CN208502801U - A kind of tunnel fast lifting baffle - Google Patents

A kind of tunnel fast lifting baffle Download PDF

Info

Publication number
CN208502801U
CN208502801U CN201821213902.3U CN201821213902U CN208502801U CN 208502801 U CN208502801 U CN 208502801U CN 201821213902 U CN201821213902 U CN 201821213902U CN 208502801 U CN208502801 U CN 208502801U
Authority
CN
China
Prior art keywords
baffle
fast lifting
screw rod
top plate
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821213902.3U
Other languages
Chinese (zh)
Inventor
李富友
李辅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Ruitie Technology Co ltd
Original Assignee
Sichuan Haodesi New Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Haodesi New Material Technology Co Ltd filed Critical Sichuan Haodesi New Material Technology Co Ltd
Priority to CN201821213902.3U priority Critical patent/CN208502801U/en
Application granted granted Critical
Publication of CN208502801U publication Critical patent/CN208502801U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to technical field of tunnel construction, disclose a kind of tunnel fast lifting baffle, including baffle, the upper surface of the baffle offers counterbore, fast lifting device is provided in counterbore, the fast lifting device includes lifting box, lifting box is fixedly connected with counterbore, screw rod is arranged in lifting box and is threadedly coupled, extend lifting box and be provided with jacking block in the upper end of the screw rod, the upper surface of jacking block is provided with top plate and contradicts connection, rotating handle is additionally provided on the screw rod and is fixedly connected, and the rotating handle is located between jacking block and lifting box.The utility model may be implemented in during Tunnel Second Lining Construction and quickly block to the faulting of slab ends between back pressure type waterstop, to avoid the purpose of spillage, and the processing that can avoid for situation the problem of consuming time is long, at high cost, low efficiency.

Description

A kind of tunnel fast lifting baffle
Technical field
The utility model relates to technical field of tunnel construction, in particular to a kind of tunnel fast lifting baffles.
Background technique
Maximum security risk is exactly arch cracking, chip off-falling and inverted arch protuberance in railway tunnel operation.Generate cracking chip off-falling The main reason for there is at construction joint trolley rigidly squeeze, the cutting of waterstop cantilever end, the cold seam of concrete construction, coagulation at construction joint Sky sound, voids and pits, sand, dusting caused by native not full, concrete spillage etc., while difficulty of vibrating at construction joint, arch Can not vibrate at construction joint, thus caused by operation tunnel disease it is very strange, but from influence concrete performance from the perspective of, Most universal, the most fundamental problem is still spillage.
Spillage can not be mainly completely coincident because back pressure type sealing is with seam when live inverted arch and lining cutting circumferential direction are constructed, and thus served as a contrast Platform building cart easily causes spillage in casting process to that will form the faulting of slab ends that can not close up after mould between back pressure type waterstop, And irregular faulting of slab ends is formed, traditional handicraft is blocked using along lining trolley lower edge using wooden model, however wooden model exists Have the following problems in use process: 1, construction speed is slow, and in the actual construction process, preliminary bracing profiled may not be too round Suitable, end head formwork width is different when end being caused to be constructed, more so as to cause end wooden model block number, and blanking punch heavy workload is applied Work is more slow;2, large labor intensity, and every piece of wooden model securely must just can guarantee and not run the quick-fried mould of mould in reinforcing process, reinforce Get up especially cumbersome;3, closed matereial cycle rate is low, and wooden model is cut when blocking according to section configuration, construction next time after demoulding Utilization rate is quite low, causes wood consumption very big, increases construction cost.
Utility model content
Based on problem above, the utility model provides a kind of tunnel fast lifting baffle.The utility model may be implemented in Quickly the faulting of slab ends between back pressure type waterstop is blocked during Tunnel Second Lining Construction, to avoid the purpose of spillage, Top plate is installed by installing fast lifting device in baffle, and in the output end of fast lifting device, top plate can quickly rise Inverted arch or back pressure type waterstop are pressed under the effect of increasing of falling unit, solving can be because between waterstop in existing tunnel construction Faulting of slab ends and cause in casting process that there is a situation where spillages, and consuming time is long, at high cost, efficiency for the processing of the situation Low problem.
In order to solve the above technical problems, the technical solution adopted in the utility model is as follows:
A kind of tunnel fast lifting baffle, including baffle, the upper surface of the baffle offer counterbore, are provided in counterbore Fast lifting device, the fast lifting device include lifting box, and lifting box is fixedly connected with counterbore, goes up and down in box and be arranged with spiral shell Bar is simultaneously threadedly coupled, and the upper end of the screw rod extends lifting box and is provided with jacking block, and the upper surface of jacking block is provided with top plate simultaneously Contradict connection, be additionally provided with rotating handle on the screw rod and be fixedly connected, the rotating handle be located at jacking block and go up and down box it Between.
In the present invention, baffle is placed on middle buried water stop, fills the fast lifting being mounted in baffle Set corresponding with back pressure type waterstop, fast lifting device is made of lifting box and the screw rod being threadedly coupled with it, by turning The fixed rotating handle being set on screw rod rotates screw rod, thus screwing length of the adjusting screw rod in lifting box, screw rod Upper end is fixedly installed jacking block, and jacking block upper surface is equipped with top plate again and contradicts connection, i.e., through adjusting screw rod in lifting box Screwing length top plate can be made to rise to contact with back pressure type waterstop, since back pressure type waterstop is made of compounded rubber, It can be made to generate elastic deformation when top plate squeezes waterstop, achieve the purpose that blocking faulting of slab ends avoids spillage.
The utility model may be implemented in during Tunnel Second Lining Construction quickly to the faulting of slab ends between back pressure type waterstop It is blocked, to avoid the purpose of spillage, by installing fast lifting device in baffle, and in the output of fast lifting device End installation top plate, top plate can press inverted arch or back pressure type waterstop under the effect of increasing of fast lifting device, solve existing It can cause in casting process that there is a situation where spillages because of the faulting of slab ends between waterstop in constructing tunnel, and for the situation The problem of consuming time is long for processing, at high cost, low efficiency, my company is to tunnel lining trolley faces end head plugging system by trying repeatedly It tests, improve, using fast lifting baffle blocking technology, realize closed, the rapid construction at end position, it is ensured that coagulation soil property Amount and waterstop precision substantially increase work efficiency.
As a preferred mode, baffle uses composite rubber material, and rigid strutting piece is provided in baffle, described Rigid strutting piece includes the multiple groups horizontal ribs being laterally arranged in baffle, and overlap joint rib is symmetrically arranged at left and right sides of baffle, described Overlap joint rib can be used for baffle lap seal two-by-two.
As a preferred mode, the upper surface of top plate is set as the arc being bonded with inverted arch or back pressure type waterstop, The side vertical of top plate is provided with pressing plate, the side of the pressing plate and concrete surface fitting.
As a preferred mode, the lower surface of top plate is provided with "T"-shaped guide rail, and the jacking block is set as "T"-shaped, top Block and "T"-shaped guide rail are slidably matched.
As a preferred mode, top plate uses composite rubber material.
As a preferred mode, fast lifting device is at least two and is keeping off along the center line symmetrical setting of baffle The both ends of plate.
As a preferred mode, lifting box includes box body, and spiral shell block, the screw rod and spiral shell block are fixedly installed in box body It is threadedly coupled, the upper end of box body is provided with capping, and the upper end of screw rod is through capping.
Compared with prior art, the utility model has the beneficial effects that
(1) the utility model may be implemented in during Tunnel Second Lining Construction quickly to the mistake between back pressure type waterstop Platform is blocked, to avoid the purpose of spillage, by installing fast lifting device in baffle, and in the defeated of fast lifting device Outlet installs top plate, and top plate can press inverted arch or back pressure type waterstop under the effect of increasing of fast lifting device, solves existing There is the problem of spillage processing is difficult, and consuming time is long in constructing tunnel.
(2) baffle uses composite rubber material in the utility model, and multiple groups horizontal ribs, baffle are horizontally arranged in baffle The left and right sides be symmetrically arranged with overlap joint rib, the overlap joint rib can be used for baffle lap seal two-by-two, using compounded rubber have make At baffle have material light, elasticity is good and good comprehensive performance, and the application of composite rubber material revolutionizes tradition Bulkhead and reinforcing bar between rigid contact be flexible contact, pass through in baffle be arranged multiple groups horizontal ribs reinforce baffle structure Intensity improves its pressure-bearing property, can constitute by overlap joint rib lap hermetically together between baffle two-by-two and tunnel-shaped is bonded A set of adjustable end stop system, improve the using flexible of the utility model.
(3) upper surface of top plate is set as the arc being bonded with inverted arch or back pressure type waterstop, top plate in the utility model Side vertical be provided with pressing plate, the side of pressing plate and concrete surface fitting, by setting the upper surface of top plate to and carrying on the back The arc of pressure type waterstop fitting, improves the laminating degree of top plate and waterstop, can be by the faulting of slab ends formed between waterstop most Big degree block, and improves leakproofness, and the pressing plate of top plate side setting can limit concrete and bring in process of setting Tension, keep the flatness of entire concrete cut ends.
(4) lower surface of top plate is provided with "T"-shaped guide rail in the utility model, and the jacking block is set as "T"-shaped, jacking block and "T"-shaped guide rail is slidably matched, and since jacking block and "T"-shaped guide rail are slidably matched, can make baffle and top by the way that jacking block horizontally slips Plate is detached from, and the baffle of replaceable different height improves the interchangeability of the utility model to adapt to different constructing tunnel situations With the flexibility used.
(5) top plate uses composite rubber material in the utility model, and having manufactured top plate using compounded rubber has material Gently, elasticity is good and good comprehensive performance, and the application of composite rubber material revolutionizes between traditional bulkhead and reinforcing bar Rigid contact be flexible contact, the top plate plasticity as made of composite rubber material is good, then by screw rod rotation to jacking block When applying pressure, top plate can be made to generate certain elastic deformation, improve the leakproofness between top plate and back pressure type waterstop, dropped A possibility that low spillage.
(6) in the utility model fast lifting device be at least two and along the center line symmetrical setting of baffle in baffle Both ends avoid top plate by unbalance stress caused by lateral force by the way that fast lifting device to be symmetricly set on to the both ends of baffle Problem that is even, keeping leak stopping sealing effect bad, two fast lifting devices can reach most in manufacturing cost and service condition Good effect.
(7) box is gone up and down in the utility model includes box body, and spiral shell block, the screw rod and spiral shell block screw thread are fixedly installed in box body Connection, the upper end of box body are provided with capping, and the upper end of screw rod is covered by being arranged on box body through capping, improves lifting The leakproofness of box is entered by the avoidable impurity of capping since impurity is more in air in constructing tunnel and blocks spiral shell in box body Bar influences screwing for screw rod and spiral shell block.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of Fig. 1 side view.
Fig. 3 is the structural schematic diagram of fast lifting device in Fig. 1.
Fig. 4 is the structural schematic diagram of rotating handle.
Fig. 5 is the structural schematic diagram of baffle.
Wherein, 1- rotating handle, 2- top plate, 3- jacking block, the "T"-shaped guide rail of 4-, 5- screw rod, 6- lifting box, 7- box body, 8- pressure Plate, 9- capping, 10- spiral shell block, 11- baffle, 12- overlap rib, 13- horizontal ribs.
Specific embodiment
The utility model will be further described below with reference to the accompanying drawings.The embodiments of the present invention includes but unlimited In the following example.
Embodiment 1:
Referring to Fig. 1~5, a kind of tunnel fast lifting baffle, including baffle 11, it is heavy that the upper surface of the baffle 11 offers Hole is provided with fast lifting device in counterbore, and the fast lifting device includes lifting box 6, goes up and down box 6 and counterbore is fixed connects It connecing, goes up and down and be arranged with screw rod 5 in box 6 and be threadedly coupled, the upper end of the screw rod 5 extends lifting box 6 and is provided with jacking block 3, The upper surface of jacking block 3 is provided with top plate 2 and contradicts connection, and rotating handle 1 is additionally provided on the screw rod 5 and is fixedly connected, institute Rotating handle 1 is stated to be located between jacking block 3 and lifting box 6.
In the present invention, baffle is placed on middle buried water stop, fills the fast lifting being mounted in baffle Set corresponding with back pressure type waterstop, fast lifting device is made of lifting box and the screw rod being threadedly coupled with it, by turning The fixed rotating handle being set on screw rod rotates screw rod, thus screwing length of the adjusting screw rod in lifting box, screw rod Upper end is fixedly installed jacking block, and jacking block upper surface is equipped with top plate again and contradicts connection, i.e., through adjusting screw rod in lifting box Screwing length top plate can be made to rise to contact with back pressure type waterstop, since back pressure type waterstop is made of compounded rubber, It can be made to generate elastic deformation when top plate squeezes waterstop, achieve the purpose that blocking faulting of slab ends avoids spillage.
The utility model may be implemented in during Tunnel Second Lining Construction quickly to the faulting of slab ends between back pressure type waterstop It is blocked, to avoid the purpose of spillage, by installing fast lifting device in baffle, and in the output of fast lifting device End installation top plate, top plate can press inverted arch or back pressure type waterstop under the effect of increasing of fast lifting device, solve existing It can cause in casting process that there is a situation where spillages because of the faulting of slab ends between waterstop in constructing tunnel, and for the situation The problem of consuming time is long for processing, at high cost, low efficiency.
Embodiment 2:
Referring to Fig. 1~5, a kind of tunnel fast lifting baffle, including baffle 11, it is heavy that the upper surface of the baffle 11 offers Hole is provided with fast lifting device in counterbore, and the fast lifting device includes lifting box 6, goes up and down box 6 and counterbore is fixed connects It connecing, goes up and down and be arranged with screw rod 5 in box 6 and be threadedly coupled, the upper end of the screw rod 5 extends lifting box 6 and is provided with jacking block 3, The upper surface of jacking block 3 is provided with top plate 2 and contradicts connection, and rotating handle 1 is additionally provided on the screw rod 5 and is fixedly connected, institute Rotating handle 1 is stated to be located between jacking block 3 and lifting box 6.
Baffle 11 uses composite rubber material, and rigid strutting piece is provided in baffle 11, and the rigid strutting piece includes The multiple groups horizontal ribs 13 being laterally arranged in baffle 11, the left and right sides of baffle 11 are symmetrically arranged with overlap joint rib 12, the overlap joint rib 12 can be used for 11 lap seal of baffle two-by-two.
In the present embodiment, having manufactured baffle using compounded rubber has material light, and elasticity is good and good comprehensive performance, And it is flexible contact that the application of composite rubber material, which revolutionizes rigid contact between traditional bulkhead and reinforcing bar, by The structural strength that the interior rigid strutting piece that multiple groups horizontal ribs are arranged and are formed of baffle reinforces baffle improves its pressure-bearing property, keeps off two-by-two Between plate a set of adjustable end stop system with tunnel-shaped fitting can be constituted, is improved by overlap joint rib lap hermetically together The using flexible of the utility model.
The other parts of the present embodiment are same as Example 1, just repeat no more here.
Embodiment 3:
Referring to Fig. 1~5, a kind of tunnel fast lifting baffle, including baffle 11, it is heavy that the upper surface of the baffle 11 offers Hole is provided with fast lifting device in counterbore, and the fast lifting device includes lifting box 6, goes up and down box 6 and counterbore is fixed connects It connecing, goes up and down and be arranged with screw rod 5 in box 6 and be threadedly coupled, the upper end of the screw rod 5 extends lifting box 6 and is provided with jacking block 3, The upper surface of jacking block 3 is provided with top plate 2 and contradicts connection, and rotating handle 1 is additionally provided on the screw rod 5 and is fixedly connected, institute Rotating handle 1 is stated to be located between jacking block 3 and lifting box 6.
The upper surface of top plate 2 is set as the arc being bonded with inverted arch or back pressure type waterstop, the side vertical setting of top plate 2 There is pressing plate 8, the side of the pressing plate 8 and concrete surface fitting, pressing plate 8 can be integrally formed with top plate 2.
In the present embodiment, by the arc for being set as being bonded with back pressure type waterstop by the upper surface of top plate, top is improved The faulting of slab ends formed between waterstop can be blocked to the greatest extent, improve leakproofness by the laminating degree of plate and waterstop, The pressing plate of top plate side setting can limit concrete bring tension in process of setting, keep the flat of entire concrete cut ends Whole degree.
As a preferred mode, the lower surface of top plate 2 is provided with "T"-shaped guide rail 4, and the jacking block 3 is set as " T " Shape, jacking block 3 and "T"-shaped guide rail 4 are slidably matched.In which, baffle and top plate can be made to be detached from by the way that jacking block horizontally slips, it can The baffle of different height is replaced to adapt to different constructing tunnel situations, locally surpassed with meeting tunnel top, owe the closure requirement dug, The flexibility for improving the interchangeability of the utility model and using.
As a preferred mode, top plate 2 uses composite rubber material.In which, it is made of compounded rubber tool Top plate have material light, elasticity is good and good comprehensive performance, and the application of composite rubber material revolutionize it is traditional Rigid contact between bulkhead and reinforcing bar is flexible contact, and the top plate plasticity as made of composite rubber material is good, then passes through When screw rod rotation applies pressure to jacking block, top plate can be made to generate certain elastic deformation, improve top plate and back pressure type waterstop Between leakproofness, a possibility that reducing spillage.
The other parts of the present embodiment are same as Example 1, just repeat no more here.
Embodiment 4:
Referring to Fig. 1~5, a kind of tunnel fast lifting baffle, including baffle 11, it is heavy that the upper surface of the baffle 11 offers Hole is provided with fast lifting device in counterbore, and the fast lifting device includes lifting box 6, goes up and down box 6 and counterbore is fixed connects It connecing, goes up and down and be arranged with screw rod 5 in box 6 and be threadedly coupled, the upper end of the screw rod 5 extends lifting box 6 and is provided with jacking block 3, The upper surface of jacking block 3 is provided with top plate 2 and contradicts connection, and rotating handle 1 is additionally provided on the screw rod 5 and is fixedly connected, institute Rotating handle 1 is stated to be located between jacking block 3 and lifting box 6.
Fast lifting device be at least two and along the center line symmetrical setting of baffle 11 at the both ends of baffle 11.
In the present embodiment, by the way that fast lifting device to be symmetricly set on to the both ends of baffle, avoid top plate by lateral force Caused discontinuity, the problem for keeping leak stopping sealing effect bad, two fast lifting devices are in manufacturing cost and use feelings Optimum efficiency can be reached in condition.
As a preferred mode, lifting box 6 includes box body 7, is fixedly installed spiral shell block 10, the screw rod 5 in box body 7 It is threadedly coupled with spiral shell block 10, the upper end of box body 7 is provided with capping 9, and the upper end of screw rod 5 is through capping 9.In the present embodiment, pass through Capping is set on box body, and the leakproofness for improving lifting box passes through capping since impurity is more in air in constructing tunnel Avoidable impurity, which enters, blocks screw rod in box body, influences screwing for screw rod and spiral shell block.
The other parts of the present embodiment are same as Example 1, just repeat no more here.
It as above is the embodiments of the present invention.Design parameter in above-described embodiment and embodiment is merely to clear The verification process of the utility model is stated by Chu, not to limit the scope of patent protection of the utility model, the utility model Scope of patent protection is still subject to the claims, made by all specifications and accompanying drawing content with the utility model Equivalent structure variation, similarly should be included in the protection scope of the utility model.

Claims (7)

1. a kind of tunnel fast lifting baffle, including baffle (11), it is characterised in that: the upper surface of the baffle (11) offers Counterbore is provided with fast lifting device in counterbore, and the fast lifting device includes lifting box (6), and lifting box (6) and counterbore are consolidated Fixed connection, lifting box (6) is interior to be arranged with screw rod (5) and is threadedly coupled, and lifting box (6) is extended simultaneously in the upper end of the screw rod (5) It is provided with jacking block (3), the upper surface of jacking block (3) is provided with top plate (2) and contradicts connection, is additionally provided with rotation on the screw rod (5) It changes hands handle (1) and is fixedly connected, the rotating handle (1) is located between jacking block (3) and lifting box (6).
2. tunnel fast lifting baffle according to claim 1, it is characterised in that: the baffle (11) uses compounded rubber Material, and it is provided with rigid strutting piece in baffle (11), the rigid strutting piece includes the multiple groups being laterally arranged in baffle (11) Horizontal ribs (13), overlap joint rib (12) is symmetrically arranged at left and right sides of baffle (11), and the overlap joint rib (12) can be used for keeping off two-by-two Plate (11) lap seal.
3. tunnel fast lifting baffle according to claim 1, it is characterised in that: the upper surface of the top plate (2) is arranged For the arc being bonded with inverted arch or back pressure type waterstop, the side vertical of top plate (2) is provided with pressing plate (8), the pressing plate (8) Side and concrete surface fitting.
4. tunnel fast lifting baffle according to claim 3, it is characterised in that: the lower surface of the top plate (2) is arranged Have "T"-shaped guide rail (4), the jacking block (3) is set as "T"-shaped, and jacking block (3) and "T"-shaped guide rail (4) are slidably matched.
5. tunnel fast lifting baffle according to claim 4, it is characterised in that: the top plate (2) uses compounded rubber Material.
6. tunnel fast lifting baffle according to claim 1, it is characterised in that: the fast lifting device is at least two It is a and along the center line symmetrical setting of baffle (11) baffle (11) both ends.
7. tunnel fast lifting baffle according to claim 6, it is characterised in that: the lifting box (6) includes box body (7), it is fixedly installed spiral shell block (10) in box body (7), the screw rod (5) is threadedly coupled with spiral shell block (10), and the upper end of box body (7) is set It is equipped with capping (9), the upper end of screw rod (5) is through capping (9).
CN201821213902.3U 2018-07-27 2018-07-27 A kind of tunnel fast lifting baffle Expired - Fee Related CN208502801U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821213902.3U CN208502801U (en) 2018-07-27 2018-07-27 A kind of tunnel fast lifting baffle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821213902.3U CN208502801U (en) 2018-07-27 2018-07-27 A kind of tunnel fast lifting baffle

Publications (1)

Publication Number Publication Date
CN208502801U true CN208502801U (en) 2019-02-15

Family

ID=65290532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821213902.3U Expired - Fee Related CN208502801U (en) 2018-07-27 2018-07-27 A kind of tunnel fast lifting baffle

Country Status (1)

Country Link
CN (1) CN208502801U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798726A (en) * 2018-07-27 2018-11-13 四川皓德斯新材料科技有限公司 A kind of tunnel fast lifting baffle
CN109930857A (en) * 2019-04-23 2019-06-25 中国人民解放军陆军工程大学 A kind of Combined spiral support system being used to support collapsing building structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798726A (en) * 2018-07-27 2018-11-13 四川皓德斯新材料科技有限公司 A kind of tunnel fast lifting baffle
CN109930857A (en) * 2019-04-23 2019-06-25 中国人民解放军陆军工程大学 A kind of Combined spiral support system being used to support collapsing building structure

Similar Documents

Publication Publication Date Title
CN208502801U (en) A kind of tunnel fast lifting baffle
CN205713092U (en) A kind of Rectangular Concrete wall column circle external angle formwork device
CN106908323A (en) A kind of rock-like materials Hydraulic fracturing test device and method
CN108798726A (en) A kind of tunnel fast lifting baffle
CN208430643U (en) A kind of wall hole plugging device
CN207079913U (en) A kind of structure for preventing cast-in-place vertical member bottom spillage
CN206655158U (en) A kind of anti-collision guard rail for highways one-piece casting template
CN209959259U (en) Water stop belt positioning and fastening plug board device for tunnel trolley lining construction
CN104790353A (en) Sluice pier construction method for small and medium size sluices
CN108729658A (en) A kind of adjustable high-rise function building template
CN213625749U (en) Underground engineering crack repairing structure
CN210100269U (en) Side die and template for producing rib prefabricated part
CN211897742U (en) Guardrail steel form
CN208379644U (en) A kind of post-cast strip built for basement
CN208918276U (en) A kind of simple plugging device of vertical duct preformed hole
CN108978595B (en) Structure for repairing water stop at bottom of peripheral seam of concrete faced rockfill dam and construction method
CN208220203U (en) A kind of masonry ring beam template bracing means
CN204491596U (en) Pile for prestressed pipe end plate exempts from welding structure
CN206902549U (en) A kind of bridge coxopodite pier shaft pours leakproof sizing device
CN209620513U (en) A kind of circle angle bead
CN208949921U (en) Waterstop fixing mould
CN208517965U (en) A kind of readily removable reserved bolt deep holes template removed, can be used in turn
CN208545965U (en) A kind of template component for secondary structure pouring construction
CN107842199A (en) A kind of preforming combination tool of mattess partitioning slot and its built-in process
CN104563490A (en) Novel adjustable wall body back ridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190719

Address after: 618300 Sichuan Province, Guanghan City, the town of goldfish cold water village, the 1 society of the

Co-patentee after: SICHUAN RUITIE TECHNOLOGY Co.,Ltd.

Patentee after: SICHUAN HAODESI NEW MATERIAL TECHNOLOGY Co.,Ltd.

Address before: 618300 Sichuan Province, Guanghan City, the town of goldfish cold water village, the 1 society of the

Patentee before: SICHUAN HAODESI NEW MATERIAL TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215

Termination date: 20210727