) two sides.
5. pure steam preparation system according to claim 1, it is characterised in that: the bottom of the pulling plate (25) is fixedly connected Have knob (26), the size of the knob (26) is adapted with the size of pulling plate (25).
6. pure steam preparation system according to claim 1, it is characterised in that: the size and annulus of the fixed column (17) The size of column (18) is adapted, and the size of the fixing sleeve (24) is adapted with the size of pulling plate (25).
CN201820910192.3U 2018-06-13 2018-06-13 A kind of pure steam preparation system Expired - Fee Related CN208587893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820910192.3U CN208587893U (en) 2018-06-13 2018-06-13 A kind of pure steam preparation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820910192.3U CN208587893U (en) 2018-06-13 2018-06-13 A kind of pure steam preparation system

Publications (1)

Publication Number Publication Date
CN208587893U true CN208587893U (en) 2019-03-08

Family

ID=65536736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820910192.3U Expired - Fee Related CN208587893U (en) 2018-06-13 2018-06-13 A kind of pure steam preparation system

Country Status (1)

Country Link
CN (1) CN208587893U (en)

Similar Documents

Publication Publication Date Title
CN201031269Y (en) Horizontal type hydrolyze stove
CN208587893U (en) A kind of pure steam preparation system
CN108730944A (en) A kind of pure steam preparation system
CN214668258U (en) Building material experimental apparatus for construction management
CN212720980U (en) Energy tower with high efficiency and energy saving
CN205495849U (en) Waste heat recovery formula cyclone
CN207699210U (en) A kind of zinc oxide production temperature-control energy saving device
CN209678202U (en) A kind of intelligent steaming cabinet
CN209147203U (en) Water ion energy-saving electromagnetic heating stove
CN207963549U (en) A kind of waste heat heat collector for waste heat recovery
CN215336246U (en) Steam generator
CN214311469U (en) Hearth pressure automatic regulating device for heating boiler
CN203956088U (en) A kind of transferred-arc plasma electric furnace with steam systematic function
CN110469831A (en) A kind of Commercial steam generator
CN208222482U (en) A kind of boiler safety monitoring device
CN204240850U (en) Easy to clean type adopting boiler chimney waste-heat heat collector
CN209074185U (en) A kind of energy-saving electric heater
CN208131056U (en) A kind of Experiment of Organic Chemistry water segregator
CN206125936U (en) High temperature flue gas heating ash hopper of dust collector device
CN110260351A (en) A kind of boiler furnace residual heat using device
CN208258287U (en) A kind of electricity dirt insulated case heating device
CN205042301U (en) Novel detach dust remover of interior pitch of flue gas
CN213187651U (en) Energy-saving device for raising chickens
CN220793101U (en) Steam reheating equipment for coal-fired generator set
CN109185908B (en) A kind of boiler afterheat recycling and reusing method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190308

Termination date: 20190613

CF01 Termination of patent right due to non-payment of annual fee