CN208563128U - One kind being used for bridge prefabrication segment concatenation construction daub device - Google Patents

One kind being used for bridge prefabrication segment concatenation construction daub device Download PDF

Info

Publication number
CN208563128U
CN208563128U CN201821119895.0U CN201821119895U CN208563128U CN 208563128 U CN208563128 U CN 208563128U CN 201821119895 U CN201821119895 U CN 201821119895U CN 208563128 U CN208563128 U CN 208563128U
Authority
CN
China
Prior art keywords
staving
capping
movable plate
construction
ptfe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821119895.0U
Other languages
Chinese (zh)
Inventor
许小海
朱晓楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Carbo Technology Group Co.,Ltd.
Original Assignee
Carbon Composite Materials (tianjin) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Carbon Composite Materials (tianjin) Co Ltd filed Critical Carbon Composite Materials (tianjin) Co Ltd
Priority to CN201821119895.0U priority Critical patent/CN208563128U/en
Application granted granted Critical
Publication of CN208563128U publication Critical patent/CN208563128U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

One kind being used for bridge prefabrication segment concatenation construction daub device, includes the staving in cavity structure, and staving bottom outside is fixed with gum outlet guide wheel, and gum outlet guide wheel and the perforation of staving bottom connect;Corresponding two sides are provided with handle in the middle part of staving, and staving is lifted carrying by handle;Polytetrafluoroethylene (PTFE) movable plate is equipped at the top of staving, polytetrafluoroethylene (PTFE) movable plate is connected in capping by spring;The top outer of staving is equipped with buckle, is connected staving with lidstock by buckling;Tracheae fast interface is installed for connecting external air pump in the capping.The utility model has the beneficial effects that light easy to operate, installed capacity and daub thickness can adjust according to demand, and construction efficiency is higher, and construct thickness and flatness high reliablity reduce waste of material.It can reach save the cost and improve the effect of construction efficiency.

Description

One kind being used for bridge prefabrication segment concatenation construction daub device
Technical field
The utility model relates to large area daub constructing device fields, specially a kind of to apply for the splicing of bridge prefabrication segment Work daub device, bridge prefabrication segment can be concrete material, Steel material etc..
Background technique
Precast Concrete Segmental Bridges technology is industrialized architecture production mode, and precast segment spliced girder is opened from the 1950s Beginning is recognized and is applied, at the end of the 20th century, precast assembly technology be widely used in industry and civil buildings, bridge road, The engineering structures fields such as flowering structure, municipal basis, wherein most commonly used application is in bridge construction field, currently, on bridge It is all using Precast Concrete Segmental Bridges technology, currently, substantially process is such as between the beam sections in portion, between bridge deck and girder unit Under: precast bridge segment is simultaneously conserved → is transported to scene and try assembly → interim prestressing force → prestressing force of Mosaic face daub → application Tensioning.Wherein, when daub is constructed, it is substantially all made of artificial daub mode, bondline thickness, uniformity are more difficult to control, simultaneously Construction efficiency is low.
Utility model content
In order to solve above-mentioned problems of the prior art, the utility model provides a kind of for the spelling of bridge prefabrication segment Connect construction daub device.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of apply for the splicing of bridge prefabrication segment Work daub device, includes the staving in cavity structure, and staving bottom outside is fixed with gum outlet guide wheel, gum outlet guide wheel and bucket The perforation connection of body bottom;Corresponding two sides are provided with handle in the middle part of staving, and staving is lifted carrying by handle;It is equipped at the top of staving Polytetrafluoroethylene (PTFE) movable plate, polytetrafluoroethylene (PTFE) movable plate are connected in capping by spring;The top outer of staving is equipped with buckle, Staving is connected with lidstock by buckling;Tracheae fast interface is installed for connecting external air pump in the capping.
The utility model also has following additional technical feature:
Optimization: the material of the staving is polyfluortetraethylene plate;The outer diameter and staving of the polytetrafluoroethylene (PTFE) movable plate Internal diameter match, and the outer profile of polytetrafluoroethylene (PTFE) movable plate is cased with sealing joint strip.
Optimization: the inside of capping and the junction of staving have rubber ring.
Optimization: the capping is the stainless steel material of high-strength light.
Optimization: the fast interface of tracheae is pressure vent, and aperture is matched with air compressor pipe.
The utility model compared to the prior art, the advantage is that:
1, device is light, easily operated, using flexible, and installed capacity and daub thickness can adjust according to demand, construction effect Rate is higher;
2, staving capacity customizes, can be according to actual needs to staving Capacity design;
3, daub thickness is adjustable, and the requirement according to design to colloid thickness can adjust gum outlet guide wheel size, realizes design Thickness;
4, plastic emitting rate is adjustable, applies pressure to polytetrafluoroethylene (PTFE) movable plate by air pump and bridge subsection is spliced glue extruding It is applied to beam sections face, according to factors such as construction personnel, basal plane situation, construction environments, is controlled out by adjusting air pressure size Glue rate, it is more flexible practical.
5, save the cost preferably controls the thickness and flatness of colloid, and construct thickness and flatness high reliablity are reduced Waste of material, reduction colloid smearing is too thick to cause waste of material, can reach save the cost and improves the effect of construction efficiency.
The additional aspect and advantage of the utility model will be set forth in part in the description, partially will be from following description In become obvious, or recognized by the practice of the utility model.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the capping and movable plate downlink connection schematic diagram of the utility model;
Fig. 2 is the utility model agent structure schematic diagram;
Fig. 3 is the utility model gum outlet guide wheel schematic diagram.
In figure: 1, gum outlet guide wheel;2, staving;3, polytetrafluoroethylene (PTFE) movable plate;4, spring;5, handle;6, it covers;7, gas Manage fast interface;8, it buckles.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.
In the description of the present invention, it should be understood that term " longitudinal direction ", " transverse direction ", "upper", "lower", " preceding ", The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" be based on Orientation or positional relationship shown in the drawings is merely for convenience of description the utility model, rather than the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to the utility model Limitation.
One kind being used for bridge prefabrication segment concatenation construction daub device, includes the staving 2 in cavity structure, 2 bottom of staving Gum outlet guide wheel 1 is fixed on the outside of portion, gum outlet guide wheel 1 and the perforation of 2 bottom of staving connect;Two sides setting is corresponded in the middle part of staving 2 There is handle 5, staving 2 is lifted by carrying by handle 5;Polytetrafluoroethylene (PTFE) movable plate 3 is equipped at the top of staving 2, polytetrafluoroethylene (PTFE) is living Movable plate 3 is connected in capping 6 by spring 4;The top outer of staving 2 is equipped with buckle 8, by buckling 8 for staving 2 and capping 6 It is tightly connected;The installation fast interface 7 of tracheae is for connecting external air pump in the capping 6.
The material of the staving 2 is polyfluortetraethylene plate;The outer diameter of the polytetrafluoroethylene (PTFE) movable plate 3 is interior with staving 2 Diameter matches, and the outer profile of polytetrafluoroethylene (PTFE) movable plate 3 is cased with sealing joint strip.
The capping 6 is the stainless steel material of high-strength light, and the inside of the capping 6 and the junction of staving 2 have rubber Cushion rubber.
The fast interface 7 of tracheae is pressure vent, and aperture is matched with air compressor pipe.
Embodiment 1
One kind being used for bridge prefabrication segment concatenation construction daub device, including staving, gum outlet guide wheel, staving, polytetrafluoro The capping lower part of ethylene movable plate, spring, handle, capping, the fast interface of tracheae and buckle, the construction daub device connects bullet Spring reserves the fast interface of tracheae, and tracheae external tapping connects air pump, will be covered using buckle and staving is tightly connected.Outside the staving There is handle, polytetrafluoroethylene (PTFE) movable plate and gum outlet guide wheel are arranged at staving bottom.The utility model, will be deployed according to quality proportioning Bridge subsection splicing mucilage binding enter staving, with buckle lidstock is good, the fast interface of tracheae and air pump are connected, air pump is passed through Pressure will push away under capping makes bridge subsection splicing glue uniformly squeeze out and be applied on beam sections face from gum outlet, and construction is convenient.
In the utility model, the material of the daub device staving is polyfluortetraethylene plate, high-strength light.
In the utility model, the capping is the stainless steel material of high-strength light, and edge is embedded with rubber ring, guarantees envelope Cover the airtightness connecting with staving.
In the utility model, the fast interface of tracheae is pressure vent, and grafting universal air compressor is convenient in aperture Pipe, convenient for quickly connection.
Embodiment 2
Application method for bridge prefabrication segment concatenation construction daub device:, should be according to the face in construction section before construction Each factor such as product, colloid design thickness, construction environment determines that engineering uses the staving capacity and gum outlet of construction daub device Guide wheel.Segment concatenation construction daub device is assembled, and carries out no-load test, whether check device system has abnormal phenomenon.Construction When, it should be stirred evenly according to colloid dosage is calculated, according to the proportion of colloid by the splicing mucilage binding stirred evenly in device staving It is interior, buckle is compressed after covering capping, the gum outlet guide wheel of size needed for installing connects the fast interface of tracheae, starts daub construction.Root Plastic emitting rate is determined according to factors such as construction area, worker operation qualification, construction environments, determines that air pressure is big by plastic emitting rate Small, air pressure can also be adjusted at any time according to practice of construction situation.After the completion of construction, the colloid inside staving is cleaned out, And it is cleaned in time with absolute alcohol or other solvents.
Although the various embodiments described above are described, once a person skilled in the art knows basic wounds The property made concept, then additional changes and modifications can be made to these embodiments, so the foregoing is merely the realities of the utility model Example is applied, the scope of patent protection of the utility model is not intended to limit, it is all to utilize the utility model specification and accompanying drawing content Made equivalent structure or equivalent flow shift, is applied directly or indirectly in other relevant technical fields, and similarly includes Within the scope of patent protection of the utility model.

Claims (5)

1. one kind is used for bridge prefabrication segment concatenation construction daub device, which is characterized in that include the staving in cavity structure (2), staving (2) bottom outside is fixed with gum outlet guide wheel (1), and gum outlet guide wheel (1) and the perforation of staving (2) bottom connect;Bucket Corresponding two sides are provided with handle (5) in the middle part of body (2), and staving (2) is lifted carrying by handle (5);It is equipped at the top of staving (2) poly- Tetrafluoroethene movable plate (3), polytetrafluoroethylene (PTFE) movable plate (3) are connected on capping (6) by spring (4);The top of staving (2) Outside is equipped with buckle (8), is tightly connected staving (2) and capping (6) by buckle (8);Tracheae is installed fast on the capping (6) Interface (7) is for connecting external air pump.
2. according to claim 1 be used for bridge prefabrication segment concatenation construction daub device, it is characterized in that: the staving (2) material is polyfluortetraethylene plate;The outer diameter of the polytetrafluoroethylene (PTFE) movable plate (3) matches with the internal diameter of staving (2), and The outer profile of polytetrafluoroethylene (PTFE) movable plate (3) is cased with sealing joint strip.
3. according to claim 1 be used for bridge prefabrication segment concatenation construction daub device, it is characterized in that: the capping (6) junction of inside and staving (2) has rubber ring.
4. according to claim 1 be used for bridge prefabrication segment concatenation construction daub device, it is characterized in that: the capping It (6) is the stainless steel material of high-strength light.
5. according to claim 1 be used for bridge prefabrication segment concatenation construction daub device, it is characterized in that: the tracheae is fast Interface (7) is pressure vent, and aperture is matched with air compressor pipe.
CN201821119895.0U 2018-07-16 2018-07-16 One kind being used for bridge prefabrication segment concatenation construction daub device Active CN208563128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821119895.0U CN208563128U (en) 2018-07-16 2018-07-16 One kind being used for bridge prefabrication segment concatenation construction daub device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821119895.0U CN208563128U (en) 2018-07-16 2018-07-16 One kind being used for bridge prefabrication segment concatenation construction daub device

Publications (1)

Publication Number Publication Date
CN208563128U true CN208563128U (en) 2019-03-01

Family

ID=65492434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821119895.0U Active CN208563128U (en) 2018-07-16 2018-07-16 One kind being used for bridge prefabrication segment concatenation construction daub device

Country Status (1)

Country Link
CN (1) CN208563128U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898424A (en) * 2019-03-28 2019-06-18 刘良国 A kind of bridge construction of tube head flow resistance reduction glue configuration equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898424A (en) * 2019-03-28 2019-06-18 刘良国 A kind of bridge construction of tube head flow resistance reduction glue configuration equipment

Similar Documents

Publication Publication Date Title
EP3188895B1 (en) Improvements relating to wind turbine blade manufacture
CN100447350C (en) GRP examine and repair hole structure and manufacturing method of GRP examine and repair hole and connection tube
CN208563128U (en) One kind being used for bridge prefabrication segment concatenation construction daub device
CN1900465A (en) Prestress hole path pressure grouting construction process by post-tensioning method
CN105350445A (en) Novel efficient assembly-type reinforced concrete composite beam
CN108177240A (en) Autoclaved aerated concrete slab with built-in pipe and preparation method thereof
CN209538743U (en) A kind of high-pressure slip-casting leakage maintaining device
CN110126367A (en) A kind of be wrapped band and its manufacture and winding construction method containing flexible fluorocarbon material
CN207742066U (en) A kind of concrete impervious testing mold
CN202266018U (en) Template sealing structure for grouting of connecting sleeve
CN103278379B (en) The special short tube of pressure testing and the using method in long-distance pipe pipe section pressure test thereof
CN210995059U (en) Intelligent control system is glued to bi-component structure
US7828496B1 (en) Watertight joint seal for concrete structures
CN211446554U (en) Bridge joint structure is assembled in prefabricated of festival section
CN208668645U (en) A kind of assembled architecture sealed waterproof device
CN208060300U (en) A kind of pneumatic pressure testing device of vehicle mounted electric
JP2006068698A (en) Mixed coating method and mixed coater for two liquid type adhesive and its adhesion structure body
CN207469290U (en) Underground pipe gallery mould plate supporting device and underground pipe gallery template construction structure
CN217896234U (en) Automatic glue of box girder is assembled in prefabrication and is pieced together device
CN208497279U (en) A kind of aerated capsule core model
CN109955504A (en) A kind of three-dimensional porous thermal protection struc ture prepares mold and preparation method with the shape
CN219343571U (en) Prefabricated window seam antiseep structure that wafts of assembled building
US11697249B2 (en) Load introduction device and method for adhesive bonding of a load introduction device
CN105625714A (en) Concrete post-cast strip air mold
CN113530286B (en) Hotel reinforcement robot and use method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200525

Address after: 300 380 C1, C2 Workshops, No. 1 Shengda Road, Xiqing Economic and Technological Development Zone, Tianjin

Patentee after: Carbo Technology Group Co.,Ltd.

Address before: 301700 Tianjin District of Wuqing City Heng Yuan Road No. 1 Keihin Industrial Zone

Patentee before: CARBON COMPOSITES (TIANJIN) Co.,Ltd.