CN208518021U - A kind of box and pump integrated supply equipment of full frequency conversion - Google Patents

A kind of box and pump integrated supply equipment of full frequency conversion Download PDF

Info

Publication number
CN208518021U
CN208518021U CN201820650884.9U CN201820650884U CN208518021U CN 208518021 U CN208518021 U CN 208518021U CN 201820650884 U CN201820650884 U CN 201820650884U CN 208518021 U CN208518021 U CN 208518021U
Authority
CN
China
Prior art keywords
tank
pump
water
electric valve
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820650884.9U
Other languages
Chinese (zh)
Inventor
陶连香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Ours Water Supply Equipment Co Ltd
Original Assignee
Yancheng Ours Water Supply Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Ours Water Supply Equipment Co Ltd filed Critical Yancheng Ours Water Supply Equipment Co Ltd
Priority to CN201820650884.9U priority Critical patent/CN208518021U/en
Application granted granted Critical
Publication of CN208518021U publication Critical patent/CN208518021U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Control Of Non-Positive-Displacement Pumps (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model relates to a kind of complete box and pump integrated supply equipments of frequency conversion, including shell, water tank room and pump house room are equipped in shell, water tank type is equipped with water inlet and sewage draining exit, water tank ceiling portion is equipped with relief tube, steady-flow tank and PLC controller are equipped in pump house, several self-straws and the first air pressure tank are equipped at the top of steady-flow tank, steady-flow tank side bottom is equipped with water-supply-pipe, water-supply-pipe is connected with main pipe, main pipe is connected with the first backwash tube and at least two tube bodies, circulation pipe is equipped with the 4th electric valve, circulating pump, second air pressure tank and filtering tank, frequency converter is equipped between the multi-stage booster self priming pump and circulating pump and PLC controller of Zhi Guanti;Integrated pump house cell structure is carried using high-intensitive water tank room, it is monitored down with sensor, multiple branch circuit freq uency conversion supercharging self-priming and backwash filter pipeline, automation control is adjusted, phenomena such as avoiding over-voltage, under-voltage, phase shortage, overheat and stall, guarantee different times and condition for water stability, improve service life.

Description

A kind of box and pump integrated supply equipment of full frequency conversion
Technical field
The utility model relates to a kind of complete box and pump integrated supply equipments of frequency conversion, belong to supply equipment technical field.
Background technique
Supply equipment is can not to reach the height or flow of user's water due to insufficient pressure for solution, and specially research and develop The professional equipment of the environment-friendly energy-saving of design, functionally, entire supply equipment answer satisfied users to water quality, water and water The demand of pressure.It influences that the element selected of supply equipment is many, mainly has the plan in cities and towns or cell, local topography, user to confession The type etc. of demand and the water group of aqueous systems, because above-mentioned element is different, supply equipment can have various different sides Formula and its composition.
It is easy using box and pump integrated not only equipment on-site installation, inlet and outlet pipes, short construction period need to be only connected, and tie up Easy feature is protected, in the intensive place of the public water supplies such as residential building, hospital, market, conference and exhibition center, factory.It is in the prior art Generally by sealing radiator, main pump unit, priming device, is filled without negative pressure flow control supercharging device box and pump integrated supply equipment The composition such as set, however due to city tap-water resource growing tension, there are hydraulic pressure deficiencies in water use peak for city planting ductwork, it is difficult to It is difficult to regulate and control immediately in phenomena such as normal water supply, water tank over-voltage, under-voltage, phase shortage, overheat and stall, causes to give up for water unstable The higher problem of loss rate.
Utility model content
The purpose of this utility model is in view of the drawbacks of the prior art, to provide a kind of box and pump integrated supply water of full frequency conversion and set It is standby, integrated pump house cell structure is carried using high-intensitive water tank room, is monitored down with sensor, multiple branch circuit freq uency conversion supercharging self-priming and anti- Phenomena such as washing and filtering pipeline, automation control adjusts, avoids over-voltage, under-voltage, phase shortage, overheat and stall, guarantees different times With condition for water stability, improve service life.
The utility model is achieved by the following technical solutions:
A kind of box and pump integrated supply equipment of full frequency conversion, including shell, the shell is interior to be equipped with water tank room and pump house room, institute Water tank room is stated equipped with water inlet and sewage draining exit, wherein water tank ceiling portion is equipped with relief tube, is equipped with current stabilization in the pump house Tank and PLC controller, the steady-flow tank top are equipped with several self-straws and the first air pressure tank, and the self-straw is in U-shape, and end It is placed in water tank room bottom, is equipped with liquid level sensor in the water tank room and steady-flow tank;
The steady-flow tank side bottom is equipped with water-supply-pipe, and the water-supply-pipe is connected with main pipe, and the main pipe is connected with the One backwash tube and at least two tube bodies, first backwash tube are equipped with the first electric valve, and the Zhi Guanti is equipped with Second electric valve, multi-stage booster self priming pump and third electric valve;
Second electric valve and third electric valve are located at multi-stage booster self priming pump two sides, first backwash tube With first pressure sensor is equipped on Zhi Guanti, and be connected with outlet pipe, the first pressure sensor be located at outlet pipe with Between third electric valve;
The outlet pipe is connected with circulation pipe, the circulation pipe be equipped with the 4th electric valve, circulating pump, the second air pressure tank and Filtering tank is equipped with second pressure sensor and relief valve on second air pressure tank, the first air pressure tank and relief tube;
Between the filtering tank side and water tank room be equipped with the second backwash tube, the second pressure sensor, relief valve, First pressure sensor, the 4th electric valve, third electric valve, the second electric valve, the first electric valve and liquid level sensor, multistage increasing Pressure self priming pump and circulating pump be electrically connecteds with PLC controller, the multi-stage booster self priming pump and circulating pump and PLC controller it Between be equipped with frequency converter.
Above-mentioned a kind of complete box and pump integrated supply equipment of frequency conversion, wherein the shell includes top plate, side plate and bottom plate, institute It states top plate, side plate and bottom plate to be made of several templates, the template includes panel and surface frame, and the face plate center is equipped with first Convex hull, and four corners are equipped with the second convex hull, the first convex hull inner wall is equipped with cross ribs, and second convex hull is in C Shape structure, and arc chord angle is equipped between first panel, the surface frame is equipped with several mounting holes, the surface frame side and bottom It is equipped with seal groove.
Above-mentioned a kind of complete box and pump integrated supply equipment of frequency conversion, wherein cartridge filter, the filtering are equipped in the filtering tank Cylinder top is equipped with angle, and the circulation pipe is located at angle side, and end is placed in inside angle, and second backwash tube is located at The angle other side.
Above-mentioned a kind of complete box and pump integrated supply equipment of frequency conversion, wherein the shell side is equipped with outer ladder.
The utility model has the following beneficial effects:
The utility model structure novel is compact, design rationally, using easy to assembly, using first with cross ribs Convex hull and the second convex hull of C-shaped improve the compressive resistance of shell, and water tank room and pump house room is made to form integral structure, water tank room water storage Afterwards, it under PLC controller automation control, is intake by steady-flow tank current stabilization, and the second pressure on relief tube and the first air pressure tank Force snesor monitors air pressure, is opened with electric valve control Zhi Guanti, and when in peak period, water supply network generates negative pressure, multichannel is opened, Frequency converter is controlled to multi-stage booster self priming pump fall forward, pressurization compensation, and pressure value, water are monitored by first pressure sensor When demand reduces, frequency converter makes to pump fall-back, guarantees municipal ductwork pressure balance, under liquid level sensor monitoring, control the One backwash tube, circulation pipe are opened, with the second air pressure tank pressure maintaining, under filtering tank filtering, to water tank room and the indoor pipe of pump house Phenomena such as road wash cycles, automation control is easy to adjust, avoids over-voltage, under-voltage, phase shortage, overheat and stall, when guaranteeing different Phase and condition for water stability, improve service life.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
Fig. 2 is the utility model formwork structure figure.
Fig. 3 is the utility model pump house cell structure figure.
(in figure, shell 1, water tank room 2 and pump house room 3, water inlet 4 and sewage draining exit 5, top plate 6, side plate 7 and bottom plate 8, template 9, panel 10 and surface frame 11, the first convex hull 12, the second convex hull 13, cross ribs 14, arc chord angle 15, mounting hole 16 seal Slot 17, relief tube 18, steady-flow tank 19 and PLC controller 20, self-straw 21 and the first air pressure tank 22, liquid level sensor 23, water delivery Pipe 24, main pipe 25, the first backwash tube 26, Zhi Guanti 27, the second electric valve 28, multi-stage booster self priming pump 29 and third electricity Valve 30, first pressure sensor 31, outlet pipe 32, circulation pipe 33, the 4th electric valve 34, circulating pump 35, the second air pressure tank 36 With filtering tank 37, second pressure sensor 38 and relief valve 39, the second backwash tube 40, frequency converter 41, cartridge filter 42, angle 43, outer ladder 44, the first electric valve 45).
Specific embodiment
Specific embodiment of the present utility model is described further with reference to the accompanying drawing.
A kind of box and pump integrated supply equipment of full frequency conversion, including shell 1, the shell 1 is interior to be equipped with water tank room 2 and pump house room 3, the water tank room is equipped with water inlet 4 and sewage draining exit 5, wherein the shell 1 includes top plate 6, side plate 7 and bottom plate 8, described Top plate 6, side plate 7 and bottom plate 8 are made of several templates 9, and the template 9 includes panel 10 and surface frame 11, in the panel 10 The heart is equipped with the first convex hull 12, and four corners are equipped with the second convex hull 13, and 12 inner wall of the first convex hull is equipped with cross ribs 14, second convex hull 13 is in C-shaped configuration, and arc chord angle 15 is equipped between first panel 10, if the surface frame 11 is equipped with Dry mounting hole 16,11 side of surface frame and bottom are equipped with seal groove 17;
It is equipped with relief tube 18 at the top of the water tank room 2, steady-flow tank 19 and PLC controller 20 are equipped in the pump house, it is described Several self-straws 21 and the first air pressure tank 22 are equipped at the top of steady-flow tank 19, the self-straw 21 is in U-shape, and end is placed in water tank 2 bottom of room is equipped with liquid level sensor 23 in the water tank room 2 and steady-flow tank 19;
19 side bottom of steady-flow tank is equipped with water-supply-pipe 24, and the water-supply-pipe 24 is connected with main pipe 25, the main pipe 25 are connected with the first backwash tube 26 and at least two tube bodies 27, and first backwash tube 26 is equipped with the first electric valve 45, the Zhi Guanti 27 are equipped with the second electric valve 28, multi-stage booster self priming pump 29 and third electric valve 30;
Second electric valve 28 and third electric valve 30 are located at 29 two sides of multi-stage booster self priming pump, and described first It is equipped with first pressure sensor 31 on backwash tube 26 and Zhi Guanti 27, and is connected with outlet pipe 32, the first pressure passes Sensor 31 is between outlet pipe 32 and third electric valve 30;
The outlet pipe 32 is connected with circulation pipe 33, and the circulation pipe 33 is equipped with the 4th electric valve 34, circulating pump 35, the Two air pressure tanks 36 and filtering tank 37 are equipped with second pressure on second air pressure tank 36, the first air pressure tank 22 and relief tube 18 Sensor 38 and relief valve 39;
Between 37 side of filtering tank and water tank room 2 be equipped with the second backwash tube 40, the second pressure sensor 38, Relief valve 39, first pressure sensor 31, the 4th electric valve 34, third electric valve 30, the second electric valve 28, the first electric valve 45 It is electrically connected with PLC controller 20 with liquid level sensor 23, multi-stage booster self priming pump 29 and circulating pump 35, the multi-stage booster is certainly Frequency converter 41 is equipped between sucking pump 29 and circulating pump 35 and PLC controller 20;
It is equipped with cartridge filter 42 in the filtering tank, is equipped with angle 43 at the top of the cartridge filter 42, the circulation pipe 33 is located at 43 side of angle, and end is placed in inside angle 43, second backwash tube 40 is located at 43 other side of angle, the shell 1 Side is equipped with outer ladder 44.
The working method of the utility model are as follows:
Sealing element is set in seal groove 17, assembly template 9 is riveted by mounting hole 16, forms top plate 6, bottom plate 8 and side 7 structure of plate makes 9 cross ribs 14 of template inwardly, and the first convex hull 12 and the second convex hull of C-shaped 13 outward, have high resistance to deformation Bearing capacity is filled the water from water inlet 4 to water tank room 2, and by gas in the upper second pressure sensor 38 of relief tube 18 monitoring water tank Pressure, if self-straw 21 is low level setting, settable throttle valve;
When water supply, water is cached by steady-flow tank 19, and monitored by liquid level sensor 23, control pressure release on the first air pressure tank 22 Valve 39 is closed, and is controlled by PLC controller 20, when peak period water supply, city planting ductwork negative pressure, what first pressure sensor 31 monitored Pressure is smaller, and the multi-stage booster self priming pump 29 controlled on manifold body 27 is opened, and changes output frequency by frequency converter 41, adjusts The motor speed of multi-stage booster self priming pump 29 improves, and is pipeline supercharging, and water flows through steady-flow tank 19, efferent duct, main pipe 25, branch pipe After body 27, flows out and supply water from outlet pipe 32;When being not necessarily to high service and smaller water supply demand, frequency converter 41 controls multistage increasing 29 reduction of speed of self priming pump is pressed, and closes the second electric valve 28 and third electric valve 30 on some Zhi Guanti 27, controls water yield;By When water reaches liquid level in 23 senses tank of liquid level sensor, the first electric valve 45 of control, the 4th electric valve 34 and circulating pump 35 are opened It opens, water is made to flow through main pipe 25, the first backwash tube 26, circulation pipe 33, in 37 self-filtering of filtering tank with cartridge filter 42, Water tank room 2 is flowed into outside cartridge filter 42, is carried out wash cycles, and pressure is monitored by the second air pressure tank 36, is guaranteed even running; When water temperature overheat, 38 pressure value of second pressure sensor is larger, and the relief valve 39 controlled on relief tube 18 opens decompression, thus Phenomena such as automation control is easy to adjust, avoids over-voltage, under-voltage, phase shortage, overheat and stall guarantees the confession of different times and condition Water stability improves service life.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in Change or replacement, should all cover within the protection scope of the present utility model.Therefore, the protection scope of the utility model should be with Subject to the protection scope of claims.

Claims (4)

1. a kind of box and pump integrated supply equipment of full frequency conversion, including shell, the shell is interior equipped with water tank room and pump house room, described Water tank room is equipped with water inlet and sewage draining exit, it is characterized in that, water tank ceiling portion is equipped with relief tube, is equipped in the pump house steady Tank and PLC controller are flowed, is equipped with several self-straws and the first air pressure tank at the top of the steady-flow tank, the self-straw is in U-shape, and holds Portion is placed in water tank room bottom, is equipped with liquid level sensor in the water tank room and steady-flow tank;
The steady-flow tank side bottom is equipped with water-supply-pipe, and the water-supply-pipe is connected with main pipe, and it is anti-that the main pipe is connected with first Flushing pipe and at least two tube bodies, first backwash tube are equipped with the first electric valve, and the Zhi Guanti is equipped with second Electric valve, multi-stage booster self priming pump and third electric valve;
Second electric valve and third electric valve are located at multi-stage booster self priming pump two sides, first backwash tube and branch It is equipped with first pressure sensor on tube body, and is connected with outlet pipe, the first pressure sensor is located at outlet pipe and third Between electric valve;
The outlet pipe is connected with circulation pipe, and the circulation pipe is equipped with the 4th electric valve, circulating pump, the second air pressure tank and filtering Tank is equipped with second pressure sensor and relief valve on second air pressure tank, the first air pressure tank and relief tube;
The second backwash tube, the second pressure sensor, relief valve, first are equipped between the filtering tank side and water tank room Pressure sensor, the 4th electric valve, third electric valve, the second electric valve, the first electric valve and liquid level sensor, multi-stage booster are certainly Sucking pump and circulating pump are electrically connected with PLC controller, are equipped between the multi-stage booster self priming pump and circulating pump and PLC controller Frequency converter.
2. a kind of complete box and pump integrated supply equipment of frequency conversion as described in claim 1, it is characterized in that, the shell includes top Plate, side plate and bottom plate, the top plate, side plate and bottom plate are made of several templates, and the template includes panel and surface frame, described Face plate center is equipped with the first convex hull, and four corners are equipped with the second convex hull, and the first convex hull inner wall is equipped with cross ribs, Second convex hull is in C-shaped configuration, and arc chord angle is equipped between first panel, and the surface frame is equipped with several mounting holes, institute It states surface frame side and bottom is equipped with seal groove.
3. a kind of complete box and pump integrated supply equipment of frequency conversion as described in claim 1, it is characterized in that, it is equipped in the filtering tank Cartridge filter, the cartridge filter top are equipped with angle, and the circulation pipe is located at angle side, and end is placed in inside angle, described Second backwash tube is located at the angle other side.
4. a kind of complete box and pump integrated supply equipment of frequency conversion as described in claims 1 to 3 any one, it is characterized in that, it is described Shell side is equipped with outer ladder.
CN201820650884.9U 2018-05-03 2018-05-03 A kind of box and pump integrated supply equipment of full frequency conversion Expired - Fee Related CN208518021U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820650884.9U CN208518021U (en) 2018-05-03 2018-05-03 A kind of box and pump integrated supply equipment of full frequency conversion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820650884.9U CN208518021U (en) 2018-05-03 2018-05-03 A kind of box and pump integrated supply equipment of full frequency conversion

Publications (1)

Publication Number Publication Date
CN208518021U true CN208518021U (en) 2019-02-19

Family

ID=65342373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820650884.9U Expired - Fee Related CN208518021U (en) 2018-05-03 2018-05-03 A kind of box and pump integrated supply equipment of full frequency conversion

Country Status (1)

Country Link
CN (1) CN208518021U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576554A (en) * 2020-05-30 2020-08-25 李坚涛 Municipal administration is with full-automatic no negative pressure water supply equipment of easy access

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576554A (en) * 2020-05-30 2020-08-25 李坚涛 Municipal administration is with full-automatic no negative pressure water supply equipment of easy access

Similar Documents

Publication Publication Date Title
WO2018102939A1 (en) Prefabricated pump station for tap water pressurization
CN208518021U (en) A kind of box and pump integrated supply equipment of full frequency conversion
CN206737040U (en) Rise residential non-negative pressure method of water supply device
CN101113600B (en) Water saving device for automatically reclaiming domestic waste water
CN211285783U (en) Water supply equipment with unit flow regulation function
CN208309683U (en) A kind of box integrated pump station of included pipeline enclosure
CN210659339U (en) Water-saving concrete drip irrigation maintenance system
CN205276379U (en) Network pressure -superposition and high flush tank unite water supply equipment
CN203080628U (en) Automatic domestic water collection and utilization system
CN207362937U (en) Pump is super-silent in tank laminates water supply integrated apparatus
CN201506996U (en) Water storage pressurizing system and horizontal pressure type water tank used in system
CN201288356Y (en) Full-automatic pipe network direct-connection non negative-pressure water-supply installation
CN202273287U (en) Box type air pressure adjusting drainage device for drainage stand pipes of buildings
CN218643459U (en) Intelligent high-level water tank pipe network pressure-superposed water supply equipment
CN216586803U (en) Fire-fighting pool system using rainwater as fire-fighting water source
CN212509671U (en) Normally open diaphragm check valve
CN212317039U (en) Two-stage pressurizing water supply device for tap water pipe network
CN213805606U (en) Intelligent water supply and drainage device for building
CN2755191Y (en) Automatic filtering direct water supplier with variable frequency and supplementary pressure
CN202945643U (en) Energy-saving water supplying device for high-rise building
CN217325615U (en) Intelligent complete set water supply equipment
CN219283515U (en) Circulation water supply device for humidifier
CN211898718U (en) Water supply installation with filtering capability
CN220080256U (en) Integrated rainwater and sewage split-flow pump station
CN217734221U (en) Variable-frequency water supply equipment with vacuum water diversion tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190219