CN208504603U - New hospital energy conserving system - Google Patents

New hospital energy conserving system Download PDF

Info

Publication number
CN208504603U
CN208504603U CN201820279556.2U CN201820279556U CN208504603U CN 208504603 U CN208504603 U CN 208504603U CN 201820279556 U CN201820279556 U CN 201820279556U CN 208504603 U CN208504603 U CN 208504603U
Authority
CN
China
Prior art keywords
water
heat
air
integrated form
machine station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820279556.2U
Other languages
Chinese (zh)
Inventor
蔡文生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yorkool Engineering (jiangsu) Co Ltd
Original Assignee
Yorkool Engineering (jiangsu) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yorkool Engineering (jiangsu) Co Ltd filed Critical Yorkool Engineering (jiangsu) Co Ltd
Priority to CN201820279556.2U priority Critical patent/CN208504603U/en
Application granted granted Critical
Publication of CN208504603U publication Critical patent/CN208504603U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/27Relating to heating, ventilation or air conditioning [HVAC] technologies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/62Absorption based systems

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

This application discloses a kind of new hospital energy conserving systems, including air conditioning terminal module, integrated form cooling-water machine station, cold, heat and power triple supply system, wherein air conditioning terminal module includes radiant panel, new blower and AHU air-treatment unit;Cold, heat and power triple supply system includes natural gas power unit, fume hot-water type lithium bromide chiller, and natural gas power unit provides electric power, and the high-temperature flue gas and high-temperature-hot-water that natural gas power unit generates access lithium bromide chiller by pipeline;Water collecting and diversifying device is connect with cold, heat and power triple supply system, and the cooling capacity or heat that cold, heat and power triple supply system generates all uniformly are collected to water collecting and diversifying device, and water collecting and diversifying device connect with air conditioning terminal module and is air conditioning terminal module supply cooling capacity or heat;Integrated form cooling-water machine station is connect with MAU Fresh air handling units, water collecting and diversifying device.By above-mentioned improvement, total operating cost is saved up to 65%, and energy-saving effect is extraordinary.

Description

New hospital energy conserving system
Technical field
The utility model relates to a kind of new hospital energy conserving systems.
Background technique
Meet medical treatment with infection control require under the premise of, energy-saving measure be from Cooling and Heat Source, transportation system, Hvac equipment, control system and operational management etc. consider.It is exemplified below existing power-economizing method:
Cooling and Heat Source
1, since unit most times run under off-design behaviour, the efficiency meaning weight of operation at part load is improved Greatly, traditional power-economizing method is selection suitable capacity, and appropriate number of units unit makes each season unit be able to maintain high-efficiency operation, but The problem is that equipment number is on the high side, increase investment and machine room area.
2, using the excess steam of summer or combustion gas absorption refrigeration unit, night ice-reserving is utilized.This method is benefit The price differential round the clock of energy charge, not energy-efficient although saving a part of expense, the multiple conversions of energy, efficiency reduce, and save It is limited.In addition space shared by computer room is big.
3, Waste Heat Recovery, the occasion for being suitble to have draining (gas, wind) to plan, can specific aim utilize different types of heat (cold) time Receipts type device, but the problem is that want anti-cross infection, be difficult to recycle using system when waste heat source dispersion.
4, it is depended on using natural energy (underground water, underground heat), that is, water resource heat pump, ground-source heat pump system, this system Risk this area natural energy situation and may cause.
Transportation system
1, according to customer charge feature, cold leaving water temperature is improved, water cooler COP can be improved in such method, but to comment Estimate the influence of the crucial department more demanding to humid control.
2, conveying Cooling and Heat Source uses water (refrigerant) system, than conveying air energy-saving, but is that non-all-air system is unfavorable for Germ-free condition control.
3, conveyance conduit resistance is reduced, the air-tightness of pipeline is reinforced in pipe insulation.But to be concerned with low-resistance filter Whether filter efficiency requirement, the fire protecting performance etc. of pipe insulation are met.
Air-conditioning system
1, system rationalization partition, but it is noted that when interregional system is stopped air adverse current.
Control system
1, hospital architecture intelligent management system is set, but increases investment, needs to monitor comprehensively, in real time, adjust in time Operating scheme.
From the point of view of the Chinese status of general hospital at present, hospital is high with annual energy consumption, heating load is big, daily load It is different (especially humid control) that difference is big, big scale of construction hospital needs all-year-around cooling, crucial department with general department controls requirement The features such as.Cooling and Heat Source generallys use water cooler (mostly compression) and combines with boiler (mostly steam), is concentrated and is supplied by Cooling and Heat Source Give medium needed for each function department (such as water, refrigerant etc.).Whole energy-saving effect is poor.
Utility model content
The application in order to solve the problems in the prior art, discloses a kind of new hospital energy conserving system, total operating cost With saving up to 65%, in the energy consumption of China's Hospitals at Present, air-conditioning and heat supply (including supplying hot water and steam) accounting are maximum, secondly It is illumination, if the energy energy conservation 65% in terms of air-conditioning and heat supply, is considerable.
In order to achieve the above objectives, the technical solution adopted in the utility model are as follows:
A kind of new hospital energy conserving system, including air conditioning terminal module, integrated form cooling-water machine station, cold, heat and electricity triple supply system System, wherein
Air conditioning terminal module includes radiant panel, new blower and AHU air-treatment unit;
Cold, heat and power triple supply system includes natural gas power unit, fume hot-water type lithium bromide chiller, natural gas generator Group provides electric power, and the high-temperature flue gas and high-temperature-hot-water that natural gas power unit generates access lithium bromide chiller by pipeline, in the summer Season, lithium bromide chiller can be freezed using the partial heat, and winter is heated using this partial heat;
Water collecting and diversifying device is connect with cold, heat and power triple supply system, and the cooling capacity or heat that cold, heat and power triple supply system generates are all unified It is collected to water collecting and diversifying device, water collecting and diversifying device connect with air conditioning terminal module and is air conditioning terminal module supply cooling capacity or heat;
Integrated form cooling-water machine station is connect with new blower, water collecting and diversifying device, and the cold of new blower is supplied at summer integrated form cooling-water machine station Amount demand;In winter, integrated form cooling-water machine station is heat pump heating mode, supplies the heat demand of new blower, we are cool and thermal power The heat of combined supply system supplies water collecting and diversifying device, to meet the heat demand of wintertime radiation plate and AHU air-treatment unit.
As a kind of preferred embodiment of new hospital energy conserving system described in the utility model, the lithium bromide chiller is Fume hot-water type lithium bromide chiller, further, lithium bromide chiller further include matched lithium bromide chiller cooling tower.
Lithium bromide chiller externally provides refrigeration with cold (heat) water of air-conditioning or technique, heating equipment, and advantage is that benefit With low grade heat energy, in various forms of distributed energies, all at least there is high-temperature flue gas, in three kinds of thermal energy of hot water and steam One kind, can effectively improve comprehensive utilization of energy rate, it is energy saving, improve system economy.
It further include water cooler, summer as a kind of preferred embodiment of new hospital energy conserving system described in the utility model The ancillary equipment of Ji Zuowei refrigeration, and the heat of recycling is connect by heat-exchangers of the plate type with hot-water heating system, winter cooling-water machine Group does not work.
As a kind of preferred embodiment of new hospital energy conserving system described in the utility model, the air conditioning terminal module There are three types of modes, in which:
Summer mode radiates 7 DEG C of -9 DEG C of cold water of Plate supplying, and return water temperature is 10 DEG C -12 DEG C, and new blower supply cold wind removes simultaneously Wet, integrated form cooling-water machine station is opened;
Transition season mode radiates Plate supplying low-temperature water heating, and at 40 DEG C, 37 DEG C of return water temperature, new blower supplies supply temperature Cold wind dehumidifies simultaneously.If outdoor temperature is lower than 15 DEG C, we can use the free cold of outdoor air, reduce disappearing for cold source Consumption, integrated form cooling-water machine station are closed;
Winter mode, 45 DEG C of radiant panel supply water temperature, 40 DEG C of return water temperature, new blower is for the warm wind after humidification, integrated form It opens at cooling-water machine station.
It further include natural gas boiler as a kind of preferred embodiment of new hospital energy conserving system described in the utility model, It is connect with air conditioning terminal module and hot-water heating system, starts supplied heat source when heat supply deficiency in system.
It further include that non-ward area is new as a kind of preferred embodiment of new hospital energy conserving system described in the utility model The fresh air air draft balance system of the new blower centralized arrangement of the fresh air air draft balance system and ward area of blower layered arrangement,
Wherein: in the fresh air air draft balance system of the non-new blower layered arrangement of ward area, integrated form cooling-water machine station is new Blower provides Cooling and Heat Source, and new blower is distributed in every layer of fresh air Special machine room, and fresh air passes through after being uniformly processed by new blower Air hose is sent into each region and room, further includes an exhaust blower, and collected wind is sent into integrated form cooling-water machine station equipment Room, the period that winter, summer and heat exchange season integrated form cooling-water machine station are opened improve integrated form cooling-water machine station using air draft Running environment.
In the fresh air air draft balance system of the new blower centralized arrangement of ward area, integrated form cooling-water machine station provides for new blower Cooling and Heat Source, new blower are distributed in ward roof, and fresh air is sent by piping shaft to each layer region after being uniformly processed by new blower And room, further include an exhaust blower, by collected wind be sent into integrated form cooling-water machine station equipment room, winter, summer and The period that heat exchange season integrated form cooling-water machine station is opened improves the running environment at integrated form cooling-water machine station using air draft.
Detailed description of the invention
Fig. 1 is a kind of preferable new hospital energy conserving system summer operation mode connection block diagram;
Fig. 2 is a kind of preferable new hospital energy conserving system winter operation mode connection block diagram;
Fig. 3 is a kind of preferable new hospital energy conserving system transition season operational mode connection block diagram;
Fig. 4 is a kind of fresh air air draft balance chart system diagram of preferably non-new blower layered arrangement of ward area;
Fig. 5 is a kind of fresh air air draft balance chart system diagram of new blower centralized arrangement of preferable ward area.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Embodiment 1
A kind of new hospital energy conserving system, including air conditioning terminal module, integrated form cooling-water machine station, cold, heat and electricity triple supply system System, there is power generation, cooling supply, heating and the big function of domestic hot-water four.
Wherein, air conditioning terminal module includes radiant panel, new blower and AHU air-treatment unit.
There are three types of mode, summer mode radiates 7 DEG C of -9 DEG C of cold water of Plate supplying, and return water temperature is 10 DEG C -12 DEG C, new blower Supply cold wind dehumidifies simultaneously, and integrated form cooling-water machine station is opened, we can collect air draft for improving around integrated form cooling-water machine station Environment temperature further increases the working efficiency at integrated form cooling-water machine station;
Transition season mode radiates Plate supplying low-temperature water heating, and at 40 DEG C, 37 DEG C of return water temperature, new blower supplies supply temperature Cold wind dehumidifies simultaneously.If outdoor temperature is lower than 15 DEG C, we can use the free cold of outdoor air, reduce disappearing for cold source Consumption, integrated form cooling-water machine station are closed.
Winter mode, 45 DEG C of radiant panel supply water temperature, 40 DEG C of return water temperature, new blower is for the warm wind after humidification, integrated form It opens at cooling-water machine station.
Cold, heat and power triple supply system includes natural gas power unit, fume hot-water type lithium bromide chiller, natural gas generator Group provides electric power, and the high-temperature flue gas and high-temperature-hot-water that natural gas power unit generates access lithium bromide chiller by pipeline, in the summer Season, lithium bromide chiller can be freezed using the partial heat, and winter is heated using this partial heat, it is first with natural gas Work by combustion generates high-grade electric energy, then the low grade heat energy that generating equipment is discharged is sufficiently used for heat supply and refrigeration, realizes Cascaded utilization of energy, thus be that a kind of efficient urban energy utilizes system.
Lithium bromide chiller externally provides refrigeration with cold (heat) water of air-conditioning or technique, heating equipment, and advantage is that benefit With low grade heat energy, in various forms of distributed energies, all at least there is high-temperature flue gas, in three kinds of thermal energy of hot water and steam One kind, can effectively improve comprehensive utilization of energy rate, it is energy saving, improve system economy.
Water collecting and diversifying device is connect with cold, heat and power triple supply system, and the cooling capacity or heat that cold, heat and power triple supply system generates all are united One is collected to water collecting and diversifying device, and water collecting and diversifying device connect with air conditioning terminal module and is air conditioning terminal module supply cooling capacity or heat.
Integrated form cooling-water machine station is connect with new blower, water collecting and diversifying device, and the cold of new blower is supplied at summer integrated form cooling-water machine station Amount demand;In winter, integrated form cooling-water machine station is heat pump heating mode, supplies the heat demand of new blower, we are cool and thermal power The heat of combined supply system supplies water collecting and diversifying device, to meet the heat demand of wintertime radiation plate and AHU air-treatment unit.
Preferably due to the daily variations of electricity price, our only period operations high in electricity price, electricity price is very cheap when paddy, So still using municipal electricity consumption, such as District of Shanghai, the runing time of our generators are 6:00-22:00.
As shown in Figure 1, we are generated electricity using natural gas power unit during 6:00-22:00 under summer operation mode, For hospital's electricity consumption, municipal electricity consumption supplement.We select fume hot-water type lithium bromide chiller, and natural gas power unit generates waste heat, 400 DEG C of delivery temperature or more, this partial fume is directly accessed lithium bromide chiller, in addition recycles natural gas from lithium bromide chiller water The cooling tower of generating set and the heat of generator.Lithium bromide chiller is freezed using heat-driven, exports 9 DEG C of chilled waters for radiation Plate and AHU air-treatment unit use, because leaving water temperature is every to improve 1 DEG C, 10% cooling capacity is probably can be improved in unit, so We do not select 7 DEG C to supply water but 9 DEG C of selection are supplied water.
In addition a centrifugal refrigerating machines, a screw-type water chiller, 70% or more centrifugal refrigerating machines are configured Efficiency is relatively high when load, and screw-type water chiller regulation performance is relatively good, and part-load efficiency is also fine, so screw is cold The capacity of water dispenser group is chosen for the 70% of centrifugal refrigerating machines capacity, and in the case that cooling capacity is inadequate, screw-type water chiller is first First start, it is high-efficient when due to screw-type water chiller sub-load, when loads being waited to increase closely at full capacity, centrifugal refrigerating machines Starting, screw-type water chiller stop, and when load continues to increase to centrifuge at full capacity, screw-type water chiller is again started up, Adjust load.Centrifugal refrigerating machines and screw-type water chiller can do recuperation of heat, and recycling heat can change offer life by plate Hot water living, reduces the open amount of boiler.
In addition configuration can the integrated form cooling-water machine station of recuperation of heat used for new blower, integrated form cooling-water machine station supply water at low temperature Stylish blower dehumidification efficiency is higher, so summer, integrated form cooling-water machine station was for 6 DEG C of chilled waters.12 DEG C of return water temperature, the temperature difference increases Greatly, water flow can reduce, and flow velocity can also reduce, and frictional resistance can reduce, and trunking loss is few.The recuperation of heat at integrated form cooling-water machine station It can be used for domestic hot-water.
Junior middle school's high efficiency filter section is arranged in new blower, and NC-5000 nano photon air clarifying device is arranged, and is guaranteeing outdoor The performance optimal of air is ensured while fresh air enters again.The air draft in room, which collects, can be used for further increasing collection The efficiency at accepted way of doing sth cooling-water machine station.
Natural gas power unit needs to access natural gas, which can provide electric power, high-temperature flue gas greater than 400 DEG C and 95 DEG C of high-temperature-hot-water.The switchgear house that electric power accesses us supplies usually electricity consumption, municipal electricity consumption supplement.High-temperature flue gas and high-temperature-hot-water Fume hot-water type lithium bromide chiller is accessed by pipeline, in summer, lithium bromide chiller can be freezed using the partial heat, bromination Lithium unit will also have matched lithium bromide chiller cooling tower.
As shown in Fig. 2, the opening time of natural gas power unit is still 6:00-22:00 under winter operation mode, for doctor Institute's electricity consumption, municipal electricity consumption supplement.The fume waste heat and hot water of natural gas power unit are for lithium bromide chiller heat supply, while integrated form The also heat supply of cooling-water machine station, heat supply new blower, radiant panel and AHU air-treatment unit, and supply water temperature is 45 DEG C, return water temperature 40.5℃.If in the case where shortage of heat, can just open natural gas boiler supplement.The air draft in room, which collects, can be used for Further increase the efficiency at integrated form cooling-water machine station.
Winter centrifugal refrigerating machines and a screw-type water chiller are not opened, so domestic hot-water is mentioned by natural gas boiler For.
Integrated form cooling-water machine station is connect with new blower, water collecting and diversifying device, and in winter, integrated form cooling-water machine station is that heat pump heats mould Formula supplies the heat demand of new blower, and winter heat demand load is less than summer refrigeration requirement load (such as District of Shanghai), this When our in addition heats that integrated form cooling-water machine station can be supplied supply water collecting and diversifying device, it is empty to meet wintertime radiation plate and AHU The heat demand of gas disposal unit, the natural gas boiler being further provided with only plays the role of supplement, due to our other units Efficiency be all higher than natural gas boiler, so the unit that service efficiency preferential as far as possible is high.
As shown in figure 3, the opening time of natural gas power unit is still 6:00-22:00 under heat exchange seasonal mode, for doctor Institute's electricity consumption, municipal electricity consumption supplement.The fume waste heat and hot water of natural gas power unit supply spoke for lithium bromide chiller heat supply, heat Plate and AHU air-treatment unit are penetrated, and what is supplied at this time is low-temperature water heating, supply water temperature is 40 DEG C, and return water temperature is 37 DEG C. For the season heating demands that exchange heat.If AHU air-treatment unit institute needs cooling supply for region, screw cooling-water machine can be opened Group supply.It, can be with recuperation of heat domestic hot-water supply, natural gas boiler supplement if screw-type water chiller is opened.
Integrated form cooling-water machine station is new blower cooling supply water, dehumidifies and the fresh air of cooling supply can if heat exchange seasonal temperature is higher To be not turned on radiant panel, only for fresh air.The recuperation of heat at integrated form cooling-water machine station at this time is for radiant panel and AHU air-treatment unit It uses, natural gas boiler supplement can be also opened when insufficient.The air draft in room, which collects, can be used for further increasing integrated form The efficiency at cooling-water machine station.
If outside air temperature is lower than 15 DEG C, integrated form cooling-water machine station can be closed, is passed through using outdoor free cold fresh air Room is sent directly into after filter processing.
As shown in figure 4, being the fresh air air draft balance chart system diagram of the new blower layered arrangement of non-ward area, integrated form cold water Machine station provides Cooling and Heat Source for new blower, and new blower is distributed in every layer of fresh air Special machine room, and fresh air is uniformly processed by new blower Each region and room are sent by air hose later, the dew-point temperature of air be it is constant, there is room sensor in each room, The humidity and carbon dioxide content in this room can be monitored, signal feeds back to controller, and controller gives fresh air air-valve to signal again, Adjust air quantity.Main air hose air quantity is adjusted according to the pressure change of main air hose after the variation of each room air quantity, and fresh air is logical Over-illumination air diffuser is sent into each room.And there is control panel in each room, may also set up humidity and dioxy according to room Change carbon content adjust automatically fresh air valve, we can be arranged the exhaust outlet of fresh air for the corner of room top, and fresh air both can be Nearest piping shaft is reached by exhaust outlet on furred ceiling, integrated form cooling-water machine station equipment room is recycled to by exhaust blower, to improve Device efficiency.Indoor constant feeding fresh air, remains barotropic state, the room even if in the case where radiant panel is closed The supply of 10% fresh air volume can be kept, to guarantee the positive pressure in room, room is constantly in the state of positive pressure, in this way it is avoided that producing Raw cross-infection.
As shown in figure 5, being the fresh air air draft balance system figure of the new blower centralized arrangement of ward area, this system and non-disease The balance chart of the new blower layered arrangement in room region is similar, and only new blower is placed on ward roof, and fresh air is unified by new blower It is sent by piping shaft to each layer region and room after processing, further includes an exhaust blower, collected wind is sent into integrated Formula cooling-water machine station equipment room, the period that winter, summer and heat exchange season integrated form cooling-water machine station are opened are improved using air draft The running environment at integrated form cooling-water machine station.The efficiency at integrated form cooling-water machine station is improved, insufficient air quantity passes through integrated form cooling-water machine station The air grille of equipment room side enters.
Although the embodiments of the present invention is illustrated in specification, these embodiments are intended only as mentioning Show, should not limit the protection scope of the utility model.Various omissions are carried out in the range of not departing from the utility model aims, are set It changes and change should be included in the protection scope of the utility model.

Claims (10)

1. a kind of new hospital energy conserving system, which is characterized in that including air conditioning terminal module, integrated form cooling-water machine station, cool and thermal power Combined supply system, wherein air conditioning terminal module includes radiant panel, new blower and AHU air-treatment unit;
Cold, heat and power triple supply system includes natural gas power unit, lithium bromide chiller, and natural gas power unit provides electric power, naturally The high-temperature flue gas and high-temperature-hot-water that gas generating set generates access lithium bromide chiller by pipeline, and in summer, lithium bromide chiller can Freezed using the partial heat, winter is heated using this partial heat;
Water collecting and diversifying device is connect with cold, heat and power triple supply system, and the cooling capacity or heat that cold, heat and power triple supply system generates all uniformly are collected To water collecting and diversifying device, water collecting and diversifying device connect with air conditioning terminal module and is air conditioning terminal module supply cooling capacity or heat;
Integrated form cooling-water machine station is connect with new blower, water collecting and diversifying device, and the cooling capacity that new blower is supplied at summer integrated form cooling-water machine station needs It asks;In winter, integrated form cooling-water machine station is heat pump heating mode, supplies the heat demand of new blower, we are cold, heat and electricity three-way Water collecting and diversifying device is supplied for the heat of system, to meet the heat demand of wintertime radiation plate and AHU air-treatment unit.
2. new hospital energy conserving system according to claim 1, it is characterised in that: the lithium bromide chiller is flue gas heat Water type lithium bromide chiller.
3. new hospital energy conserving system according to claim 2, it is characterised in that: the lithium bromide chiller further includes matching The lithium bromide chiller cooling tower of set.
4. new hospital energy conserving system according to claim 1, it is characterised in that: further include water cooler, summer conduct The ancillary equipment of refrigeration, and the heat of recycling is connect by heat-exchangers of the plate type with hot-water heating system;Winter water cooler not work Make.
5. new hospital energy conserving system according to claim 4, it is characterised in that: the water cooler is at least one Centrifugal refrigerating machines and a screw-type water chiller.
6. new hospital energy conserving system according to claim 1, it is characterised in that: there are three types of the air conditioning terminal modules Mode, in which:
Summer mode radiates 7 DEG C of -9 DEG C of cold water of Plate supplying, and return water temperature is 10 DEG C -12 DEG C, and new blower supply cold wind dehumidifies simultaneously, It opens at integrated form cooling-water machine station;
Transition season mode radiates Plate supplying low-temperature water heating, and supply temperature is at 40 DEG C, 37 DEG C of return water temperature, new blower supply cold wind It dehumidifies simultaneously;If outdoor temperature is lower than 15 DEG C, we can use the free cold of outdoor air, reduce the consumption of cold source, collect Accepted way of doing sth cooling-water machine station is closed;
Winter mode, 45 DEG C of radiant panel supply water temperature, 40 DEG C of return water temperature, new blower is for the warm wind after humidification, integrated form cold water It opens at machine station.
7. new hospital energy conserving system according to claim 2, it is characterised in that: further include natural gas boiler, with air-conditioning Terminus module and hot-water heating system connection, start supplied heat source when heat supply deficiency in system.
8. new hospital energy conserving system according to claim 5, it is characterised in that: the appearance of the screw-type water chiller Amount is chosen for the 70% of centrifugal refrigerating machines capacity.
9. new hospital energy conserving system according to claim 1, which is characterized in that further include the new blower of non-ward area point The fresh air air draft balance system of the new blower centralized arrangement of the fresh air air draft balance system and ward area of layer arrangement,
Wherein: in the fresh air air draft balance system of the non-new blower layered arrangement of ward area, integrated form cooling-water machine station is new blower Cooling and Heat Source is provided, new blower is distributed in every layer of fresh air Special machine room, and fresh air passes through air hose after being uniformly processed by new blower It is sent into each region and room, further includes an exhaust blower, collected wind is sent into integrated form cooling-water machine station equipment room, winter The period that season, summer and heat exchange season integrated form cooling-water machine station are opened improves the operation at integrated form cooling-water machine station using air draft Environment;
In the fresh air air draft balance system of the new blower centralized arrangement of ward area, integrated form cooling-water machine station provides cold and hot for new blower Source, new blower are distributed in ward roof, and fresh air is sent by piping shaft to each layer region and room after being uniformly processed by new blower Between, further include an exhaust blower, collected wind is sent into integrated form cooling-water machine station equipment room, winter, summer and heat exchange The period that season integrated form cooling-water machine station is opened improves the running environment at integrated form cooling-water machine station using air draft.
10. new hospital energy conserving system according to claim 9, which is characterized in that the non-new blower of ward area is layered cloth In the fresh air air draft balance drawing system set, fresh air is constantly sent into the room of non-ward area, remains barotropic state, i.e., Make radiant panel close in the case where room can also keep 10% fresh air volume supply.
CN201820279556.2U 2018-02-28 2018-02-28 New hospital energy conserving system Expired - Fee Related CN208504603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820279556.2U CN208504603U (en) 2018-02-28 2018-02-28 New hospital energy conserving system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820279556.2U CN208504603U (en) 2018-02-28 2018-02-28 New hospital energy conserving system

Publications (1)

Publication Number Publication Date
CN208504603U true CN208504603U (en) 2019-02-15

Family

ID=65294995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820279556.2U Expired - Fee Related CN208504603U (en) 2018-02-28 2018-02-28 New hospital energy conserving system

Country Status (1)

Country Link
CN (1) CN208504603U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108224646A (en) * 2018-02-28 2018-06-29 永固工程技术(江苏)有限公司 New hospital energy conserving system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108224646A (en) * 2018-02-28 2018-06-29 永固工程技术(江苏)有限公司 New hospital energy conserving system

Similar Documents

Publication Publication Date Title
CN201589376U (en) Central air-conditioning variable water volume and variable air volume whole group-control energy saving system
CN202041020U (en) Household air-source heat pump-floor radiation multifunctional system
KR100984831B1 (en) Cooling and heating system in each household using heat sources from combined heat and power(chp) and district heating
CN110748970B (en) Air conditioning system and control method thereof
CN203215882U (en) All-air energy-saving air conditioning system
CN203964260U (en) A kind of automatic control system of earth-source hot-pump system
CN108775611B (en) It comprehensively utilizes clean energy resource and produces the cold-hot combined supply system of waste heat
CN103453691A (en) Three-in-one air conditioner and hot water supply device
CN207990847U (en) Full effective type air source heat pump system
CN102213465A (en) Temperature-humidity separately-controlled central air conditioner of water source heat pump for ship
CN208504603U (en) New hospital energy conserving system
CN201293409Y (en) Fresh air handling unit
CN211233486U (en) Air conditioner outdoor unit defrosting system integrating vortex tube and semiconductor refrigerating sheet
CN209991573U (en) Radiation air-conditioning system with independent temperature and humidity control function
CN111895572A (en) Residence fresh air system control method and system
CN201285185Y (en) Heat pump combination type air-conditioner
CN2926891Y (en) Ventilating and dehumidifying air-conditioner
CN202166137U (en) Radiating air conditioning system preventing moisture condensation through variable water temperatures
CN205678890U (en) A kind of High Efficiency Thermal source apparatus based on side, water source UTILIZATION OF VESIDUAL HEAT IN
CN101354163A (en) New fan machine unit
CN2913926Y (en) Gas-electricity interlocking air-conditioning water heating and warming system
CN204063424U (en) Commercial Complex air conditioner energy source recovery system
CN108224646A (en) New hospital energy conserving system
CN209672515U (en) A kind of ducting system of Air Conditioning System energy focus utilization
CN210399311U (en) Circulating type cold and heat cogeneration system in office building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215

Termination date: 20210228

CF01 Termination of patent right due to non-payment of annual fee