- CN208571427U CN208571427U CN201821418116.7U CN201821418116U CN208571427U CN 208571427 U CN208571427 U CN 208571427U CN 201821418116 U CN201821418116 U CN 201821418116U CN 208571427 U CN208571427 U CN 208571427U
- Authority
- CN
- China
- Prior art keywords
- pedestal
- threaded rod
- tool
- route
- telemetering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Insulating Bodies (AREA)
Abstract
The utility model discloses the tools of 10kV route telemetering insulation, including pedestal, fixed device is equipped at the upper end-face edge of the pedestal, the upper end of the pedestal is fixedly connected with support rod, the side wall of the support rod is equipped with sliding slot, sliding block is equipped in the sliding slot, the opposite inner wall of the sliding slot is equipped with limiting slot, the side wall of the sliding block is fixedly connected with limited block corresponding with limit groove location, the limited block is arranged in limiting slot, the upper end of the support rod is equipped with the second threaded rod, second threaded rod sequentially passes through the upper end of support rod and sliding block and is rotatably connected on the inner wall of the sliding slot.The utility model rotates band dynamic pressure plate by the first threaded rod and moves down, and then tool is fixed, and effectively prevents setting from moving when in use;It is mobile by the second threaded rod band movable slider, it can adjust the height of megger, the operator of different demands facilitated to use;In the two sides of pedestal, earrings is set, it can be in order to the carrying of tool.
Description
Technical field
The utility model relates to the tools that technical field of electric power more particularly to 10kV route telemetering insulate.
Background technique
Megger also known as mega-ohms ohmmeter are in order to avoid accident generation, for measuring the insulated electro of various electrical equipments
The mega-ohms ohmmeter of resistance, megameter were not only convenient but also reliable for measuring insulation resistance.
Megger is by a hand generator, voting and three binding post (i.e. L: line scan pickup coil side, E: ground terminal, G: shielding end) groups
At, be widely used in coal mine installation and maintenance, be the insulation situation and measuring high resistance for checking motor, electric appliance and route.
Existing megger is not easy to fix when in use, is easy to shake megger when hand, not only inconvenient to use, together
When shake precision parts in megger also easy to damage, while existing megger cannot adjust the height of megger according to the needs of use
Degree, operator's use for a long time are also easy to produce fatigue.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and the 10kV route telemetering proposed is exhausted
The tool of edge.
To achieve the goals above, the utility model adopts the technical scheme that
The tool of 10kV route telemetering insulation, including pedestal are equipped with fixed device at the upper end-face edge of the pedestal, described
The upper end of pedestal is fixedly connected with support rod, and the side wall of the support rod is equipped with sliding slot, is equipped with sliding block, the cunning in the sliding slot
The opposite inner wall of slot is equipped with limiting slot, and the side wall of the sliding block is fixedly connected with limited block corresponding with limit groove location,
The limited block is arranged in limiting slot, and the upper end of the support rod is equipped with the second threaded rod, and second threaded rod successively passes through
The upper end of perforating branches strut and sliding block are simultaneously rotatably connected on the inner wall of the sliding slot, and second threaded rod and sliding block screw thread connect
It connects, is fixedly connected with megger on the right side of the sliding block.
Preferably, the fixed device includes the vertical bar for being fixedly connected on the pedestal upper end, is arranged on the vertical bar
Pressing plate, through the first threaded rod is equipped on the pressing plate, the lower end of first threaded rod is rotatably connected on the upper of the pedestal
End, the upper end of first threaded rod is fixedly connected with the first runner.
Preferably, the side wall of first runner is equipped with rubber sleeve, and the side wall of the rubber sleeve is equipped with multiple tracks non-slip groove, more
Non-slip groove described in road is evenly distributed on the side wall of the rubber sleeve.
Preferably, the upper end of second threaded rod is fixedly connected with the second runner, and the side wall of second runner is equipped with
Anti-skid chequer.
Preferably, the upper end of the pedestal is equipped with cushion, and the cushion is located at the lower section of megger.
Preferably, the two sides of the pedestal are equipped with earrings.
The utility model has the following beneficial effects:
1, band dynamic pressure plate is rotated by the first threaded rod to move down, and then tool is fixed, effectively prevent setting from existing
It is moved when use;
2, mobile by the second threaded rod band movable slider, it can adjust the height of megger, the operator of different demands facilitated to make
With;
3, earrings is set in the two sides of pedestal, it can be in order to the carrying of tool.
Detailed description of the invention
Fig. 1 be the utility model proposes 10kV route telemetering insulation tool structural schematic diagram;
Fig. 2 be the utility model proposes 10kV route telemetering insulation tool overlooking structure diagram;
Fig. 3 be the utility model proposes 10kV route telemetering insulation tool support bar structural schematic diagram.
In figure: 1 pedestal, 2 support rods, 3 limited blocks, 4 limiting slots, 5 second runners, 6 second threaded rods, 7 sliding blocks, 8 meggers,
9 cushions, 10 first runners, 11 vertical bars, 12 pressing plates, 13 earrings, 14 first threaded rods.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right",
The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-3,10kV route telemetering insulation tool, including pedestal 1, the two sides of pedestal 1 are equipped with earrings 13, bottom
It is equipped with fixed device at the upper end-face edge of seat 1, fixed device includes the vertical bar 11 for being fixedly connected on 1 upper end of pedestal, on vertical bar 11
It is arranged with pressing plate 12, runs through on pressing plate 12 and is equipped with the first threaded rod 14, the lower end of the first threaded rod 14 is rotatably connected on pedestal 1
Upper end, the upper end of the first threaded rod 14 are fixedly connected with the first runner 10, and the side wall of the first runner 10 is equipped with rubber sleeve, rubber sleeve
Side wall be equipped with multiple tracks non-slip groove, multiple tracks non-slip groove is evenly distributed on the side wall of rubber sleeve.
The upper end of pedestal 1 is fixedly connected with support rod 2, and the side wall of support rod 2 is equipped with sliding slot, and sliding block 7 is equipped in sliding slot, sliding
The opposite inner wall of slot is equipped with limiting slot 4, and the side wall of sliding block 7 is fixedly connected with limited block 3 corresponding with 4 position of limiting slot,
Limited block 3 is arranged in limiting slot 4, and the upper end of support rod 2 is equipped with the second threaded rod 6, and the second threaded rod 6 sequentially passes through support rod
2 upper end and sliding block 7 are simultaneously rotatably connected on the inner wall of sliding slot, and the second threaded rod 6 is threadedly coupled with sliding block 7, the second threaded rod 6
Upper end be fixedly connected with the second runner 5, the side wall of the second runner 5 is equipped with anti-skid chequer, and the right side of sliding block 7 is fixedly connected with megger
8, the upper end of pedestal 1 is equipped with cushion 9, and cushion 9 is located at the lower section of megger 8.
In the utility model, in use, remote-measuring equipment to be placed on to the side of instrument to be detected, the first runner is then rotated
10, it is mobile that the rotation of the first runner 10 drives the pressing plate 12 that is threadedly coupled therewith, and then pressing plate 12 is made to push down the corner of detecting instrument,
Remote-measuring equipment is fixed, then operator rotates the second runner 5, and the rotation of the second runner 5 drives the rotation of the second threaded rod 6,
The rotation of second threaded rod 6 drives the sliding block 7 being threadedly coupled therewith mobile, and then adjusts the height of megger 8, facilitates different raised
Operator carries out using after use, it is quick that operator can carry out convenient in carrying to equipment by earrings 13.
In the present invention unless specifically defined or limited otherwise, term " the cover ", " embedded ", " connection ", " Gu
Calmly ", the terms such as " distribution " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;
It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can be with
It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly.For this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
- The tool of 1.10kV route telemetering insulation, including pedestal (1), which is characterized in that set at the upper end-face edge of the pedestal (1) There is fixed device, the upper end of the pedestal (1) is fixedly connected with support rod (2), and the side wall of the support rod (2) is equipped with sliding slot, Sliding block (7) are equipped in the sliding slot, the opposite inner wall of the sliding slot is equipped with limiting slot (4), and the side wall of the sliding block (7) is fixed It is connected with limited block (3) corresponding with limiting slot (4) position, limited block (3) setting is in limiting slot (4), the branch The upper end of strut (2) is equipped with the second threaded rod (6), and second threaded rod (6) sequentially passes through upper end and the sliding block of support rod (2) (7) it and is rotatably connected on the inner wall of the sliding slot, second threaded rod (6) is threadedly coupled with sliding block (7), the sliding block (7) megger (8) are fixedly connected on the right side of.
- 2. the tool of 10kV route telemetering insulation according to claim 1, which is characterized in that the fixed device includes solid Surely it is connected to the vertical bar (11) of the pedestal (1) upper end, is arranged with pressing plate (12) on the vertical bar (11), on the pressing plate (12) The upper end of the pedestal (1), institute are rotatably connected on through the lower end for being equipped with the first threaded rod (14), first threaded rod (14) The upper end for stating the first threaded rod (14) is fixedly connected with the first runner (10).
- 3. the tool of 10kV route telemetering insulation according to claim 2, which is characterized in that first runner (10) Side wall is equipped with rubber sleeve, and the side wall of the rubber sleeve is equipped with multiple tracks non-slip groove, and non-slip groove described in multiple tracks is evenly distributed on the rubber On the side wall of gum cover.
- 4. the tool of 10kV route telemetering insulation according to claim 1, which is characterized in that second threaded rod (6) Upper end be fixedly connected with the second runner (5), the side wall of second runner (5) is equipped with anti-skid chequer.
- 5. the tool of 10kV route telemetering insulation according to claim 1, which is characterized in that the upper end of the pedestal (1) Equipped with cushion (9), the cushion (9) is located at the lower section of megger (8).
- 6. the tool of 10kV route telemetering insulation according to claim 1, which is characterized in that the two sides of the pedestal (1) It is equipped with earrings (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821418116.7U CN208571427U (en) | 2018-08-31 | 2018-08-31 | The tool of 10kV route telemetering insulation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821418116.7U CN208571427U (en) | 2018-08-31 | 2018-08-31 | The tool of 10kV route telemetering insulation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208571427U true CN208571427U (en) | 2019-03-01 |
Family
ID=65451536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821418116.7U Expired - Fee Related CN208571427U (en) | 2018-08-31 | 2018-08-31 | The tool of 10kV route telemetering insulation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208571427U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111896809A (en) * | 2020-08-26 | 2020-11-06 | 广东电网有限责任公司梅州供电局 | 10kv overhead line telemetering auxiliary tool |
-
2018
- 2018-08-31 CN CN201821418116.7U patent/CN208571427U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111896809A (en) * | 2020-08-26 | 2020-11-06 | 广东电网有限责任公司梅州供电局 | 10kv overhead line telemetering auxiliary tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203109949U (en) | Intelligent detecting robot for connecting rod peristalsis insulator string | |
CN106353060B (en) | Electric-power safe instruments preventive trial mobile laboratory | |
CN208200295U (en) | A kind of liftable mobile electrical maintenance of equipment device | |
CN210572581U (en) | Auxiliary device for transformer substation GIS partial discharge detection | |
CN204536482U (en) | The horizontal Withstand test device of insulating bar | |
CN208571427U (en) | The tool of 10kV route telemetering insulation | |
CN208046041U (en) | A kind of lift power distribution cabinet pedestal convenient for walking | |
CN107390101A (en) | The reinforcing steel bar insulating automatic detection device of high ferro non-fragment orbit board assembly line | |
CN206804188U (en) | A kind of current-carrying temperature rise test equipment of automatic measurement function | |
CN201742012U (en) | Phase determination movable bracket for metal enclosed 10 kV high voltage switch cabinet | |
CN202837338U (en) | Substation line parameter test connection assembly | |
CN203455443U (en) | Power frequency voltage resisting test device for insulating rod or rope | |
CN203301006U (en) | Rapid electricity testing grounding telescoping dolly of high voltage switch cabinet | |
CN204666724U (en) | Insulation resistance on-site detecting device | |
CN207472919U (en) | A kind of convertible insulating bar test auxiliary stand | |
CN205363815U (en) | Multifunctional protector examines workstation surely | |
CN204855659U (en) | Arrester detection device | |
CN206422462U (en) | A kind of apparatus for peeling off of cableport | |
CN105445660B (en) | Breaker Adaptive Second line termination | |
CN102788941A (en) | Insulation tester with centering device | |
CN108832518B (en) | A kind of 10kV switch cabinet phasing handcart | |
CN105158528A (en) | Support specially used for power frequency AC withstand voltage test of high-voltage electroscope | |
CN207601121U (en) | A kind of power supply full-automatic testing frame | |
CN112904183A (en) | Circuit detection device for digital design system of power transmission line | |
CN204927632U (en) | In put cabinet ground connection car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |