CN208501987U - Between a kind of integral bathroom between the exposed corner connecting structure of wallboard and integral bathroom using it - Google Patents

Between a kind of integral bathroom between the exposed corner connecting structure of wallboard and integral bathroom using it Download PDF

Info

Publication number
CN208501987U
CN208501987U CN201820950198.3U CN201820950198U CN208501987U CN 208501987 U CN208501987 U CN 208501987U CN 201820950198 U CN201820950198 U CN 201820950198U CN 208501987 U CN208501987 U CN 208501987U
Authority
CN
China
Prior art keywords
wallboard
slot
connecting portion
panel
integral bathroom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201820950198.3U
Other languages
Chinese (zh)
Inventor
关孝海
杨立鑫
廖冶涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Innoci Toilet And Bathroom Article Co Ltd
Guangdong Dongpeng Holdings Co Ltd
Foshan Dongpeng Sanitary Ware Co Ltd
Original Assignee
Guangdong Innoci Toilet And Bathroom Article Co Ltd
Guangdong Dongpeng Holdings Co Ltd
Foshan Dongpeng Sanitary Ware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Innoci Toilet And Bathroom Article Co Ltd, Guangdong Dongpeng Holdings Co Ltd, Foshan Dongpeng Sanitary Ware Co Ltd filed Critical Guangdong Innoci Toilet And Bathroom Article Co Ltd
Priority to CN201820950198.3U priority Critical patent/CN208501987U/en
Application granted granted Critical
Publication of CN208501987U publication Critical patent/CN208501987U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a kind of exposed corner connecting structures of wallboard between integral bathroom, including the first wallboard, the second wallboard and Corner Link;The lower end surface of first wallboard is equipped with lower frame, and lower frame is equipped with opening towards the first left T-slot, and the angle between the lower surface of lower frame and the right surface of the first wallboard is 45 °;The right side of second wallboard is equipped with left frame, and left frame is equipped with the second opening up T-slot, and the angle between the right surface of left frame and the lower surface of the second wallboard is 45 °;Corner Link includes the first connecting portion and second connecting portion for being rectangular plate-like, and first connecting portion is vertical with second connecting portion to be connect;Angle between first wallboard and the second wallboard is 90 °, and the lower surface of lower frame is close to the right surface of left frame, and the first T-slot and first connecting portion are attached using bolt, and the second T-slot and second connecting portion are attached using bolt.The application has the advantages that structure is simple, bonding strength is high and maintenance easy to assemble.

Description

Between a kind of integral bathroom between the exposed corner connecting structure of wallboard and integral bathroom using it
Technical field
The utility model relates to a kind of exposed corner connecting structures of wallboard between field between integral bathroom more particularly to integral bathroom And between the integral bathroom using it.
Background technique
Due between integral bathroom compared to traditional bathroom have be easily installed, waterproof effect is excellent and thermal insulation property is outstanding The advantages of, so more and more people are more partial between installing integral bathroom when carrying out bathroom finishing now, it is existing The structure of male and female part Tenon is generallyd use between integral bathroom on the exposed corner connecting structure of side wallboard, and on joinery and its construction It is bonded using marine glue, to increase bonding strength, but due to the shadow of mismachining tolerance and stress deformation by male and female part It rings, and the cohesive force of glue is limited, is easy to appear loosening over time, the problem for causing installation unstable.
Utility model content
The purpose of this utility model is that proposing between a kind of integral bathroom the exposed corner connecting structure of wallboard and using the whole of it Body bathroom, to solve the above problems.
For this purpose, the utility model uses following technical scheme:
The exposed corner connecting structure of wallboard between a kind of integral bathroom, including the first wallboard, the second wallboard and Corner Link;
The lower end surface of first wallboard is equipped with lower frame, and the lower frame, which is equipped with, to be open towards the first left T-slot, described Angle between the lower surface of lower frame and the right surface of first wallboard is 45 °;
The right side of second wallboard is equipped with left frame, and the left frame is equipped with the second opening up T-slot, described Angle between the right surface of left frame and the lower surface of second wallboard is 45 °;
The Corner Link includes the first connecting portion and second connecting portion for being rectangular plate-like, the first connecting portion It is vertical with the second connecting portion to connect;
Angle between first wallboard and second wallboard is 90 °, the lower surface of the lower frame and the right side The right surface of frame is close to, and first T-slot is attached with the first connecting portion using bolt, second T-slot It is attached with the second connecting portion using bolt.
It further include sealing strip, the lower surface of the lower frame is equipped with the first seal groove, and the right surface of the left frame is set There is the second seal groove, first seal groove and second seal groove surround a cavity, and the sealing strip is arranged described In cavity, the inner wall of first seal groove and second seal groove compresses the sealing strip.
The first connecting portion is equipped with the first mounting hole, and the upper end of the first connecting portion is equipped with upper positioning bending, described The lower end of first connecting portion is equipped with the first lower positioning bending, and the width of positioning bending is equal under the upper positioning bending and described first With the equivalent width of first T-slot or second T-slot;The upper positioning bending and the first lower positioning bending are same When be inserted into first T-slot or second T-slot, the setting of the head of the bolt is in first T-slot or described In second T-slot, the tail portion of the bolt is pierced by from first mounting hole to be connect with nut;
The second connecting portion be equipped with U-shaped hole, the U-shaped hole it is opening up, the lower end of the second connecting portion is equipped with Second lower positioning bending, the width of the described second lower positioning bending and the width one of second T-slot or first T-slot It causes, the described second lower positioning bending is inserted into second T-slot or first T-slot, and the head of the bolt is set It sets in second T-slot or first T-slot, the tail portion of the bolt is pierced by from the U-shaped hole to be connect with nut.
First wallboard 1 include the first backboard, the first aluminum honeycomb panel, the first intermediate plate and first panel, described first The right surface of first backboard is arranged in aluminum honeycomb panel, and the right table of first aluminum honeycomb panel is arranged in first intermediate plate Face, the first panel are arranged in the right surface of first intermediate plate, first backboard and first aluminum honeycomb panel Lower end is equipped with the first evacuation position, the lower frame setting at first evacuation position, the lower end surface of the first panel with Angle between its right surface is 45 °;
Second wallboard includes the second backboard, the second aluminum honeycomb panel, the second intermediate plate and second panel, second aluminium The lower surface of second backboard is arranged in cellular board, and the following table of second aluminum honeycomb panel is arranged in second intermediate plate Face, the second panel are arranged in the lower surface of second intermediate plate, second backboard and second aluminum honeycomb panel Right end is equipped with the second evacuation position, the left frame setting at second evacuation position, the right side of the second panel with Angle between its lower surface is 45 °.
The width of the bottom surface of first T-slot and second T-slot is of same size with the head of the bolt.
The lower end of the first connecting portion is arranged in the mounting hole, and the second connecting portion is arranged in the U-shaped hole Upper end.
The first panel and the second panel are respectively the one or more of ceramics, glass or stone material.
The section of the sealing strip is circle, and the material of the sealing strip is one of rubber or silica gel or a variety of.
The lower frame and the left frame are aluminum profile.
It is a kind of using between the integral bathroom of the exposed corner connecting structure of wallboard between a kind of above-mentioned integral bathroom.
The beneficial effects of the utility model are: the first wallboard and the second wallboard are bolted with Corner Link respectively, it is whole Body structure is relatively simple, and male and female joinery and its construction is used between traditional integral bathroom, and bull and parent part hold in the biggish situation of stress It easily directly separates, damages;The application is attached using bolt, and the first wallboard and the second wallboard are only unclamping bolt In the case of it is just removable, loosening is less prone to stress is larger, it is more durable, and bolt is easy to install and remove, It can be convenient maintenance;Furthermore frame is set in the end face of the first wallboard and the second wallboard, it can be in the first wallboard and the second wallboard Endface formed skeleton, the intensity of the first wallboard and the second wallboard is promoted respectively, so that stronger between integral bathroom.
Detailed description of the invention
Attached drawing is described further the utility model, but the content in attached drawing does not constitute any limit to the utility model System.
Fig. 1 is the exposed corner connecting structure schematic cross-section of the one of embodiment of the utility model;
Fig. 2 is the schematic front view of the Corner Link of the one of embodiment of the utility model;
Fig. 3 is the left view schematic diagram of the Corner Link of the one of embodiment of the utility model;
Wherein: the first wallboard 1, the second wallboard 2, Corner Link 3, sealing strip 4, bolt 5, nut 6, lower frame 11, One backboard 12, the first aluminum honeycomb panel 13, the first intermediate plate 14, first panel 15, the first T-slot 111, the first seal groove 112, the right side Frame 21, the second backboard 22, the second aluminum honeycomb panel 23, the second intermediate plate 24, second panel 25, the second T-slot 211, second are close Sealing groove 212, first connecting portion 31, the first mounting hole 311, the lower positioning bending 313, second of upper positioning bending 312, first connect Portion 32, the lower positioning bending 322 in U-shaped hole 321, second.
Specific embodiment
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.
The exposed corner connecting structure of wallboard between a kind of integral bathroom of the present embodiment, as shown in Figure 1, including the first wallboard 1, the Two wallboards 2 and Corner Link 3;
The lower end surface of first wallboard 1 is equipped with lower frame 11, and the lower frame 11 is equipped with opening towards the first left T-slot 111, the angle between the lower surface of the lower frame 11 and the right surface of first wallboard 1 is 45 °;
The right side of second wallboard 2 is equipped with left frame 21, and the left frame 21 is equipped with the second opening up T-slot 211, the angle between the right surface of the left frame 21 and the lower surface of second wallboard 2 is 45 °;
The Corner Link 3 include be rectangular plate-like first connecting portion 31 and second connecting portion 32, described first Interconnecting piece 31 is vertical with the second connecting portion 32 to be connect;
Angle between first wallboard 1 and second wallboard 2 is 90 °, the lower surface of the lower frame 11 and institute The right surface for stating left frame 21 is close to, and first T-slot 111 is attached with the first connecting portion 31 using bolt 5, Second T-slot 211 is attached with the second connecting portion 32 using bolt 5.
First wallboard 1 and the second wallboard 2 are connect with 3 bolt 5 of Corner Link respectively, and overall structure is relatively simple, tradition Male and female joinery and its construction is used between integral bathroom, bull is easy directly to separate with parent part in the biggish situation of stress, damages; The application is attached using bolt 5, and only in the case where unclamping bolt 5, ability is removable with the second wallboard 2 for the first wallboard 1, Loosening is less prone to stress is larger, it is more durable, and bolt 5 is easy to install and remove, and can be convenient maintenance;This Frame is arranged in the end face of external first wallboard 1 and the second wallboard 2, can be formed in the endface of the first wallboard 1 and the second wallboard 2 Skeleton promotes the intensity of the first wallboard 1 and the second wallboard 2, so that stronger between integral bathroom respectively.
It further include sealing strip 4, the lower surface of the lower frame 11 is equipped with the first seal groove 112, the left frame 21 Right surface is equipped with the second seal groove 212, and first seal groove 112 surrounds a cavity, institute with second seal groove 212 It states sealing strip 4 to be arranged in the cavity, the inner wall of first seal groove 112 and second seal groove 212 will be described close Strip of paper used for sealing 4 compresses.
Waterproof sealing processing is carried out usually using sealant between traditional integral bathroom, but sealant is easy over time It falls off, causes waterproof effect poor;The application compresses sealing strip 4 by two seal grooves to realize the first wallboard 1 and the second sealing between wallboard 2, since sealing strip 4 is mounted in two seal grooves, so the phenomenon that there is no fall off, It is more durable.
As shown in Figures 2 and 3, the first connecting portion 31 be equipped with the first mounting hole 311, the first connecting portion 31 it is upper End is equipped with upper positioning bending 312, and the lower end of the first connecting portion 31 is equipped with the first lower positioning bending 313, the upper positioning folding Width of the width of positioning bending 313 with first T-slot 111 or second T-slot 211 under curved 312 and described first Degree is consistent;First T-slot 111 or described is inserted into the upper positioning bending 312 and the first lower positioning bending 313 simultaneously In second T-slot 211, the head of the bolt 5 is arranged in first T-slot 111 or second T-slot 211, described The tail portion of bolt 5 is pierced by from first mounting hole 311 and connect with nut 6;
The second connecting portion 32 is equipped with U-shaped hole 321, opening up, the second connecting portion 32 in the U-shaped hole 321 Lower end be equipped with second and lower position bending 322, the width of the described second lower positioning bending 322 and second T-slot 211 or institute The equivalent width of the first T-slot 111 is stated, second T-slot 211 or described first are inserted into the described second lower positioning bending 322 In the T-slot, the head of the bolt 5 is arranged in second T-slot 211 or first T-slot 111, the spiral shell The tail portion of bolt 5 is pierced by from the U-shaped hole 321 and connect with nut 6.
The lower positioning bending 313 of upper positioning bending 312, first and the second lower positioning bending 322 can divide Corner Link 3 It is not positioned with the first T-slot 111 and the second T-slot 211, Corner Link 3 is made to be less prone to shaking after mounting, it can be with Effectively improve the installation strength of Corner Link 3, the first wallboard 1 and the second wallboard 2.
First wallboard 1 includes the first backboard 12, the first aluminum honeycomb panel 13, the first intermediate plate 14 and first panel 15, The right surface of first backboard is arranged in first aluminum honeycomb panel 13, and first intermediate plate 14 is arranged in first aluminium The right surface of first intermediate plate 14, first backboard 12 is arranged in the right surface of cellular board 13, the first panel 15 It is equipped with the first evacuation position with the lower end of first aluminum honeycomb panel 13, the setting of lower frame 11 is in first evacuation position Place, the angle between the lower end surface of the first panel 15 and its right surface is 45 °;
Second wallboard 2 includes the second backboard 22, the second aluminum honeycomb panel 23, the second intermediate plate 24 and second panel 25, The lower surface of second backboard is arranged in second aluminum honeycomb panel 23, and second intermediate plate 24 is arranged in second aluminium The lower surface of second intermediate plate 24, second backboard 22 is arranged in the lower surface of cellular board 23, the second panel 25 It is equipped with the second evacuation position with the right end of second aluminum honeycomb panel 23, the setting of left frame 21 is in second evacuation position Place, the angle between the right side and its lower surface of the second panel 25 is 45 °.
The first aluminum honeycomb panel 13 and the second aluminum honeycomb panel 23 are respectively set in first wallboard 1 and the second wallboard 2 can have Higher intensity and lighter weight, can be effectively reduced transportation cost, be not susceptible to deform after mounting, and the first aluminum honeycomb Plate 13 and the second aluminum honeycomb panel 23 have the advantages that heat insulating ability is stronger, and making bathroom, heat is not easy to lose during use, It is positively retained at certain humidity range in bathroom, prevents user from catching a cold, the shower experience of user is preferable.
The width of the bottom surface of first T-slot 111 and second T-slot 211 with the head of the bolt 5 It is of same size.
The inner wall of first T-slot 111 and the second T-slot 211 carries out clamping to the head of bolt 5 respectively, to 5 tail of bolt Portion is fixed when screwing in nut 6 without using head of the spanner to bolt 5, easier for installation.
The lower end of the first connecting portion 31 is arranged in the mounting hole, and the U-shaped setting of hole 321 is in second connection The upper end in portion 32.
Mounting hole and U-shaped hole 321 are setting up and down to interfere when can be to avoid installation bolt 5.
The first panel 15 and the second panel 25 are respectively the one or more of ceramics, glass or stone material.
Different decorative effects can have using the panel 15 of unlike material, can satisfy the aesthetic of different clients and need It asks.
The section of the sealing strip 4 is circle, and the material of the sealing strip 4 is one of rubber or silica gel or a variety of.
Rubber and silica gel have preferable elasticity, have excellent sealing performance, can play preferable waterproof effect;It passes It is sealed between the integral bathroom of system using glue, since glue can release various toxic chemical substances, and is volatilized the time Relatively long, be easy the health of user is impacted, the sealing strip 4 in the application and between seal groove use physical connection, And sealing strip 4 is nontoxic rubber or silica gel, will not release any noxious material, more environmentally-friendly health.
The lower frame 11 and the left frame 21 are aluminum profile.
Have the advantages that easy processing as frame using aluminum profile, and intensity is higher, price is relatively cheap, it can be in entirety Four edges of bathroom form skeleton, keep the stiffness and strength between integral bathroom higher, are more firmly mounted.
It is a kind of using between the integral bathroom of the exposed corner connecting structure of wallboard between a kind of above-mentioned integral bathroom.
Technical principle of the utility model has been described above with reference to specific embodiments.These descriptions are intended merely to explain this reality With novel principle, and it cannot be construed to the limitation to scope of protection of the utility model in any way.Based on the explanation herein, Those skilled in the art, which does not need to pay for creative labor, can associate with other specific implementation modes of this utility model, These modes are fallen within the protection scope of the utility model.

Claims (10)

1. the exposed corner connecting structure of wallboard between a kind of integral bathroom, which is characterized in that including the first wallboard, the second wallboard and corner Connector;
The lower end surface of first wallboard is equipped with lower frame, and the lower frame, which is equipped with, to be open towards the first left T-slot, described following Angle between the lower surface of frame and the right surface of first wallboard is 45 °;
The right side of second wallboard is equipped with left frame, and the left frame is equipped with the second opening up T-slot, described the right Angle between the right surface of frame and the lower surface of second wallboard is 45 °;
The Corner Link includes the first connecting portion and second connecting portion for being rectangular plate-like, the first connecting portion and institute Second connecting portion is stated vertically to connect;
Angle between first wallboard and second wallboard is 90 °, the lower surface of the lower frame and the left frame Right surface be close to, first T-slot is attached with the first connecting portion using bolt, second T-slot and institute Second connecting portion is stated to be attached using bolt.
2. the exposed corner connecting structure of wallboard between a kind of integral bathroom according to claim 1, which is characterized in that further include close Strip of paper used for sealing, the lower surface of the lower frame are equipped with the first seal groove, and the right surface of the left frame is equipped with the second seal groove, described First seal groove and second seal groove surround a cavity, and the sealing strip is arranged in the cavity, and described first is close The inner wall of sealing groove and second seal groove compresses the sealing strip.
3. the exposed corner connecting structure of wallboard between a kind of integral bathroom according to claim 1, which is characterized in that described first Interconnecting piece is equipped with the first mounting hole, and the upper end of the first connecting portion is equipped with upper positioning bending, the lower end of the first connecting portion Equipped with first it is lower position bending, the width of the upper positioning bending and the first lower positioning bending with first T-slot Or the equivalent width of second T-slot;The first T is inserted into the upper positioning bending and the first lower positioning bending simultaneously In type groove or second T-slot, the head of the bolt is arranged in first T-slot or second T-slot, described The tail portion of bolt is pierced by from first mounting hole and connect with nut;
The second connecting portion is equipped with U-shaped hole, the U-shaped hole it is opening up, the lower end of the second connecting portion is equipped with second Lower positioning bending, the width of the described second lower positioning bending and the equivalent width of second T-slot or first T-slot, Described second lower positioning bending is inserted into second T-slot or first T-slot, and the head setting of the bolt exists In second T-slot or first T-slot, the tail portion of the bolt is pierced by from the U-shaped hole to be connect with nut.
4. the exposed corner connecting structure of wallboard between a kind of integral bathroom according to claim 1, which is characterized in that described first Wallboard 1 includes the first backboard, the first aluminum honeycomb panel, the first intermediate plate and first panel, and first aluminum honeycomb panel is arranged in institute The right surface of the first backboard is stated, the right surface of first aluminum honeycomb panel, the first panel is arranged in first intermediate plate The right surface of first intermediate plate is set, and the lower end of first backboard and first aluminum honeycomb panel is equipped with first and keeps away It steps down, folder of the lower frame setting at first evacuation position, between the lower end surface of the first panel and its right surface Angle is 45 °;
Second wallboard includes the second backboard, the second aluminum honeycomb panel, the second intermediate plate and second panel, second aluminum honeycomb The lower surface of second backboard is arranged in plate, and the lower surface of second aluminum honeycomb panel, institute is arranged in second intermediate plate State the lower surface that second intermediate plate is arranged in second panel, the right end of second backboard and second aluminum honeycomb panel is equal Equipped with the second evacuation position, the left frame setting is at second evacuation position, the right side of the second panel and its following table Angle between face is 45 °.
5. the exposed corner connecting structure of wallboard between a kind of integral bathroom according to claim 1, which is characterized in that described first The width of the bottom surface of T-slot and second T-slot is of same size with the head of the bolt.
6. the exposed corner connecting structure of wallboard between a kind of integral bathroom according to claim 3, which is characterized in that the installation The lower end of the first connecting portion is arranged in hole, and the upper end of the second connecting portion is arranged in the U-shaped hole.
7. the exposed corner connecting structure of wallboard between a kind of integral bathroom according to claim 4, which is characterized in that described first Panel and the second panel are respectively the one or more of ceramics, glass or stone material.
8. the exposed corner connecting structure of wallboard between a kind of integral bathroom according to claim 2, which is characterized in that the sealing The section of item is circle, and the material of the sealing strip is one of rubber or silica gel or a variety of.
9. the exposed corner connecting structure of wallboard between a kind of integral bathroom according to claim 1, which is characterized in that described following Frame and the left frame are aluminum profile.
10. the entirety of the exposed corner connecting structure of wallboard is defended between a kind of a kind of any integral bathroom using claim 1-9 Between bath.
CN201820950198.3U 2018-06-20 2018-06-20 Between a kind of integral bathroom between the exposed corner connecting structure of wallboard and integral bathroom using it Withdrawn - After Issue CN208501987U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820950198.3U CN208501987U (en) 2018-06-20 2018-06-20 Between a kind of integral bathroom between the exposed corner connecting structure of wallboard and integral bathroom using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820950198.3U CN208501987U (en) 2018-06-20 2018-06-20 Between a kind of integral bathroom between the exposed corner connecting structure of wallboard and integral bathroom using it

Publications (1)

Publication Number Publication Date
CN208501987U true CN208501987U (en) 2019-02-15

Family

ID=65287134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820950198.3U Withdrawn - After Issue CN208501987U (en) 2018-06-20 2018-06-20 Between a kind of integral bathroom between the exposed corner connecting structure of wallboard and integral bathroom using it

Country Status (1)

Country Link
CN (1) CN208501987U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708483A (en) * 2018-06-20 2018-10-26 佛山东鹏洁具股份有限公司 The exposed corner connecting structure of wallboard and using between its integral bathroom between a kind of integral bathroom
CN110629951A (en) * 2019-09-02 2019-12-31 合肥高丽今生实业有限公司 Internal and external corner waterproof assembly for integral bathroom and installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708483A (en) * 2018-06-20 2018-10-26 佛山东鹏洁具股份有限公司 The exposed corner connecting structure of wallboard and using between its integral bathroom between a kind of integral bathroom
CN108708483B (en) * 2018-06-20 2023-12-12 佛山东鹏洁具股份有限公司 External corner connection structure of wallboard of integral bathroom and integral bathroom thereof
CN110629951A (en) * 2019-09-02 2019-12-31 合肥高丽今生实业有限公司 Internal and external corner waterproof assembly for integral bathroom and installation method thereof

Similar Documents

Publication Publication Date Title
CN208501987U (en) Between a kind of integral bathroom between the exposed corner connecting structure of wallboard and integral bathroom using it
CN108308966B (en) Silver mirror mounting assembly and mounting method thereof
CN106088408A (en) A kind of precast wall body external corner installs module
CN102535698B (en) Heat insulation curtain wall
CN108708483A (en) The exposed corner connecting structure of wallboard and using between its integral bathroom between a kind of integral bathroom
CN208501988U (en) Between a kind of inner corner trim connection structure between integral bathroom and the integral bathroom using it
CN203532992U (en) Novel air pipe mounting connecting structure
CN108708484A (en) It is a kind of to be used for the inner corner trim connection structure between integral bathroom and using between its integral bathroom
CN208858190U (en) A kind of installation system between integral bathroom
CN207079779U (en) A kind of attachment structure of metal insulation board curtain wall
CN205476267U (en) Corner decoration panel combination pendant and corner decoration panel integrated configuration
CN201981675U (en) Reinforced back bolt trespa curtain wall
CN205369608U (en) Open aluminium veneer curtain
CN205712642U (en) A kind of nylon sheet curtain wall construction
CN212295509U (en) Can preset limit angle line structure of gluing agent
CN214364629U (en) Novel wallboard hanging structure
CN209099695U (en) A kind of face dry-hung plate support decorating structure
CN217461277U (en) Outer wall integration heat preservation decorates aluminum plate connection structure
CN209586086U (en) A kind of hollow glass parting bead disconnecting prevention structure
CN101182737A (en) Honeycomb composite board and decorative structure containing same
CN216405863U (en) Ornamental strip mounting structure for curtain
CN216008217U (en) Aluminum-wood section bar with stable connection and door and window frame using same
CN214364340U (en) Bevel edge suspended ceiling
CN216008216U (en) Connect cavity aluminum-wood section bar more firm
CN210658852U (en) Steel frame curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190215

Effective date of abandoning: 20231212

AV01 Patent right actively abandoned

Granted publication date: 20190215

Effective date of abandoning: 20231212

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned