CN208578313U - The prefabricated ladder of external scaffolding - Google Patents

The prefabricated ladder of external scaffolding Download PDF

Info

Publication number
CN208578313U
CN208578313U CN201821023194.7U CN201821023194U CN208578313U CN 208578313 U CN208578313 U CN 208578313U CN 201821023194 U CN201821023194 U CN 201821023194U CN 208578313 U CN208578313 U CN 208578313U
Authority
CN
China
Prior art keywords
main frame
side main
reinforcing rib
prefabricated ladder
ladder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821023194.7U
Other languages
Chinese (zh)
Inventor
于正靖
于海东
杨树森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201821023194.7U priority Critical patent/CN208578313U/en
Application granted granted Critical
Publication of CN208578313U publication Critical patent/CN208578313U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a kind of prefabricated ladders of external scaffolding, including scaffold wood springboard and putlog (put-lock), it is characterised in that: further include prefabricated ladder, prefabricated ladder upper end is connected with upper layer putlog (put-lock), and lower end is arranged on lower layer's scaffold wood springboard;Prefabricated ladder includes the main frame that two sides are arranged in, and main frame includes left side main frame and right side main frame;Left side main frame is connected with right side main frame by marking time;It is described to mark time as rectangular frame;The left side marked time is connected with the reinforcing rib on the main frame of left side;The right side marked time is connected with the reinforcing rib on the main frame of right side, and it is fluted to constitute the rebar surface setting that each is marked time.The prefabricated ladder of the utility model external scaffolding, structure is simple, securely and reliably, easy for assemble or unload, improves construction efficiency, guarantees construction personnel's safety.

Description

The prefabricated ladder of external scaffolding
Technical field
The utility model relates to a kind of architectural furnitures, in particular to a kind of prefabricated ladder of external scaffolding.
Background technique
When external scaffolding, which needs repairing or completely hangs Dense mesh screen etc., ascends a height operation, most operating personnels are directly from lower layer's foot hand Frame work layer climbs the supreme layer scaffold operating layer of frame body, and this form of construction work not can guarantee the life peace of construction personnel not only Entirely, and the requirement of construction site safety construction is not met, is a kind of dangerous, worthless form of construction work, there are poles Big security risk.
Utility model content
In view of the deficiency of the prior art, it is simple to provide a kind of structure for the utility model, securely and reliably, guarantees construction Personnel's personal safety improves the prefabricated ladder of external scaffolding of construction efficiency.
Technical solution adopted in the utility model is:
A kind of prefabricated ladder of external scaffolding, including scaffold wood springboard and putlog (put-lock), it is characterised in that: further include Prefabricated ladder, prefabricated ladder upper end are connected with upper layer putlog (put-lock), and lower end is arranged on lower layer's scaffold wood springboard;
Prefabricated ladder includes the main frame that two sides are arranged in, and main frame includes left side main frame and right side main frame;
Left side main frame is connected with right side main frame by marking time;
The left side main frame parallelogram;
Left side main frame is provided with reinforcing rib, and left side main frame is divided into 6-10 a equal-sized flat by the reinforcing rib Row quadrangle;
The right side main frame parallelogram;
Right side main frame is provided with reinforcing rib, and right side main frame is divided into 6-10 a equal-sized flat by the reinforcing rib Row quadrangle;
Left side main frame and right side main frame are symmetrical arranged;
It is described to mark time as rectangular frame;
The left side marked time is connected with the reinforcing rib on the main frame of left side;
The right side marked time is connected with the reinforcing rib on the main frame of right side;
Described mark time is made of the reinforcing bar that 3-4 root is parallel to each other;
Each rebar surface marked time of the composition is arranged fluted;
The groove includes left groove and right groove;
The shape of groove is sole shape;The distance of two grooves is 5-10 centimetres;
The bottom reinforcement bars surface of groove is provided with anti-skid chequer;
The upper end of left side main frame and right side main frame is separately provided for the drag hook being overlapped on putlog (put-lock);
The drag hook and main frame end constitute U-shaped card slot;
The inner surface of the drag hook is provided with anti-skid chequer;
The free end of the drag hook is provided with through-hole;
The check lock lever of L-type is provided in through-hole;
One end of check lock lever is provided with screw thread;Check lock lever is connected by nut with through-hole;
The diameter of check lock lever is less than through-hole diameter;
The other end of check lock lever is provided with annulus;
The upper end of main frame is provided with the fixed link for being inserted into annulus;
The front end of fixed link is provided with external screw thread;
Fixed link front end insertion annulus is fixed annulus by locking nut.
The utility model compared with the prior art the utility model has the advantages that
The prefabricated ladder of the utility model external scaffolding, structure is simple, securely and reliably, easy for assemble or unload, improves construction effect Rate guarantees construction personnel's safety.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of the prefabricated ladder of the utility model external scaffolding;
Fig. 2 is the overlooking structure diagram of the prefabricated ladder of the utility model external scaffolding;
Fig. 3 is the drag hook partial structural diagram of the prefabricated ladder of the utility model external scaffolding;
Fig. 4 is the A of Fig. 3 to structural schematic diagram;
Fig. 5 is the tread structure schematic diagram of the prefabricated ladder of the utility model external scaffolding;
Fig. 6 is the schematic perspective view of the prefabricated ladder of the utility model external scaffolding;
Fig. 7 is the connection schematic perspective view of the prefabricated ladder of the utility model external scaffolding and putlog (put-lock).
Main component symbol description in attached drawing:
In figure:
1, upper layer scaffold wood springboard 2, putlog (put-lock)
3, left side main frame 4, right side main frame
5, it marks time 6, reinforcing rib
7, groove 8, drag hook
9, U-shaped card slot 10, through-hole
11, check lock lever 12, nut
13, annulus 14, fixed link
15, lower layer's scaffold wood springboard 16, upright bar
17, leger 18, prefabricated ladder
19, locking nut.
Specific embodiment
Referring to the drawings and the utility model is described in detail in embodiment:
Attached drawing 1-7 is it is found that a kind of prefabricated ladder of external scaffolding, including scaffold wood springboard 1 and putlog (put-lock) 2, also Including prefabricated ladder, prefabricated ladder upper end is connected with upper layer putlog (put-lock), and lower end is arranged in lower layer's scaffold wood springboard On;
Prefabricated ladder includes the main frame that two sides are arranged in, and main frame includes left side main frame 3 and right side main frame 4;
Left side main frame and right side main frame 5 are connected by marking time;
The left side main frame parallelogram;
Left side main frame is provided with reinforcing rib 6, and left side main frame is divided into 6-10 a equal-sized by the reinforcing rib 6 Parallelogram;
4 parallelogram of right side main frame;
Right side main frame is provided with reinforcing rib, and right side main frame is divided into 6-10 a equal-sized flat by the reinforcing rib Row quadrangle;
Left side main frame and right side main frame are symmetrical arranged;
It is described to mark time 5 as rectangular frame;
The left side marked time is connected with the reinforcing rib on the main frame of left side;
The right side marked time is connected with the reinforcing rib on the main frame of right side;
Described mark time is made of the reinforcing bar that 3-4 root is parallel to each other;
It is described to constitute each rebar surface setting fluted 7 marked time;
The groove includes left groove and right groove;
The shape of groove is sole shape;The distance of two grooves is 5-10 centimetres;
The bottom reinforcement bars surface of groove is provided with anti-skid chequer;
The upper end of left side main frame and right side main frame is separately provided for the drag hook being overlapped on putlog (put-lock) 8;
It is provided with a putlog (put-lock) again above the treadle of false work of 8 top of drag hook.
The drag hook and main frame end constitute U-shaped card slot 9;
The inner surface of the drag hook is provided with anti-skid chequer;
The free end of the drag hook 8 is provided with through-hole 10;
The check lock lever 11 of L-type is provided in through-hole;
One end of check lock lever is provided with screw thread;Check lock lever is connected by nut 12 with through-hole;
The diameter of check lock lever is less than through-hole diameter;
The other end of check lock lever is provided with annulus 13;
The upper end of main frame is provided with the fixed link 14 for being inserted into annulus;
The front end of fixed link 14 is provided with external screw thread;
Fixed link front end insertion annulus is fixed annulus by locking nut 19.
The prefabricated ladder of the utility model external scaffolding, structure is simple, securely and reliably, easy for assemble or unload, improves construction effect Rate guarantees construction personnel's safety.
Ladder total height is 3.0 meters, floor projection length is 3.0 meters, and overall width is 0.8 meter, is marked time using 3-4 root model For HRB400, the grade III steel of diameter 14,0.08 meter of spacing and the main reinforcement of lateral diameters 16 are welded, and side main reinforcement is on ladder top Drag hook is made in portion's clod wash, is hung over prefabricated ladder on putlog (put-lock) by drag hook, drag hook upper cover wood springboard, the wooden springboard top It adds small cross bar together to lock drag hook, ladder drag hook and small cross bar is prevented to be detached from the generation that capsizing case occurs, ladder Whole brushing twice antirust paint, ensures its safe handling function after the completion of welding.

