CN208571555U - A kind of building hydroelectric line preburied positioning device - Google Patents
A kind of building hydroelectric line preburied positioning device Download PDFInfo
- Publication number
- CN208571555U CN208571555U CN201821351926.5U CN201821351926U CN208571555U CN 208571555 U CN208571555 U CN 208571555U CN 201821351926 U CN201821351926 U CN 201821351926U CN 208571555 U CN208571555 U CN 208571555U
- Authority
- CN
- China
- Prior art keywords
- locating rack
- positioning device
- support rod
- rod
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a kind of building hydroelectric line preburied positioning devices, including leveling base and support rod, grooved hole is opened up on the leveling base, slot has been internally embedded elevating lever, platform has been screwed at the top of elevating lever, the first sliding rail is fixed with by rivet on platform, pulley is slidably connected on first sliding rail, the both ends of support rod, which are equipped with, shrinks seat, the middle section of support rod offers through-hole, through-hole has been internally embedded locating rack, locating rack is cavity structure, screw hole is offered at the top of locating rack, the internal whorl of screw hole is connected with adjusting screw rod, pass through leveling base, elevating lever, counter balance pocket, platform, shrink seat, the isostructural setting of support rod, the present apparatus can overcome the defect of site ground injustice, locating rack can be adjusted to horizontal position, locating rod is set accurately to mark parallel pipe The width of road position, positioning device is adjustable, can adapt to the ditch of inadequate width to be positioned.
Description
Technical field
The utility model relates to build water pipeline mounting technique field more particularly to a kind of pre-buried positioning of building hydroelectric line
Device.
Background technique
It in building construction process, needs to be laid with cable, but at least simply digs out ditch in pipeline installation now
Then it is embedded to water pipe electric wire, but when construction now, the levelness of the ditch dug out is bad, this has resulted in pipeline and has been in for a long time
Inclined state, and for pipeline, the position possessed has been grown using the time may cause obstruction, and personnel are using fixed
When the device of position, since site ground may not be horizontal, cause positioning device that can not be normally carried out measurement, since ditch obtains width
Different, current positioning device adaptability is not strong, restricted.
Utility model content
Purpose of the utility model is to solve exist in the prior art levelness not enough, can not level and be difficult to carry out
The shortcomings that work, width can not be adjusted, and a kind of building hydroelectric line preburied positioning device proposed.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of building hydroelectric line preburied positioning device, including leveling base and support rod open up on the leveling base
Grooved hole, slot have been internally embedded elevating lever, and platform has been screwed at the top of elevating lever, has been consolidated on platform by rivet
Surely there is the first sliding rail, pulley is slidably connected on the first sliding rail, the both ends of support rod, which are equipped with, shrinks seat, the middle section of support rod
Through-hole is offered, through-hole has been internally embedded locating rack, and locating rack is cavity structure, and screw hole, spiral shell are offered at the top of locating rack
The internal whorl in hole is connected with adjusting screw rod, and the inner wall of locating rack is welded with bearing plate, and the bottom of bearing plate is bolted
There are press rods, the other end of press rods is connected with interlocking bar by rotation axis, and the other end of interlocking bar is connected with by rotation axis
Locating rod.
Preferably, connecting rod has been screwed at the top of the pulley, the other end of connecting rod is welded on contraction seat
Bottom.
Preferably, the inside for shrinking seat is fixed with the second sliding rail by rivet, and the second sliding rail and support rod sliding connect
It connects.
Preferably, the side of the bearing plate is fixed with link block by screw, and the bottom of link block is welded with spring, bullet
The other end of spring is welded with fixed block, and the side of fixed block is welded on the interior side of locating rack.
Preferably, counter balance pocket is offered at the top of the locating rack.
Preferably, the two sides of the bottom of the locating rack offer movable span, and the locating rod is embedded in the interior of movable span
Portion.
The beneficial effects of the utility model are:
1, the utility model by leveling base, elevating lever, counter balance pocket, platform, shrink seat, support rod is isostructural sets
It sets, the present apparatus can overcome the defect of site ground injustice, can adjust locating rack to horizontal position, enable locating rod
Parallel pipeline location is accurately marked, the width of positioning device is adjustable, can adapt to the ditch of inadequate width to be positioned.
2, the utility model can be by locating rod, locating rack, interlocking bar, the isostructural setting locating rack of adjusting screw rod
Parallel lines are marked in the inside of cable duct, give the pre-buried accurate positioning of spool, with making Pipe installing more accurate.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of building hydroelectric line preburied positioning device positive structure schematic;
Fig. 2 be the utility model proposes a kind of building hydroelectric line preburied positioning device top view.
In figure: seat, 8 liftings are shunk in 1 leveling base, 2 support rods, 3 first sliding rails, 4 platforms, 5 pulleys, 6 second sliding rails, 7
Bar, 9 locating racks, 10 link blocks, 11 adjusting screw rods, 12 bearing plates, 13 press rods, 14 locating rods, 15 counter balance pockets, 16 interlocking bar.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2:
A kind of building hydroelectric line preburied positioning device, including leveling base 1 and support rod 2 are opened on the leveling base 1
Equipped with slot, slot has been internally embedded elevating lever 8, by leveling base 1, elevating lever 8, counter balance pocket 15, platform 4, shrinks seat
7, the isostructural setting of support rod 2, the present apparatus can overcome the defect of site ground injustice, can adjust locating rack 9 to water
Flat position enables locating rod 14 accurately to mark parallel pipeline location, and the width of positioning device is adjustable, can adapt to
The ditch of inadequate width is positioned, and the top of elevating lever 8 has been screwed platform 4, is fixed on platform 4 by rivet
First sliding rail 3 slidably connects pulley 5 on first sliding rail 3, and the top of pulley 5 has been screwed connecting rod, connecting rod
The other end is welded on the bottom for shrinking seat 7, and the inside for shrinking seat 7 is fixed with the second sliding rail 6, the second sliding rail 6 and branch by rivet
Strut 2 is slidably connected, and the both ends of support rod 2, which are equipped with, shrinks seat 7, and the middle section of support rod 2 offers through-hole, the inside of through-hole
It is embedded with locating rack 9, locating rack 9 is cavity structure, and the top of locating rack 9 offers counter balance pocket 15, the two sides of the bottom of locating rack 9
Offer movable span, the locating rod is embedded in the inside of movable span, and the top of locating rack 9 offers screw hole, screw hole it is interior
Portion is threaded with adjusting screw rod 11, fixed by locating rod 14, locating rack 9, interlocking bar 16, the isostructural setting of adjusting screw rod 11
Position frame 9 can mark parallel lines in the inside of cable duct, give the pre-buried accurate positioning of spool, with making Pipe installing more accurate, fixed
The inner wall of position frame 9 is welded with bearing plate 12, and the side of bearing plate 12 is fixed with link block 10, the bottom of link block 10 by screw
It is welded with spring, the other end of spring is welded with fixed block, and the side of fixed block is welded on the interior side of locating rack 9, load-bearing
The bottom of plate 12 has been bolted press rods 13, and the other end of press rods 13 is connected with interlocking bar 16 by rotation axis, connection
The other end of lever 16 is connected with locating rod 14 by rotation axis.
The working principle and process for using of the utility model:
According to cable duct of different size, the contraction seat of two sides is adjusted in personnel, and the two sides at 2 both ends of support rod are installed with
Ball can slide on the second sliding rail 6, and after suitable position is arrived in adjusting, if ground is uneven, personnel place leveling base 1
In the two sides of cable duct, by up and down adjustment elevating lever until locating rack 9 reaches horizontal position, personnel can be by observing counter balance pocket
15 internal liquids judge whether locating rack 9 balances, and after balance, pulley 5 is placed on the first sliding rail 3 by personnel, subsequent turn
Adjusting screw rod 11, adjusting screw rod 11, which rotates down, pushes down bearing plate 12, and link block 10 also moves down, spring stress compression, pressure
Power bar 13 has downward pressure, and one end of interlocking bar 16 is under pressure, the thrust of the oriented two sides of the other end of interlocking bar 16, pushes
Locating rod 14 is inserted on soil, and subsequent personnel can pull locating rack 9, and pulley 5 slides on the first sliding rail 3, and locating rod 14 is the bottom of at
Mark the position of pipe built-in in portion.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of building hydroelectric line preburied positioning device, including leveling base (1) and support rod (2), which is characterized in that described
Grooved hole is opened up on leveling base (1), slot has been internally embedded elevating lever (8), and elevating lever is screwed at the top of (8)
Have platform (4), be fixed with the first sliding rail (3) on platform (4) by rivet, pulley (5) are slidably connected on the first sliding rail (3),
The both ends of support rod (2), which are equipped with, shrinks seat (7), and the middle section of support rod (2) offers through-hole, and being internally embedded for through-hole is fixed
Position frame (9), locating rack (9) are cavity structure, offer screw hole at the top of locating rack (9), the internal whorl of screw hole is connected with tune
It saves screw rod (11), the inner wall of locating rack (9) is welded with bearing plate (12), and the bottom of bearing plate (12) has been bolted pressure
The other end of bar (13), press rods (13) is connected with interlocking bar (16) by rotation axis, and the other end of interlocking bar (16) is by turning
Moving axis is connected with locating rod (14).
2. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the pulley (5)
Top be screwed connecting rod, the other end of connecting rod is welded on the bottom for shrinking seat (7).
3. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the contraction seat
(7) inside is fixed with the second sliding rail (6) by rivet, and the second sliding rail (6) is slidably connected with support rod (2).
4. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the bearing plate
(12) side is fixed with link block (10) by screw, and the bottom of link block (10) is welded with spring, the other end weldering of spring
It is connected to fixed block, the side of fixed block is welded on the interior side of locating rack (9).
5. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the locating rack
(9) counter balance pocket (15) are offered at the top of.
6. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the locating rack
(9) two sides of the bottom offer movable span, and the locating rod is embedded in the inside of movable span.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821351926.5U CN208571555U (en) | 2018-08-22 | 2018-08-22 | A kind of building hydroelectric line preburied positioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821351926.5U CN208571555U (en) | 2018-08-22 | 2018-08-22 | A kind of building hydroelectric line preburied positioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208571555U true CN208571555U (en) | 2019-03-01 |
Family
ID=65450860
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821351926.5U Expired - Fee Related CN208571555U (en) | 2018-08-22 | 2018-08-22 | A kind of building hydroelectric line preburied positioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208571555U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113027150A (en) * | 2021-03-16 | 2021-06-25 | 国网山东省电力公司乐陵市供电公司 | Pre-buried fixing device of cable frame for electric power construction |
CN113833285A (en) * | 2021-10-09 | 2021-12-24 | 中建三局集团有限公司 | Building embedded part installation moving device with correction function |
-
2018
- 2018-08-22 CN CN201821351926.5U patent/CN208571555U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113027150A (en) * | 2021-03-16 | 2021-06-25 | 国网山东省电力公司乐陵市供电公司 | Pre-buried fixing device of cable frame for electric power construction |
CN113833285A (en) * | 2021-10-09 | 2021-12-24 | 中建三局集团有限公司 | Building embedded part installation moving device with correction function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208571555U (en) | A kind of building hydroelectric line preburied positioning device | |
CN103217512A (en) | Experimental device with physical landslide model | |
WO2015147685A1 (en) | Method for installing a stationary support in a planned position | |
CN111794515B (en) | Installation and construction method for electric power construction cement telegraph pole | |
CN114407191B (en) | Mould for manufacturing prefabricated box girder steel reinforcement framework | |
CN204079367U (en) | Bont installed by airduct | |
CN208257359U (en) | A kind of apparatus for fixing cord of power transmission and transformation line | |
CN107356308A (en) | A kind of real time water level supervising device for drainage system | |
CN102747840B (en) | Door and window installation device and method for installing doors and windows through device | |
CN106121343A (en) | Compound polyurethane material electric pole and installation method thereof | |
CN106602984A (en) | Photovoltaic support stand column or pile foundation elevation adjusting device and construction method thereof | |
CN104064105B (en) | Large vertical type unit vertical coaxiality measuring and adjusting experimental device and experimental method | |
CN114113542B (en) | Rock-soil and underground engineering model test traffic dynamic load simulation device | |
CN212377454U (en) | Positioning and fixing device for small-diameter circular pipeline | |
CN211371484U (en) | Pipeline fixing device for water conservancy construction | |
CN112629372A (en) | Inner diameter measuring tool for MPP power tube and using method thereof | |
CN208950364U (en) | Pitched roof gantry adjustable composite bracket | |
CN206874276U (en) | A kind of inclination angle type opening size test device | |
CN206593578U (en) | One kind building hydroelectric line preburied positioning device | |
CN207300196U (en) | Surface displacement meter mobile positioning mechanism in a kind of rainfall model case | |
CN211475080U (en) | Water supply and drainage pipeline installation positioner | |
CN205620280U (en) | Atmospheric corrosion exposure test frame | |
CN206345608U (en) | A kind of precasting yard door machine electric power system | |
CN205712230U (en) | A kind of pile body shifting discharge observation device of foundation pile self-balanced static-load testing | |
CN215952566U (en) | Mounting device for inclinometer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190301 Termination date: 20210822 |