CN208534077U - A kind of construction ceiling edge protection device - Google Patents

A kind of construction ceiling edge protection device Download PDF

Info

Publication number
CN208534077U
CN208534077U CN201820840589.XU CN201820840589U CN208534077U CN 208534077 U CN208534077 U CN 208534077U CN 201820840589 U CN201820840589 U CN 201820840589U CN 208534077 U CN208534077 U CN 208534077U
Authority
CN
China
Prior art keywords
fixing piece
protection device
edge protection
construction ceiling
ceiling edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820840589.XU
Other languages
Chinese (zh)
Inventor
周萧飒
牛亚良
董玉坤
王希河
赵学智
王殿林
李永伟
樊新坡
姚继鑫
李双庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201820840589.XU priority Critical patent/CN208534077U/en
Application granted granted Critical
Publication of CN208534077U publication Critical patent/CN208534077U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to civil construction field, especially a kind of construction ceiling edge protection device, it includes that the fixation kit turned on eaves is fixed at several intervals, and a support rod is respectively equipped at the top of each fixation kit, is equipped with welded net between adjacent support rod;The fixation kit includes the first fixing piece and the second fixing piece being oppositely arranged, a connector being connected with the second fixing piece is equipped in the upper section of the first fixing piece, there are several abutting bolts towards the second fixing piece in the first fixing piece lower section threaded engagement, several are equipped on the second fixing piece and is used for the fixation hole that expansion bolt passes through.The utility model no longer needs to embedded steel tube or installation setscrew at eaves gutter, can effectively ensure that the integral waterproofing of eaves gutter, guarantees the drainage effect on roof;Also, it is separated between each fixation kit and welded net of the utility model, convenient transportation and installation, the utility model can effectively meet the needs of people.

Description

A kind of construction ceiling edge protection device
Technical field:
The utility model relates to civil construction field, especially a kind of construction ceiling edge protection device.
Background technique:
In building construction process, generally require to carry out manual work on roof, in order to which worker is effectively ensured in operation Personal safety.Edge protection can be arranged in deck outer rim in construction to build in order to organized discharge roof precipitation It builds to be equipped on deck more and turns over eaves, the eaves gutter flowed through for rainwater is equipped in the inside for turning over eaves.Therefore it is being equipped with the deck for turning over eaves When carrying out construction operation, in order to avoid edge protection influences operation, edge protection need to be arranged outward as far as possible, i.e., it is close to turn over It is arranged at eaves.Existing edge protection is formed frequently with the embedded steel tube on eaves gutter, then by setting up steel pipe on embedded steel tube Edge protection, or eaves is destroyed using this kind of method by expansion bolt fixed standard guardrail piece using directly at eaves gutter The integral waterproofing of ditch causes large effect to the waterproof at later period eaves gutter position, also, using steel pipe or standardization shield When column piece, the dosage and weight of steel pipe and standardization guardrail piece are all larger, and it is more inconvenient to install and transport on construction ceiling. Obviously, existing roofing edge protection device can not effectively meet the needs of people.
Utility model content:
The utility model provides a kind of construction ceiling edge protection device, its clever structure, and design rationally, passes through fixation Component, which is fixed on, to be turned on eaves, and welded net is arranged between each support rod and constitutes provisional protection structure, is no longer needed at eaves gutter Embedded steel tube or installation setscrew, can effectively ensure that the integral waterproofing of eaves gutter, guarantee the drainage effect on roof;Also, this It is separated between each fixation kit and welded net of utility model, convenient transportation and installation.Obviously, the utility model can have Effect meets the needs of people.
Used technical solution is the utility model to solve above-mentioned technical problem: a kind of construction ceiling edge protection dress It sets, is fixed on the fixation kit turned on eaves including several intervals, a support rod is respectively equipped at the top of each fixation kit, it is adjacent Support rod between be equipped with welded net;The fixation kit includes the first fixing piece and the second fixing piece being oppositely arranged, The upper section of first fixing piece is equipped with a connector being connected with the second fixing piece, has in the first fixing piece lower section threaded engagement several The abutting bolt of a the second fixing piece of direction is equipped with several on the second fixing piece and is used for the fixation hole that expansion bolt passes through.
Further, it is equipped at intervals with along its length several in the support rod towards the side on the inside of construction ceiling A installation part.
Further, the installation part is cyclic annular installation part, and is all provided in the installation part at each support rod sustained height There is a wirerope being connected with welded net.
Further, it is connected between the wirerope and welded net by steel wire bundle.
Alternatively, the installation part is hook-shaped installation part.
Further, first fixing piece includes one first fixed link, is set respectively in the left and right sides of the first fixed link Have one for push against bolt screw across abutting nut.
Further, second fixing piece includes one second fixed link, is equipped with a wing plate in the inside of the second fixed link, It is respectively equipped with one on the wing plate at left and right sides of the second fixed link and is used for the fixation hole that expansion bolt passes through.
Further, a backing plate is equipped in the inside of first fixing piece.
Further, the connector is a rod shape connector, and is equipped with one for even at the top of second fixing piece The casing that fitting passes through, is equipped at intervals with several through-holes along its length on connector, a fixing bolt pass through casing and Through-hole on connector and the outside for extending to casing, screw with a fixture nut.
Further, the top of the support rod and the second fixing piece to be connected.
The beneficial effects of the utility model are that its clever structure, design rationally, is fixed on by fixation kit and turns over eaves On, and welded net is set between each support rod and constitutes provisional protection structure, no longer need to embedded steel tube or installation at eaves gutter Setscrew can effectively ensure that the integral waterproofing of eaves gutter, guarantee the drainage effect on roof;Also, the utility model is each solid Determine to separate between component and welded net, convenient transportation and installation.Obviously, the utility model can effectively meet the need of people It asks.
Detailed description of the invention:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the backsight structural representation of Fig. 1;
Fig. 3 be remove in Fig. 2 A-A after welded net 2 and wirerope 9 to side structure schematic view;
In figure, 1, support rod;2, welded net;3, the first fixing piece;301, the first fixed link;302, nut is pushed against;4, Second fixing piece;401, the second fixed link;402, wing plate;5, connector;6, bolt is pushed against;7, fixation hole;8, installation part 8;9, Wirerope;10, backing plate;11, casing;12, fixing bolt;13, fixture nut;14, through-hole;15, eaves is turned over.
Specific embodiment:
In order to clarify the technical characteristics of the invention, below by specific embodiment, and its attached drawing is combined, to this reality It is described in detail with novel.
The embodiments of the present invention as shown in Figure 1-3, a kind of construction ceiling edge protection device, including several Every being fixed on the fixation kit turned on eaves 15, be respectively equipped with a support rod 1 at the top of each fixation kit, adjacent support rod 1 it Between be equipped with welded net 2;The fixation kit includes the first fixing piece 3 and the second fixing piece 4 being oppositely arranged, fixed first The upper section of part 3 is equipped with a connector 5 being connected with the second fixing piece 4, has several courts in 3 lower section threaded engagement of the first fixing piece To the abutting bolt 6 of the second fixing piece 4, it is equipped with several on the second fixing piece 4 and is used for the fixation hole 7 that expansion bolt passes through.
Thus it can be arranged in by the first fixing piece 3 and the second fixing piece 4 when carrying out edge protection and turn over eaves 15 two Side, also, by expansion bolt by the second fixing piece 4 with turn over eaves 15 and be closely connected, then bolt 6 is pushed against by rotation, makes to push against Bolt 6 and turn over the abutting of eaves 15 so that the first fixing piece 3 with turn over the abutting of eaves 15, thus realize fixation kit and turn over eaves 15 it Between be fixedly connected, the support rod 1 at the top of fixation kit and welded net 2 are formed together edge protection.Using the utility model Edge protection device, no longer need at eaves gutter position embedded steel tube or installation expansion bolt, can effectively ensure that the entirety of eaves gutter is anti- It is aqueous, guarantee the drainage effect on roof;
Also, the utility model forms edge protection in the form of support rod 1 is connect with welded net 2, in installation, fortune During defeated, the independent transport installation of each fixation kit and its corresponding support rod 1, welded net 2, transport and install compared with For convenience;
In addition, the utility model can also be according to live actual landform condition and protection requirements, flexibly adjustment mounting assembly Packing density, installation site, use is more flexible.
In the present embodiment, for the ease of being installed on support rod 1 or picking and placing welded net 2, in the support direction Side on the inside of bar construction ceiling is equipped at intervals with several installation parts 8 along its length.Specifically, the fixing piece is ring Shape installation part 8, and a wirerope 9 being connected with welded net 2 is equipped in the fixing piece at each 1 sustained height of support rod. It is possible thereby to by being arranged cricoid installation part 8 towards the side on the inside of construction ceiling in support rod 1, and by wirerope 9 with Welded net 2 is connected, so that welded net 2 is located at the inside of support rod 1, has article or worker to transport in construction ceiling outward Dynamic, when welded net 2 prevents the movement, support rod 1 can play abutting supporting role to welded net 2, compared to supporting When installation part 8 being arranged on the outside of bar 1, support rod 1 plays this mode of drag interaction to welded net 2 by installation part 8, has more Good support protection effect;Also, by using cricoid installation part 8, it is connected using wirerope 9 with welded net 2, wirerope 9 have bigger tensile strength, can increase the protection effect of welded net 2, also add welded net 2 and support rod 1 it Between the stability that connects.
Further, it for the ease of installation, is connected between the wirerope 9 and welded net 2 by steel wire bundle.This reality It is not limited thereto with the connection type between novel wirerope 9 and welded net 2, other connection types, example can also be used The mesh on welded net 2 is such as alternately passed through by wirerope 9, realizes the connection between welded net 2 and wirerope 9, or Pass through the forms such as lock connection.
Alternatively, for the ease of installing and removing welded net 2, it can also be so set, the fixing piece may be hook-shaped Fixing piece.Thus when in use, it is only necessary to which welded net 2 is articulated on fixing piece.
In the present embodiment, for the ease of processing, first fixing piece 3 includes one first fixed link 301, first Fixed link 301 be respectively arranged on the left side and the right side one for push against bolt 6 screw across abutting nut 302.Also, push against bolt 6 It is connected in the form of welding between the first fixed link 301, in actual use, can also be opened up in the first fixed link 301 For push against bolt 6 screw across threaded hole.
Correspondingly, second fixing piece 4 includes one second fixed link 401, one is equipped in the inside of the second fixed link 401 Wing plate 402 is respectively equipped with one on the wing plate 402 of 401 left and right sides of the second fixed link and is used for the fixation hole that expansion bolt passes through 7。
Further, a backing plate 10 is equipped in the inside of first fixing piece 3.It is possible thereby to by backing plate 10 and turn over eaves 15 directly contact, and push against bolt 6 and contact with backing plate 10, it is possible to reduce damage of the abutting bolt 6 to eaves 15 is turned over, can also prevent to Tight bolt 6 and turning over skids between eaves 15, increases the stability of whole device.
Further, in order to turn over eaves 15 suitable for different in width, the connector 5 is a rod shape connector 5, and The top of second fixing piece 4 be equipped with a casing 11 passed through for connector 5, on connector 5 along its length between Every being equipped with several through-holes 14, a fixing bolt 12 passes through the through-hole 14 on casing 11 and connector 5 and extends to the outer of casing 11 Side is screwed with a fixture nut 13.It is slided in casing 11 from there through connector 5, thus it is possible to vary the first fixing piece 3 and second The distance between fixing piece 4 so as to turn over eaves 15 applied to different in width, also, can will be connected by fixing bolt 12 It is fixed between fitting 5 and casing 11, and then make fixed between connector 5 and the second fixing piece 4.
In the present embodiment, the top of the support rod 1 and the second fixing piece 4 to be connected.It can be further support It is integrally formed between bar 1 and the second fixing piece 4, it is possible thereby to increase the stability connected between support rod 1 and fixation kit, and And in the present embodiment, the second fixing piece 4 is arranged and turns over the outside of eaves 15, so that support rod 1, which is located at, turns over eaves 15 At outer position, further prevent temporary protection device from occupying construction ceiling working space.
Above-mentioned specific embodiment cannot function as the limitation to scope of protection of the utility model, for the skill of the art For art personnel, any alternate modification or transformation made to the utility model embodiment all fall within the guarantor of the utility model It protects in range.
Place is not described in detail for the utility model, is the well-known technique of those skilled in the art of the present technique.

Claims (10)

1. a kind of construction ceiling edge protection device, which is characterized in that be fixed on the fixation group turned on eaves including several intervals Part is respectively equipped with a support rod at the top of each fixation kit, is equipped with welded net between adjacent support rod;The fixation kit Including the first fixing piece and the second fixing piece being oppositely arranged, one is equipped in the upper section of the first fixing piece and is connected with the second fixing piece Connector, have several abutting bolts towards the second fixing pieces in the first fixing piece lower section threaded engagement, it is fixed second Part is equipped with several and is used for the fixation hole that expansion bolt passes through.
2. a kind of construction ceiling edge protection device according to claim 1, it is characterised in that: in the support rod direction Side on the inside of construction ceiling is equipped at intervals with several installation parts along its length.
3. a kind of construction ceiling edge protection device according to claim 2, it is characterised in that: the installation part is ring-type Installation part, and a wirerope being connected with welded net is equipped in the installation part at each support rod sustained height.
4. a kind of construction ceiling edge protection device according to claim 3, it is characterised in that: the wirerope and welding It is connected between mesh sheet by steel wire bundle.
5. a kind of construction ceiling edge protection device according to claim 2, it is characterised in that: the installation part is hook-shaped Installation part.
6. a kind of construction ceiling edge protection device according to claim 1, it is characterised in that: the first fixing piece packet Include one first fixed link, the first fixed link be respectively arranged on the left side and the right side one for push against bolt screw across abutting nut.
7. a kind of construction ceiling edge protection device according to claim 1, it is characterised in that: the second fixing piece packet One second fixed link is included, is equipped with a wing plate in the inside of the second fixed link, on the wing plate at left and right sides of the second fixed link respectively The fixation hole passed through equipped with one for expansion bolt.
8. a kind of construction ceiling edge protection device according to claim 1, it is characterised in that: in first fixing piece Inside be equipped with a backing plate.
9. a kind of construction ceiling edge protection device according to claim 1, it is characterised in that: the connector is a bar Shape connector, and it is equipped with a casing passed through for connector at the top of second fixing piece, on connector along its length Direction is equipped at intervals with several through-holes, and a fixing bolt passes through the through-hole on casing and connector and extends to the outside of casing, with One fixture nut screws.
10. a kind of construction ceiling edge protection device according to claim 1, it is characterised in that: the support rod and The top of two fixing pieces to be connected.
CN201820840589.XU 2018-05-31 2018-05-31 A kind of construction ceiling edge protection device Active CN208534077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820840589.XU CN208534077U (en) 2018-05-31 2018-05-31 A kind of construction ceiling edge protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820840589.XU CN208534077U (en) 2018-05-31 2018-05-31 A kind of construction ceiling edge protection device

Publications (1)

Publication Number Publication Date
CN208534077U true CN208534077U (en) 2019-02-22

Family

ID=65382703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820840589.XU Active CN208534077U (en) 2018-05-31 2018-05-31 A kind of construction ceiling edge protection device

Country Status (1)

Country Link
CN (1) CN208534077U (en)

Similar Documents

Publication Publication Date Title
US6763910B2 (en) Safety roof structure including safety stanchions
JP3160565U (en) Installation structure of solar panel mount
KR101144709B1 (en) Rain Waterspout of knockdown building
JP4519015B2 (en) Perforated plate fence and its construction method
CN208534077U (en) A kind of construction ceiling edge protection device
JP2016102331A (en) Prefabricated building
CN107700840A (en) Formwork structure
CN109457876B (en) Metal roof system with hidden maintenance horse way
KR200455034Y1 (en) Strut structures for road traffic facilities
DE102009013463A1 (en) Building, has support connected to base rod by traction element, where base rod is aligned perpendicularly to edge of roof, and is connected to load-carrying roof component by retaining bracket
JP3970062B2 (en) Roof support metal fitting fixing method for parent rope fastening
DE102013104340A1 (en) roof hook
AU2017213548B2 (en) Safety Roof Anchors
CN206987720U (en) A kind of double shield cage cat ladders
CN206205768U (en) Combined type hangs cat ladder
KR200407047Y1 (en) Soundproof wall combined fall prevention
CN220377917U (en) Face limit guard rail structure that slope roofing later stage construction was used
AU2007100612A4 (en) An improved method for attaching pergolas etc to new and existing structures
CN213836139U (en) Bolt-fastened steel grating
CN214498486U (en) Pier column type anti-typhoon component for reinforcing high-mountain movable plank house
US20160312465A1 (en) Air conditioner platform
CN209211789U (en) Assembly type girder steel
CA2714167A1 (en) Rainwater gutter/eaves trough - rotating/tipping system
AU663413B2 (en) Support structure
CN212001975U (en) Roof system with waterproof and snow-blocking functions

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant