CN208516209U - One kind is kept a public place clean garbage truck wagon box mounting device - Google Patents
One kind is kept a public place clean garbage truck wagon box mounting device Download PDFInfo
- Publication number
- CN208516209U CN208516209U CN201820781815.1U CN201820781815U CN208516209U CN 208516209 U CN208516209 U CN 208516209U CN 201820781815 U CN201820781815 U CN 201820781815U CN 208516209 U CN208516209 U CN 208516209U
- Authority
- CN
- China
- Prior art keywords
- hydraulic cylinder
- wagon box
- clevis arm
- garbage truck
- firm banking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Handcart (AREA)
Abstract
Keep a public place clean garbage truck wagon box mounting device the utility model discloses one kind, including heavy truck, first hydraulic cylinder, second firm banking, clevis arm, chassis is provided in the heavy truck, electric cabinet is provided on the chassis, the electric cabinet side is provided with hydraulic power unit, the hydraulic power unit side is provided with the clevis arm, hook is provided with above the clevis arm, the first firm banking is provided in front of the clevis arm, the first hydraulic cylinder is provided on first firm banking, the first hydraulic cylinder side is provided with the first fixed column, first fixed column side is provided with the first supporting block, the first pin shaft is provided in first supporting block.Beneficial effect is: this device can quickly draw rubbish wagon box with hook onto cram packer, and power has the characteristics that the big handling of power are steady using hydraulic cylinder, and structure is simply easy to loading and unloading, reduces the labor intensity of cleaner, improves work efficiency.
Description
Technical field
The utility model relates to garbage truck production fields, and in particular to one kind is kept a public place clean garbage truck wagon box mounting device.
Background technique
Garbage truck refers to a kind of special-purpose vehicle for transporting various rubbish dedicated for municipal environmental sanitation department, type point
Are as follows: compression type garbage truck, rocker arm type refuse vehicle, hook arm type garbage truck, extension tub garbage truck etc., rubbish wagon box is being transported to rubbish
During, is transported if hanging on truck with manpower or crane, be a thing very troublesome, and increase cleaning
The labor intensity of worker, and improve entreprise cost.
Utility model content
The purpose of this utility model be that solve the above-mentioned problems and provide one kind keep a public place clean garbage truck wagon box installation dress
It sets.
The utility model achieves the above object through the following technical schemes:
One kind is kept a public place clean garbage truck wagon box mounting device, including heavy truck, first hydraulic cylinder, the second firm banking, clevis arm, institute
It states and is provided with chassis in heavy truck, electric cabinet is provided on the chassis, the electric cabinet side is provided with hydraulic power unit, the liquid
Press pump station side is provided with the clevis arm, and hook is provided with above the clevis arm, is provided with first in front of the clevis arm
Firm banking is provided with the first hydraulic cylinder on first firm banking, and the first hydraulic cylinder side is provided with first
Fixed column, first fixed column side are provided with the first supporting block, and the first pin shaft is provided in first supporting block, described
First pin shaft side is provided with the first conveying roller, and first supporting block rear is provided with the second supporting block, and described second
The second conveying roller is provided on bracer, second conveying roller side is provided with the second pin shaft, second pin shaft side
It is provided with the second fixed column, second fixed column side is provided with second hydraulic cylinder, and the second hydraulic cylinder is arranged described
On second firm banking.
The hydraulic power unit in above structure, when the built-in full rubbish of rubbish wagon box needs to transport, in the heavy truck
To the first hydraulic cylinder, the second hydraulic cylinder fuel feeding, the first hydraulic cylinder, second hydraulic cylinder movement will be described
Clevis arm, which boosts, makes its rotary turning, and then by the hook hung on rubbish wagon box, the electric cabinet controls institute
State first hydraulic cylinder, the telescopic rod retraction in the second hydraulic cylinder retracts the clevis arm, the clevis arm is by garbage truck
It struggles against and is pulled up to the chassis, rubbish wagon box is pulled to the chassis by first conveying roller, second conveying roller
On.
In order to which further rubbish wagon box is quickly mounted on garbage truck transport vehicle and is unloaded, the electric cabinet passes through
Bolt is fixed on the chassis.
In order to which further rubbish wagon box is quickly mounted on garbage truck transport vehicle and is unloaded, described first is hydraulic
Cylinder, the second hydraulic cylinder are connect by oil pipe with the hydraulic power unit.
In order to which further rubbish wagon box is quickly mounted on garbage truck transport vehicle and is unloaded, the hydraulic power unit is logical
Conducting wire is crossed to connect with the electric cabinet.
In order to which further rubbish wagon box is quickly mounted on garbage truck transport vehicle and is unloaded, the first hydraulic cylinder
It is bolted on first firm banking, second fixed column is welded on the clevis arm.
In order to which further rubbish wagon box is quickly mounted on garbage truck transport vehicle and is unloaded, the second hydraulic cylinder
It is bolted on second firm banking.
In order to which further rubbish wagon box is quickly mounted on garbage truck transport vehicle and is unloaded, the welding hook exists
On the clevis arm, the clevis arm is connect with second supporting block by second pin shaft.
Beneficial effect is: the utility model can quickly draw rubbish wagon box with hook onto cram packer, power
Have the characteristics that the big handling of power are steady using hydraulic cylinder, and structure is simply easy to loading and unloading, the labour for reducing cleaner is strong
Degree, improves work efficiency.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
Some embodiments of the utility model, for those of ordinary skill in the art, in the premise of not making the creative labor property
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of main view of garbage truck wagon box mounting device of keeping a public place clean described in the utility model;
Fig. 2 is a kind of top view of garbage truck wagon box mounting device of keeping a public place clean described in the utility model;
Fig. 3 is a kind of part drawing of the electric cabinet of garbage truck wagon box mounting device of keeping a public place clean described in the utility model.
The reference numerals are as follows:
1, heavy truck;2, electric cabinet;3, hydraulic power unit;4, clevis arm;5, it links up with;6, the first fixed column;7, the first pin shaft;8,
First conveying roller;9, first hydraulic cylinder;10, the first firm banking;11, the first supporting block;12, the second supporting block;13, second
Conveying roller;14, the second pin shaft;15, the second fixed column;16, second hydraulic cylinder;17, the second firm banking;18, chassis.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
As shown in Figure 1-Figure 3, one kind is kept a public place clean garbage truck wagon box mounting device, including heavy truck 1, first hydraulic cylinder 9, second are solid
Determine pedestal 17, clevis arm 4, be provided with chassis 18 in heavy truck 1, is used as and places refuse hopper, be provided with electric cabinet 2 on chassis 18, use
It controls, 2 side of electric cabinet is provided with hydraulic power unit 3, is used as to first hydraulic cylinder 9,16 fuel feeding of second hydraulic cylinder, hydraulic power unit
3 sides are provided with clevis arm 4, are used as support, are provided with hook 5 above clevis arm 4, as tangling refuse hopper, 4 front of clevis arm
It is provided with the first firm banking 10, is used as installation first hydraulic cylinder 9, is provided with first hydraulic cylinder 9 on the first firm banking 10, uses
Make that clevis arm 4 is pushed to rotate, 9 side of first hydraulic cylinder is provided with the first fixed column 6, is used as connection first hydraulic cylinder 9, and first is solid
6 side of fixed column is provided with the first supporting block 11, is used as installation clevis arm 4, is provided with the first pin shaft 7 in the first supporting block 11, uses
Make the rotation of clevis arm 4,7 side of the first pin shaft is provided with the first conveying roller 8, as sliding over rubbish wagon box, first
11 rear of supporting block is provided with the second supporting block 12, is used as installation clevis arm 4, the second conveying rolling is provided in the second supporting block 12
Wheel 13, as rubbish wagon box is being slid over, 13 side of the second conveying roller is provided with the second pin shaft 14, as making clevis arm
4 rotations, 14 side of the second pin shaft are provided with the second fixed column 15, are used as connection second hydraulic cylinder 16,15 side of the second fixed column
It is provided with second hydraulic cylinder 16, is used as and clevis arm 4 is pushed to rotate, second hydraulic cylinder 16 is arranged on the second firm banking 17.
Hydraulic power unit 3 to first in above structure, when the built-in full rubbish of rubbish wagon box needs to transport, in heavy truck 1
Hydraulic cylinder 9,16 fuel feeding of second hydraulic cylinder, first hydraulic cylinder 9, second hydraulic cylinder 16 act, and clevis arm 4, which is boosted, turns over its rotation
Turn, hook 5 is hung on the hook on rubbish wagon box, then electric cabinet 2 controls first hydraulic cylinder 9, in second hydraulic cylinder 16
Telescopic rod retraction retracts clevis arm 4, and clevis arm 4 pulls up rubbish wagon box to chassis 18, and rubbish wagon box passes through the first conveying rolling
The 8, second conveying roller 13 of wheel is pulled on chassis 18.
In order to which further rubbish wagon box is quickly mounted on garbage truck transport vehicle and is unloaded, electric cabinet 2 passes through spiral shell
Bolt is fixed on chassis 18, and first hydraulic cylinder 9, second hydraulic cylinder 16 are connect by oil pipe with hydraulic power unit 3, and hydraulic power unit 3 is logical
It crosses conducting wire to connect with electric cabinet 2, first hydraulic cylinder 9 is bolted on the first firm banking 10, the weldering of the second fixed column 15
It connects on clevis arm 4, second hydraulic cylinder 16 is bolted on the second firm banking 17, and hook 5 is welded on clevis arm 4
On, clevis arm 4 is connect with the second supporting block 12 by the second pin shaft 14.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry
It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this
The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change
And improvement, these various changes and improvements fall within the scope of the claimed invention.
Claims (7)
- The garbage truck wagon box mounting device 1. one kind is kept a public place clean, including heavy truck (1), first hydraulic cylinder (9), the second firm banking (17), Clevis arm (4), it is characterised in that: be provided with chassis (18) on the heavy truck (1), be provided with electric cabinet on the chassis (18) (2), electric cabinet (2) side is provided with hydraulic power unit (3), and hydraulic power unit (3) side is provided with the clevis arm (4), it is provided with hook (5) above the clevis arm (4), is provided with the first firm banking (10), institute in front of the clevis arm (4) It states and is provided on the first firm banking (10) first hydraulic cylinder (9), it is solid that first hydraulic cylinder (9) side is provided with first Fixed column (6), the first fixed column (6) side are provided with the first supporting block (11), are provided on first supporting block (11) First pin shaft (7), the first pin shaft (7) side are provided with the first conveying roller (8), and the first supporting block (11) rear is set It is equipped with the second supporting block (12), is provided with the second conveying roller (13) on second supporting block (12), the second conveying rolling Wheel (13) side is provided with the second pin shaft (14), and the second pin shaft (14) side is provided with the second fixed column (15), and described the Two fixed columns (15) side is provided with second hydraulic cylinder (16), and the second hydraulic cylinder (16) is arranged in second firm banking (17) on.
- The garbage truck wagon box mounting device 2. one kind according to claim 1 is kept a public place clean, it is characterised in that: the electric cabinet (2) It is bolted on the chassis (18).
- The garbage truck wagon box mounting device 3. one kind according to claim 1 is kept a public place clean, it is characterised in that: the first hydraulic cylinder (9), the second hydraulic cylinder (16) is connect by oil pipe with the hydraulic power unit (3).
- The garbage truck wagon box mounting device 4. one kind according to claim 1 is kept a public place clean, it is characterised in that: the hydraulic power unit (3) it is connect by conducting wire with the electric cabinet (2).
- The garbage truck wagon box mounting device 5. one kind according to claim 1 is kept a public place clean, it is characterised in that: the first hydraulic cylinder (9) it is bolted on first firm banking (10), second fixed column (15) is welded on the clevis arm (4) On.
- The garbage truck wagon box mounting device 6. one kind according to claim 1 is kept a public place clean, it is characterised in that: the second hydraulic cylinder (16) it is bolted on second firm banking (17).
- The garbage truck wagon box mounting device 7. one kind according to claim 1 is kept a public place clean, it is characterised in that: hook (5) weldering It connects on the clevis arm (4), the clevis arm (4) and second supporting block (12) are connected by second pin shaft (14) It connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820781815.1U CN208516209U (en) | 2018-05-24 | 2018-05-24 | One kind is kept a public place clean garbage truck wagon box mounting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820781815.1U CN208516209U (en) | 2018-05-24 | 2018-05-24 | One kind is kept a public place clean garbage truck wagon box mounting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208516209U true CN208516209U (en) | 2019-02-19 |
Family
ID=65340120
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820781815.1U Expired - Fee Related CN208516209U (en) | 2018-05-24 | 2018-05-24 | One kind is kept a public place clean garbage truck wagon box mounting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208516209U (en) |
-
2018
- 2018-05-24 CN CN201820781815.1U patent/CN208516209U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105059800A (en) | Movable garbage compressing device with bucket hanging mechanism | |
CN208516209U (en) | One kind is kept a public place clean garbage truck wagon box mounting device | |
CN204802470U (en) | Feed mechanism behind garbage truck | |
CN205989962U (en) | A kind of hook heart adjustable height refuse bin Self-loading-unloading device | |
CN206606710U (en) | Refrigerator disassembling flow line overturns installation device | |
CN105253503A (en) | Garbage truck with detachable carriage | |
CN206782597U (en) | A kind of feed mechanism of compartment removable garbage truck | |
CN208828346U (en) | A kind of automatic apparatus for getting on/down of power construction cable reel | |
CN207090239U (en) | Compartment removable garbage truck with fuel and electric hybrid hydraulic system | |
CN208070605U (en) | Rotary type hook arm lock | |
CN203450673U (en) | Plastic barrel overturning mechanism for back-loading compressed garbage vehicle | |
CN214877492U (en) | Kitchen waste collection transfer box | |
CN204872389U (en) | Put from loading and unloading formula sanitation car bumper barreled | |
CN212402297U (en) | Compression push plate transmission mechanism for garbage truck | |
CN209226185U (en) | A kind of mechanical buffer lift easing gear | |
CN211944853U (en) | Intelligent compression type garbage truck | |
CN209889575U (en) | Garbage bin hoisting device for garbage truck | |
CN202880254U (en) | Sanitation vehicle for loading, unloading and transferring trash | |
CN206939605U (en) | One kind hangs tub dumping device of garbage truck | |
CN210592821U (en) | Quick collection device of corn for agricultural | |
CN202054021U (en) | Hydraulic side-tipping tramcar | |
CN112340316A (en) | Garbage truck feed mechanism | |
CN2651195Y (en) | Self-ceiling refuse compressing vehicles | |
CN204398943U (en) | A kind of 8 pipe CNG hydraulic substation long-tube trailers | |
CN209144725U (en) | A kind of dustbin lifting device of bucket type street cleaner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 474150 Henan Nanyang Dengzhou City Industrial Agglomeration Area Patentee after: Kaida Environmental Technology Co.,Ltd. Address before: 474150 Henan Nanyang Dengzhou City Industrial Agglomeration Area Patentee before: HENAN KAIDA AUTOMOBILE Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190219 |