CN208555205U - A kind of overflow-type steel band multi-stage spray system - Google Patents

A kind of overflow-type steel band multi-stage spray system Download PDF

Info

Publication number
CN208555205U
CN208555205U CN201820559583.5U CN201820559583U CN208555205U CN 208555205 U CN208555205 U CN 208555205U CN 201820559583 U CN201820559583 U CN 201820559583U CN 208555205 U CN208555205 U CN 208555205U
Authority
CN
China
Prior art keywords
spray
water storage
storage tank
water
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820559583.5U
Other languages
Chinese (zh)
Inventor
李龙来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Suxun New Material Technology Co.,Ltd.
Original Assignee
李龙来
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李龙来 filed Critical 李龙来
Priority to CN201820559583.5U priority Critical patent/CN208555205U/en
Application granted granted Critical
Publication of CN208555205U publication Critical patent/CN208555205U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)

Abstract

The utility model discloses a kind of overflow-type steel band multi-stage spray systems, it include: successively the join end to end multiple spray grooves connect and the water storage tank being connected respectively with each spray groove, water storage tank successively reduces height, form step structure, the junior's sink overflowed to lower than higher level's sink is generated by the spilling of higher level's water trough inner water, steel band in corresponding spray groove is sprayed, complete steel strip surface cleaning, the water that overflow generates, which is formed, to be recycled, water for cleaning is reduced to 2 tons of water of use per ton from original 10 tons of steel band water per ton, water resource waste is effectively reduced, reduce waste water yield and water treatment work amount, simultaneously, pass through multi-stage spray, improve the cleaning efficiency and quality of steel strip surface.

Description

A kind of overflow-type steel band multi-stage spray system
Technical field
The utility model relates to steel band production technical field more particularly to a kind of overflow-type steel band multi-stage spray systems.
Background technique
Tinplate also known as tinplate, are being commonly called as electrolytic tinplate, and english abbreviation SPTE refers to that two sides is coated with business The Low carbon cold rolling steel sheet or steel band of pure tin.It plates ferrochrome and is substantially better than tinplate in the processing performance of coatings for tin plate printing.Due to chromium plating During tank processed processing and corrosion resistance of the iron with substrate are identical as the substrate of tinplate, coating is processed, it is not necessary to consider as Ma Kou The molten tin problem of iron, can be used higher baking temperature, improve print apply production efficiency, to the adhesive force of film better than tinplate, Because being Wuxi thin plate, tin resource is saved, meets the developing direction of tinplate, especially in terms of bottle cap, plating ferrochrome is more By the attention of people.
Plate ferrochrome steel band after processing is completed, need to clean the chromium plating liquid on its surface, so that it is guaranteed that chromium plating iron surface without Residual, convenient for the production of down-stream enterprise.
In the prior art, it for the cleaning of plating ferrochrome, mainly adopts and washes with water.Common cleaning equipment, water provides when cleaning Source waste is serious, and cleaning efficiency is low, and waste water displacement is big, and water treatment work is caused to aggravate, and improves the production cost of enterprise.
Utility model content
The purpose of this utility model is to provide a kind of online multi-stage spray systems of steel band, and the utilization of water is effectively reduced, drop Low discharge of wastewater and production cost.
For this purpose, the utility model uses following technical scheme:
A kind of online multi-stage spray system of steel band, comprising: successively join end to end the first spray groove connect, the second spray groove, Third spray groove, the 4th spray groove and the 5th spray groove, top is provided with live-roller between the adjacent spray groove, and described the One spray groove, the second spray groove, third spray groove, the 4th spray groove and the 5th spray groove interior lower end are respectively arranged with and are driven The parallel pressure roller of roller, first spray groove are connected with the first water storage tank, and the second spray groove is connected with the second water storage tank, third Spray groove is connected with third water storage tank, and the 4th spray groove is connected with the 4th water storage tank, and the 5th spray groove is connected with the 5th water storage tank, The front panel of first water storage tank is higher than squab panel, and the front panel of second water storage tank is lower than the rear wall of the first water storage tank Plate, the squab panel of second water storage tank are lower than the front panel of the second water storage tank, and the front panel of the third water storage tank is lower than the The squab panel of two water storage tanks, the squab panel of the third water storage tank are lower than the front panel of third water storage tank, the 4th water storage tank Front panel be lower than the squab panel of third water storage tank, the squab panel of the 4th water storage tank is lower than the front panel of the 4th water storage tank, The squab panel of low 4th water storage tank of front panel of 5th water storage tank, the squab panel and the 5th water storage tank of the 5th water storage tank Front panel it is contour, the first spray equipment is provided in first spray groove, the second spray groove and third spray groove, it is described The second spray equipment is respectively arranged in 4th spray groove and the 5th spray groove.
Wherein, first water storage tank is connected by first pipe with the first spray groove, and second water storage tank passes through Second pipe is connected with the second spray groove, and three water storage tank is connected by third pipeline with third spray groove, and described Four water storage tanks are connected by the 4th pipeline with the 4th spray groove, and the 5th water storage tank passes through the 5th pipeline and the 5th spray groove It is connected, the first high-pressure pump and the first water segregator is respectively arranged on the first pipe, second pipe and third pipeline, it is described The second high-pressure pump and the second water segregator are respectively arranged on third pipeline and the 4th pipeline.
Wherein, first high-pressure pump and the second high pressure pump type are identical, and first water segregator is No. 8 water segregators, institute Stating the second water segregator is No. 2 water segregators.
Wherein, the first spray trench bottom is provided with the first return pipe for being passed through the first water storage tank, second spray Trench bottom is provided with the second return pipe for being passed through the second water storage tank, third spray trench bottom is provided with and is passed through third water storage tank Third return pipe, it is described 4th spray trench bottom be provided be passed through the 4th water storage tank the 4th return pipe, it is described 5th spray Trench bottom is provided with the 5th return pipe for being passed through the 5th water storage tank.
Wherein, first spray equipment includes 4 group of first sparge pipe, and 4 group of first sparge pipe is horizontally spaced about In corresponding spray groove.
Wherein, in 4 group of first spray tube, 2 spray tubes are one group, and same group of spray tube is parallel to each other up and down to be set It sets.
Wherein, 4 groups of spray tubes pass through it is corresponding be in charge of be connected with the first water segregator.
Wherein, second spray equipment includes the second spray tube of 2 horizontal spacing settings.
Wherein, at least two high pressure fine hole nozzle is provided on first spray tube and the second spray tube.
Wherein, the first water storage trench bottom is provided with water inlet pipe.
The utility model has the beneficial effects that a kind of overflowed to by the spilling generation of higher level's water trough inner water lower than higher level's sink Junior's sink, the steel band in corresponding spray groove is sprayed, complete steel strip surface cleaning, overflow generate Water, which is formed, to be recycled, water for cleaning is reduced to from original 10 tons of steel band water per ton it is per ton use 2 tons of water, water money is effectively reduced Source waste reduces waste water yield and water treatment work amount, meanwhile, by multi-stage spray, improve the cleaning efficiency of steel strip surface And quality, reduce enterprise's production cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
The technical solution of the utility model is further illustrated below with reference to Fig. 1 and by specific embodiment.
A kind of online multi-stage spray system of steel band, comprising: successively join end to end the first spray groove 1 connect, the second spray groove 2, third spray groove 3, the 4th spray groove 4 and the 5th spray groove 5, several spray grooves are sequentially fixed in support platform, the phase Top is provided with live-roller 6 between adjacent spray groove, and cleaned steel band 8 is fed forward through the transmission of live-roller 6, the live-roller 6 one end are respectively connected with driving motor motor, form the power of driving steel band.
First spray groove 1, inside the second spray groove 2, third spray groove 3, the 4th spray groove 4 and the 5th spray groove 5 Lower end is respectively arranged with the pressure roller 7 parallel with live-roller 6, and the steel band 8 after live-roller 6 enters corresponding spray groove Afterwards, steel band 8 is bypassed from 7 bottom of pressure roller, and the steel band between live-roller 6 and pressure roller 7 is formed stretching, extension, is improved spray woods surface and is connect Contacting surface product, improves cleaning effect.
First spray groove 1 is connected with the first water storage tank 9, and the second spray groove 2 is connected with the second water storage tank 10, third spray Leaching slot 3 is connected with third water storage tank 11, and the 4th spray groove 4 is connected with the 4th water storage tank 12, and the 5th spray groove 5 is connected with the 5th storage Sink 13, the water in each water storage tank are used to supply water resource to the steel band 8 in corresponding spray groove.
The front panel 91 of first water storage tank 9 is higher than squab panel 92, and the front panel 101 of second water storage tank 10 is lower than The squab panel 92 of first water storage tank 9, the squab panel 102 of second water storage tank 10 are lower than the front panel 101 of the second water storage tank 10, The front panel 111 of the third water storage tank 11 is lower than the squab panel 102 of the second water storage tank 10, the rear wall of the third water storage tank 11 Plate 112 is lower than the front panel 111 of third water storage tank 11, and the front panel 121 of the 4th water storage tank 12 is lower than third water storage tank 11 Squab panel 111, the squab panel 122 of the 4th water storage tank 12 is lower than the front panel 121 of the 4th water storage tank 12, the 5th storage The squab panel 122 of low 4th water storage tank 12 of front panel 131 of sink 13, the squab panel 132 and the 5th of the 5th water storage tank 13 The front panel 131 of water storage tank 13 is contour, from the first water storage tank 9 to the 5th water storage tank 13 formed hierarchic structure, each water storage tank it Between be connected with diversion trench, preceding water storage tank water because of step structure, directly overflow to posterior water storage tank, then utilize front What is sprayed successively carries out overflow backward, forms multistage overflow spray, and 9 bottom of the first water storage tank is provided with water inlet pipe, need to only lead to Cross and be passed through clean shower water in the first intake chamber 9, successively subsequent spray is without being passed through water, using the water after preceding spray into Enter water storage tank overflow spray, greatly saved spray water resource, reduce the discharge amount of sewage, reduces production cost.
The first spray equipment 14, institute are provided in first spray groove 9, the second spray groove 10 and third spray groove 11 It states and is respectively arranged with the second spray equipment 15 in the 4th spray groove 12 and the 5th spray groove 13, installation spray dress in each spray groove It sets, forms repeatedly spray.
In the present embodiment, first water storage tank 1 is connected by first pipe 16 with the first spray groove 9, and described second Water storage tank 2 is connected by second pipe 17 with the second spray groove 10, and three water storage tank 3 is sprayed by third pipeline 18 and third Leaching slot 11 is connected, and the 4th water storage tank 4 is connected by the 4th pipeline 19 with the 4th spray groove 12, the 5th water storage tank 5 are connected by the 5th pipeline 20 with the 5th spray groove 13.
In the present embodiment, the first high pressure is respectively arranged on the first pipe 16, second pipe 17 and third pipeline 18 Pump 21 and first water segregator 22, come out in each water storage tank into respective pipeline, then by corresponding first high-pressure pump, 21 shape It is rear into corresponding spray equipment, the third pipeline 18 and the 4th pipeline 19 in the first water segregator 22 at entering after high pressure On be respectively arranged with the second high-pressure pump 23 and the second water segregator 24.
In the present embodiment, first high-pressure pump 21 is identical with 23 model of the second high-pressure pump, and first water segregator 22 is 8 Road water segregator, second water segregator 24 are No. 2 water segregators, and the first water segregator 22 comes out its corresponding first high-pressure pump 21 High pressure is divided into 8 tunnels, its corresponding second high-pressure pump 23 is divided into two-way, is diverted to corresponding spray respectively by the second water segregator 24 In shower device, multi-stage spray is formed.
In the present embodiment, 9 bottom of the first spray groove is provided with the first return pipe 25 for being passed through the first water storage tank 1, institute State that 10 bottom of the second spray groove is provided with the second return pipe 26 for being passed through the second water storage tank 2,11 bottom of third spray groove is set It is equipped with the third return pipe 27 for being passed through third water storage tank 3,12 bottom of the 4th spray groove is provided with and is passed through the 4th water storage tank 4 4th return pipe 28,13 bottom of the 5th spray groove are provided with the 5th return pipe 29 for being passed through the 5th water storage tank 5, each spray groove Water converge after spray equipment sprays in slot bottom, carried out subsequently into being flowed into corresponding water storage tank by respective return pipe Then the recycling of shower water forms spray again.
In the present embodiment, first spray equipment 14 includes 4 group of first sparge pipe 141,4 group of first sparge pipe 141 are horizontally spaced about in corresponding spray groove, and in 4 group of first spray tube 141,2 spray tubes are one group, together It is arranged in parallel above and below one group of spray tube, the first spray in the first spray groove 1, the second spray groove 2 and third spray groove 3 In device 14, using 4 group of first spray tube 141, into the first spray groove 1, the second spray groove 2 and third spray groove 3 When steel band is around the respectively pressure roller 7 of inside, every two groups spray to form one group of use, carry out front and back sides to the steel band of process and spray simultaneously Leaching.
In the present embodiment, 4 groups of spray tubes pass through it is corresponding be in charge of be connected with the first water segregator 22.
In the present embodiment, second spray equipment 15 includes the second spray tube 151 of 2 horizontal spacing settings.
In the present embodiment, at least two high pressure pore is provided on first spray tube 141 and the second spray tube 151 Nozzle 30, the water outlet of high pressure fine hole nozzle are directed to steel strip surface setting, while using the structure of high pressure fine hole nozzle 30, real Existing high-pressure spraying, spray dynamics is strong, and effect is good.
The above content is only the preferred embodiment of the utility model, for those of ordinary skill in the art, according to this reality With novel thought, there will be changes in the specific implementation manner and application range, and the content of the present specification should not be construed as Limitations of the present invention.

Claims (10)

1. a kind of overflow-type steel band multi-stage spray system characterized by comprising successively join end to end the first spray groove connect, Second spray groove, third spray groove, the 4th spray groove and the 5th spray groove, top is provided with biography between the adjacent spray groove Dynamic roller, first spray groove, the second spray groove, third spray groove, the 4th spray groove and the 5th spray groove interior lower end difference It is provided with the pressure roller parallel with live-roller, first spray groove is connected with the first water storage tank, and the second spray groove is connected with Two water storage tanks, third spray groove are connected with third water storage tank, and the 4th spray groove is connected with the 4th water storage tank, the connection of the 5th spray groove There is the 5th water storage tank, the front panel of first water storage tank is higher than squab panel, and the front panel of second water storage tank is lower than first The squab panel of water storage tank, the squab panel of second water storage tank are lower than the front panel of the second water storage tank, the third water storage tank Front panel is lower than the squab panel of the second water storage tank, and the squab panel of the third water storage tank is lower than the front panel of third water storage tank, institute The front panel for stating the 4th water storage tank is lower than the squab panel of third water storage tank, and the squab panel of the 4th water storage tank is lower than the 4th water storage The front panel of slot, the squab panel of low 4th water storage tank of front panel of the 5th water storage tank, the squab panel of the 5th water storage tank It is contour with the front panel of the 5th water storage tank, first is provided in first spray groove, the second spray groove and third spray groove Spray equipment is respectively arranged with the second spray equipment in the 4th spray groove and the 5th spray groove.
2. overflow-type steel band multi-stage spray system according to claim 1, which is characterized in that first water storage tank passes through First pipe is connected with the first spray groove, and second water storage tank is connected by second pipe with the second spray groove, described Three water storage tanks are connected by third pipeline with third spray groove, and the 4th water storage tank passes through the 4th pipeline and the 4th spray groove It is connected, the 5th water storage tank is connected by the 5th pipeline with the 5th spray groove, the first pipe, second pipe and It is respectively arranged with the first high-pressure pump and the first water segregator on three pipelines, is respectively arranged on the third pipeline and the 4th pipeline Two high-pressure pumps and the second water segregator.
3. overflow-type steel band multi-stage spray system according to claim 2, which is characterized in that first high-pressure pump and Two high pressure pump types are identical, and first water segregator is No. 8 water segregators, and second water segregator is No. 2 water segregators.
4. overflow-type steel band multi-stage spray system according to claim 1, which is characterized in that the first spray trench bottom It is provided with the first return pipe for being passed through the first water storage tank, the second spray trench bottom is provided with and is passed through the second of the second water storage tank Return pipe, third spray trench bottom are provided with the third return pipe for being passed through third water storage tank, the 4th spray trench bottom It is provided with the 4th return pipe for being passed through the 4th water storage tank, the 5th spray trench bottom is provided with and is passed through the 5th of the 5th water storage tank Return pipe.
5. overflow-type steel band multi-stage spray system according to claim 1, which is characterized in that the first spray equipment packet 4 group of first sparge pipe is included, 4 group of first sparge pipe is horizontally spaced about in corresponding spray groove.
6. overflow-type steel band multi-stage spray system according to claim 5, which is characterized in that 4 group of first spray tube In, 2 spray tubes are one group, arranged in parallel above and below same group of spray tube.
7. overflow-type steel band multi-stage spray system according to claim 5, which is characterized in that 4 groups of spray tubes are logical Cross it is corresponding be in charge of be connected with the first water segregator.
8. overflow-type steel band multi-stage spray system according to claim 1, which is characterized in that the second spray equipment packet Include the second spray tube of 2 horizontal spacing settings.
9. overflow-type steel band multi-stage spray system according to claim 5, which is characterized in that first spray tube and At least two high pressure fine hole nozzle is provided on two spray tubes.
10. overflow-type steel band multi-stage spray system according to claim 1, which is characterized in that first water storage tank bottom Portion is provided with water inlet pipe.
CN201820559583.5U 2018-04-19 2018-04-19 A kind of overflow-type steel band multi-stage spray system Active CN208555205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820559583.5U CN208555205U (en) 2018-04-19 2018-04-19 A kind of overflow-type steel band multi-stage spray system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820559583.5U CN208555205U (en) 2018-04-19 2018-04-19 A kind of overflow-type steel band multi-stage spray system

Publications (1)

Publication Number Publication Date
CN208555205U true CN208555205U (en) 2019-03-01

Family

ID=65481542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820559583.5U Active CN208555205U (en) 2018-04-19 2018-04-19 A kind of overflow-type steel band multi-stage spray system

Country Status (1)

Country Link
CN (1) CN208555205U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580384A (en) * 2018-04-19 2018-09-28 李龙来 A kind of overflow-type steel band multi-stage spray system
CN113145672A (en) * 2021-05-17 2021-07-23 山东绿钢环保科技股份有限公司 Efficient descaling system for steel strip

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580384A (en) * 2018-04-19 2018-09-28 李龙来 A kind of overflow-type steel band multi-stage spray system
CN113145672A (en) * 2021-05-17 2021-07-23 山东绿钢环保科技股份有限公司 Efficient descaling system for steel strip

Similar Documents

Publication Publication Date Title
CN108580384A (en) A kind of overflow-type steel band multi-stage spray system
CN102357541B (en) System for cleaning surface of strip steel through hot-water circulation
CN208555205U (en) A kind of overflow-type steel band multi-stage spray system
CN104532325B (en) A kind of electrophoretic coating device of the floating paint of automatic cleaning electrophoresis
CN103060884A (en) Chromic acid recycling treatment system and process in hard chrome plating production line
CN101717987A (en) Treatment device and method for realizing electroplating wastewater zero-release by circulated spraying method
CN103008268B (en) Method for pretreating automobile coating
CN103952751B (en) A kind of device electroplating cleaning showers liquid recycle and reuse
CN102605399A (en) On-line recycling method for steel strip continuous copper plating
CN107876350B (en) Metal surface atomizing sprays former treatment facility
CN101935080B (en) High-concentration ammonia nitrogen blowoff treatment system
CN204602716U (en) Ultrasonic cleaning circulating groove in parkerizing process
CN101402093A (en) Spraying and cleaning apparatus
CN107937902B (en) A kind of metal surface atomizing spray pre-treating technology
CN104846410A (en) Method for electroplating nickel on brass and red copper alloy
CN202144243U (en) Pre-treatment water washing system based on pure water recycling
CN104959337A (en) Coating workpiece reverse backflow cleaning method
CN213835548U (en) Energy-concerving and environment-protective type pickling circulation system
CN214734689U (en) Multi-channel oil intercepting groove
CN203034135U (en) System for recycling and treating chromic acid circularly on hard chrome plating production line
CN202214421U (en) Automotive coating pretreatment line
CN209393693U (en) Pop can tank washing equipment
CN206064359U (en) A kind of water-saving system of high pressure formation device
CN202989288U (en) Acid-alkali tank water circulation system
CN205128486U (en) Washing device sprays in can automatic recycle washing effluent's plating bath

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190523

Address after: 223600 No. 11 Cixi Road, Shuyang Economic Development Zone, Suqian, Jiangsu.

Patentee after: JIANGSU SUXUN NEW MATERIAL TECHNOLOGY CO., LTD.

Address before: 214400 Room 402, 51 Dongfang Courtyard, Jiangyin City, Wuxi City, Jiangsu Province

Patentee before: Li Longlai

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 223600 No. 11 Cixi Road, Shuyang Economic Development Zone, Suqian, Jiangsu.

Patentee after: Jiangsu Suxun New Material Technology Co.,Ltd.

Address before: 223600 No. 11 Cixi Road, Shuyang Economic Development Zone, Suqian, Jiangsu.

Patentee before: JIANGSU SUXUN NEW MATERIAL TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder