CN208502823U - A kind of tunnel ventilation device - Google Patents

A kind of tunnel ventilation device Download PDF

Info

Publication number
CN208502823U
CN208502823U CN201820997421.XU CN201820997421U CN208502823U CN 208502823 U CN208502823 U CN 208502823U CN 201820997421 U CN201820997421 U CN 201820997421U CN 208502823 U CN208502823 U CN 208502823U
Authority
CN
China
Prior art keywords
tunnel
draft pipe
air draft
suction opening
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820997421.XU
Other languages
Chinese (zh)
Inventor
张彦飞
刘东明
高航
刘长鹏
于鹏远
李大利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Construction Group Ltd
Original Assignee
PowerChina Construction Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Construction Group Ltd filed Critical PowerChina Construction Group Ltd
Priority to CN201820997421.XU priority Critical patent/CN208502823U/en
Application granted granted Critical
Publication of CN208502823U publication Critical patent/CN208502823U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The utility model belongs to tunnel construction facility technology field, discloses a kind of tunnel ventilation device, is provided with exhaust fan;Suction opening is fixedly connected with air draft pipe by connecting hoop, and air draft pipe outer cover is equipped with multiple pipeline fixing bolts, and air draft pipe tail end is welded with suction opening in hole;Blower duct is fixed with by the support bar welded inside air draft pipe, the blowing mouth of blower duct tail end is sheathed in hole in suction opening.Exhaust fan and air blower are mounted on the outside of tunnel by the utility model, so that the noise generated can not impact the construction personnel in tunnel, blower duct is arranged in air draft pipe, the carry out exhausting that can be independent of each other and blowing, while being sent into fresh air into tunnel, effectively the pernicious gas in hole can be sucked out, avoid the phenomenon that occurring being poisoned in tunnel or exploding.

Description

A kind of tunnel ventilation device
Technical field
The utility model belongs to tunnel construction facility technology field more particularly to a kind of tunnel ventilation device.
Background technique
Currently, the prior art commonly used in the trade is such that
Toxic and harmful gas present in tunnel is always the main hazard source in constructing, if construction wrong easily occurs Serious accident.
Pernicious gas in tunnel engineering typically refers to gas, biogas (methane CH4), carbon dioxide (CO2), hydrogen sulfide (H2S) and the natural-gas such as radon gas, these pernicious gases are not only harmful to the health of human body, and are all inflammable gas, often It sprays suddenly, causes catastrophic failure, these pernicious gases frequently occur in the coal measure strata of relative closure construction, it is also possible to Occur in non-coal seam stratum.
Pernicious gas is mostly to encounter in construction in the tunnel for penetrate coal seam, also has minority to be because being on the verge of coal seam construction, and Neighbouring geological structure is convenient for the infiltration or transmission of gas.
Tunnel ventilation blower is mainly used for discharge in tunnel construction, when due to explosive charge, the use of internal combustion engine, excavation Pernicious gas is released in layer, is that good construction environment is provided for tunnel construction, upkeep operation personnel's health ensures just Often, smooth construction improves working efficiency, ensures the essential condition of construction quality.
Pernicious gas in tunnel is very large for the injury of human body, if do not arranged gas therein It removes, cleans, it is easy to cause that worker is poisoned or even the risk of Tunnel explosion, existing ventilation device generally use multiple air blast Machine carries out air draft, and blower noise is too big, in this closed space of tunnel, can generate very big echo, influence constructor The health of member, and a large amount of dust floatings are be easy to cause in air by air blower, it is not easy to it is cleared up.
In conclusion problem of the existing technology is:
(1) existing tunnel ventilation device noise is too big, in this closed space of tunnel, can generate very big return Sound influences the health of construction personnel;
(2) air blower can blow afloat the dust in tunnel, cause a large amount of dust floatings in air, it is not easy to carry out clear Reason.
Summary of the invention
In view of the problems of the existing technology, the utility model provides a kind of tunnel ventilation device.
The utility model is realized in this way a kind of tunnel ventilation device is provided with
Exhaust fan;
It is welded with air outlet on exhaust fan, is provided with suction opening below exhaust fan, suction opening is fixedly connected by connecting hoop There is air draft pipe, air draft pipe outer cover is equipped with multiple pipeline fixing bolts, and air draft pipe tail end is welded with suction opening in hole;
Blower duct is fixed with by the support bar welded inside air draft pipe, the blowing mouth of blower duct tail end is sheathed on In hole in suction opening.
Exhaust fan and air blower are mounted on the outside of tunnel by the utility model, so that the noise generated can not be in tunnel Construction personnel impacts, and blower duct is arranged in air draft pipe, the carry out exhausting that can be independent of each other and blowing, to tunnel While being sent into fresh air in hole, effectively the pernicious gas in hole can be sucked out, avoid being poisoned in tunnel Or the phenomenon that explosion;And this device is additionally provided with protective net at the suction opening of bottom end, and can be effectively prevented will be in tunnel Small article intake line in result in blockage.
Further, there are two pipeline connection buckles for two sides setting up and down for adjacent air draft pipe junction, and junction is connected with close Seal.
It is even closer that the utility model by pipeline connection buckle fixes adjacent air draft pipe, passes through sealing ring It can prevent gas leakage.
Further, air draft pipe outer wall offers multiple exhausting holes.
The utility model is aspirated by the air that exhausting hole can will be far from suction opening in hole, convenient for will float in air Floating dust is cleared up.
Further, protective net has been bolted on the inside of suction opening and exhausting hole in hole.
The utility model can prevent the small article of sucking construction site by protective net, to cause air draft pipe stifled Plug.
Detailed description of the invention
Fig. 1 is tunnel ventilation device structural schematic diagram provided by the embodiment of the utility model;
Fig. 2 is tunnel ventilation device drawing fan structure schematic diagram provided by the embodiment of the utility model;
In figure: 1, exhaust fan;2, air draft pipe;3, exhausting hole;4, pipeline fixing bolt;5, pipeline connection buckle;6, it is taken out in hole Air port;7, support bar;8, air outlet;9, suction opening;10, protective net;11, air blower;12, blower duct;13, blowing mouth.
Specific embodiment
For the invention, features and effects that can further appreciate that the utility model, the following examples are hereby given, and cooperates Detailed description are as follows for attached drawing 1 and attached drawing 2.
The structure of the utility model is explained in detail with reference to the accompanying drawing.
As shown in attached drawing 1 and attached drawing 2, this novel tunnel ventilation device include: exhaust fan 1, air draft pipe 2, exhausting hole 3, Pipeline fixing bolt 4, pipeline connection buckle 5, suction opening 6, support bar 7, air outlet 8, suction opening 9, protective net 10, air blower in hole 11, blower duct 12, blowing mouth 13.
It is welded with air outlet 8 on exhaust fan 1, suction opening 9 is provided with below exhaust fan 1, suction opening 9 is fixed by connecting hoop It is connected with air draft pipe 2,2 outer cover of air draft pipe is equipped with multiple pipeline fixing bolts 4, and 2 tail end of air draft pipe is welded in hole and takes out Air port 6;
Blower duct 12, the blowing mouth of 12 tail end of blower duct are fixed with by the support bar 7 of welding inside air draft pipe 2 13 are sheathed in hole in suction opening 6.
Preferably, there are two pipeline connection buckle 5, junction clampings for two sides setting up and down for adjacent 2 junction of air draft pipe There is sealing ring.
Preferably, 2 outer wall of air draft pipe offers multiple exhausting holes 3.
Preferably, being bolted protective net 10 on the inside of suction opening 6 and exhausting hole 3 in hole.
Exhaust fan 1, air draft pipe 2, exhausting hole 3, pipeline fixing bolt 4, pipeline connection buckle 5, suction opening 6, support bar in hole 7, air outlet 8, suction opening 9, protective net 10, air blower 11, blower duct 12, blowing mouth 13.
When the utility model is used, prime minister installs it, 6 part of suction opening in hole is placed in tunnel, then It is connected by pipeline connection buckle 5, air draft pipe 3 is fixed to each other, and be fixed on tunnel wall by pipeline fixing bolt 4, Exhaust fan 1 and air blower 11 are finally installed, starts to work.Exhausting is carried out by suction opening 9, it can effectively will be in hole Pernicious gas be sucked out, avoid the phenomenon that occurring being poisoned in tunnel or exploding;It can be sent into hole by blowing mouth 13 Enter fresh air, the life of staff can be advantageously ensured that in order to draw the aerial dust of floating by exhausting hole 3 Safety.
The above is only the preferred embodiment to the utility model, is not made in any form to the utility model Limitation, it is all according to the technical essence of the utility model any simple modification made to the above embodiment, equivalent variations with Modification, is all within the scope of the technical scheme of the utility model.

Claims (4)

1. a kind of tunnel ventilation device, which is characterized in that the tunnel ventilation device is provided with
Exhaust fan;
It is welded with air outlet on exhaust fan, is provided with suction opening below exhaust fan, suction opening is fixedly connected with pumping by connecting hoop Air piping, air draft pipe outer cover are equipped with multiple pipeline fixing bolts, and air draft pipe tail end is welded with suction opening in hole;
Blower duct is fixed with by the support bar welded inside air draft pipe, the blowing mouth of blower duct tail end is sheathed in hole In suction opening.
2. tunnel ventilation device as described in claim 1, which is characterized in that adjacent air draft pipe junction is provided with two sides up and down Two pipeline connection buckles, junction is connected with sealing ring.
3. tunnel ventilation device as described in claim 1, which is characterized in that air draft pipe outer wall offers multiple exhausting holes.
4. tunnel ventilation device as described in claim 1, which is characterized in that consolidated on the inside of suction opening and exhausting hole by bolt in hole Surely there is protective net.
CN201820997421.XU 2018-06-27 2018-06-27 A kind of tunnel ventilation device Active CN208502823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820997421.XU CN208502823U (en) 2018-06-27 2018-06-27 A kind of tunnel ventilation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820997421.XU CN208502823U (en) 2018-06-27 2018-06-27 A kind of tunnel ventilation device

Publications (1)

Publication Number Publication Date
CN208502823U true CN208502823U (en) 2019-02-15

Family

ID=65282799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820997421.XU Active CN208502823U (en) 2018-06-27 2018-06-27 A kind of tunnel ventilation device

Country Status (1)

Country Link
CN (1) CN208502823U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566265A (en) * 2019-09-20 2019-12-13 河南城建学院 Coal mine underground gas circulating pumping and draining system
CN112796834A (en) * 2021-01-13 2021-05-14 临沂矿业集团菏泽煤电有限公司 Fully-mechanized mining face underground online safety intelligent monitoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566265A (en) * 2019-09-20 2019-12-13 河南城建学院 Coal mine underground gas circulating pumping and draining system
CN112796834A (en) * 2021-01-13 2021-05-14 临沂矿业集团菏泽煤电有限公司 Fully-mechanized mining face underground online safety intelligent monitoring system

Similar Documents

Publication Publication Date Title
CN208502823U (en) A kind of tunnel ventilation device
CN105240040B (en) The method of ventilation of the double hole constructions of inclined shaft auxiliary
CN103352718A (en) Fully-sealed wind power slagging gas-drainage deep well drilling system and method
CN104612739A (en) Small-section tunnel single-head long-distance ventilation construction method
CN109025864A (en) Dust removal system and dust removal method for dry drilling
CN104196558A (en) Fast and safe gas emission method of coal mine closed roadway
CN205308105U (en) Colliery ventilation air methane and take out mixing processing system of putting gas
CN204591331U (en) The mine development end dash system of adjoint high-concentration hydrogen sulfide and gas
WO2024152912A1 (en) Negative pressure gas seal induction-type pipe jacking operation environmental control system
CN112796826B (en) Tunnel escape pipe without fan blades and capable of ventilating and design method
CN206071637U (en) Dual back-fire relief explosion venting device
CN106016322A (en) Flue gas desulfurization equipment
CN204041099U (en) Pipeline type fine water-spray gas and coal dust destatics inerting explosion suppression device
CN205243507U (en) Gas stirring swells up soil box
CN210685989U (en) Harmful gas treatment device for earth pressure balance shield
CN113047856B (en) Earth pressure shield machine for harmful gas-rich stratum and tunnel construction method
CN205746939U (en) Flue gas desulfurization device
CN106838531A (en) A kind of anti-flaming device of automatic suction type pipeline
CN205746923U (en) A kind of chemicals dosing plant of exhaust boiler smoke pipe
CN207004459U (en) A kind of Novel dust removal device dust gathering arrester
CN215718887U (en) Ventilation system for driving face
CN204716160U (en) A kind of mine underground drilling dust-proof
CN220081364U (en) Underground drilling explosion-proof device
CN106593509A (en) Tunnel negative pressure ventilation system
CN110761727A (en) Coal mine wall drilling chip collecting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant