CN208562140U - A kind of Muffle furnace overflow brick holding device - Google Patents

A kind of Muffle furnace overflow brick holding device Download PDF

Info

Publication number
CN208562140U
CN208562140U CN201820773531.8U CN201820773531U CN208562140U CN 208562140 U CN208562140 U CN 208562140U CN 201820773531 U CN201820773531 U CN 201820773531U CN 208562140 U CN208562140 U CN 208562140U
Authority
CN
China
Prior art keywords
pressure sensor
muffle furnace
overflow brick
out against
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820773531.8U
Other languages
Chinese (zh)
Inventor
郑红宣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rainbow Group Co Ltd
Original Assignee
Rainbow Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rainbow Group Co Ltd filed Critical Rainbow Group Co Ltd
Priority to CN201820773531.8U priority Critical patent/CN208562140U/en
Application granted granted Critical
Publication of CN208562140U publication Critical patent/CN208562140U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of Muffle furnace overflow brick holding device, including sequentially connected holds out against cylinder, transition link block, pressure sensor, pressure sensor fixed block and push rod;The transition link block is held out against with pressure sensor pressure test area by hasp, and pressure sensor is fixed by screws on pressure sensor fixed block, and pressure sensor is used to detect the pressure change during Muffle furnace overflow brick is held out against.Quantify variation of the overflow brick in heating, trial production, normal productive process, provides data basis to summarize the mutation analysis that Muffle furnace overflow brick generates in process of production.

Description

A kind of Muffle furnace overflow brick holding device
Technical field
The utility model belongs to G7.5 liquid crystal substrate glass manufacturing field, is related to a kind of Muffle furnace overflow brick holding device.
Background technique
In G7.5 liquid crystal substrate glass production process, upper process glass metal flows in overflow brick by L pipe, and overflow brick is logical It crosses glass metal overflow two sides and forms glass plate, so the variation of overflow brick stretch pressure may will affect hot end production matter at any time Amount can adjust pressure, adjustment production if stretch pressure changes in production process in time, this quantization display pressure data is Adjustment product quality provides theoretical foundation.
Utility model content
The shortcomings that the purpose of the utility model is to overcome the above-mentioned prior arts provides a kind of Muffle furnace overflow brick and holds out against dress It sets, has quantified variation of the overflow brick in heating, trial production, normal productive process, produced to summarize Muffle furnace overflow brick The mutation analysis generated in journey provides data basis.
In order to achieve the above objectives, the utility model is achieved using following technical scheme:
A kind of Muffle furnace overflow brick holding device, including sequentially connected hold out against cylinder, transition link block, pressure sensing Device, pressure sensor fixed block and push rod;
The transition link block is held out against with pressure sensor pressure test area by hasp, and pressure sensor is solid by screw It is scheduled on pressure sensor fixed block, pressure sensor is used to detect the pressure change during Muffle furnace overflow brick is held out against.
Preferably, the water-cooled jacket for cooling is provided with outside pressure sensor.
Further, the water-cooled jacket is tubular, by pressure sensor, transition link block and pressure sensor fixed block packet It wraps up in wherein.
Preferably, it holds out against and cylinder fixed support is successively fixedly installed on the shell of cylinder and is connected and fixed bracket, hold out against gas Piston rod, transition link block, pressure sensor, pressure sensor fixed block and the push rod of cylinder sequentially pass through cylinder fixed support and It is connected and fixed bracket setting.
Further, push rod is provided with the first locking adjusting nut and the second locking adjustment spiral shell across holder part is connected and fixed Mother, the first locking adjusting nut and second lock the adjusting nut upper and lower surfaces with the top for being connected and fixed bracket respectively.
Further, it cylinder fixed support and is connected and fixed on bracket and is respectively arranged with multiple reinforcing ribs.
Compared with prior art, the utility model has the following beneficial effects:
The pressure of overflow brick is passed to pressure sensor by pushing block and push rod by the utility model, to quantify to overflow Variation of the brick in heating, trial production, normal productive process is flowed, and is shown in computer end by the data that communication will test End provides data basis to summarize the mutation analysis that Muffle furnace overflow brick generates in process of production, also can be in production Carry out adjustment at any time.
Further, by being mounted with water-cooling system on the outside of pressure sensor, cooling in 24 hours is carried out to pressure sensor, Influence of the high temperature to pressure sensor is prevented, to guarantee detection data accuracy.
Further, by being provided with cylinder fixed support outside cylinder holding out against, the company of being provided with outside pressure sensor and push rod Fixed bracket is connect, the rigidity of device axial direction and intensity are enhanced.
Further, during holding out against by adjusting two locking adjusting nuts, so as in process of production at any time Adjust the amount of holding out against.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the sectional view of the utility model.
Wherein: 1- holds out against cylinder;2- cylinder fixed support;3- water-cooled jacket;4- pressure sensor;5- transition link block;6- Pressure sensor fixed block;7- first locks adjusting nut;8- second locks adjusting nut;9- push rod;10- pushing block;11- connection Fixed bracket.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
As illustrated in fig. 1 and 2, device described in the utility model, which prolongs axis direction and passes through to be disposed with, holds out against Cylinder 1, transition link block 5, pressure sensor 4, pressure sensor fixed block 6, push rod 9 and pushing block 10, pushing block 10 and overflow brick Connection, transition link block are held out against with 4 pressure test area of pressure sensor by hasp, and pressure sensor 4 is fixed by screws in On pressure sensor fixed block 6, pressure sensor 4 is used to detect the pressure change during Muffle furnace overflow brick is held out against, pressure Sensor fixed block 6 is threadedly coupled with push rod 9.
It holds out against and is provided with cylinder fixed support 2 outside cylinder 1, hold out against and cylinder is successively fixedly installed on the shell of cylinder 1 fixes Bracket 2 and it is connected and fixed bracket 11, piston rod, transition link block 5, pressure sensor 4, the pressure sensor for holding out against cylinder 1 are solid Determine block 6 and push rod 9 sequentially passes through cylinder fixed support 2 and is connected and fixed the setting of bracket 11, cylinder fixed support 2 and is connected and fixed Multiple reinforcing ribs are respectively arranged on bracket 11;Push rod 9 is provided with the first locking adjustment spiral shell across 11 part of bracket is connected and fixed Mother 7 and second locking adjusting nut 8, first locking adjusting nut 7 and second locking adjusting nut 8 respectively be connected and fixed bracket The upper and lower surfaces at 11 top, during holding out against, the thrust towards overflow brick direction for holding out against the generation of cylinder 1 is locked first Adjusting nut 7 is extruded in one of them and is connected and fixed on the bottom surface of bracket 11, and the court that overflow brick generates holds out against 1 direction of cylinder Second locking adjusting nut 8 is extruded in another upper top surface for being connected and fixed bracket 11 by thrust.
It holds out against 1 pressure of cylinder and strength is transmitted on pressure sensor 4 by transition link block 5, pressure sensor 4 is another One end holds out against pushing block 10 by push rod 9, is holding out against brick by the promotion of pushing block 10, is finally holding out against overflow brick, during this holds out against, First locking adjusting nut 7 is locked simultaneously with the second locking adjusting nut 8, and cylinder 1 is held out against after being installed and is supplied gas, is then adjusted Distance of 8 distance of the second locking nut to 4 direction of pressure sensor displacement 10mm or so is locked, so as to adjust pressure, according to The variation of temperature rising condition observation 4 display end of pressure sensor.What pressure sensor 4 will test by data transmission system Data feedback is to computer terminal, and since temperature is higher, the water-cooled jacket 3 for cooling, water-cooled jacket are mounted with outside pressure sensor 4 3 be tubular, wherein by pressure sensor 4, transition link block 5 and pressure sensor fixed block 6 package, to pressure sensor 4 Cooling in 24 hours is carried out, to guarantee detection data accuracy.
The above content is only to illustrate the technical idea of the utility model, and the protection model of the utility model cannot be limited with this Enclose, it is all according to the utility model proposes technical idea, any changes made on the basis of the technical scheme each falls within this reality Within protection scope with novel claims.

Claims (6)

1. a kind of Muffle furnace overflow brick holding device, which is characterized in that hold out against cylinder (1), transition connection including sequentially connected Block (5), pressure sensor (4), pressure sensor fixed block (6) and push rod (9);
The transition link block (5) is held out against with pressure sensor (4) pressure test area by hasp, and pressure sensor (4) passes through Screw is fixed on pressure sensor fixed block (6), and pressure sensor (4) is for detecting during Muffle furnace overflow brick holds out against Pressure change.
2. a kind of Muffle furnace overflow brick holding device according to claim 1, which is characterized in that pressure sensor (4) is outside Portion is provided with the water-cooled jacket (3) for cooling.
3. a kind of Muffle furnace overflow brick holding device according to claim 2, which is characterized in that the water-cooled jacket is round tube Shape, wherein by pressure sensor (4), transition link block (5) and pressure sensor fixed block (6) package.
4. a kind of Muffle furnace overflow brick holding device according to claim 1, which is characterized in that hold out against the outer of cylinder (1) Cylinder fixed support (2) is successively fixedly installed on shell and is connected and fixed bracket (11), holds out against the piston rod of cylinder (1), transition connects Block (5), pressure sensor (4), pressure sensor fixed block (6) and push rod (9) is connect to sequentially pass through cylinder fixed support (2) and connect Connect fixed bracket (11) setting.
5. a kind of Muffle furnace overflow brick holding device according to claim 4, which is characterized in that push rod (9) passes through connection Fixed bracket (11) are partially provided with the first locking adjusting nut (7) and the second locking adjusting nut (8), the first locking adjustment spiral shell Female (7) and second lock adjusting nut (8) upper and lower surfaces with the top for being connected and fixed bracket (11) respectively.
6. a kind of Muffle furnace overflow brick holding device according to claim 4, which is characterized in that cylinder fixed support (2) Multiple reinforcing ribs are respectively arranged with being connected and fixed on bracket (11).
CN201820773531.8U 2018-05-23 2018-05-23 A kind of Muffle furnace overflow brick holding device Active CN208562140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820773531.8U CN208562140U (en) 2018-05-23 2018-05-23 A kind of Muffle furnace overflow brick holding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820773531.8U CN208562140U (en) 2018-05-23 2018-05-23 A kind of Muffle furnace overflow brick holding device

Publications (1)

Publication Number Publication Date
CN208562140U true CN208562140U (en) 2019-03-01

Family

ID=65482839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820773531.8U Active CN208562140U (en) 2018-05-23 2018-05-23 A kind of Muffle furnace overflow brick holding device

Country Status (1)

Country Link
CN (1) CN208562140U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112479562A (en) * 2020-11-17 2021-03-12 彩虹(合肥)液晶玻璃有限公司 Platinum passageway water cooling plant
CN113415977A (en) * 2021-05-19 2021-09-21 河南旭阳光电科技有限公司 Protection device, heating furnace and deformation prevention method
CN113603337A (en) * 2021-08-06 2021-11-05 中国建材国际工程集团有限公司 Photovoltaic calendering glass melting furnace and overflow port structure thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112479562A (en) * 2020-11-17 2021-03-12 彩虹(合肥)液晶玻璃有限公司 Platinum passageway water cooling plant
CN113415977A (en) * 2021-05-19 2021-09-21 河南旭阳光电科技有限公司 Protection device, heating furnace and deformation prevention method
CN113603337A (en) * 2021-08-06 2021-11-05 中国建材国际工程集团有限公司 Photovoltaic calendering glass melting furnace and overflow port structure thereof

Similar Documents

Publication Publication Date Title
CN208562140U (en) A kind of Muffle furnace overflow brick holding device
CN106226347B (en) Displacement measurement system of vertical high-temperature thermal expansion instrument
CN206014657U (en) A kind of glass substrate forming state monitoring device
CN104330304A (en) Clamping mechanism of testing device for direct tensile strength of fragile material
CN104931336A (en) Test device for testing creep of metal materials under low stress
CN207963567U (en) A kind of cold hydrogenation wrap-round tubular heat exchanger of production of polysilicon
CN210802692U (en) Temperature measurement structure for crucible bottom in silicon carbide furnace
CN206884034U (en) A kind of insulating tube internal alarm line installs constant force positioner
CN201334426Y (en) Compound electrode of 12t high borosilicate glass electric melting furnace
CN203310707U (en) Heating device for measuring thermal performance of coke
CN204440190U (en) A kind of air chamber attemperating unit of gas analyzer
CN104155005A (en) Comparison method radiant heat-flow meter calibration apparatus
CN105841868A (en) Unilateral-heating coal coking expansion force detection apparatus and detection method thereof
CN201857355U (en) Device capable of machining and correcting large-diameter carbon/carbon heat insulating screen with elliptic deformation
CN206029043U (en) Novel follow -on graphite sweat soldering mould
CN106645280B (en) Coking coal heat transfer process simulation device
CN207019807U (en) The big arch surface temperature measurement device of glass melter
CN203768206U (en) Real-time monitoring device for stress of crown pull rod of glass melting furnace
CN113154871B (en) Cooling device for muffle furnace external steel structure
CN201041519Y (en) An onsite measurement device for aluminum electrolyte initial crystal temperature
CN210313552U (en) Crystal material reactor
CN206706222U (en) A kind of electrolytic cell production run parameter real-time detecting system
CN205732335U (en) A kind of with rail large-scale drilling rod extruder
CN208621546U (en) A kind of equipment for testing LOW- glass heat-proof effect
CN204973835U (en) Nanometer heat -insulating material apparatus for producing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Shaohong special glass Co.,Ltd.

Assignor: CAIHONG GROUP Co.,Ltd.

Contract record no.: X2023980042112

Denomination of utility model: A top tightening device for overflow bricks of muffle furnace

Granted publication date: 20190301

License type: Common License

Record date: 20230922