CN208505001U - A kind of dustless IR continuous tunnel furnace - Google Patents

A kind of dustless IR continuous tunnel furnace Download PDF

Info

Publication number
CN208505001U
CN208505001U CN201821071662.8U CN201821071662U CN208505001U CN 208505001 U CN208505001 U CN 208505001U CN 201821071662 U CN201821071662 U CN 201821071662U CN 208505001 U CN208505001 U CN 208505001U
Authority
CN
China
Prior art keywords
tunnel furnace
continuous tunnel
fixedly installed
dust
dustless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821071662.8U
Other languages
Chinese (zh)
Inventor
胡川
刘小军
丁永生
华远洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Lunfeng Electronic Technology Co Ltd
Original Assignee
Wuhu Lunfeng Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Lunfeng Electronic Technology Co Ltd filed Critical Wuhu Lunfeng Electronic Technology Co Ltd
Priority to CN201821071662.8U priority Critical patent/CN208505001U/en
Application granted granted Critical
Publication of CN208505001U publication Critical patent/CN208505001U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model provides a kind of dustless IR continuous tunnel furnace, is related to continuous tunnel furnace technical field.The dustless IR continuous tunnel furnace, including continuous tunnel furnace, the right side outer surface of the continuous tunnel furnace is fixedly installed with feed inlet, described and continuous tunnel furnace inside is fixedly installed with conveyer belt, the left outer surface of the continuous tunnel furnace is fixedly installed with discharge port, and the upper end outer surface of continuous tunnel furnace is fixedly installed with servo motor, the lower end outer surface of the servo motor is fixedly installed with air blower, the inner wall apical position of the continuous tunnel furnace is fixedly installed with heating tube, is fixedly installed with sensor of dust concentration on the right side of the heating tube.The dustless IR continuous tunnel furnace, makes dust from being scattering into outside continuous tunnel furnace, causes dust pollution, the health of staff is damaged, completion recycles water resource, becomes a water circulation, continue to settle the dust inside continuous tunnel furnace, has saved water resource.

Description

A kind of dustless IR continuous tunnel furnace
Technical field
The utility model relates to IR continuous tunnel furnace technical field, specially a kind of dustless IR continuous tunnel furnace.
Background technique
IR continuous tunnel furnace is a kind of conduction by heat, and the tunnel type mechanical equipment of drying is completed to workpiece, and workpiece passes through defeated Send band and heating element to generate relative motion, to complete the work dried and conveyed, can continuous production, high production efficiency, section Human-saving dries stay in grade.
And traditional IR continuous tunnel furnace is during the drying process, is easy to produce a large amount of dust, and these dust are usually from work Part can generate some volatile substances in drying and motor element air blower and heating element heats pipe etc. work long hours it Surface also can aging generate dust so that the cleanliness of pollution workpiece and continuous tunnel furnace, even strong to the body of staff Health impacts.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of dustless IR continuous tunnel furnace, solves above-mentioned background skill The problem of traditional IR continuous tunnel furnace that art proposes is easy to produce a large amount of dust during the drying process.
Technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of dustless IR continuous tunnel furnace, packet Continuous tunnel furnace is included, the right side outer surface of the continuous tunnel furnace is fixedly installed with feed inlet, and described and continuous tunnel furnace inside is fixedly installed with Conveyer belt, the left outer surface of the continuous tunnel furnace is fixedly installed with discharge port, and the upper end outer surface of continuous tunnel furnace is fixedly installed with Servo motor, the lower end outer surface of the servo motor are fixedly installed with air blower, and the inner wall apical position of the continuous tunnel furnace is solid Dingan County is equipped with heating tube, is fixedly installed with sensor of dust concentration, the left side appearance of the continuous tunnel furnace on the right side of the heating tube Face offers exhaust outlet close to top position, and the lower end outer surface of the exhaust outlet is fixedly installed with inverted ventilation plate, the continuous tunnel furnace Left outer surface be fixedly installed with controller close to lower position, the inner wall bottom of the continuous tunnel furnace, which is fixedly installed with, catchments Slot is fixedly installed with above the catch basin and leads dirt disk, and the bottom for leading dirt disk is fixedly installed with dust filtering case, described to catchment Water tank is fixedly installed on the left of slot, the inner wall of the dust filtration case is movably installed with dust filtering film, between the water tank and catch basin It is fixedly installed with reflux line, the first water pump is provided with above the conveyer belt, the upper end outer surface of first water pump is solid Dingan County is equipped with spray tube, and the lower end outer surface of the spray tube is fixedly installed with spray head, and the outer surface of the reflux line is fixed Second water pump is installed.
Further, it is flexibly connected between the conveyer belt and continuous tunnel furnace, and the surface of conveyer belt is provided with mesh.
Further, the quantity of the heating tube is eight groups, and every four groups of heating tubes are transversely arranged in "-" type.
Further, the quantity of the inverted ventilation plate is two groups, and is fixedly connected between inverted ventilation plate and continuous tunnel furnace.
Further, the input terminal of the output end of the controller and sensor of dust concentration is electrically connected, and controller Output end and servo motor, the first water pump and the second water pump input terminal be electrically connected.
Further, it is fixedly connected between first water pump and spray tube, the quantity of the spray head is several groups.
Beneficial effect
Compare the prior art:
1, the dustless IR continuous tunnel furnace by sensor of dust concentration, controller, leads dirt disk, water tank, the first water pump, spray The cooperation of pipe and spray head, when dust reaches a certain concentration inside continuous tunnel furnace, sensor of dust concentration sends a signal to controller, Then controller controls the first water pump and extracts the water in water tank out, is then conveyed to spray head by spray tube, makes spray head to tunnel Furnace interior is sprayed, to dust carry out depositing dust processing, then dust with dampening enter leads dirt disk, lead dirt disk to dust into Row is collected, and well to dust settling to leading in dirt disk, is made dust from being scattering into outside continuous tunnel furnace, is caused dust pollution, right The health of staff damages.
2, the dustless IR continuous tunnel furnace, by the cooperation of catch basin, dust filtering case, dust filtering film, reflux line and the second water pump, Dust is deposited to water lead in dirt disk after, water and dust continue to be deposited to dust filtering case, are then completely cut off dust by dust filtering film Inside dust filtering case, then water enters catch basin by dust filtering film, and then water is pumped into water tank by the second water pump, completes to provide water Source recycles, and becomes a water circulation, continues to settle the dust inside continuous tunnel furnace, saved water resource.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the backside structure figure of the utility model.
In figure: 1 continuous tunnel furnace, 2 feed inlets, 3 conveyer belts, 4 discharge ports, 5 servo motors, 6 air blowers, 7 heating tubes, 8 dust Dirt disk, 14 dust filtering casees, 15 water tanks, 16 dust filterings are led in concentration sensor, 9 exhaust outlets, 10 inverted ventilation plates, 11 controllers, 12 catch basins, 13 Film, 17 reflux lines, 18 first water pumps, 19 spray tubes, 20 spray heads, 21 second water pumps.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figs. 1-2, the utility model embodiment provides a kind of dustless IR continuous tunnel furnace, including continuous tunnel furnace 1, continuous tunnel furnace 1 Right side outer surface be fixedly installed with feed inlet 2, and the inside of continuous tunnel furnace 1 is fixedly installed with conveyer belt 3, conveyer belt 3 and tunnel It is flexibly connected between furnace 1, and the surface of conveyer belt 3 is provided with mesh, the left outer surface of continuous tunnel furnace 1 is fixedly installed with discharge port 4, and the upper end outer surface of continuous tunnel furnace 1 is fixedly installed with servo motor 5, the lower end outer surface of servo motor 5 is fixedly installed with drum Blower 6, the inner wall apical position of continuous tunnel furnace 1 are fixedly installed with heating tube 7, and the quantity of heating tube 7 is eight groups, and every four groups of heating Pipe 7 is transversely arranged in "-" type, and the right side of heating tube 7 is fixedly installed with sensor of dust concentration 8, the left side appearance of continuous tunnel furnace 1 Face offers exhaust outlet 9 close to top position, and the lower end outer surface of exhaust outlet 9 is fixedly installed with inverted ventilation plate 10, inverted ventilation plate 10 Quantity is two groups, and is fixedly connected between inverted ventilation plate 10 and continuous tunnel furnace 1, and the left outer surface of continuous tunnel furnace 1 is solid close to lower position Dingan County is equipped with controller 11, and the output end of controller 11 and the input terminal of sensor of dust concentration 8 are electrically connected, and controller 11 Output end and servo motor 5, the first water pump 18 and the second water pump 21 input terminal be electrically connected, the inner wall bottom of continuous tunnel furnace 1 It is fixedly installed with catch basin 12, the top of catch basin 12, which is fixedly installed with, leads dirt disk 13, and the bottom for leading dirt disk 13 is fixedly installed with Dust filtering case 14, the left side of catch basin 12 are fixedly installed with water tank 15, and the inner wall of dust filtering case 14 is movably installed with dust filtering film 16, water tank Reflux line 17 is fixedly installed between 15 and catch basin 12, the top of conveyer belt 3 is provided with the first water pump 18, the first water pump 18 Upper end outer surface be fixedly installed with spray tube 19, be fixedly connected between the first water pump 18 and spray tube 19, the quantity of spray head 20 Lower end outer surface for several groups, spray tube 19 is fixedly installed with spray head 20, by sensor of dust concentration 8, controller 11, leads The cooperation of dirt disk 13, water tank 15, the first water pump 18, spray tube 19 and spray head 20, when 1 inside dust of continuous tunnel furnace reaches a certain concentration When, sensor of dust concentration 8 sends a signal to controller 11, and then controller 11 controls the first water pump 18 for the water in water tank 15 Then extraction is conveyed to spray head 20 by spray tube 19, makes spray head 20 to spraying inside continuous tunnel furnace 1, drop to dust Dirt processing, then dust enters with dampening leads dirt disk 13, leads dirt disk 13 and is collected to dust, well to dust settling To leading in dirt disk 13, makes dust from being scattering into outside continuous tunnel furnace 1, cause dust pollution, the health of staff is made At damage, the outer surface of reflux line 17 is fixedly installed with the second water pump 21, by catch basin 12, dust filtering case 14, dust filtering film 16, The cooperation of reflux line 17 and the second water pump 21, after dust is deposited to water and to lead in dirt disk 13, water continues to settle with dust To dust filtering case 14, then dust is completely cut off inside dust filtering case 14 by dust filtering film 16, then water enters collection by dust filtering film 16 Sink 12, then water is pumped into water tank 15 by the second water pump 21, and completion recycles water resource, is become a water and is followed Ring continues to settle the dust inside continuous tunnel furnace 1, has saved water resource.
Working principle: being put into feed inlet 2 for material first, and then material enters inside continuous tunnel furnace 1 with conveyer belt 3, Then controller 11 controls heating tube 7 and opens, and heating tube 7 is heated rapidly to the condition of high temperature, and then servo motor 5 is opened, control Air blower 6 is opened, and then air blower 6 takes away the heat on 7 surface of heating tube, a blast of hot air is formed inside continuous tunnel furnace 1, then It is reflected inside continuous tunnel furnace 1 under the action of inverted ventilation plate 10, material is dried, material can produce during drying Raw volatile substance adheres on inner wall, and when dust being waited to accumulate to a certain extent, sensor of dust concentration 8 senses that dust concentration is concurrent The number of delivering letters gives controller 11, and then controller 11 controls the first water pump 18 and extracts the water in water tank 15 out, then passes through spray tube 19 are conveyed to spray head 20, make spray head 20 to spraying inside continuous tunnel furnace 1, carry out depositing dust processing to dust, then dust with Water enters together leads dirt disk 13, is settled well to dust, and collected, in order to avoid pollute material and right It is polluted outside continuous tunnel furnace 1, influences the health of staff, then dust can be deposited in dust filtering case 14 with dampening, Dust filtering film 16 completely cuts off dust inside dust filtering case 14, and then water enters catch basin 12 by dust filtering film 16, then the second water pump 21 are pumped into water in water tank 15, and completion recycles water resource, become a water circulation, continue in continuous tunnel furnace 1 The dust in portion is settled, and water resource has been saved, and is conducive to sustainable development, opens exhaust outlet 9 to arranging inside continuous tunnel furnace 1 Gas makes continuous tunnel furnace 1 be cooled down, and then material is come out by discharge port 4, completes drying.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of dustless IR continuous tunnel furnace, including continuous tunnel furnace (1), it is characterised in that: the right side outer surface of the continuous tunnel furnace (1) is fixed It is equipped with feed inlet (2), and the inside of the continuous tunnel furnace (1) is fixedly installed with conveyer belt (3), the left side of the continuous tunnel furnace (1) Outer surface is fixedly installed with discharge port (4), and the upper end outer surface of continuous tunnel furnace (1) is fixedly installed with servo motor (5), described to watch The lower end outer surface for taking motor (5) is fixedly installed with air blower (6), and the inner wall apical position of the continuous tunnel furnace (1) is fixedly mounted Have heating tube (7), is fixedly installed with sensor of dust concentration (8) on the right side of the heating tube (7), a left side for the continuous tunnel furnace (1) Side external surface offers exhaust outlet (9) close to top position, and the lower end outer surface of the exhaust outlet (9) is fixedly installed with inverted ventilation plate (10), the left outer surface of the continuous tunnel furnace (1) is fixedly installed with controller (11) close to lower position, the continuous tunnel furnace (1) Inner wall bottom be fixedly installed with catch basin (12), be fixedly installed with and lead dirt disk (13) above the catch basin (12), it is described The bottom for leading dirt disk (13) is fixedly installed with dust filtering case (14), is fixedly installed with water tank (15) on the left of the catch basin (12), The inner wall of the dust filtration case (14) is movably installed with dust filtering film (16), is fixedly mounted between the water tank (15) and catch basin (12) Have reflux line (17), be provided with the first water pump (18) above the conveyer belt (3), outside the upper end of first water pump (18) Surface is fixedly installed with spray tube (19), and the lower end outer surface of the spray tube (19) is fixedly installed with spray head (20), and described time The outer surface in flow tube road (17) is fixedly installed with the second water pump (21).
2. a kind of dustless IR continuous tunnel furnace according to claim 1, it is characterised in that: the conveyer belt (3) and continuous tunnel furnace (1) Between be flexibly connected, and the surface of conveyer belt (3) is provided with mesh.
3. a kind of dustless IR continuous tunnel furnace according to claim 1, it is characterised in that: the quantity of the heating tube (7) is eight Group, and every four groups of heating tubes (7) are transversely arranged in "-" type.
4. a kind of dustless IR continuous tunnel furnace according to claim 1, it is characterised in that: the quantity of the inverted ventilation plate (10) is two Group, and be fixedly connected between inverted ventilation plate (10) and continuous tunnel furnace (1).
5. a kind of dustless IR continuous tunnel furnace according to claim 1, it is characterised in that: the output end of the controller (11) with The input terminal of sensor of dust concentration (8) is electrically connected, and the output end of controller (11) and servo motor (5), the first water pump (18) it is electrically connected with the input terminal of the second water pump (21).
6. a kind of dustless IR continuous tunnel furnace according to claim 1, it is characterised in that: first water pump (18) and spray tube (19) it is fixedly connected between, the quantity of the spray head (20) is several groups.
CN201821071662.8U 2018-07-07 2018-07-07 A kind of dustless IR continuous tunnel furnace Expired - Fee Related CN208505001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821071662.8U CN208505001U (en) 2018-07-07 2018-07-07 A kind of dustless IR continuous tunnel furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821071662.8U CN208505001U (en) 2018-07-07 2018-07-07 A kind of dustless IR continuous tunnel furnace

Publications (1)

Publication Number Publication Date
CN208505001U true CN208505001U (en) 2019-02-15

Family

ID=65284598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821071662.8U Expired - Fee Related CN208505001U (en) 2018-07-07 2018-07-07 A kind of dustless IR continuous tunnel furnace

Country Status (1)

Country Link
CN (1) CN208505001U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108826966A (en) * 2018-07-07 2018-11-16 芜湖伦丰电子科技有限公司 A kind of dustless IR continuous tunnel furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108826966A (en) * 2018-07-07 2018-11-16 芜湖伦丰电子科技有限公司 A kind of dustless IR continuous tunnel furnace
CN108826966B (en) * 2018-07-07 2024-04-02 芜湖伦丰电子科技有限公司 Dustless IR tunnel furnace

Similar Documents

Publication Publication Date Title
CN108212485B (en) Broken brushing device of building grit
CN203975939U (en) A kind of delivery system
CN208505001U (en) A kind of dustless IR continuous tunnel furnace
CN207815550U (en) Self-cleaning fresh air machine
CN208452223U (en) Cooling device is used in injection molding
CN209577152U (en) A kind of automatic spray coating powder room
CN108826966A (en) A kind of dustless IR continuous tunnel furnace
CN206868680U (en) A kind of ceramic fine bead particle cleaning device
CN109160710A (en) A kind of sludge treatment complete equipment and its method with sludge pre-drying device
CN213421730U (en) Drying device is used in ceramic tile production
CN205090774U (en) Heat recovery of drying and cooling ware utilizes system
CN205310583U (en) Plastic grain washs drying device
CN209222719U (en) Die casting high-efficiency cleaning equipment
CN205570280U (en) Boiling granulation drying machine
CN103950150A (en) Waste heat recovery circulating system of injection moulding machine
CN204193707U (en) Ceramic membrane deduster
CN203723413U (en) Water tank type tobacco stem moisture regaining machine
CN203816397U (en) Novel filter
CN209512456U (en) A kind of two-sided automatic drying production line of ceramic bowl
CN208115298U (en) A kind of PVC plastic pipe extruder ejected wash water cooling filtering device
CN105128153A (en) Concrete-dust centralized recycling system
CN210229158U (en) Dye drying system
CN205516549U (en) Horizontal drier
CN204104718U (en) A kind of pig blood reusing appts of mist projection granulating
CN216513916U (en) Stoving dust collector is used in brown sugar production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215