CN208563813U - The cladding Combined hanger of dalle - Google Patents
The cladding Combined hanger of dalle Download PDFInfo
- Publication number
- CN208563813U CN208563813U CN201821023555.8U CN201821023555U CN208563813U CN 208563813 U CN208563813 U CN 208563813U CN 201821023555 U CN201821023555 U CN 201821023555U CN 208563813 U CN208563813 U CN 208563813U
- Authority
- CN
- China
- Prior art keywords
- dalle
- supporting piece
- bending part
- fastener
- level board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The cladding Combined hanger of dalle, including supporting piece and fastener, supporting piece include level board and vertical plate, and the bottom of vertical plate is equipped with the first bending part, and level board is provided with the second bending part being folded upward at far from one end of vertical plate;It is provided on fastener and matches notch with the second bending part.The advantageous effects of the utility model are: supporting piece is mounted in angle steel crossbeams by the way of sliding, and level board can also can adjust the installation site of dalle all around by the installation site of adjusting hole slot as needed;Mounting process is simplified, the construction time has been saved, reduces construction personnel's workload;It avoids construction personnel and carries out a large amount of installation procedure directly on keel shoe, guarantee is provided to the construction safety of construction personnel.
Description
Technical field
The utility model relates to decorations technical field, specially a kind of cladding Combined hanger of dalle.
Background technique
In modern building design, the plate decorated to metope often uses cladding form of construction work, wherein decorative panel
Material can be customization, can also with on-site cutting, by fixed point is set on building wall or arrangement keel be used as by
Force is directly hung ornamental stone on metope or keel using metal hanger, forms decorative curtain wall.
In the prior art, application No. is the utility model patents of CN201620840482.6 to disclose a kind of single-beam back of the body bolt
Stone material, including stone panel, column, crossbeam, pendant, upper fixing element and lower fixing piece etc. use fixing piece in this scenario
With the mode of pendant grafting, stone panel is connect with skeleton body, simplifies the mounting process of stone panel, by connecting bolt
It connect pendant with crossbeam, upper fixing element and lower fixing piece are coupled by expansion bolt with stone panel;Improve stone panel
With the bonding strength of pendant, achieve the purpose that not easily to fall off.
But in this dry-hanging, pendant by connect bolt connect with crossbeam, the position of pendant be it is fixed, be
Guarantee the flatness of the correct installation site of stone panel and entirety, it is necessary to fixation position of the pendant on crossbeam and
There is stringent required precision in the position of slabstone aperture, and the position of the two is intended to correspond in front and back up and down, otherwise
It will appear installation site deviation, complex process in practical operation, installation progress is slow.
Utility model content
The purpose of the utility model is to provide a kind of dalle easy for installation and being conveniently adjusted installation site is cladding
Combined hanger.
To achieve the above object, following technical scheme is proposed:
The cladding Combined hanger of dalle, including supporting piece and fastener, supporting piece include level board and vertical plate, the bottom of vertical plate
Portion is equipped with the first bending part, and level board is provided with the second bending part being folded upward at far from one end of vertical plate;It is arranged on fastener
Have and matches notch with the second bending part.
The principles of the present invention are: in actual use, wall is sequentially installed with multiple groups angle bar fixing piece, angle
Vertical upright column is installed on ferropexy part, angle steel crossbeams are installed on vertical upright column, forms decorative panel dry-hanging keel frame;Wherein
Under, and before angle steel crossbeams are mounted on vertical upright column, first will on upper, vertical one side on one side of angle steel crossbeams level
Supporting piece in this programme is sleeved on angle bar crossbeam, and the level board of supporting piece is bonded on one side with the level of angle steel crossbeams, and supporting piece is erected
Straight panel is bonded on one side vertically with angle steel crossbeams, since the vertical plate bottom of supporting piece is provided with the first bending part, can make supporting piece
It hooks angle bar crossbeam and erects sidewise bottom, so that supporting piece horizontal on the angle bar crossbeam between the vertical upright column of two sides can move
It is dynamic, and will not fall off;
Construction personnel dalle back side aperture or be cut into groove, fastener is mounted on to the back of dalle
Plate with fastener is directly mounted on the second bending part in supporting piece by face, such construction personnel, simplifies installation
Technique reduces construction personnel's workload;In addition, the groove or mounting hole of up and down direction only need and adjacent two angle steel cross
The relative position between supporting piece on beam is consistent, and precision is easily controllable, and installation site is avoided to misplace.
