CN208571555U - A kind of building hydroelectric line preburied positioning device - Google Patents

A kind of building hydroelectric line preburied positioning device Download PDF

Info

Publication number
CN208571555U
CN208571555U CN201821351926.5U CN201821351926U CN208571555U CN 208571555 U CN208571555 U CN 208571555U CN 201821351926 U CN201821351926 U CN 201821351926U CN 208571555 U CN208571555 U CN 208571555U
Authority
CN
China
Prior art keywords
locating rack
positioning device
support rod
rod
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821351926.5U
Other languages
Chinese (zh)
Inventor
王向东
纪庆
杨长长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNNC Huachen Construction Engineering Co Ltd
Original Assignee
CNNC Huachen Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNNC Huachen Construction Engineering Co Ltd filed Critical CNNC Huachen Construction Engineering Co Ltd
Priority to CN201821351926.5U priority Critical patent/CN208571555U/en
Application granted granted Critical
Publication of CN208571555U publication Critical patent/CN208571555U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of building hydroelectric line preburied positioning devices, including leveling base and support rod, grooved hole is opened up on the leveling base, slot has been internally embedded elevating lever, platform has been screwed at the top of elevating lever, the first sliding rail is fixed with by rivet on platform, pulley is slidably connected on first sliding rail, the both ends of support rod, which are equipped with, shrinks seat, the middle section of support rod offers through-hole, through-hole has been internally embedded locating rack, locating rack is cavity structure, screw hole is offered at the top of locating rack, the internal whorl of screw hole is connected with adjusting screw rod, pass through leveling base, elevating lever, counter balance pocket, platform, shrink seat, the isostructural setting of support rod, the present apparatus can overcome the defect of site ground injustice, locating rack can be adjusted to horizontal position, locating rod is set accurately to mark parallel pipe The width of road position, positioning device is adjustable, can adapt to the ditch of inadequate width to be positioned.

Description

A kind of building hydroelectric line preburied positioning device
Technical field
The utility model relates to build water pipeline mounting technique field more particularly to a kind of pre-buried positioning of building hydroelectric line Device.
Background technique
It in building construction process, needs to be laid with cable, but at least simply digs out ditch in pipeline installation now Then it is embedded to water pipe electric wire, but when construction now, the levelness of the ditch dug out is bad, this has resulted in pipeline and has been in for a long time Inclined state, and for pipeline, the position possessed has been grown using the time may cause obstruction, and personnel are using fixed When the device of position, since site ground may not be horizontal, cause positioning device that can not be normally carried out measurement, since ditch obtains width Different, current positioning device adaptability is not strong, restricted.
Utility model content
Purpose of the utility model is to solve exist in the prior art levelness not enough, can not level and be difficult to carry out The shortcomings that work, width can not be adjusted, and a kind of building hydroelectric line preburied positioning device proposed.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of building hydroelectric line preburied positioning device, including leveling base and support rod open up on the leveling base Grooved hole, slot have been internally embedded elevating lever, and platform has been screwed at the top of elevating lever, has been consolidated on platform by rivet Surely there is the first sliding rail, pulley is slidably connected on the first sliding rail, the both ends of support rod, which are equipped with, shrinks seat, the middle section of support rod Through-hole is offered, through-hole has been internally embedded locating rack, and locating rack is cavity structure, and screw hole, spiral shell are offered at the top of locating rack The internal whorl in hole is connected with adjusting screw rod, and the inner wall of locating rack is welded with bearing plate, and the bottom of bearing plate is bolted There are press rods, the other end of press rods is connected with interlocking bar by rotation axis, and the other end of interlocking bar is connected with by rotation axis Locating rod.
Preferably, connecting rod has been screwed at the top of the pulley, the other end of connecting rod is welded on contraction seat Bottom.
Preferably, the inside for shrinking seat is fixed with the second sliding rail by rivet, and the second sliding rail and support rod sliding connect It connects.
Preferably, the side of the bearing plate is fixed with link block by screw, and the bottom of link block is welded with spring, bullet The other end of spring is welded with fixed block, and the side of fixed block is welded on the interior side of locating rack.
Preferably, counter balance pocket is offered at the top of the locating rack.
Preferably, the two sides of the bottom of the locating rack offer movable span, and the locating rod is embedded in the interior of movable span Portion.
The beneficial effects of the utility model are:
1, the utility model by leveling base, elevating lever, counter balance pocket, platform, shrink seat, support rod is isostructural sets It sets, the present apparatus can overcome the defect of site ground injustice, can adjust locating rack to horizontal position, enable locating rod Parallel pipeline location is accurately marked, the width of positioning device is adjustable, can adapt to the ditch of inadequate width to be positioned.
2, the utility model can be by locating rod, locating rack, interlocking bar, the isostructural setting locating rack of adjusting screw rod Parallel lines are marked in the inside of cable duct, give the pre-buried accurate positioning of spool, with making Pipe installing more accurate.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of building hydroelectric line preburied positioning device positive structure schematic;
Fig. 2 be the utility model proposes a kind of building hydroelectric line preburied positioning device top view.
In figure: seat, 8 liftings are shunk in 1 leveling base, 2 support rods, 3 first sliding rails, 4 platforms, 5 pulleys, 6 second sliding rails, 7 Bar, 9 locating racks, 10 link blocks, 11 adjusting screw rods, 12 bearing plates, 13 press rods, 14 locating rods, 15 counter balance pockets, 16 interlocking bar.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2:
A kind of building hydroelectric line preburied positioning device, including leveling base 1 and support rod 2 are opened on the leveling base 1 Equipped with slot, slot has been internally embedded elevating lever 8, by leveling base 1, elevating lever 8, counter balance pocket 15, platform 4, shrinks seat 7, the isostructural setting of support rod 2, the present apparatus can overcome the defect of site ground injustice, can adjust locating rack 9 to water Flat position enables locating rod 14 accurately to mark parallel pipeline location, and the width of positioning device is adjustable, can adapt to The ditch of inadequate width is positioned, and the top of elevating lever 8 has been screwed platform 4, is fixed on platform 4 by rivet First sliding rail 3 slidably connects pulley 5 on first sliding rail 3, and the top of pulley 5 has been screwed connecting rod, connecting rod The other end is welded on the bottom for shrinking seat 7, and the inside for shrinking seat 7 is fixed with the second sliding rail 6, the second sliding rail 6 and branch by rivet Strut 2 is slidably connected, and the both ends of support rod 2, which are equipped with, shrinks seat 7, and the middle section of support rod 2 offers through-hole, the inside of through-hole It is embedded with locating rack 9, locating rack 9 is cavity structure, and the top of locating rack 9 offers counter balance pocket 15, the two sides of the bottom of locating rack 9 Offer movable span, the locating rod is embedded in the inside of movable span, and the top of locating rack 9 offers screw hole, screw hole it is interior Portion is threaded with adjusting screw rod 11, fixed by locating rod 14, locating rack 9, interlocking bar 16, the isostructural setting of adjusting screw rod 11 Position frame 9 can mark parallel lines in the inside of cable duct, give the pre-buried accurate positioning of spool, with making Pipe installing more accurate, fixed The inner wall of position frame 9 is welded with bearing plate 12, and the side of bearing plate 12 is fixed with link block 10, the bottom of link block 10 by screw It is welded with spring, the other end of spring is welded with fixed block, and the side of fixed block is welded on the interior side of locating rack 9, load-bearing The bottom of plate 12 has been bolted press rods 13, and the other end of press rods 13 is connected with interlocking bar 16 by rotation axis, connection The other end of lever 16 is connected with locating rod 14 by rotation axis.
The working principle and process for using of the utility model:
According to cable duct of different size, the contraction seat of two sides is adjusted in personnel, and the two sides at 2 both ends of support rod are installed with Ball can slide on the second sliding rail 6, and after suitable position is arrived in adjusting, if ground is uneven, personnel place leveling base 1 In the two sides of cable duct, by up and down adjustment elevating lever until locating rack 9 reaches horizontal position, personnel can be by observing counter balance pocket 15 internal liquids judge whether locating rack 9 balances, and after balance, pulley 5 is placed on the first sliding rail 3 by personnel, subsequent turn Adjusting screw rod 11, adjusting screw rod 11, which rotates down, pushes down bearing plate 12, and link block 10 also moves down, spring stress compression, pressure Power bar 13 has downward pressure, and one end of interlocking bar 16 is under pressure, the thrust of the oriented two sides of the other end of interlocking bar 16, pushes Locating rod 14 is inserted on soil, and subsequent personnel can pull locating rack 9, and pulley 5 slides on the first sliding rail 3, and locating rod 14 is the bottom of at Mark the position of pipe built-in in portion.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of building hydroelectric line preburied positioning device, including leveling base (1) and support rod (2), which is characterized in that described Grooved hole is opened up on leveling base (1), slot has been internally embedded elevating lever (8), and elevating lever is screwed at the top of (8) Have platform (4), be fixed with the first sliding rail (3) on platform (4) by rivet, pulley (5) are slidably connected on the first sliding rail (3), The both ends of support rod (2), which are equipped with, shrinks seat (7), and the middle section of support rod (2) offers through-hole, and being internally embedded for through-hole is fixed Position frame (9), locating rack (9) are cavity structure, offer screw hole at the top of locating rack (9), the internal whorl of screw hole is connected with tune It saves screw rod (11), the inner wall of locating rack (9) is welded with bearing plate (12), and the bottom of bearing plate (12) has been bolted pressure The other end of bar (13), press rods (13) is connected with interlocking bar (16) by rotation axis, and the other end of interlocking bar (16) is by turning Moving axis is connected with locating rod (14).
2. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the pulley (5) Top be screwed connecting rod, the other end of connecting rod is welded on the bottom for shrinking seat (7).
3. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the contraction seat (7) inside is fixed with the second sliding rail (6) by rivet, and the second sliding rail (6) is slidably connected with support rod (2).
4. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the bearing plate (12) side is fixed with link block (10) by screw, and the bottom of link block (10) is welded with spring, the other end weldering of spring It is connected to fixed block, the side of fixed block is welded on the interior side of locating rack (9).
5. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the locating rack (9) counter balance pocket (15) are offered at the top of.
6. a kind of building hydroelectric line preburied positioning device according to claim 1, which is characterized in that the locating rack (9) two sides of the bottom offer movable span, and the locating rod is embedded in the inside of movable span.
CN201821351926.5U 2018-08-22 2018-08-22 A kind of building hydroelectric line preburied positioning device Expired - Fee Related CN208571555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821351926.5U CN208571555U (en) 2018-08-22 2018-08-22 A kind of building hydroelectric line preburied positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821351926.5U CN208571555U (en) 2018-08-22 2018-08-22 A kind of building hydroelectric line preburied positioning device

Publications (1)

Publication Number Publication Date
CN208571555U true CN208571555U (en) 2019-03-01

Family

ID=65450860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821351926.5U Expired - Fee Related CN208571555U (en) 2018-08-22 2018-08-22 A kind of building hydroelectric line preburied positioning device

Country Status (1)

Country Link
CN (1) CN208571555U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113027150A (en) * 2021-03-16 2021-06-25 国网山东省电力公司乐陵市供电公司 Pre-buried fixing device of cable frame for electric power construction
CN113833285A (en) * 2021-10-09 2021-12-24 中建三局集团有限公司 Building embedded part installation moving device with correction function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113027150A (en) * 2021-03-16 2021-06-25 国网山东省电力公司乐陵市供电公司 Pre-buried fixing device of cable frame for electric power construction
CN113833285A (en) * 2021-10-09 2021-12-24 中建三局集团有限公司 Building embedded part installation moving device with correction function

Similar Documents

Publication Publication Date Title
CN208571555U (en) A kind of building hydroelectric line preburied positioning device
CN103217512A (en) Experimental device with physical landslide model
WO2015147685A1 (en) Method for installing a stationary support in a planned position
CN111794515B (en) Installation and construction method for electric power construction cement telegraph pole
CN114407191B (en) Mould for manufacturing prefabricated box girder steel reinforcement framework
CN204079367U (en) Bont installed by airduct
CN208257359U (en) A kind of apparatus for fixing cord of power transmission and transformation line
CN107356308A (en) A kind of real time water level supervising device for drainage system
CN102747840B (en) Door and window installation device and method for installing doors and windows through device
CN106121343A (en) Compound polyurethane material electric pole and installation method thereof
CN106602984A (en) Photovoltaic support stand column or pile foundation elevation adjusting device and construction method thereof
CN104064105B (en) Large vertical type unit vertical coaxiality measuring and adjusting experimental device and experimental method
CN114113542B (en) Rock-soil and underground engineering model test traffic dynamic load simulation device
CN212377454U (en) Positioning and fixing device for small-diameter circular pipeline
CN211371484U (en) Pipeline fixing device for water conservancy construction
CN112629372A (en) Inner diameter measuring tool for MPP power tube and using method thereof
CN208950364U (en) Pitched roof gantry adjustable composite bracket
CN206874276U (en) A kind of inclination angle type opening size test device
CN206593578U (en) One kind building hydroelectric line preburied positioning device
CN207300196U (en) Surface displacement meter mobile positioning mechanism in a kind of rainfall model case
CN211475080U (en) Water supply and drainage pipeline installation positioner
CN205620280U (en) Atmospheric corrosion exposure test frame
CN206345608U (en) A kind of precasting yard door machine electric power system
CN205712230U (en) A kind of pile body shifting discharge observation device of foundation pile self-balanced static-load testing
CN215952566U (en) Mounting device for inclinometer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190301

Termination date: 20210822