CN208579948U - A kind of high economy internal cooling geotechnical boring edits and records sample acquisition bar - Google Patents
A kind of high economy internal cooling geotechnical boring edits and records sample acquisition bar Download PDFInfo
- Publication number
- CN208579948U CN208579948U CN201821065506.0U CN201821065506U CN208579948U CN 208579948 U CN208579948 U CN 208579948U CN 201821065506 U CN201821065506 U CN 201821065506U CN 208579948 U CN208579948 U CN 208579948U
- Authority
- CN
- China
- Prior art keywords
- bull stick
- stick set
- mobile jib
- edits
- sample acquisition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a kind of high economy internal cooling geotechnical boring and edits and records sample acquisition bar, including bore motor and rod portion;Rod portion includes the bull stick mobile jib being vertically arranged, bull stick mobile jib outer cover is equipped with third bull stick set, third bull stick covers outer cover and is equipped with the second bull stick set, second bull stick covers outer cover and is equipped with the first bull stick set, third bull stick covers upper two gas ports and be connected to cylindrical type groove, outside upper two gas ports of the first bull stick set respectively with first interface component and second interface members;By the way that bull stick mobile jib is arranged in rod portion, and the first bull stick set, the second bull stick set and third bull stick set are arranged outside bull stick mobile jib, it can guarantee to occur to be replaced when local damage, interconnected gas port is arranged on the side end face of the first bull stick set, the second bull stick set and third bull stick set simultaneously can export into cylindrical type groove plus when water cools down by vapor, to improve cooling efficiency.
Description
Technical field
The utility model edits and records sample acquisition bar more particularly to a kind of high economy internal cooling geotechnical boring.
Background technique
Currently, drilling project has irreplaceable role, by adopting to ground end deep core in domestic geological research
Collection can accurately reflect longitudinal upper lithology, the situation of change of mineralising, to provide effectively for geologic development and scientific research
Support, but existing geotechnical boring acquisition device often due to drilling when temperature it is excessively high and damage, so being badly in need of a kind of high economy
Property internal cooling geotechnical boring edit and record sample acquisition bar to solve the problems, such as this.
Utility model content
The purpose of this utility model is that in view of the deficiencies of the prior art, providing a kind of high economy internal cooling geology brill
Sample acquisition bar is edited and recorded in hole, which, which edits and records sample acquisition bar, can well solve above-mentioned ask
Topic.
To reach above-mentioned requirements, the technical scheme adopted by the utility model is that: a kind of high economy internal cooling is provided
Sample acquisition bar is edited and recorded in matter drilling, and it includes bore motor and brill which, which edits and records sample acquisition bar,
Bar portion;Rod portion includes the bull stick mobile jib being vertically arranged, and the bull stick mobile jib outer cover is equipped with third bull stick set, and the third turns
Rod set outer cover is equipped with the second bull stick set, and the second bull stick set outer cover is equipped with the first bull stick set, the bull stick mobile jib top
Center at be equipped with cylindrical type groove straight down, the first bull stick set, the second bull stick set and third bull stick set two sides
Be provided with interconnected gas port at the top of side end face, the third bull stick cover upper two gas ports with the cylindrical type
Groove connection, first bull stick covers to be connected with first interface component and second interface component respectively outside upper two gas ports
Logical, the first interface component is connected to by filler pipe with the water outlet of water pump;The motor output end of bore motor bottom and top
Part connecting part is fixedly connected, and is connect at the top of top connecting component bottom and the rod portion;First bull stick covers outboard end
The top in face is equipped with external screw thread, and the top connecting component is the cylindrical structure that bottom is equipped with lower fixed groove, described lower solid
Determine the internal screw thread of groove being equipped with for fixing the first bull stick set, the side end face of the top connecting component is equipped at least
Two horizontal side fixing threaded holes are inserted with the fixed spiral shell in side for compressing the first bull stick set in the side fixing threaded hole
Silk.
The high economy internal cooling geotechnical boring edit and record sample acquisition bar have the advantage that it is as follows:
(1) by the way that bull stick mobile jib is arranged in rod portion, and the first bull stick set, the second bull stick are arranged outside bull stick mobile jib
Set and third bull stick set carry out the local replacing of broken parts, reduce integral replacing not when allowing rod portion impaired
Economy.
(2) by the way that cylindrical type groove is arranged at the center of bull stick mobile jib, and water pump, filler pipe, first interface portion are set
Part and second interface component so that rod portion is provided with the condition of internal plus water cooling, thus solve it is existing can only be from outer
Portion's mode for cooling down of watering cools down halfway problem, while in the first bull stick set, the second bull stick set and third bull stick set
Side end face on interconnected gas port is set can be into cylindrical type groove plus when water cooling export vapor.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present application, constitutes part of this application, at this
The same or similar part, the illustrative embodiments and their description of the application are indicated using identical reference label in a little attached drawings
For explaining the application, do not constitute an undue limitation on the present application.In the accompanying drawings:
Fig. 1, which is schematically shown, edits and records sample according to the high economy internal cooling geotechnical boring of the application one embodiment
The structural schematic diagram of product acquisition bar.
Fig. 2 schematically shows edit and record sample according to the high economy internal cooling geotechnical boring of the application one embodiment
Product acquire the structural schematic diagram of the third bull stick set of bar.
Fig. 3, which is schematically shown, edits and records sample according to the high economy internal cooling geotechnical boring of the application one embodiment
Product acquire the top structure schematic diagram of the rod portion of bar.
Fig. 4 schematically shows edit and record sample according to the high economy internal cooling geotechnical boring of the application one embodiment
Product acquire the structural schematic diagram at the top connecting component of bar.
Wherein: 1, bore motor;2, water pump;3, motor output end;4, top connecting component;5, filler pipe;6, it first connects
Mouthpiece;7, hemispherical projections;8, gas port;9, second interface component;10, rod portion;11, cylindrical type groove;12, first turn
Rod set;13, the second bull stick set;14, third bull stick set;15, bull stick mobile jib;16, side fixing threaded hole;17, side fixed screw.
Specific embodiment
To keep the purposes, technical schemes and advantages of the application clearer, below in conjunction with drawings and the specific embodiments, to this
Application is described in further detail.
In the following description, the reference of " one embodiment ", " embodiment ", " example ", " example " etc. is shown
The embodiment or example so described may include special characteristic, structure, characteristic, property, element or limit, but not each reality
Applying example or example all necessarily includes special characteristic, structure, characteristic, property, element or limit.In addition, reuse phrase " according to
Although it is possible to be to refer to identical embodiment, but be not necessarily referring to identical embodiment for one embodiment of the application ".
For the sake of simplicity, some technical features known to those skilled in the art are omitted in being described below.
According to one embodiment of the application, a kind of high economy internal cooling geotechnical boring is provided and edits and records sample acquisition
Bar, as shown in Figs 1-4, including bore motor 1 and rod portion 10;Rod portion 10 includes the bull stick mobile jib 15 being vertically arranged, described
15 outer cover of bull stick mobile jib is equipped with third bull stick set 14, and the third bull stick covers 14 outer covers and is equipped with the second bull stick set 13, described
Second bull stick covers 13 outer covers and is equipped with the first bull stick set 12, and circle straight down is equipped at the center at 15 top of bull stick mobile jib
Column type groove 11, the side end face top that first bull stick covers 14 two sides of the 12, second bull stick set 13 and third bull stick set are respectively provided with
There is interconnected gas port 8, two gas ports 8 on the third bull stick set 14 are connected to the cylindrical type groove 11,
It is connected to respectively with first interface component 6 and second interface component 9 outside two gas ports 8 on the first bull stick set 12, institute
First interface component 6 is stated to be connected to by filler pipe 5 with the water outlet of water pump 2.
According to one embodiment of the application, which edits and records the drilling of sample acquisition bar
The motor output end 3 of 1 bottom of motor is fixedly connected with top connecting component 4,4 bottom of top connecting component and the drilling rod
It is connected at the top of portion 10.
According to one embodiment of the application, which edits and records the first of sample acquisition bar
The top that bull stick covers 12 end face outsides is equipped with external screw thread, and the top connecting component 4 is the cylinder that bottom is equipped with lower fixed groove
Body structure, the inner side end of the lower fixed groove are equipped with the internal screw thread for fixing the first bull stick set 12, the top
The side end face of connecting component 4 is equipped at least two horizontal side fixing threaded holes 16, is inserted with use in the side fixing threaded hole 16
In the side fixed screw 17 for compressing the first bull stick set 12.
According to one embodiment of the application, which edits and records the first of sample acquisition bar
At least 20 hemispherical projections 7 are evenly arranged with outside bull stick set 12.
According to one embodiment of the application, which edits and records the first of sample acquisition bar
Interface unit 6 and second interface component 9 are external equipped with externally threaded circular ring structure, and first bull stick covers two on 12
The inner wall of gas port 8 is equipped with the internal screw thread for fixing the first interface component 6 and second interface component 9.
According to one embodiment of the application, which edits and records the water pump of sample acquisition bar
2 water intake end is connected to bucket.
According to one embodiment of the application, which edits and records the bull stick of sample acquisition bar
The end face outside of mobile jib 15, the second bull stick set 13 and third bull stick set 14 is equipped with external screw thread, the first bull stick set 12, second
The inner side end of bull stick set 13 and third bull stick set 14 is equipped with internal screw thread, and the bull stick mobile jib 15, the second bull stick cover 13, third
It is fixed between bull stick set 14 and the first bull stick set 12 by helicitic texture.
According to one embodiment of the application, which edits and records the bull stick of sample acquisition bar
Mobile jib 15, the second bull stick set 13, third bull stick set 14 and the first bull stick set 12 horizontal direction section be circle, and upper circumference
The diameter of tee section is all larger than the diameter in lower circular section.
According to one embodiment of the application, which edits and records the bull stick of sample acquisition bar
The horizontal direction section of mobile jib 15, the second bull stick set 13 and third bull stick set 14 is square, and the first bull stick set 12 is
Inside is equipped with the cylindrical structure of vertical square through hole, the bull stick mobile jib 15, the second bull stick set 13, third bull stick set 14 and the
One bull stick set 12 is upper coarse and lower fine structure.
According to one embodiment of the application, when which edits and records sample acquisition bar use
The first bull stick successively packaged can be covered to the 12, second bull stick set 13, third bull stick set 14 and bull stick mobile jib 15 and protrude into geology sky
Hole simultaneously carries out rotation realization drilling under the drive of bore motor 1, can suspend bore motor 1 when needing to be sampled, separate
Second bull stick is simultaneously covered 13, third bull stick set 14 and bull stick mobile jib 15 from the first bull stick set by rod portion 10 and top connecting component 4
It takes out in 12, can be sampled from the cavity that the first bull stick covers 12 centers in this way, squeezing between rock mass and drill bit when due to drilling
Pressure is very big, drill bit is integrally extracted it is very difficult, therefore this mode locally taken out can be convenient carry out geotechnical boring when
Sampling work, while can be filled the water by water pump 2 into cylindrical type groove 11 in boring procedure, water passes through filler pipe 5, the
One interface unit 6 and the gas port 8 in left side enter in cylindrical type groove 11, and are becoming air guide of the vapor from right side after heated
Hole 8 and second interface component 9 are discharged.
According to one embodiment of the application, the high economy internal cooling geotechnical boring edit and record sample acquisition bar by
Bull stick mobile jib 15 is set in rod portion 10, and is arranged outside bull stick mobile jib 15 first bull stick and covers the 12, second bull stick set 13 and the
Three bull sticks set 14, it is ensured that local replacing can be carried out when rod portion 10 is damaged, while covering 12, second in the first bull stick
Interconnected gas port 8 is arranged on the side end face of bull stick set 13 and third bull stick set 14 can add into cylindrical type groove 11
Water exports vapor when cooling down;By the way that cylindrical type groove 11 is arranged at the center of bull stick mobile jib 15, and water pump 2 is set, is added
Water pipe 5, first interface component 6 and second interface component 9, so that rod portion 10 is provided with the condition of internal plus water cooling, thus
It is halfway to solve the problems, such as that the existing mode that can only cool down from outside watering cool down.
Embodiment described above only indicates the several embodiments of the utility model, and the description thereof is more specific and detailed, but
It can not be interpreted as the limitation to the scope of the utility model.It should be pointed out that for those of ordinary skill in the art,
Without departing from the concept of the premise utility, various modifications and improvements can be made, these belong to the utility model
Protection scope.Therefore the protection scope of the utility model should be subject to the claim.
Claims (7)
1. a kind of high economy internal cooling geotechnical boring edits and records sample acquisition bar, it is characterised in that: including bore motor and brill
Bar portion;
The rod portion includes the bull stick mobile jib being vertically arranged, and the bull stick mobile jib outer cover is equipped with third bull stick set, and described the
Three bull sticks cover outer cover and are equipped with the second bull stick set, and the second bull stick set outer cover is equipped with the first bull stick set, the bull stick mobile jib
Cylindrical type groove straight down, the first bull stick set, the second bull stick set and third bull stick set two are equipped at the center at top
Be provided with interconnected gas port at the top of the side end face of side, the third bull stick cover upper two gas ports with the circle
The connection of column type groove, first bull stick cover outside upper two gas ports respectively with first interface component and second interface component
Connection, the first interface component are connected to by filler pipe with the water outlet of water pump;
The motor output end of the bore motor bottom is fixedly connected with top connecting component, top connecting component bottom with
Connection at the top of the rod portion;
The top of the first bull stick set end face outside is equipped with external screw thread, and the top connecting component is that bottom is equipped with lower anchor
The cylindrical structure of slot, the inner side end of the lower fixed groove are equipped with the internal screw thread for fixing the first bull stick set, institute
The side end face for stating top connecting component is equipped at least two horizontal side fixing threaded holes, is inserted with use in the side fixing threaded hole
In the side fixed screw for compressing the first bull stick set.
2. high economy internal cooling geotechnical boring according to claim 1 edits and records sample acquisition bar, it is characterised in that: institute
It states the first bull stick set outside and is evenly arranged at least 20 hemispherical projections.
3. high economy internal cooling geotechnical boring according to claim 1 edits and records sample acquisition bar, it is characterised in that: institute
It states first interface component and second interface component is external equipped with externally threaded circular ring structure, the first bull stick set upper two
The inner wall of a gas port is equipped with the internal screw thread for fixing the first interface component and second interface component.
4. high economy internal cooling geotechnical boring according to claim 1 edits and records sample acquisition bar, it is characterised in that: institute
The water intake end for stating water pump is connected to bucket.
5. high economy internal cooling geotechnical boring according to claim 1 edits and records sample acquisition bar, it is characterised in that: institute
The end face outside for stating bull stick mobile jib, the second bull stick set and third bull stick set is equipped with external screw thread, the first bull stick set, second turn
The inner side end of rod set and third bull stick set is equipped with internal screw thread, the bull stick mobile jib, the second bull stick set, third bull stick set and the
It is fixed between one bull stick set by helicitic texture.
6. high economy internal cooling geotechnical boring according to claim 1 edits and records sample acquisition bar, it is characterised in that: institute
The horizontal direction section for stating bull stick mobile jib, the second bull stick set, third bull stick set and the first bull stick set is circle, and upper rounded
The diameter in section is all larger than the diameter in lower circular section.
7. high economy internal cooling geotechnical boring according to claim 1 edits and records sample acquisition bar, it is characterised in that: turn
The horizontal direction section of bar mobile jib, the second bull stick set and third bull stick set is square, and the first bull stick set sets for inside
There is the cylindrical structure of vertical square through hole, the bull stick mobile jib, the second bull stick set, third bull stick set and the first bull stick set are
Upper coarse and lower fine structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821065506.0U CN208579948U (en) | 2018-07-06 | 2018-07-06 | A kind of high economy internal cooling geotechnical boring edits and records sample acquisition bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821065506.0U CN208579948U (en) | 2018-07-06 | 2018-07-06 | A kind of high economy internal cooling geotechnical boring edits and records sample acquisition bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208579948U true CN208579948U (en) | 2019-03-05 |
Family
ID=65508699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821065506.0U Expired - Fee Related CN208579948U (en) | 2018-07-06 | 2018-07-06 | A kind of high economy internal cooling geotechnical boring edits and records sample acquisition bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208579948U (en) |
-
2018
- 2018-07-06 CN CN201821065506.0U patent/CN208579948U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109653722A (en) | A kind of mash gas extraction device and method of coal seam hydraulic slotted liner technique and the linkage of lower screen casing | |
CN208795535U (en) | Geotechnical engineering sampler | |
CN207923527U (en) | A kind of hydrogeology underground water sampler | |
CN206223473U (en) | A kind of ground sampler | |
CN209570371U (en) | A kind of stratified soil sample sampler | |
CN208579948U (en) | A kind of high economy internal cooling geotechnical boring edits and records sample acquisition bar | |
CN214886948U (en) | Well drilling pressure maintaining closed coring tool | |
CN2402798Y (en) | Shape-retaining seal coring tool | |
CN208885222U (en) | A kind of ocean hole bottom freezing cord coring drill | |
CN209102415U (en) | A kind of geological and mineral exploration sampler | |
CN210396678U (en) | Advance and bore geological exploration drilling sample coring device | |
CN206681678U (en) | A kind of screw type bit for ground exploration | |
CN210533762U (en) | Shallow layer soil sampling device for geological exploration | |
CN208736263U (en) | A kind of coal seam Deephole pre-splitting blasting charge constitution | |
CN104897431B (en) | A kind of harvester and acquisition method of free hydrocarbon and pedotheque | |
CN209339928U (en) | A kind of mash gas extraction device of coal seam hydraulic slotted liner technique and the linkage of lower screen casing | |
CN209025623U (en) | A kind of soft rock coring drill rod | |
CN218847678U (en) | Soil environment monitoring and sampling device suitable for different soil qualities | |
CN215811728U (en) | Sampling device for concrete detection | |
CN109406204A (en) | Frangible formation sample acquires jackrod structure | |
CN214096679U (en) | Multiple pipe geotome | |
CN208887985U (en) | A kind of petroleum geology sampler | |
CN212482970U (en) | A sampling device for engineering investigation | |
CN201152898Y (en) | Shallow layer core fetching tool for oil and seismic exploration | |
CN210660006U (en) | Intelligent coring tool for measurement while drilling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190305 Termination date: 20200706 |