The advantageous effects of the utility model are:
1. supporting piece is mounted in angle steel crossbeams by the way of sliding, level board can also pass through the installation of adjusting guide groove
Position can adjust installation site of the dalle all around on direction as needed.
2. simplifying mounting process, the construction time has been saved, has reduced construction personnel's workload.
3. avoid construction personnel carries out a large amount of installation procedure directly on keel shoe, to the construction safety of construction personnel
Provide guarantee.
Detailed description of the invention
Attached drawing 1 is a kind of perspective view of the explosion that supporting piece is combined with F type fastener in the utility model.
Attached drawing 2 is a kind of mounting structure floor map of supporting piece and F type fastener in the utility model.
Attached drawing 3 is that supporting piece combines another perspective view of the explosion with F type fastener in the utility model.
Attached drawing 4 is the similar alternative arrangements floor map of supporting piece and F type fastener in the utility model.
Attached drawing 5 combines a kind of perspective view of the explosion with H type fastener for supporting piece in the utility model.
Attached drawing 6 is a kind of mounting structure floor map of supporting piece and H type fastener in the utility model.
Attached drawing 7 is that supporting piece combines another perspective view of the explosion with H type fastener in the utility model.
Attached drawing 8 is the similar alternative arrangements floor map of supporting piece and H type fastener in the utility model
Attached drawing 9 is the cladding Combined hanger mounting structure stereoscopic schematic diagram of the utility model dalle.
In figure: level board 1, vertical plate 2, the first bending part 3, the second bending part 4, F type fastener 501, H type fastener 502,
Notch 503, connecting pin 504, first horizontal segment 101, the second horizontal segment 102, guide groove 103, bolt 6, nut 7, wall 8, angle
Ferropexy part 9, vertical upright column 10, angle steel crossbeams 11, dalle 12, dry-hang glue 13.
Specific embodiment
The cladding Combined hanger of the utility model dalle is further illustrated in the following with reference to the drawings and specific embodiments.
As shown in Figures 1 to 8, the cladding Combined hanger of dalle, including supporting piece and fastener, supporting piece include 1 He of level board
Vertical plate 2, the bottom of vertical plate 2 be equipped with the first bending part 3, and level board 1 is provided with far from one end of vertical plate 2 to be folded upward at
Second bending part 4;The notch 503 to match with the second bending part 4 is provided on fastener.
As shown in Fig. 2, Fig. 4, Fig. 6, Fig. 8, Fig. 9, in actual use, it is solid that wall 8 is sequentially installed with multiple groups angle bar
Determine part 9, vertical upright column 10 is installed on angle bar fixing piece 9, angle steel crossbeams 11 are installed on vertical upright column 10, it is dry to form decorative panel
Hang keel frame;Wherein the horizontal one side of angle steel crossbeams 11 is installed under, and by angle steel crossbeams 11 on upper, vertical one side
Before vertical upright column 10, first the supporting piece in this programme is sleeved on angle bar crossbeam, the level board 1 and angle steel crossbeams 11 of supporting piece
Level be bonded on one side, the vertical plate 2 of supporting piece is bonded on one side with the vertical of angle steel crossbeams 11, due to 2 bottom of vertical plate of supporting piece
It is provided with the first bending part 3, supporting piece can be made to hook angle bar crossbeam and erect sidewise bottom, so that supporting piece can be vertical in two sides
It moves horizontally, and will not fall off on angle bar crossbeam between column 10.
Construction personnel dalle 12 back side aperture or be cut into groove, fastener is mounted on dalle 12
Dalle 12 with fastener is directly mounted on the second bending in supporting piece by the back side, such construction personnel by notch 503
It in portion 4, is easily installed, simplifies mounting process, reduce construction personnel's workload;In addition, the groove of up and down direction or
Person's mounting hole only need and adjacent two angle steel crossbeams 11 on supporting piece between relative position be consistent, precision is easy to
Control, avoids installation site from misplacing.
Further, shown in as shown in Figure 1, Figure 2, Fig. 5, Fig. 6, level board 1 is to be integrally formed component, and structure is simple, processing side
Just.
Further, as shown in Fig. 3, Fig. 4, Fig. 7, Fig. 8, level board 1 includes first horizontal segment 101 and the second horizontal segment
102, guide groove 103 is provided in first horizontal segment 101 and the second horizontal segment 102, the setting of the second bending part 4 is in the second level
In section 102, first horizontal segment 101 and the second about 102 horizontal segment are bonded to each other, and pass through bolt 6 and spiral shell at guide groove 103
Mother 7 is fixedly connected.
Construction personnel is when dalle 12 to be mounted in supporting piece, it is only necessary to carry the second horizontal segment 102 with
And bolt 6 and nut 7, the second horizontal segment 102 is connect at guide groove 103 with first horizontal segment 101, then will be with fastener
Plate is mounted on the second bending part 4 being mounted in supporting piece by notch 503.
During the installation process, the relative position of first horizontal segment 101 and the second horizontal segment 102 is adjusted by guide groove 103,
The position of 12 front and back of dalle can be adjusted, at the same time, supporting piece is slided in angle steel crossbeams 11, can control dress
The position adjustment of decoratice board 12 in the lateral direction, ensure that the installation effect that plate curtain wall is smooth, neat.
Further, as shown in Fig. 3, Fig. 7, guide groove 103 is bar shaped.Due to first horizontal segment 101 and the second horizontal segment
Guide groove 103 is provided on 102, the adjustment distance after combination can reach 5 centimeters or more, meet decorative panel in installation process
The adjusting of material integral smoothness.
Further, as shown in Figures 1 to 4, fastener is F type fastener 501;Construction personnel cuts at the back side of dalle 12
Groove is cut out, the slotting position of groove matches with the supporting piece relative position in adjacent two angle steel crossbeams 11, by F in this programme
The connecting pin 504 of type fastener 501 is inserted into groove, then using dry-hang glue 13 that F type fastener 501 and dalle 12 is fixed viscous
It is connected into one;After solidifying to dry-hang glue 13, the plate with F type fastener 501 directly can be mounted on supporting piece by construction personnel
On the second bending part 4 on;When F type fastener 501 and the second bending part 4 in left and right directions not to it is corresponding when can by sliding supporting piece
To adjust supporting piece position, guarantees to also simplify mounting process while the precision of plate installation, reduce construction personnel's workload.
As shown in Fig. 5 to Fig. 8, fastener is also possible to H type fastener 502;Connecting pin 504 on H type fastener 502 is provided with spiral shell
Hole first connects connecting pin 504 and dalle 12 by setscrew in the back side aperture of dalle 12 using boring device
It connects.Dalle 12 with H type fastener 502 can be directly mounted on the second bending part 4 in supporting piece by construction personnel;When
H type fastener 502 and the second bending part 4 in left and right directions not to it is corresponding when by the sliding adjustable supporting piece position of supporting piece, guarantee plate
Mounting process is also simplified while the precision of material installation, reduces construction personnel's workload.
In example 1, the bending angle of the first bending part 3 is 150 °, and the first bending part 3 can effectively hook angle
The bottom on the vertical one side of gooseneck 11, prevents pendant from falling off, and after hanging up dalle 12, in the weight of dalle 12
Under power effect, supporting piece can more fasten in angle steel crossbeams 11.
In example 2, the bending angle of the first bending part 3 is 90 °, and bending angle is small, is conducive to processing and fabricating.
In the third embodiment, the bending angle of the first bending part 3 is 180 °, and bending angle is big, and tautness is best at this time, support
Part is more not easily to fall off.
It should be understood that embodiment is merely to illustrate the utility model rather than limitation the scope of the utility model.Furthermore it should manage
Solution, after reading the content taught by the present invention, those skilled in the art can make the utility model any various
Change and modification, such equivalent forms equally fall within the application the appended claims and are limited.
Claims (7)
1. the cladding Combined hanger of dalle, including supporting piece and fastener, which is characterized in that supporting piece includes level board (1) and vertical
The bottom of plate (2), vertical plate (2) is equipped with the first bending part (3), and level board (1) is provided with upwards far from the one end of vertical plate (2)
The second bending part (4) of bending;The notch (503) that the second bending part (4) matches is provided on fastener.
2. the cladding Combined hanger of dalle as described in claim 1, which is characterized in that level board (1) is to be integrally formed structure
Part.
3. the cladding Combined hanger of dalle as described in claim 1, which is characterized in that level board (1) includes first level
Section (101) and the second horizontal segment (102), the second bending part (4) are arranged on the second horizontal segment (102), first horizontal segment (101)
With guide groove (103) are provided on the second horizontal segment (102), first horizontal segment (101) and the second horizontal segment (102) are being oriented to
Slot (103) is fixedly connected by bolt (6) with nut (7).
4. the cladding Combined hanger of dalle as claimed in claim 3, which is characterized in that guide groove (103) is bar shaped.
5. the cladding Combined hanger of dalle as described in any claim in Claims 1-4, which is characterized in that fastener
It is F type fastener (501) or H type fastener (502).
6. the cladding Combined hanger of dalle as described in any claim in Claims 1-4, which is characterized in that first
The bending angle of bending part (3) is 90 ° -180 °.
7. the cladding Combined hanger of dalle as claimed in claim 5, which is characterized in that the bending angle of the first bending part (3)
Degree is 90 ° -180 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821023555.8U CN208563813U (en) | 2018-06-29 | 2018-06-29 | The cladding Combined hanger of dalle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821023555.8U CN208563813U (en) | 2018-06-29 | 2018-06-29 | The cladding Combined hanger of dalle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208563813U true CN208563813U (en) | 2019-03-01 |
Family
ID=65489656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821023555.8U Expired - Fee Related CN208563813U (en) | 2018-06-29 | 2018-06-29 | The cladding Combined hanger of dalle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208563813U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113431252A (en) * | 2021-06-29 | 2021-09-24 | 中建七局建筑装饰工程有限公司 | Hoist and mount stone material installation pendant |
CN113863548A (en) * | 2021-09-23 | 2021-12-31 | 中国建筑第八工程局有限公司 | Combined type outer wall structure and construction method thereof |
-
2018
- 2018-06-29 CN CN201821023555.8U patent/CN208563813U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113431252A (en) * | 2021-06-29 | 2021-09-24 | 中建七局建筑装饰工程有限公司 | Hoist and mount stone material installation pendant |
CN113863548A (en) * | 2021-09-23 | 2021-12-31 | 中国建筑第八工程局有限公司 | Combined type outer wall structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208563813U (en) | The cladding Combined hanger of dalle | |
WO1999046455A3 (en) | Clear wall panel system | |
CN105492705A (en) | Ceiling-mounted baffle system | |
KR20110033425A (en) | Stone panel fixing device of a building wall | |
CN209457366U (en) | A kind of architectural furniture with safeguard function | |
CN205217213U (en) | Smallclothes metal hanger for sprayed part | |
CN204663001U (en) | Regulating structure for wallboard | |
CN203729477U (en) | Integrated suspended ceiling keel assembly | |
CN209907705U (en) | Prevent furred ceiling structure of gypsum board deformation | |
CN111101622A (en) | Easy-to-mount hanging partition wall | |
CN109372161A (en) | Hung type division wall | |
CN109927231A (en) | A kind of quick die-filling foamed molding machine | |
CN205777340U (en) | A kind of removable bracket | |
CN114737703A (en) | Unit type aluminum plate curtain wall system adaptable to any modeling and construction process thereof | |
CN108301585A (en) | Armouring keel-free direct pendant | |
CN210530069U (en) | Transverse decorative strip design system convenient to install | |
CN205352697U (en) | Engine pedestal | |
CN208685988U (en) | The anchoring piece of heat insulating decorative board | |
CN208899790U (en) | A kind of plug-in aluminium alloy railing | |
CN208815747U (en) | A kind of micro- wrong second level beam | |
CN208235779U (en) | Furred ceiling erecting by overhang | |
CN207919841U (en) | A kind of back taper unit curtain wall system | |
JP2016087260A (en) | Desktop frame, covering device, and desk system | |
CN216587265U (en) | Assembled design structure of super large specification stainless steel star sky top | |
CN218091564U (en) | Decoration furred ceiling smallpox arranges mounting structure based on BIM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190301 Termination date: 20200629 |