Claims (2)

1. a kind of prefabricated ladder of external scaffolding, including scaffold wood springboard and putlog (put-lock), it is characterised in that: further include pre- Ladder processed, prefabricated ladder upper end are connected with upper layer putlog (put-lock), and lower end is arranged on lower layer's scaffold wood springboard;
Prefabricated ladder includes the main frame that two sides are arranged in, and main frame includes left side main frame and right side main frame;
Left side main frame is connected with right side main frame by marking time;
The left side main frame parallelogram;
Left side main frame is provided with reinforcing rib, and left side main frame is divided into 6-10 equal-sized parallel four by the reinforcing rib Side shape;
The right side main frame parallelogram;
Right side main frame is provided with reinforcing rib, and right side main frame is divided into 6-10 equal-sized parallel four by the reinforcing rib Side shape;
Left side main frame and right side main frame are symmetrical arranged;
It is described to mark time as rectangular frame;
The left side marked time is connected with the reinforcing rib on the main frame of left side;
The right side marked time is connected with the reinforcing rib on the main frame of right side;
Described mark time is made of the reinforcing bar that 3-4 root is parallel to each other;
The upper end of left side main frame and right side main frame is separately provided for the drag hook being overlapped on putlog (put-lock);
The drag hook and main frame end constitute U-shaped card slot;
The inner surface of the drag hook is provided with anti-skid chequer;
The free end of the drag hook is provided with through-hole;
The check lock lever of L-type is provided in through-hole;
One end of check lock lever is provided with screw thread;Check lock lever is connected by nut with through-hole;
The diameter of check lock lever is less than through-hole diameter;
The other end of check lock lever is provided with annulus;
The upper end of main frame is provided with the fixed link for being inserted into annulus;
The front end of fixed link is provided with external screw thread;
Fixed link front end insertion annulus is fixed annulus by locking nut.
2. the prefabricated ladder of external scaffolding according to claim 1, it is characterised in that:
Each rebar surface marked time of the composition is arranged fluted;
The groove includes left groove and right groove;
The shape of groove is sole shape;The distance of two grooves is 5-10 centimetres;
The bottom reinforcement bars surface of groove is provided with anti-skid chequer.
CN201821023194.7U 2018-06-29 2018-06-29 The prefabricated ladder of external scaffolding Active CN208578313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821023194.7U CN208578313U (en) 2018-06-29 2018-06-29 The prefabricated ladder of external scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821023194.7U CN208578313U (en) 2018-06-29 2018-06-29 The prefabricated ladder of external scaffolding

Publications (1)

Publication Number Publication Date
CN208578313U true CN208578313U (en) 2019-03-05

Family

ID=65509849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821023194.7U Active CN208578313U (en) 2018-06-29 2018-06-29 The prefabricated ladder of external scaffolding

Country Status (1)

Country Link
CN (1) CN208578313U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725701A (en) * 2019-11-01 2020-01-24 中铁二十二局集团有限公司 Efficient and safe over-bracing lining trolley for construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725701A (en) * 2019-11-01 2020-01-24 中铁二十二局集团有限公司 Efficient and safe over-bracing lining trolley for construction

Similar Documents

Publication Publication Date Title
CN208578313U (en) The prefabricated ladder of external scaffolding
CN206600143U (en) A kind of large-scale water tower cat ladder
CN209040528U (en) A kind of U-shaped operation platform of colored umbrella column
CN207363241U (en) A kind of attachment device of steel security net and design of coupler scaffold
DE202009000878U1 (en) finishing stand
CN214785757U (en) Scaffold frame that building engineering used
CN205948302U (en) Sole of climbing tree
CN206110636U (en) Burst formula hydraulic lifting climbs frame
CN108277972A (en) A kind of safety-type hanging basket of construction
CN211114732U (en) Portable movable reinforcement operation platform
CN204920278U (en) Rotatory cage ladder structure
CN209179451U (en) A kind of building safety operation platform
CN203097694U (en) All-directional fixed connection ladder
CN207307161U (en) A kind of amusement facility climbing frame
CN205330128U (en) Door -type scaffold
CN207934419U (en) Packaged type builder's jack
CN206636479U (en) Possesses the hanging ladder that locomotive function is easy to carry
CN206737397U (en) Type multi-layer scaffold can be climbed
CN207959882U (en) A kind of safety-type frame of ascending a height
CN203361595U (en) Multifunctional building lifting scaffold
CN219732694U (en) Scaffold for building with adjust structure
CN208203110U (en) A kind of protective device of ascending a height of large-sized gantry machining center
CN205858161U (en) Welding for steel structure crosshead
CN216840816U (en) Shaft ladder cage safety channel
CN214195456U (en) Construction foot rest for highway bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant