CN208566744U - A kind of First air low-voltage variation system for pulverized-coal fired boiler - Google Patents

A kind of First air low-voltage variation system for pulverized-coal fired boiler Download PDF

Info

Publication number
CN208566744U
CN208566744U CN201820440710.XU CN201820440710U CN208566744U CN 208566744 U CN208566744 U CN 208566744U CN 201820440710 U CN201820440710 U CN 201820440710U CN 208566744 U CN208566744 U CN 208566744U
Authority
CN
China
Prior art keywords
coal pulverizer
group
coal
sequence
oil gun
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820440710.XU
Other languages
Chinese (zh)
Inventor
武旭升
张国峰
焦传宝
南波
周亚军
范焕霞
秦敏
乔永成
张文龙
刘林虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Yangchen Power Generation LLC
Original Assignee
Datang Yangchen Power Generation LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Yangchen Power Generation LLC filed Critical Datang Yangchen Power Generation LLC
Priority to CN201820440710.XU priority Critical patent/CN208566744U/en
Application granted granted Critical
Publication of CN208566744U publication Critical patent/CN208566744U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The utility model provides a kind of First air low-voltage variation system, and system includes detection unit, for detecting the real-time pressure of First air main pipe;First control unit, the real-time pressure for will test is compared with preset pressure, when real-time pressure is lower than preset pressure, after postponing preset time period, disconnects the power supply of two coal pulverizers under current state on priority sequence;It is by way of delay cut-off stage by stage; so that when First air forces down triggering; coal pulverizer and oil gun are selectively gradually powered off according to preset priority sequence; reduce unit unplanned outage, ensure that boiler combustion is stablized, will not influence the operation of other equipment; it ensure that coal pulverizer reliability of operation; to realize the First air low-voltage variation of pulverized-coal fired boiler, the boiler extinguishment stoppage in transit accident triggered due to low-voltage variation is avoided, ensure that stabilization of equipment performance when the interim low pressure of First air.

Description

A kind of First air low-voltage variation system for pulverized-coal fired boiler
Technical field
The utility model relates to pulverized-coal fired boiler safety features technical fields, are used for pulverized-coal fired boiler more particularly, to one kind First air low-voltage variation system.
Background technique
The main function of large coal powder boiler First air is that coal dust in coal-grinding machine drum body is sent into hearth combustion, in order to guarantee The design of flameholding system once protect by wind pressure minimum living.At present large coal powder boiler be typically designed to go with each other all the time, First air just Pressure unit pulverized-coal system is typically provided six coal pulverizers, two primary air fans by taking 600MW boiler as an example.Under normal circumstances, Two primary air fan operations, maintain 8~9Kpa of First air main-piping pressure, and the operation of separate unit primary air fan can receive 60% load (360MW), in actual motion, steady combustion when combustion-supporting and boiler operatiopn of the oil gun for coal pulverizer initial start stage is unstable, normally Do not put into operation oil gun when operation;Every coal pulverizer can on-load be about 18%, prior to starting the coal pulverizer of two sides and its corresponding Oil gun, (four coal pulverizer maximums can on-load at this time for two intermediate coal pulverizers of starting and its corresponding oil gun when undercapacity About 70%), start innermost two coal pulverizers and its corresponding oil gun (six coal pulverizer maximums at this time when power output is or else sufficient Can on-load be 100%).
The main function of primary air fan is that the coal dust in coal-grinding machine drum body is sent into furnace chamber inner combustion, it requires First air It is pressed in reasonable range, when primary wind pressure is reduced to the resistance for being not enough to overcome pulverized coal preparation system, is sent into coal in burner hearth at this time Detonation operating condition can occur in furnace for powder air-flow fluctuation.For the generation for preventing such operating condition, system is commonly designed once low pressure Protective module triggers running all coal pulverizers and powers off shutdown simultaneously, to prevent in furnace when primary wind pressure is lower than setting value Detonation operating condition occurs, while related oil gun interlocking puts into operation unit with underrun.
But when using this method low-voltage variation being triggered, coal dust will lead to since all coal pulverizers are top simultaneously Fuel loses, and causes boiler extinguishment stoppage in transit or fault spread, causes unit unplanned outage or equipment damage.Therefore it provides A kind of First air low-voltage variation system for pulverized-coal fired boiler, to avoid the boiler extinguishment stoppage in transit thing triggered due to low-voltage variation Therefore stabilization of equipment performance when guaranteeing the interim low pressure of First air, just become those skilled in the art's urgent problem to be solved.
Utility model content
The purpose of the utility model is to provide a kind of First air low-voltage variation system for pulverized-coal fired boiler, to avoid due to Low-voltage variation and the boiler extinguishment stoppage in transit accident triggered guarantee stabilization of equipment performance when the interim low pressure of First air.
In order to solve the above-mentioned technical problem, the utility model provides a kind of First air low-voltage variation system for pulverized-coal fired boiler System, comprising:
Detection unit, for detecting the real-time pressure of First air main pipe;
First control unit, the real-time pressure for will test is compared with preset pressure, when real-time pressure is lower than pre- If when pressure, after postponing preset time period, disconnecting the power supply of two coal pulverizers under current state on priority sequence;
The preset time period is multiple periods, after postponing each preset time period, is disconnected in default with this The power supply of two coal pulverizers on period corresponding priority sequence, until all coal pulverizers are closed.
Further, further includes:
First judging unit, for judging the working condition of each coal pulverizer, according to the current working status of each coal pulverizer Judge the priority sequence of coal pulverizer.
Further, further includes:
Second control unit, the real-time pressure for will test is compared with preset pressure, when real-time pressure is lower than pre- If when pressure, after postponing preset time period, disconnecting the power supply of two oil guns under current state on priority sequence;
The preset time period is multiple periods, after postponing each preset time period, is disconnected in default with this The power supply of two oil guns on period corresponding priority sequence, until all oil guns are closed.
Further, further includes:
Second judgment unit, for judging the working condition of each oil gun, to be sentenced according to the current working status of each oil gun The priority sequence of oil-break rifle.
Further, the quantity of the coal pulverizer is six, and six coal pulverizers are divided into first group of coal pulverizer and second Group coal pulverizer, first group of coal pulverizer include priority successively reduce first group of First ray coal pulverizer, first group second Sequence coal pulverizer and first group of third sequence coal pulverizer, second group of coal pulverizer include second group that priority successively reduces One sequence coal pulverizer, second group of second sequence coal pulverizer and second group of third sequence coal pulverizer;
The quantity of the oil gun is six, and six oil guns are divided into first group of oil gun and second group of oil gun, described first Group oil gun includes first group of First ray oil gun, first group of second sequence oil gun and the first group of third sequence that priority successively reduces Column oil gun, second group of oil gun include second group of First ray oil gun, the second group of second sequence oil that priority successively reduces Rifle and second group of third sequence oil gun;
When the real-time pressure that the detection unit detects is lower than preset pressure, disconnected after postponing the first preset time period The power supply of first group of First ray coal pulverizer and second group of First ray coal pulverizer continues to postpone the second preset time The power supply that first group of second sequence coal pulverizer and second group of second sequence coal pulverizer are disconnected after section continues to postpone third The power supply of first group of third sequence coal pulverizer and second group of third sequence coal pulverizer is disconnected after preset time period;
It has no progeny in delay preset time, if the coal pulverizer that should currently power off is in off working state, according to priority drops Sequence disconnects it with the coal pulverizer for organizing next sequence;
When the real-time pressure that the detection unit detects is lower than preset pressure, after postponing first preset time period The power supply for disconnecting first group of First ray oil gun and second group of First ray oil gun continues to postpone the second preset time It is default to continue delay third for the power supply that first group of second sequence oil gun and second group of second sequence oil gun are disconnected after section The power supply of first group of third sequence oil gun and second group of third sequence oil gun is disconnected after period;
It has no progeny in delay preset time, if the oil gun that should currently power off is in off working state, according to priority descending It is disconnected with the oil gun for organizing next sequence.
Detailed description of the invention
It, below will be to specific embodiment or the prior art in order to illustrate more clearly of specific embodiment of the present invention Attached drawing needed in description is briefly described, it should be apparent that, the accompanying drawings in the following description is the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is the structural schematic diagram of the protection system provided in a kind of specific embodiment of the utility model;
Fig. 2 is the forming circuit of primary wind pressure low signal;
Fig. 3 is 2 kinds of special circumstances of four coal pulverizers operation;
Fig. 4 is the trip(ping) circuit of C coal pulverizer;
Fig. 5 is the trip(ping) circuit of B coal pulverizer;
Fig. 6 is the trip(ping) circuit of A coal pulverizer;
Fig. 7 is the trip(ping) circuit of F coal pulverizer;
Fig. 8 is the trip(ping) circuit of E coal pulverizer;
Fig. 9 is the trip(ping) circuit of D coal pulverizer.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
In a specific embodiment, the utility model provides a kind of First air low-voltage variation system for pulverized-coal fired boiler System, comprising:
Detection unit, for detecting the real-time pressure of First air main pipe;
First control unit, the real-time pressure for will test is compared with preset pressure, when real-time pressure is lower than pre- If when pressure, after postponing preset time period, disconnecting the power supply of two coal pulverizers under current state on priority sequence;
The preset time period is multiple periods, after postponing each preset time period, is disconnected in default with this The power supply of two coal pulverizers on period corresponding priority sequence, until all coal pulverizers are closed.
During the work time, when there is the real-time pressure in First air main pipe lower than preset pressure, then according to coal pulverizer Quantity determine the coal pulverizer quantity and precedence number of power-off simultaneously, i.e., when pressure is lower than preset pressure, from front to back (i.e. the sequence of priority reduction) successively judges whether the coal pulverizer in each priority is in running order, if being in work shape State then powers off the coal pulverizer, is such as in off working state, i.e., to the first job shape in the subsequent priority of the coal pulverizer The coal pulverizer of state is powered off.
Above-mentioned protection system further includes the first judging unit, which is used to judge the work shape of each coal pulverizer State, to judge the priority sequence of coal pulverizer according to the current working status of each coal pulverizer.
Power down sequence in addition to controlling coal pulverizer, in order to further increase stabilization of equipment performance, which can also be wrapped Include the module for time-delay closing oil gun.Specifically, which also wraps:
Second control unit, the real-time pressure for will test is compared with preset pressure, when real-time pressure is lower than pre- If when pressure, after postponing preset time period, disconnecting the power supply of two oil guns under current state on priority sequence;
The preset time period is multiple periods, after postponing each preset time period, is disconnected in default with this The power supply of two oil guns on period corresponding priority sequence, until all oil guns are closed;
Second judgment unit, for judging the working condition of each oil gun, to be sentenced according to the current working status of each oil gun The priority sequence of oil-break rifle.
In above-mentioned specific embodiment, by taking the equipment of corresponding six oil guns of six coal pulverizers as an example, the coal pulverizer Quantity is six, and six coal pulverizers are divided into first group of coal pulverizer and second group of coal pulverizer, and first group of coal pulverizer includes First group of First ray coal pulverizer, first group of second sequence coal pulverizer and the first group of third sequence coal-grinding that priority successively reduces Machine, second group of coal pulverizer include second group of First ray coal pulverizer, the second group of second sequence mill that priority successively reduces Coal machine and second group of third sequence coal pulverizer;
The quantity of the oil gun is six, and six oil guns are divided into first group of oil gun and second group of oil gun, described first Group oil gun includes first group of First ray oil gun, first group of second sequence oil gun and the first group of third sequence that priority successively reduces Column oil gun, second group of oil gun include second group of First ray oil gun, the second group of second sequence oil that priority successively reduces Rifle and second group of third sequence oil gun;
When the real-time pressure that the detection unit detects is lower than preset pressure, disconnected after postponing the first preset time period The power supply of first group of First ray coal pulverizer and second group of First ray coal pulverizer continues to postpone the second preset time The power supply that first group of second sequence coal pulverizer and second group of second sequence coal pulverizer are disconnected after section continues to postpone third The power supply of first group of third sequence coal pulverizer and second group of third sequence coal pulverizer is disconnected after preset time period;
It has no progeny in delay preset time, if the coal pulverizer that should currently power off is in off working state, according to priority drops Sequence disconnects it with the coal pulverizer for organizing next sequence;
When the real-time pressure that the detection unit detects is lower than preset pressure, after postponing first preset time period The power supply for disconnecting first group of First ray oil gun and second group of First ray oil gun continues to postpone the second preset time It is default to continue delay third for the power supply that first group of second sequence oil gun and second group of second sequence oil gun are disconnected after section The power supply of first group of third sequence oil gun and second group of third sequence oil gun is disconnected after period;
It has no progeny in delay preset time, if the oil gun that should currently power off is in off working state, according to priority descending It is disconnected with the oil gun for organizing next sequence.
Specifically, the preset pressure in above-mentioned First air main pipe is 6KPa, and the first preset time period is 15 seconds, and second is default Period is 45 seconds, and third preset time period is 75 seconds.
Protection system provided by the utility model is by way of delay cut-off stage by stage, so that when First air forces down touching When hair, coal pulverizer and oil gun are selectively gradually powered off according to preset priority sequence, reduce unit unplanned outage, are protected It has demonstrate,proved boiler combustion to stablize, will not influence the operation of other equipment, ensure that coal pulverizer reliability of operation, to realize coal The First air low-voltage variation of powder boiler, avoids the boiler extinguishment stoppage in transit accident triggered due to low-voltage variation, ensure that primary Stabilization of equipment performance when the interim low pressure of wind.
1-9 with reference to the accompanying drawing, and the equipment based on six coal pulverizers, six oil guns carry out above-mentioned specific embodiment Supplementary explanation in circuit theory.
Fig. 1 is the schematic diagram of typical 600MW large coal powder boiler at present, is typically designed to go with each other all the time, First air Pressurized direct pulverizing coal system, 600MW boiler are typically provided six coal pulverizers, two primary air fans, under normal circumstances, two one Secondary fan operation, maintains 8~9Kpa of First air main-piping pressure, and the operation of separate unit primary air fan can receive 60% load (360MW). In actual motion, steady combustion when combustion-supporting and boiler operatiopn of the oil gun for coal pulverizer initial start stage is unstable, when normal operation not Put into operation oil gun;Every coal pulverizer can on-load be about 18%, prior to starting A, F coal pulverizer and its corresponding oil gun, power output is not Start B, E coal pulverizer and its corresponding oil gun (at this time four coal pulverizer maximums can on-load be about 70%) when sufficient, power output is or else Start C, D coal pulverizer and its corresponding oil gun (at this time six coal pulverizer maximums can on-load be 100%) when sufficient.
Fig. 2 is the forming circuit of primary wind pressure low signal, when the First air main pipe real-time pressure detected is less than default pressure When power, then primary wind pressure low signal triggers, and be delayed 15 seconds, 45 seconds, 75 seconds generation coal pulverizer trip commands respectively, send to jump coal-grinding The logic judgment circuit of machine, instruction are sent out in the form of 5 pulse per second (PPS)s.In Fig. 2, " XQ01 " of the first row is to represent " primary wind pressure " Analog signals, it is the real-time First air main-piping pressure of actual measurement, and current being constantly changed, can reflect First air actual pressure, our task seeks to be kept for its moment not less than 6KPa, once it is triggered lower than 6KPa " First air forces down " signal and be delayed respectively 15 seconds, 45 seconds, 75 seconds generation coal pulverizer trip commands, starting coal pulverizer tripping Logic judgment circuit.It is followed by a comparison block, in which: " SWITCH=0 " means " being less than ", and " GW=6 " is meant " 6KPa ", when " X=XQ01 " of input is less than 6Kpa, " comparison block " output on-off model " 1 " simultaneously forms XH01 signal, The meaning of XH01 signal is exactly " primary wind pressure is less than 6Kpa ";Three positive delay blocks are followed by, if " primary wind pressure is less than The time of 6Kpa " signal is greater than the time of delay block setting, and output will be set as 1, and otherwise its output is 0, and three just It is respectively 15 seconds, 45 seconds, 75 seconds to the delay time of delay block;Followed by three 5 seconds pulse packets, if positive delay block Output is 1, and output will be set as 1 and be kept for 5 seconds, and otherwise its output is 0.In this way, after First air forces down, Jiu Huifen Not Yan Shi 15 seconds, 45 seconds, 75 seconds and respectively generate three instructions P15, P45, P75, and send to coal pulverizer tripping logic judgment Circuit, the instruction are sent out in the form of 5 pulse per second (PPS)s.
Fig. 3 is two kinds of special circumstances of four coal pulverizers operation, it may be assumed that the first special circumstances of four mill operations are as follows: ABC With any operation of D/E/F, second of special circumstances of four mill operations are as follows: any operation of DEF and A/B/C.It is counter to prolong When block, the time of anti-delay is set as 10s, it is therefore an objective to keep the signal again 10 seconds, avoid the problem that causing to patrol because of execution cycle Collect error (effect of " anti-delay block " is identical in each figure below).Wherein, " 4PULV 1ABC&D/E/F " means " 4 in Fig. 3 Platform coal pulverizer operation (A, B, C coal pulverizer are all run, and D, E, F coal pulverizer have an operation) ";"4PULV 2DEF&A/B/C" Mean " 4 coal pulverizer operations (D, E, F coal pulverizer are all run, and A, B, C coal pulverizer have an operation) ";"4PULV OP " mean " 2 kinds of special circumstances of 4 coal pulverizers operation (point 2 kinds of situations, one is: A, B, C coal pulverizer all operation and D, E, F coal pulverizer have an operation, the second is: D, E, F coal pulverizer are all run and A, B, C coal pulverizer have an operation) ".
Attached drawing 4 is the trip(ping) circuit of C coal pulverizer in Fig. 1, and which illustrate the conditions of triggering C coal pulverizer tripping: in mill operation, When the real-time pressure of First air is less than preset pressure, jump C mill after 15s delay, four mills run above-mentioned second of special circumstances: When DEF and A/B/C is run, DE mill has been jumped after 15s delay, F and A/B/C has been jumped after 45s delay and grind;Four mill operations first When kind special circumstances, ABC and D/E/F are run, BC mill is jumped after 15s delay.
In Fig. 4, " TRIP C " (that is: the XV21 signal) at end represents " signal of triggering No. 3 coal pulverizer C tripping ";"or" 3 inputs of door are to form 3 conditions of the signal:
" 4PULV OP " mean " 2 kinds of special circumstances of 4 coal pulverizers operation (point 2 kinds of situations, one is: A, B, C Coal pulverizer is all run and D, E, F coal pulverizer have an operation, the second is: D, E, F coal pulverizer are all run and A, B, C coal pulverizer Have an operation) ";Thereafter " o " means logic " NOT gate ";When not being this two kinds of situations, occur " First air forces down " Afterwards, if primary wind pressure is still low after delay 15 seconds, No. 3 coal pulverizer C trippings are triggered.
In " TRIP A/B/C " signal, " 4PULV 2DEF&A/B/C " means that " 4 coal pulverizers run (D, E, F coal-grinding Machine is all run, and A, B, C coal pulverizer have an operation) ", P45 means " after First air forces down, being delayed 45 seconds ", it may be assumed that has Operation (D, E, F coal pulverizer are all run, and A, B, C coal pulverizer have an operation), generation First air forces down to be prolonged 4 coal pulverizers When 45 seconds after primary wind pressure it is still low, then according to No. 3 coal pulverizer C of set sequence trigger switch tripping, No. 2 coal pulverizer B trippings, No. 1 coal-grindings Machine A tripping.
In " TRIP CB " signal, " 4PULV 1ABC&D/E/F " means that " 4 coal pulverizers run (A, B, C coal pulverizer All operation, and D, E, F coal pulverizer have an operation) ", after First air forces down, be delayed 15 seconds after primary wind pressure it is still low, then according to No. 3 coal pulverizer C trippings of set sequence trigger switch, No. 2 coal pulverizer B trippings.
Attached drawing 5 is the trip(ping) circuit of B coal pulverizer in Fig. 1, and which illustrate the conditions of triggering B coal pulverizer tripping: C mill is not transported Row, First air force down, and jump B mill after 15s delay;In mill operation, First air is forced down, and jumps B mill after 45s delay;Four mill fortune The 2nd kind of special circumstances of row: when DEF and A/B/C is run, DE mill has been jumped after 15s delay, to have jumped F and A/B/C after 45s delay Mill;Four mills run the 1st kind of special circumstances: when ABC and D/E/F is run, BC mill is jumped after 15s delay.
In Fig. 5, " TRIP B " (that is: the XV22 signal) at end represents " signal of triggering No. 2 coal pulverizer B tripping ";"or" 3 inputs of door are to form 3 conditions of the signal:
" 4PULV OP " mean " 2 kinds of special circumstances of 4 coal pulverizers operation (point 2 kinds of situations, one is: A, B, C Coal pulverizer is all run and D, E, F coal pulverizer have an operation, the second is: D, E, F coal pulverizer are all run and A, B, C coal pulverizer Have an operation) ";Thereafter " o " means " NOT gate "." PULV C OP " means " coal pulverizer C operation ";Thereafter " o " means " NOT gate ".P15 means " after First air forces down, being delayed 15 seconds ".P45 means that " First air forces down Afterwards, it is delayed 45 seconds ".The logic means that when not being this two kinds of situations, then occurs after First air forces down, if coal pulverizer C Not running, primary wind pressure is still low after delay 15 seconds, triggers No. 2 coal pulverizer B trippings;After generation First air forces down, if delay 45 Primary wind pressure is still low (at this point, No. 3 coal pulverizer C not running) after second, also to trigger No. 2 coal pulverizer B trippings.
In " TRIP A/B/C " signal, " 4PULV 2DEF&A/B/C " means that " 4 coal pulverizers run (D, E, F coal-grinding Machine is all run, and A, B, C coal pulverizer have an operation) ", P45 means " after First air forces down, being delayed 45 seconds ", it may be assumed that has 4 coal pulverizers then occur First air and force down operation (D, E, F coal pulverizer are all run, and A, B, C coal pulverizer have an operation) Primary wind pressure is still low after delay 45 seconds, then triggers No. 3 coal pulverizer C trippings, No. 2 coal pulverizer B trippings, No. 1 coal pulverizer A tripping.
In " TRIP CB " signal, " 4PULV 1ABC&D/E/F " means that " 4 coal pulverizers run (A, B, C coal pulverizer All operations, and D, E, F coal pulverizer have an operation) ", after First air forces down, primary wind pressure is still low after delay 15 seconds, then triggers No. 3 coal pulverizer C trippings, No. 2 coal pulverizer B trippings.
Attached drawing 6 is the trip(ping) circuit of A coal pulverizer, and which illustrate the conditions of triggering A coal pulverizer tripping: BC mill all not running, one Secondary wind pressure is low, jumps A mill after 15s delay;B grinds not running, and First air forces down, and jumps A mill after 45s delay;In mill operation, once Wind pressure is low, jumps A mill after 75s delay;Four mills run the 1st kind of special circumstances: when ABC and D/E/F is run, after 15s delay It jumps BC mill, to jump A and D/E/F after 45s delay and grind;Four mills run the 2nd kind of special circumstances: when DEF and A/B/C is run, DE mill has been jumped after 15s delay, to be jumped F and A/B/C after 45s delay and be ground.
In Fig. 6, " TRIP A " (that is: the XV23 signal) at end represents " signal of triggering No. 1 coal pulverizer A tripping ";End 2 of OR-gate inputs be to form 2 conditions of the signal: " 4PULV OP " means " 2 kinds of 4 coal pulverizers operation Special circumstances (point 2 kinds of situations, one is: A, B, C coal pulverizer are all run and D, E, F coal pulverizer have an operation, the second is: D, E, F coal pulverizer are all run and A, B, C coal pulverizer have an operation) ";Thereafter " o " means " NOT gate "."PULV C OP " means " coal pulverizer C operation ";Thereafter " o " means " NOT gate "." PULV B IN OP " means " coal-grinding Machine B is being run ";Thereafter " o " means " NOT gate ".P15 means " after First air forces down, being delayed 15 seconds ".The meaning of P45 Think of is " after First air forces down, being delayed 45 seconds ".P75 means " after First air forces down, being delayed 75 seconds ".The meaning of the logic It is: when not being this two kinds of situations, then occurs after First air forces down, if coal pulverizer C not running and coal pulverizer B not running, prolong When 15 seconds after primary wind pressure it is still low, trigger No. 1 coal pulverizer A tripping;After generation First air forces down, if First air after delay 45 seconds It presses still low (at this point, No. 3 coal pulverizer C not running and No. 2 coal pulverizer B not running), also to trigger No. 1 coal pulverizer A tripping;Occur After First air forces down, if primary wind pressure is still low after delay 75 seconds, No. 1 coal pulverizer A tripping is also triggered.
In " TRIP A/B/C " signal, " 4PULV 2DEF&A/B/C " means that " 4 coal pulverizers run (D, E, F coal-grinding Machine is all run, and A, B, C coal pulverizer have an operation) ", P45 means " after First air forces down, being delayed 45 seconds ", it may be assumed that has 4 coal pulverizers then occur First air and force down operation (D, E, F coal pulverizer are all run, and A, B, C coal pulverizer have an operation) Primary wind pressure is still low after delay 45 seconds, then triggers No. 3 coal pulverizer C trippings, No. 2 coal pulverizer B trippings, No. 1 coal pulverizer A tripping.
Attached drawing 7 is F coal pulverizer trip(ping) circuit in Fig. 1, and which illustrate the conditions of triggering F coal pulverizer tripping: DE mill is not all transported Row, First air force down, and jump F mill after 15s delay;E grinds not running, and First air forces down, and jumps F mill after 45s delay;Mill operation In, First air forces down, and jumps F mill after 75s delay;Four mills run the 1st kind of special circumstances: when ABC and D/E/F is run, 15s prolongs Shi Houyi jumps BC mill, to jump A and D/E/F after 45s delay and grind;Four mills run the 2nd kind of special circumstances: DEF and A/B/C is transported When row, DE mill has been jumped after 15s delay, F and A/B/C has been jumped after 45s delay and grind.
Attached drawing 8 is E coal pulverizer trip(ping) circuit in Fig. 1, and which illustrate the conditions of triggering E coal pulverizer tripping: D grinds not running, First air forces down, and jumps E mill after 15s delay;In mill operation, First air is forced down, and jumps E mill after 45s delay;Four mills operation the 1 kind of special circumstances: when ABC and D/E/F is run, BC mill has been jumped after 15s delay, A and D/E/F has been jumped after 45s delay and grind;Four Platform mill the 2nd kind of special circumstances of operation: when DEF and A/B/C is run, DE mill is jumped after 15s delay.
Attached drawing 9 is D coal pulverizer trip(ping) circuit in Fig. 1, and which illustrate the conditions of triggering D coal pulverizer tripping: in mill operation, one Secondary wind pressure is low, jumps D mill after 15s delay;Four mills run the 1st kind of special circumstances: when ABC and D/E/F is run, after 15s delay BC mill has been jumped, A and D/E/F has been jumped after 45s delay and grind;Four mills run the 2nd kind of special circumstances: DEF and A/B/C is run When, DE mill is jumped after 15s delay.
Although the embodiments of the present invention have been shown and described above, it is to be understood that above-described embodiment is Illustratively, it should not be understood as limiting the present invention, those skilled in the art are in the scope of the utility model Inside it can make changes, modifications, alterations, and variations to the above described embodiments.

Claims (5)

1. a kind of First air low-voltage variation system for pulverized-coal fired boiler characterized by comprising
Detection unit, for detecting the real-time pressure of First air main pipe;
First control unit, the real-time pressure for will test are preset multiple periods compared with preset pressure, and Disconnect the power supply of two coal pulverizers under current state on priority sequence;
First judging unit, for judging the priority sequence of the coal pulverizer.
2. First air low-voltage variation system according to claim 1, which is characterized in that first judging unit is used for The priority sequence of coal pulverizer is judged according to the current working status of the coal pulverizer.
3. First air low-voltage variation system according to claim 2, which is characterized in that further include:
Second control unit, for the real-time pressure for will test compared with preset pressure, preset time period is multiple times Section, and disconnect the power supply of two oil guns under current state on priority sequence.
4. First air low-voltage variation system according to claim 3, which is characterized in that further include:
Second judgment unit, for judging the priority sequence of oil gun according to the current working status of the oil gun.
5. First air low-voltage variation system according to claim 4, which is characterized in that the quantity of the coal pulverizer is six A, six coal pulverizers are divided into first group of coal pulverizer and second group of coal pulverizer, first group of coal pulverizer include priority according to First group of First ray coal pulverizer, first group of second sequence coal pulverizer and the first group of third sequence coal pulverizer of secondary reduction, it is described Second group of coal pulverizer includes second group of First ray coal pulverizer, the second group of second sequence coal pulverizer and that priority successively reduces Two groups of third sequence coal pulverizers;
The quantity of the oil gun is six, and six oil guns are divided into first group of oil gun and second group of oil gun, first group of oil Rifle includes first group of First ray oil gun, first group of second sequence oil gun and the first group of third sequence oil that priority successively reduces Rifle, second group of oil gun include priority successively reduce second group of First ray oil gun, second group of second sequence oil gun and Second group of third sequence oil gun.
CN201820440710.XU 2018-03-30 2018-03-30 A kind of First air low-voltage variation system for pulverized-coal fired boiler Expired - Fee Related CN208566744U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820440710.XU CN208566744U (en) 2018-03-30 2018-03-30 A kind of First air low-voltage variation system for pulverized-coal fired boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820440710.XU CN208566744U (en) 2018-03-30 2018-03-30 A kind of First air low-voltage variation system for pulverized-coal fired boiler

Publications (1)

Publication Number Publication Date
CN208566744U true CN208566744U (en) 2019-03-01

Family

ID=65453845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820440710.XU Expired - Fee Related CN208566744U (en) 2018-03-30 2018-03-30 A kind of First air low-voltage variation system for pulverized-coal fired boiler

Country Status (1)

Country Link
CN (1) CN208566744U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644804A (en) * 2018-03-30 2018-10-12 大唐阳城发电有限责任公司 It is a kind of for the First air low-voltage variation system of pulverized-coal fired boiler and guard method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644804A (en) * 2018-03-30 2018-10-12 大唐阳城发电有限责任公司 It is a kind of for the First air low-voltage variation system of pulverized-coal fired boiler and guard method

Similar Documents

Publication Publication Date Title
CN102226513B (en) Fault optimizing control method of supercritical unit unilateral auxiliary engine
CN104633638A (en) Comprehensive control method for function of machine halt without boiler shutdown in power plant FCB
CN110017498B (en) Starting mode of direct-blowing pulverizing system
CN111555372A (en) Variable-rate energy storage auxiliary power plant AGC frequency modulation control method
CN208566744U (en) A kind of First air low-voltage variation system for pulverized-coal fired boiler
CN102591201A (en) Control method of integral saturation resistance in auxiliary machine failure load reduction process
CN104197367B (en) Primary air fan RB optimal control method based on mother tube pressure
CN110360592A (en) The disconnected coal control method of coal pulverizer under three operation of coal pulverizing mills of underload
CN111981459A (en) Optimization control method of multi-fuel co-combustion coal-fired unit under RB working condition
CN107132758B (en) Operation method of induced draft fan PID controller feedforward logic optimization configuration control system
CN108644804A (en) It is a kind of for the First air low-voltage variation system of pulverized-coal fired boiler and guard method
CN116382200A (en) Full-load self-stabilization system of unit and operation method thereof
US4398141A (en) Static VAR generators
CN112657665B (en) Control method for preventing and coping with fan stall in RB process
CN105116765A (en) Plasma automatic arc starting control system and method with multiple control functions
CN110296386B (en) Fuel control method under FCB working condition of coal-fired unit for mixed combustion of coal gas
CN107238102A (en) A kind of primary air fan RB control methods under full load mode
CN210430932U (en) Low-voltage ride-through device for coal feeder in power plant
CN113477389B (en) Control method and device of pulverizing system
CN217940447U (en) Auxiliary engine tripping control system for low-load working condition of thermal power plant
CN102003378A (en) Novel start control circuit for double-winding compressor
CN206055674U (en) A kind of 400,000 kilocalorie above combustors
CN112963859A (en) Boiler critical flame protection misoperation prevention regulation and control system
CN106678787B (en) Banking fire guard method and system
JP2008148369A (en) Secondary battery pack with simple overcharge protective function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190301

Termination date: 20200330