CN208569689U - Project cost schedule management apparatus - Google Patents
Project cost schedule management apparatus Download PDFInfo
- Publication number
- CN208569689U CN208569689U CN201821059018.9U CN201821059018U CN208569689U CN 208569689 U CN208569689 U CN 208569689U CN 201821059018 U CN201821059018 U CN 201821059018U CN 208569689 U CN208569689 U CN 208569689U
- Authority
- CN
- China
- Prior art keywords
- movable balls
- hollow frame
- management apparatus
- project cost
- fixedly installed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pinball Game Machines (AREA)
Abstract
The utility model relates to project cost technical fields, and disclose project cost schedule management apparatus, including hollow frame, there are four the mounting bases of generating heat that is evenly distributed for the left side fixed installation of the hollow frame, top on the right side of the hollow frame offers the circular hole communicated therewith, shaft is fixedly installed on the inner wall of the circular hole, the outside of the shaft and internal activity for being located at circular hole is equipped with movable balls, the inside of the hollow frame and is located above and below circular hole and offers inner cavity.The project cost schedule management apparatus, because being carved with unfinished three words on the left of movable balls, its right side, which is carved with, completes two words, so rotating 180 degree by stirring movable balls, whether the job schedule on the same day can be completed to show, which can be shown the result whether work on the same day is completed by way of rotating movable balls, the effective efficiency for improving progress control.
Description
Technical field
The utility model relates to project cost technical field, specially a kind of project cost schedule management apparatus.
Background technique
Project cost just refers to the construction price of engineering, refers to complete the construction of an engineering, it is contemplated that or it is actually required
Full payment summation, therefore, in this sense, project cost is exactly construction project investment in fixed assets, is given out a contract for a project from holding
Angle defines, and project cost refers to engineering price, as build up an engineering, it is contemplated that or it is practical in soil, equipment, technology labor
Be engaged in and contract etc. in the market, by the modes of doing business such as bidding be formed by building installation engineering price and construction project it is total
Price.
Current cost process is staff's information provided according to owner and the letter oneself obtained to site inspection
It ceases to the engineering of undertaking, work is calculated according to the cost that the progress of engineering carries out different phase, it is cumbersome due to cost work, it needs
It to exercise supervision to the work of cost staff, and can only be worked at present by cost of the related personnel to cost staff
It exercises supervision, this mode neither can guarantee the timeliness of supervision, and inefficiency, while also need extra work people
Member, causes the waste of human resources, and the communication in terms of construction party and cost side still lack progress, cannot mutually know well
Know the progress situation of other side, so a kind of project cost schedule management apparatus is provided to solve the problems, such as above-mentioned be previously mentioned.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of project cost schedule management apparatus, has display
The advantages of job schedule, solving can only exercise supervision to the cost work of cost staff by related personnel at present, this
Kind mode neither can guarantee the timeliness of supervision, and inefficiency, while also need extra work personnel, and manpower is caused to provide
The waste in source, and the communication in terms of construction party and cost side still lack progress, cannot mutually know the progress of other side well
The problem of situation.
(2) technical solution
For the purpose for realizing above-mentioned display job schedule, the utility model is provided the following technical solutions: project cost progress
Managing device, including hollow frame, the left side of the hollow frame is fixedly mounted there are four the mounting base of generating heat that is evenly distributed, described
Top on the right side of hollow frame offers the circular hole communicated therewith, is fixedly installed with shaft on the inner wall of the circular hole, and described turn
The outside of the axis and internal activity for being located at circular hole is equipped with movable balls, the inside of the hollow frame and is located at the upper of circular hole
Side and lower section offer inner cavity, and the inside of the inner cavity is fixedly installed with goring push spring, and two goring push springs are opposite
One end and be located at inner cavity inside be fixedly installed with limited block, the opposite side company of being fixedly installed with of two limited blocks
Plug, the top and bottom of the movable balls offer the corresponding connected slot of connection plug, the hollow frame
Right side and be located at movable balls below be fixedly installed with U-shaped seat, bar shaped sliding slot, the U-shaped are offered on the inside of the U-shaped seat
The inside of seat is movably installed with board, and the top of the board, front and back are fixedly installed with and bar shaped sliding slot phase
Corresponding bar shaped sliding block, the bottom of the board are fixedly installed with bracelet, are fixedly installed with deck at the top of the U-shaped seat,
The top movable of the deck is connected with marker, and the both ends of the U-shaped seat bottom are fixedly installed with pin shaft, the pin shaft
Outside is movably installed with limit shield.
Preferably, the board is slidably connected by bar shaped sliding slot and bar shaped sliding block with U-shaped seat, the bar shaped sliding slot
Bottom is opening-like.
Preferably, it is opened up on the left of the mounting base there are two mounting hole, the length of the deck is less than the length of marker
Degree.
Preferably, the board is flexibly connected by pin shaft and limit shield with U-shaped seat.
Preferably, the quantity of the movable balls be seven, and it is equidistant be arranged on the right side of hollow frame, it is described
The inside of hollow frame is extended on the left of movable balls, and the outside of hollow frame, the work are extended on the right side of the movable balls
Unfinished three word is carved on the left of dynamic ball, right side, which is carved with, completes two words.
Preferably, the opposite one end of two connection plugs runs through inner cavity and extends to the inside of connected slot.
Preferably, the trapezoidal shape in cross section of two connection plugs opposite one end and connected slot.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of project cost schedule management apparatus, has following beneficial
Effect:
1, the project cost schedule management apparatus, because being carved with unfinished three words on the left of movable balls, right side carving
It is carved with and completes two words, so rotating 180 degree by stirring movable balls, so that it may which whether the job schedule on the same day is complete
At showing, while during movable balls rotate, connection plug by movable balls extruding force to retracting in inner cavity, work as work
After dynamic ball rotates 180 degree, connection plug is inserted in the connected slot at the top and bottom of movable balls by the thrust of goring push spring
Inside while also preventing the rotation of movable balls so that movable balls be stablized, and which, can be with by way of rotating movable balls
The result whether work on the same day is completed is shown, the effective efficiency for improving progress control.
2, the project cost schedule management apparatus can be by board in by setting bar shaped sliding slot and bar shaped sliding block
Empty frames body is flexibly connected, then by two limit shields of setting, can prevent falling for board, while being also convenient for board
It disassembles, is convenient for changing and repairs, the surface of board can write the job schedule situation on the same day, preferable to show pipe
Reason progress improves working efficiency.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structural side view;
Fig. 3 is the schematic enlarged-scale view in the utility model Fig. 1 at A.
In figure: 1 hollow frame, 2 mounting bases, 3 circular holes, 4 shafts, 5 movable balls, 6 inner cavities, 7 goring push springs, 8 limited blocks, 9
Connection plug, 10 connected slots, 11U shape seat, 12 bar shaped sliding slots, 13 boards, 14 bar shaped sliding blocks, 15 decks, 16 markers, 17
Pin shaft, 18 limit shields, 19 bracelets.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3, project cost schedule management apparatus, including hollow frame 1 are please referred to, hollow frame 1 uses aluminium alloy system
At corrosion-resistant, the left side of hollow frame 1 is fixedly mounted there are four the mounting base 2 of generating heat that is evenly distributed, and the left side of mounting base 2 opens up
There are two mounting holes, hollow frame 1 can be fixedly installed on metope by mounting hole and mounting base 2,1 right side of hollow frame
Top offer the circular hole 3 communicated therewith, be fixedly installed with shaft 4 on the inner wall of circular hole 3, the outside of shaft 4 and be located at
The internal activity of circular hole 3 is equipped with movable balls 5, and movable balls 5 can be made of ceramics, and the quantity of movable balls 5 is seven, and is waited
Distance is arranged on the right side of hollow frame 1, and the left side of movable balls 5 extends to the inside of hollow frame 1, movable balls 5
Right side extends to the outside of hollow frame 1, and the left side of movable balls 5 is carved with unfinished three word, and right side, which is carved with, completes two words,
So rotating 180 degree by stirring movable balls 5, so that it may whether the job schedule on the same day is completed to show, it is hollow
The inside of framework 1 and be located at circular hole 3 above and below offer inner cavity 6, the inside of inner cavity 6 is fixedly installed with pushing tow bullet
Spring 7, goring push spring 7 are in the state of pushing tow, the fixed peace in the opposite one end of two goring push springs 7 and the inside for being located at inner cavity 6
Equipped with limited block 8, limited block 8 prevents connection plug 9 to be detached from the inside of inner cavity 6, and the opposite side of two limited blocks 8 is fixed to pacify
Equipped with connection plug 9, the top and bottom of movable balls 5 offer the corresponding connected slot 10 of connection plug 9, two connections
The opposite one end of plug 9 runs through inner cavity 6 and extends to the inside of connected slot 10, the opposite one end of two connection plugs 9 with
The trapezoidal shape in the cross section of connected slot 10, the right side of hollow frame 1 and the lower section for being located at movable balls 5 are fixedly installed with U
Shape seat 11, the inside of U-shaped seat 11 offer bar shaped sliding slot 12, and the bottom of bar shaped sliding slot 12 is opening-like, and the inside of U-shaped seat 11 is living
Dynamic to be equipped with board 13, for board 13 using plate body common in the market, the top of board 13, front and back are fixed
Bar shaped sliding block 14 corresponding with bar shaped sliding slot 12 is installed, board 13 passes through bar shaped sliding slot 12 and bar shaped sliding block 14 and U-shaped
Seat 11 is slidably connected, and the bottom of board 13 is fixedly installed with bracelet 19, by bracelet 19 board 13 can be pulled out come,
Or it is put into the inside of U-shaped seat 11, the top of U-shaped seat 11 is fixedly installed with deck 15, and the top movable of deck 15 is connected with horse
Gram pen 16, marker 16 use water-soluble writing pen, are easy to wipe, and the length of deck 15 is less than the length of marker 16, U-shaped
The both ends of 11 bottoms of seat are fixedly installed with pin shaft 17, and the outside of pin shaft 17 is movably installed with limit shield 18, limits shield 18
Falling for board 13 can be prevented, plays the role of blocking to writing, board 13 passes through pin shaft 17 and limit shield 18 and U
Shape seat 11 is flexibly connected, because the left side of movable balls 5 is carved with unfinished three words, right side, which is carved with, completes two words, institute
To rotate 180 degree by stirring movable balls 5, so that it may whether the job schedule on the same day is completed to show, it is living simultaneously
During dynamic ball 5 rotates, connection plug 9 by movable balls 5 extruding force to the inner retraction in inner cavity 6, when movable balls 5 rotate 100
After 80 degree, connection plug 9 is inserted in inside the connected slot 10 of 5 top and bottom of movable balls by the thrust of goring push spring 7, from
And stablize movable balls 5, while also preventing the rotation of movable balls 5, which can will be worked as by way of rotating movable balls 5
The result whether work of day is completed is shown, the effective efficiency for improving progress control, also, passes through setting bar shaped sliding slot
12 and bar shaped sliding block 14, board 13 can be flexibly connected with hollow frame 1, then by two limit shields 18 of setting, it can
It to prevent falling for board 13, while being also convenient for disassembling board 13, is convenient for changing and repairs, board 13
Surface can write the job schedule situation on the same day, preferable to show management progress, improve working efficiency.
In conclusion the project cost schedule management apparatus, because the left side of movable balls 5 is carved with unfinished three words,
Its right side be carved with complete two words, so by stir movable balls 5 rotate 180 degree, so that it may by the work on the same day into
During whether degree is completed to show, while movable balls 5 rotate, connection plug 9 by movable balls 5 extruding force to inner cavity
6 inner retractions, after movable balls 5 rotate 180 degree, connection plug 9 is inserted in 5 top of movable balls by the thrust of goring push spring 7
Inside the connected slot 10 of bottom, so that movable balls 5 be stablized, while the rotation of movable balls 5 is also prevented, which is by turning
The mode of dynamic movable balls 5, the result whether work on the same day is completed can be shown, the effective effect for improving progress control
Rate.
Also, the project cost schedule management apparatus can will be write by setting bar shaped sliding slot 12 and bar shaped sliding block 14
Plate 13 is flexibly connected with hollow frame 1, then by two limit shields 18 of setting, can prevent falling for board 13, simultaneously
Be also convenient for disassembling board 13, be convenient for changing and repair, the surface of board 13 can write the work on the same day into
Situation is spent, it is preferable to show management progress, improve working efficiency.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (7)
1. project cost schedule management apparatus, including hollow frame (1), it is characterised in that: the left side of the hollow frame (1) is solid
For Dingan County's dress there are four generate heat mounting base (2) that are evenly distributed, the top on the right side of the hollow frame (1) offers the circle communicated therewith
Hole (3) is fixedly installed with shaft (4) on the inner wall of the circular hole (3), the outside of the shaft (4) and is located at circular hole (3)
Internal activity is equipped with movable balls (5), the inside of the hollow frame (1) and be located at circular hole (3) above and below open
Equipped with inner cavity (6), the inside of the inner cavity (6) is fixedly installed with goring push spring (7), and two goring push springs (7) are opposite
One end and be located at inner cavity (6) inside be fixedly installed with limited block (8), two opposite sides of the limited block (8) are solid
Dingan County is equipped with connection plug (9), and the top and bottom of the movable balls (5) offer the corresponding connection of connection plug (9)
Slot (10), the right side of the hollow frame (1) and be located at movable balls (5) below be fixedly installed with U-shaped seat (11), it is described
It is offered on the inside of U-shaped seat (11) bar shaped sliding slot (12), is movably installed with board (13), institute on the inside of the U-shaped seat (11)
State the top of board (13), front and back is fixedly installed with bar shaped sliding block (14) corresponding with bar shaped sliding slot (12),
The bottom of the board (13) is fixedly installed with bracelet (19), is fixedly installed with deck (15) at the top of the U-shaped seat (11),
The top movable of the deck (15) is connected with marker (16), and the both ends of U-shaped seat (11) bottom are fixedly installed with pin
Axis (17) is movably installed with limit shield (18) on the outside of the pin shaft (17).
2. project cost schedule management apparatus according to claim 1, it is characterised in that: the board (13) passes through item
Shape sliding slot (12) and bar shaped sliding block (14) are slidably connected with U-shaped seat (11), and the bottom of the bar shaped sliding slot (12) is opening-like.
3. project cost schedule management apparatus according to claim 1, it is characterised in that: the left side of the mounting base (2)
It opens up there are two mounting hole, the length of the deck (15) is less than the length of marker (16).
4. project cost schedule management apparatus according to claim 1, it is characterised in that: the board (13) passes through pin
Axis (17) and limit shield (18) are flexibly connected with U-shaped seat (11).
5. project cost schedule management apparatus according to claim 1, it is characterised in that: the quantity of the movable balls (5)
It is seven, and on equidistant right side for being arranged in hollow frame (1), extends to middle empty frames on the left of the movable balls (5)
The inside of body (1) extends to the outside of hollow frame (1), the left side carving of the movable balls (5) on the right side of the movable balls (5)
It is carved with unfinished three word, right side, which is carved with, completes two words.
6. project cost schedule management apparatus according to claim 1, it is characterised in that: two connection plugs (9)
Opposite one end runs through inner cavity (6) and extends to the inside of connected slot (10).
7. project cost schedule management apparatus according to claim 1, it is characterised in that: two connection plugs (9)
The trapezoidal shape in cross section of opposite one end and connected slot (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821059018.9U CN208569689U (en) | 2018-07-05 | 2018-07-05 | Project cost schedule management apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821059018.9U CN208569689U (en) | 2018-07-05 | 2018-07-05 | Project cost schedule management apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208569689U true CN208569689U (en) | 2019-03-01 |
Family
ID=65490222
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821059018.9U Expired - Fee Related CN208569689U (en) | 2018-07-05 | 2018-07-05 | Project cost schedule management apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208569689U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112976880A (en) * | 2021-03-17 | 2021-06-18 | 章小波 | Engineering cost building progress management equipment |
-
2018
- 2018-07-05 CN CN201821059018.9U patent/CN208569689U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112976880A (en) * | 2021-03-17 | 2021-06-18 | 章小波 | Engineering cost building progress management equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Rolfe et al. | Lessons from the social and economic impacts of the mining boom in the Bowen Basin 2004-2006 | |
Hawkins | Manufacturing | |
CN208569689U (en) | Project cost schedule management apparatus | |
CN107169709A (en) | The one-stop management method of building trade and its management platform | |
Goncalves | Technological Spill-Overs and Manpower Training | |
Khan et al. | Experience of a financial reforms project in Bangladesh | |
Brothers | A practical approach to water loss reduction. | |
CN210324886U (en) | Light-duty magnetism connection panel | |
Petersen et al. | Resource commitment to foreign markets: The Establishment patterns of danish firms in South East Asian markets | |
CN203013042U (en) | Enterprise resource planning sand-table teaching aid | |
Juravich et al. | Introduction: Bringing the study of work back to labor studies | |
Knotten et al. | Veidekke: collaborative planning in design | |
CN211087750U (en) | Conveniently change mark sign for bid of information | |
CN206503376U (en) | Steel building site based on BIM | |
Turner | Unlocking trenchless knowledge | |
CN209729179U (en) | A kind of teaching aid of financial analysis | |
CN208016465U (en) | A kind of easy-to-mount dendrobium candidum plantation protective frame | |
Luiters | As the world changes, workplace teams need to change with it | |
Binney et al. | Government injects Pounds 43m to restart Manchester's heart | |
CN207473654U (en) | Scientific and technological total management system | |
Stevenson et al. | Report on the National Local Government Cultural Forum Initiative 2013-2018 | |
Liu | Research and application of information technology in construction enterprise | |
Fedulova | Innovative development of Ukraine’s economy | |
Jackman | Review of:“Modeling Techniques for Business Process Re-engineering and Benchmarking” Guy Doumeingts and Jim Browne (eds) Chapman & Hall, 1997 | |
Miller | Oyu Tolgoi: a nation changer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190301 Termination date: 20190705 |