CN208587163U - A kind of well lane engineering erecting device - Google Patents

A kind of well lane engineering erecting device Download PDF

Info

Publication number
CN208587163U
CN208587163U CN201820740188.7U CN201820740188U CN208587163U CN 208587163 U CN208587163 U CN 208587163U CN 201820740188 U CN201820740188 U CN 201820740188U CN 208587163 U CN208587163 U CN 208587163U
Authority
CN
China
Prior art keywords
mounting rack
fixed frame
lane engineering
well lane
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820740188.7U
Other languages
Chinese (zh)
Inventor
罗发安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820740188.7U priority Critical patent/CN208587163U/en
Application granted granted Critical
Publication of CN208587163U publication Critical patent/CN208587163U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a kind of well lane engineering erecting devices, including mounting rack, fixed frame and support frame, the mounting rack and fixed frame are provided with two groups, the both ends of the mounting rack offer locating slot, the both ends of the fixed frame correspond to locating slot and are provided with locating piece, the fixed frame end base corresponds to mounting rack and is fixedly installed supporting plate, the end face of the supporting plate contacts setting with the bottom end face of mounting rack, the opposing end surface of the mounting rack is fixedly installed mounting base, support frame as described above is fixedly mounted between mounting rack by mounting base, positioning seat is set on support frame as described above, the end face that the positioning seat corresponds to fixed frame is fixedly installed with locating rod.The advantages of well lane engineering erecting device has structure simple, fixes convenient for assembling, improves the convenience using operation fixed to well lane engineering, solves existing not easy to disassemble to well lane engineering Construction Support template, uses complexity, it is not easy to the problem of operating.

Description

A kind of well lane engineering erecting device
Technical field
The utility model relates to well lane engineering technical field, specially a kind of well lane engineering erecting device.
Background technique
Cast-in-place concrete and cast-in-situ steel reinforced concrete supporting are structure type important in well lane engineering permanent support, are commonly used In to the higher ingate of supporting class requirement, Substation Chamber, pump house chamber, crushing cave and rock crusher degree compared with High well lane engineering supporting.At present to well lane engineering support device, for example application No. is one kind disclosed in CN105422140.A Well lane engineering gangboard beam, after clump reality, the support device stress of the inside is not easy to take out, and overall structure is more multiple It is miscellaneous, it is not easy to operate.
Utility model content
The purpose of this utility model is to provide a kind of well lane engineering erecting devices, have structure simple, convenient for assembling The advantages of fixing, improving the convenience for using operation fixed to well lane engineering solves existing to well lane engineering Construction Support use Template is not easy to disassemble, uses complexity, it is not easy to the problem of operating.
To achieve the above object, the utility model provides the following technical solutions: a kind of well lane engineering erecting device, including Mounting rack, fixed frame and support frame, the mounting rack and fixed frame are provided with two groups, and the both ends of the mounting rack offer Locating slot, the both ends of the fixed frame correspond to locating slot and are provided with locating piece, and it is solid that the fixed frame end base corresponds to mounting rack Surely it is provided with supporting plate, the end face of the supporting plate contacts setting with the bottom end face of mounting rack, and the opposing end surface of the mounting rack is solid Surely it is provided with mounting base, support frame as described above is fixedly mounted between mounting rack by mounting base, and it is fixed to be set on support frame as described above Position seat, the end face that the positioning seat corresponds to fixed frame are fixedly installed with locating rod, and the end of the locating rod corresponds to fixed frame Lower section accept setting.
Preferably, the bottom of the fixed frame and mounting rack is fixedly installed position-limited edge, and the position-limited edge and fixed frame are in L The setting of shape integral structure.When to present apparatus assembling, mounting rack is corresponded to the opposite sides fixing card of well lane engineering by position-limited edge Dress, fixed frame is by position-limited edge to the locating slot after the fixed clamping in well lane engineering side corresponding with mounting rack with mounting rack both ends It is fixed.
Preferably, support frame as described above and locating rod are all made of stretching structure setting.Support frame and locating rod are using flexible knot Structure setting, convenient for the internal diameter constructed according to well lane engineering between support frame support mounting rack position and locating rod to fixation The length adjustment of frame bottom support improves the fastness when present apparatus uses.
Preferably, the end of the locating rod is fixedly installed with bracket by pin shaft, and the bracket is in hook-shaped corresponding fixed The bottom of frame is arranged, and the rotation angle of the pin shaft corresponds to fixed frame in 90 degree of settings.The bracket of locating rod end passes through pin shaft Angle is adjusted to accept the end support of fixed frame, and by pin shaft to the angle of fixed frame bottom support improve fixed frame with Mounting rack is fixed on the stability on well lane engineering periphery.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, fixed frame is fixedly mounted by locating slot at the both ends of mounting rack in the utility model, and passes through between fixed frame Support frame installs locating rod, and the fixed clamping of opposite sides that mounting rack is corresponded to well lane engineering by position-limited edge, support frame passes through Mounting base is fixedly mounted on the top of the well lane engineering between mounting rack, fixes to the position between mounting rack, fixed frame passes through Position-limited edge is fixed to well lane engineering side corresponding with mounting rack to be clamped, the locating piece of fixed frame end and determining for mounting rack both ends Position slot is fixed to be clamped, and the locating rod being fixedly installed on support frame by positioning seat supports the bottom of fixed frame and fixes, and improves this Device is mounted on the convenience used in well lane engineering, and the fastness of support.
2, bracket of the utility model in the end of locating rod by pin shaft installation in hook-shaped setting, the support of locating rod end Frame adjusts angle by pin shaft and accepts to the end support of fixed frame, and passes through the angle to the support of fixed frame bottom of pin shaft, It improves fixed frame and mounting rack is fixed on the stability on well lane engineering periphery.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model A-A structural schematic diagram.
In figure: 1 mounting rack;11 locating slots;12 position-limited edges;2 fixed frames;21 location holes;22 mounting bases;23 supporting plates;3 supports Frame;31 positioning seats;32 locating rods;321 pin shafts;33 brackets.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
A kind of well lane engineering erecting device referring to FIG. 1-2, including mounting rack 1, fixed frame 2 and support frame 3, it is described Mounting rack 1 and fixed frame 2 are provided with two groups, and the both ends of the mounting rack 1 offer locating slot 11, the fixed frame 2 Both ends correspond to locating slot 11 and are provided with locating piece 21, and 2 end base of fixed frame corresponds to mounting rack 1 and is fixedly installed supporting plate 23, the end face of the supporting plate 23 contacts setting with the bottom end face of mounting rack 1, and the bottom of the fixed frame 2 and mounting rack 1 is fixed It is provided with position-limited edge 12, the position-limited edge 12 is arranged with the L-shape integral structure of fixed frame 2.When to present apparatus assembling, by mounting rack 1 fixes clamping by the opposite sides of the corresponding well lane engineering of position-limited edge 12, and fixed frame 2 is by position-limited edge 12 to well lane engineering and peace It is fixed with the locating slot 11 at 1 both ends of mounting rack after shelving the fixed clamping in 1 corresponding side.The opposing end surface of the mounting rack 1 is solid Surely it is provided with mounting base 22, support frame as described above 3 is fixedly mounted between mounting rack 1 by mounting base 22, on support frame as described above 3 It is set with positioning seat 31, the end face of the corresponding fixed frame 2 of the positioning seat 31 is fixedly installed with locating rod 32, support frame as described above 3 Stretching structure setting is all made of with locating rod 32.Support frame 3 and locating rod 32 are arranged using stretching structure, convenient for according to roadway work The internal diameter of journey construction supports position and the length that supports to 2 bottom of fixed frame of locating rod 32 between mounting rack 1 to support frame 3 It adjusts, improves the fastness when present apparatus uses.Accept setting in the lower section that the end of the locating rod 32 corresponds to fixed frame 2.Institute The end for stating locating rod 32 is fixedly installed with bracket 33 by pin shaft 321, and the bracket 33 is in the bottom of hook-shaped corresponding fixed frame 2 Setting, the rotation angle of the pin shaft 321 correspond to fixed frame 2 in 90 degree of settings.The bracket 33 of 32 end of locating rod passes through pin shaft 321, which adjust angle, accepts the end support of fixed frame 2, and improving to the angle of 2 bottom of fixed frame support by pin shaft 321 Fixed frame 2 and mounting rack 1 are fixed on the stability on well lane engineering periphery.
In use, by mounting rack 1 by the fixed clamping of opposite sides of the corresponding well lane engineering of position-limited edge 12, support frame 3 is logical The position between mounting rack 1 is fixed in the top for crossing the well lane engineering that mounting base 31 is fixedly mounted between mounting rack 1, fixed Frame 2 is clamped by the way that position-limited edge 12 is fixed to well lane engineering side corresponding with mounting rack 1, the locating piece 21 of 2 end of fixed frame and The locating slot 11 at 1 both ends of mounting rack is fixed to be clamped, and supporting plate 23 is contacted with the bottom of mounting rack 1 borrows power to mounting rack 1, is improved and is fixed The effect that balances after installing between frame 2 and mounting rack 1, the locating rod 32 being fixedly installed on support frame 3 by positioning seat 22 is to solid The bottom support for determining frame 2 is fixed, and the bracket 33 of 32 end of locating rod adjusts angle to the end branch of fixed frame 2 by 321 axis of pin Support is accepted, and is improved the present apparatus and is mounted on the convenience used in well lane engineering, and the fastness of support.
In summary: the well lane engineering erecting device is fixedly mounted by locating slot 11 at the both ends of mounting rack 1 and is fixed Frame 2, and locating rod 32 is installed by support frame 3 between fixed frame 2, mounting rack 1 is passed through into the corresponding well lane engineering of position-limited edge 12 Opposite sides it is fixed clamp, support frame 3 is fixedly mounted on the top of the well lane engineering between mounting rack 1 by mounting base 22, Position between mounting rack 1 is fixed, fixed frame 2 fixes well lane engineering side corresponding with mounting rack 1 by position-limited edge 12 It clamps, supporting plate 23 is contacted with the bottom of mounting rack 1 borrows power to mounting rack 1, improves and puts down after installing between fixed frame 2 and mounting rack 1 The effect of weighing apparatus, the locating piece 21 of 2 end of fixed frame and the locating slot 11 at 1 both ends of mounting rack are fixed and are clamped, by fixed on support frame 3 The locating rod 32 that position seat 31 is fixedly installed supports the bottom of fixed frame 2 and fixes, and solves existing to well lane engineering Construction Support It is not easy to disassemble with template, use complexity, it is not easy to the problem of operating.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of well lane engineering erecting device, including mounting rack (1), fixed frame (2) and support frame (3), the mounting rack (1) Two groups are provided with fixed frame (2), it is characterised in that: the both ends of the mounting rack (1) offer locating slot (11), described The both ends of fixed frame (2) correspond to locating slot (11) and are provided with locating piece (21), and fixed frame (2) end base corresponds to mounting rack (1) it is fixedly installed supporting plate (23), the end face of the supporting plate (23) contacts setting, the peace with the bottom end face of mounting rack (1) The opposing end surface for shelving (1) is fixedly installed mounting base (22), and support frame as described above (3) is fixedly mounted on peace by mounting base (22) It shelves between (1), is set on support frame as described above (3) positioning seat (31), the end face of the positioning seat (31) corresponding fixed frame (2) It is fixedly installed with locating rod (32), setting is accepted in the lower section that the end of the locating rod (32) corresponds to fixed frame (2).
2. a kind of well lane engineering erecting device according to claim 1, it is characterised in that: the fixed frame (2) and peace The bottom for shelving (1) is fixedly installed position-limited edge (12), the position-limited edge (12) and fixed frame (2) and mounting rack (1) L-shape one Body structure setting.
3. a kind of well lane engineering erecting device according to claim 1, it is characterised in that: support frame as described above (3) and fixed Position bar (32) is all made of stretching structure setting.
4. a kind of well lane engineering erecting device according to claim 1, it is characterised in that: the end of the locating rod (32) End is fixedly installed with bracket (33) by pin shaft (321), and the bracket (33) is arranged in the bottom of hook-shaped corresponding fixed frame (2), The rotation angle of the pin shaft (321) corresponds to fixed frame (2) in 90 degree of settings.
CN201820740188.7U 2018-05-18 2018-05-18 A kind of well lane engineering erecting device Expired - Fee Related CN208587163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820740188.7U CN208587163U (en) 2018-05-18 2018-05-18 A kind of well lane engineering erecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820740188.7U CN208587163U (en) 2018-05-18 2018-05-18 A kind of well lane engineering erecting device

Publications (1)

Publication Number Publication Date
CN208587163U true CN208587163U (en) 2019-03-08

Family

ID=65533935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820740188.7U Expired - Fee Related CN208587163U (en) 2018-05-18 2018-05-18 A kind of well lane engineering erecting device

Country Status (1)

Country Link
CN (1) CN208587163U (en)

Similar Documents

Publication Publication Date Title
CN106426541B (en) Precast beam reinforced bar binding tire film and precast beam reinforced bar construction technology
CN208587163U (en) A kind of well lane engineering erecting device
CN209228105U (en) A kind of strenthening member of pin
CN205897599U (en) Slot type solar rack based on gravity principle
CN105004521B (en) It is a kind of to be used for the device of aircraft quick-detachable lock durability and slow test
CN216553951U (en) Combined variable-size U-shaped steel frame for supporting roadway
CN109217790A (en) A kind of counter weight type photovoltaic bracket
CN207480544U (en) A kind of photovoltaic module rack
CN207496817U (en) A kind of automobile rear driving axle assembly remanufactures device
CN209255181U (en) A kind of building sandstone screening installation
CN209070091U (en) A kind of tile-shaped magnet central magnetic field test fixture
CN208793983U (en) A kind of Portable dismountable open air dashboard cradle
CN209513395U (en) A kind of electronic table tensile testing machine high-temperature heater removable support
CN209156967U (en) A kind of reinforcing bar bending device
CN207163813U (en) The sample support device of static load anchoring test
CN109296217A (en) A kind of strenthening member and its application method of pin
CN108532748B (en) Prevent braced frame base for assembly building of sinking
CN107830321B (en) Flush type foundation bolt for electrical bracket positions levelling device
CN207279942U (en) Air conditioner mounting bracket
CN207215816U (en) A kind of yarn twist meter with novel specimen seat
CN209462363U (en) A kind of instant microwave millimeter wave receiver carries out the fixed structure of detachable maintaining
CN108500929A (en) A kind of levelness regulating device
CN215254611U (en) Novel formwork support device for building construction
CN216399351U (en) High-speed railway bridge curtain board steel reinforcement cage adjusting and positioning device
CN219797046U (en) Stable flange base based on solar street lamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190308

CF01 Termination of patent right due to non-payment of annual fee