CN208583417U - A kind of ball mill ball adding suspension bucket - Google Patents

A kind of ball mill ball adding suspension bucket Download PDF

Info

Publication number
CN208583417U
CN208583417U CN201820756807.1U CN201820756807U CN208583417U CN 208583417 U CN208583417 U CN 208583417U CN 201820756807 U CN201820756807 U CN 201820756807U CN 208583417 U CN208583417 U CN 208583417U
Authority
CN
China
Prior art keywords
suspension bucket
main body
gate
bucket main
suspender
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820756807.1U
Other languages
Chinese (zh)
Inventor
赵学文
张应强
齐鸿
樊国飞
孙波
李喜涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Nickel Cobalt Co ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201820756807.1U priority Critical patent/CN208583417U/en
Application granted granted Critical
Publication of CN208583417U publication Critical patent/CN208583417U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crushing And Grinding (AREA)

Abstract

The utility model belongs to ore machine apparatus technical field, more particularly to a kind of ball mill ball adding suspension bucket, including bracket, suspension bucket main body and suspender, it is fixedly connected on the outside of the suspension bucket lower body with bracket side wall, suspension bucket body interior bottom end is equipped with gate, the gate is the downward opposite opened of two halves, and gate is rotatablely connected by door-hinge and suspension bucket main body lower edge;Lifting lug is equipped in the middle part of the gate, lifting lug is connect with the lifting rope one end for passing through conductor rope ring, and the other end of lifting rope is connect with suspender, and the suspender is connect with the fixed ring of the upper edge of suspension bucket main body setting respectively;Gusset is additionally provided in the suspension bucket main body, conductor rope ring is fixedly mounted on suspension bucket body interior center by gusset, the utility model ball adding operation mode goes up manual task substantially without personnel in person, it is only necessary to which ball adding operation can be completed in primary lifting, time saving, laborsaving and safe and efficient.

Description

A kind of ball mill ball adding suspension bucket
Technical field
The utility model belongs to ore machine apparatus technical field, and in particular to a kind of ball mill ball adding suspension bucket.
Background technique
Ball mill is key equipment of the mineral again in crushing technology process, internal to fill a certain amount of steel ball or steel section is made In order to ensure product reaches qualified process grain size, and the charge weight and proportion of steel ball are kept in grinding operation for abrasive media Stablize, needs to timing, quantitative, the steel ball of each model specification of addition in proportion in ball mill barrel.
Ball mill steel ball addition operation is to ensure that the basis that grinding machine can be produced efficiently.Traditional steel ball addition operation uses day The plain ball coal tub for filling with steel ball is hoisted on grinding machine ball feeding mouth table top by vehicle, then is sling steel ball coal tub side with suspension hook and made it It topples, allows steel ball to slide out into ball feeding mouth and fulfil assignment;The operation mode needs operating personnel that need to repeatedly set out crown block hook, Need to prepare to refer to repeatedly and hang overhead traveling crane operation, steel ball leakiness, which skids off, during coal tub topples has one's foot squashed, big, low efficiency that there are operation intensities and The problems such as security risk is high.
Utility model content
For above-mentioned problems of the prior art and deficiency, the utility model provides a kind of ball mill ball adding suspension bucket.
To achieve the above object, the utility model provides the following technical solutions:
A kind of ball mill ball adding suspension bucket, including bracket, suspension bucket main body and suspender, the suspension bucket lower body outside and support Frame side wall is fixedly connected, and suspension bucket body interior bottom end is equipped with gate, and the gate is the downward opposite opened of two halves, and gate passes through door Axis and suspension bucket main body lower edge are rotatablely connected;Lifting lug, lifting lug and the lifting rope one end for passing through conductor rope ring are equipped in the middle part of the gate Connection, the other end of lifting rope are connect with suspender, and the suspender is connect with the fixed ring of the upper edge of suspension bucket main body setting respectively; Gusset is additionally provided in the suspension bucket main body, conductor rope ring is fixedly mounted on suspension bucket body interior center by gusset.
Further, cushion rubber bumper is coated at the two ends of the bracket.
Compared with prior art, the utility model has the beneficial effects that
The utility model is solved traditional steel ball addition operation and is hung using the plain ball coal tub that overhead traveling crane will fill with steel ball It is transported on grinding machine ball feeding mouth table top, then slinging steel ball coal tub side with suspension hook makes it topple, and steel ball is allowed to slide out into ball adding Mouth fulfils assignment;It need to repeatedly set out crown block hook since the operation mode needs operating personnel, need to prepare to refer to repeatedly and hang overhead traveling crane operation, Steel ball leakiness, which skids off, during coal tub topples has one's foot squashed, and there is a problem of that big operation intensity, low efficiency and security risk are high, using this Utility model ball adding operation mode goes up manual task substantially without personnel in person, it is only necessary to which ball adding operation can be completed in primary lifting, saves When, it is laborsaving and safe and efficient.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure: 1. brackets, 2. gates, 3. conductor rope rings, 4. suspension bucket main bodys, 5. suspenders, 6. door-hinges, 7. lifting lugs, 8. fixed rings, 9. cushion rubber bumper, 10. gussets.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1, a kind of ball mill ball adding suspension bucket, including bracket 1, suspension bucket main body 4 and suspender 5,4 lower end of suspension bucket main body Outside is fixedly connected with 1 side wall of bracket, and 4 inner bottom of suspension bucket main body is equipped with gate 2, and gate 2 is the downward opposite opened of two halves, gate 2 are rotatablely connected by door-hinge 6 and 4 lower edge of suspension bucket main body;Lifting lug 7, lifting lug 7 and hanging across conductor rope ring 3 are equipped in the middle part of gate 2 The connection of rope one end, the other end of lifting rope are connect with suspender 5, the fixed ring 8 that suspender 5 is arranged with the upper edge of suspension bucket main body 4 respectively Connection;Gusset 10 is additionally provided in suspension bucket main body 4, conductor rope ring 3 is fixedly mounted on 4 inside center of suspension bucket main body by gusset 10.
Suspender 5 after steel ball storing place installs steel ball to ball adding hanging ball, is hung up day when specifically used by the utility model Vehicle suspension hook, steady to lift by crane, gate 2 is in blocking, day in the case where passing through the effect of the lifting rope pull-up of suspender 5 of conductor rope ring 3 at this time It slowly falls when right above vehicle handling ball adding suspension bucket main body 4 to ball mill ball feeding mouth, bracket 1 rests in ball feeding mouth along upper, overhead traveling crane Suspension hook continues to fall, and under steel ball self weight state, gate 2, which is gradually opened into, to be fully opened, and realizes that steel ball adds operation, bracket 1 Two ends at be coated with cushion rubber bumper 9, can reduce impact of the suspension bucket in landing, it is ensured that the steady safety of suspension bucket main body 4.

Claims (2)

1. a kind of ball mill ball adding suspension bucket, including bracket (1), suspension bucket main body (4) and suspender (5), which is characterized in that described hangs Bucket main body (4) lower end outside is fixedly connected with bracket (1) side wall, and inner bottom is equipped with gate (2), and the gate (2) is The downward opposite opened of two halves, gate (2) are rotatablely connected by door-hinge (6) and suspension bucket main body (4) lower edge;In the gate (2) Portion is equipped with lifting lug (7), and lifting lug (7) is connect with the lifting rope one end for passing through conductor rope ring (3), and the other end of lifting rope is connect with suspender (5), The suspender (5) is connect with the fixed ring (8) of the upper edge of suspension bucket main body (4) setting respectively;In the suspension bucket main body (4) It is additionally provided with gusset (10), conductor rope ring (3) is fixedly mounted on suspension bucket main body (4) inside center by gusset (10).
2. a kind of ball mill ball adding suspension bucket as described in claim 1, which is characterized in that at the two ends of the bracket (1) It is coated with cushion rubber bumper (9).
CN201820756807.1U 2018-05-21 2018-05-21 A kind of ball mill ball adding suspension bucket Active CN208583417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820756807.1U CN208583417U (en) 2018-05-21 2018-05-21 A kind of ball mill ball adding suspension bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820756807.1U CN208583417U (en) 2018-05-21 2018-05-21 A kind of ball mill ball adding suspension bucket

Publications (1)

Publication Number Publication Date
CN208583417U true CN208583417U (en) 2019-03-08

Family

ID=65534507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820756807.1U Active CN208583417U (en) 2018-05-21 2018-05-21 A kind of ball mill ball adding suspension bucket

Country Status (1)

Country Link
CN (1) CN208583417U (en)

Similar Documents

Publication Publication Date Title
CN203889909U (en) Bottom-opening cargo hopper lifting appliance for bulk cargo loading operation
CN206298269U (en) Can automatic discharging combination lifting system
CN208583417U (en) A kind of ball mill ball adding suspension bucket
CN107738976A (en) Steel ladle allocates and transports device
CN201678198U (en) Ball loading and unloading container of grinder
CN105152006B (en) Gravity-controlled opening and closing lifting appliance
CN206203657U (en) A kind of suspender for lifting loading machine
CN202414976U (en) Feeding cableway bucket for heat accumulating type smelting furnace
CN208916624U (en) A kind of shield-tunneling construction slag discharging system
CN206375552U (en) Inner steel cylinder of chimney hanger
CN203173193U (en) Batch can for producing steel
CN201834433U (en) Cold coke transportation bucket of dry quenching furnace
CN207046671U (en) A kind of suspender for safely and efficiently loading and unloading high line
CN203636970U (en) Feeding device of firebrick producing press machine
CN103803403A (en) Special hook for hoisting wringing roller
CN104386592B (en) A kind of special lorry-mounted crane of railway
CN208843578U (en) Pulp pump spiral case special hanger
CN208378173U (en) A kind of Novel hanging beam
CN206599373U (en) A kind of unhook suspension hook
CN206751189U (en) A kind of crane suspension hook group safe to use
CN206839150U (en) A kind of safety-type metallurgy ladle
CN205152260U (en) Steel scrap basket
CN205798416U (en) A kind of eccentric center trunnion ladle
CN205973424U (en) Spreader can tumble
CN205187637U (en) Loading hopper

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240222

Address after: 737100 No. 2 Lanzhou Road, Beijing Road Street, Jinchuan District, Jinchang City, Gansu Province

Patentee after: Jinchuan Group Nickel Cobalt Co.,Ltd.

Country or region after: China

Address before: 737103 No. 98, Jinchuan Road, Jinchang, Gansu

Patentee before: JINCHUAN GROUP Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right