CN208501727U - The pre-buried fixed frame of heavy foundation bolt - Google Patents
The pre-buried fixed frame of heavy foundation bolt Download PDFInfo
- Publication number
- CN208501727U CN208501727U CN201820836810.4U CN201820836810U CN208501727U CN 208501727 U CN208501727 U CN 208501727U CN 201820836810 U CN201820836810 U CN 201820836810U CN 208501727 U CN208501727 U CN 208501727U
- Authority
- CN
- China
- Prior art keywords
- foundation bolt
- longitudinal bracing
- brace
- cross
- heavy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to a kind of pre-buried fixed frames of heavy foundation bolt, including left and right ends coil holder (1), wherein the left and right ends coil holder (1) passes through two parallel cross-brace (2) connections, described two parallel cross-brace (2) lower ends are respectively corresponded equipped with several columns (4), described two parallel cross-braces (2) are connected by longitudinal bracing (3), and longitudinal bracing (3) setting position is corresponding with column (4) position, the longitudinal bracing (3) is for installing fixed foundation bolt (6), bridging (5) are equipped between described two parallel corresponding two columns (4) in cross-brace (2) lower end.The utility model structure is simple, it makes, is easy for installation, the upper and lower ends of heavy foundation bolt are respectively welded on the longitudinal bracing and bridging of fixed frame, it ensure that in concreting process foundation bolt not sideslip, popularization with higher and practical value in the Embedment Construction of heavy foundation bolt.
Description
Technical field
The utility model category equipment mounting technique field, more particularly to a kind of pre-buried fixed frame of heavy foundation bolt.
Background technique
Foundation bolt is the important fixed form of equipment installation.The pre-buried precision of foundation bolt, to equipment installment quality and
Duration has a major impact, therefore the inbuilt center line of foundation bolt, absolute altitude and verticality are always control stress point.Foundation bolt can
It is fixed by angle steel or round steel with reinforcement welding.But for heavy foundation bolt, this fixed form is not secured enough, in equipment base
It is likely to result in reinforcing bar system in the concreting process of plinth to shift, cover to reinforcement even Equipment Foundations intensity is made
At influence, it can also make foundation bolt that sideslip occur, cause doing over again for installation.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of pre-buried fixed frames of heavy foundation bolt, solve existing
Have that fixed form is not secured enough, reinforcing bar system is likely to result in the concreting process of Equipment Foundations and is shifted, it is right
The problem of cover to reinforcement or even Equipment Foundations intensity impact.
The technical scheme adopted by the utility model to solve the technical problem is as follows: providing a kind of the pre-buried of heavy foundation bolt
Fixed frame, including left and right ends coil holder, wherein the left and right ends coil holder is connected by two parallel cross-braces, described two
A parallel cross-brace lower end is respectively corresponded equipped with several columns, and described two parallel cross-braces are connected by longitudinal bracing
It connecing, and longitudinal bracing setting position is corresponding with stud, the longitudinal bracing is used to install fixed foundation bolt, and described two
Bridging is equipped between corresponding two columns in a parallel cross-brace lower end.
The further technical solution of the utility model is that the left and right ends coil holder is respectively by No. 10 channel steel welding groups
At.
The further technical solution of the utility model is that the length of the column is opposite with left and right ends coil holder height
It answers, is used to support cross-brace.
The further technical solution of the utility model is, the cross-brace, longitudinal bracing and bridging be by L50~
The angle steel of L75 is made.
The further technical solution of the utility model is, the foundation bolt top and longitudinal bracing be welded and fixed, under
Portion is welded and fixed with bridging.
Beneficial effect
The utility model structure is simple, makes, is easy for installation, the upper and lower ends of heavy foundation bolt is respectively welded at solid
Determine on the longitudinal bracing and bridging of frame, fixed foundation bolt can be stablized, ensure that foundation bolt is not in concreting process
Sideslip, popularization with higher and practical value in the Embedment Construction of heavy foundation bolt.
Detailed description of the invention
Fig. 1 is that the top view of the utility model is illustrated.
Fig. 2 is that the left view of the utility model is illustrated.
Fig. 3 is that the A-A cross-sectional view of the utility model is illustrated.
Specific embodiment
The present invention will be further illustrated below in conjunction with specific embodiments.It should be understood that these embodiments are merely to illustrate this
Utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, in the content for having read the utility model instruction
Later, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms equally fall within this Shen
It please the appended claims limited range.
Embodiment 1
As shown in Figure 1-3, a kind of pre-buried fixed frame of heavy type foundation bolt, including left and right ends coil holder 1, wherein the left side
Right both ends coil holder 1 is connected by two parallel cross-braces 2, and described two parallel 2 lower ends of cross-brace, which respectively correspond, to be set
There are several columns 4, described two parallel cross-braces 2 are connected by longitudinal bracing 3, and longitudinal bracing 3 is arranged position and stands
4 position of column is corresponding, and the longitudinal bracing 3 is for installing fixed foundation bolt 6, described two parallel 2 lower ends of cross-brace
Bridging 5 is equipped between corresponding two columns 4.
The left and right ends coil holder 1 is respectively to be welded to form by No. 10 channel steels, the length and left and right ends line of the column 4
1 height of frame is corresponding, is used to support cross-brace 2, and the cross-brace 2, longitudinal bracing 3 and bridging 5 are by L50~L75
Angle steel be made, 6 top of foundation bolt is welded and fixed with longitudinal bracing 3, lower part and bridging 5 are welded and fixed.
In actual use, the side of foundation bolt is contacted with longitudinal bracing, and by welding foundation bolt and longitudinal direction
Support is fixed, and foundation bolt lower part is with bridging by being welded and fixed.
Claims (5)
1. a kind of pre-buried fixed frame of heavy type foundation bolt, including left and right ends coil holder (1), it is characterised in that: the left and right two
By two parallel cross-brace (2) connections, described two parallel cross-brace (2) lower ends respectively correspond end line frame (1)
Equipped with several columns (4), described two parallel cross-braces (2) are connected by longitudinal bracing (3), and longitudinal bracing (3) is set
Seated position is corresponding with column (4) position, and the longitudinal bracing (3) is described two parallel for installing fixed foundation bolt (6)
Corresponding two columns (4) in cross-brace (2) lower end between be equipped with bridging (5).
2. a kind of pre-buried fixed frame of heavy foundation bolt according to claim 1, it is characterised in that: the left and right ends line
Frame (1) is respectively to be welded to form by No. 10 channel steels.
3. a kind of pre-buried fixed frame of heavy foundation bolt according to claim 1, it is characterised in that: the column (4)
Length is corresponding with left and right ends coil holder (1) height, is used to support cross-brace (2).
4. a kind of pre-buried fixed frame of heavy foundation bolt according to claim 1, it is characterised in that: the cross-brace
(2), longitudinal bracing (3) and bridging (5) of the angle steel of L50~L75 by being made.
5. a kind of pre-buried fixed frame of heavy foundation bolt according to claim 1, it is characterised in that: the foundation bolt
(6) top is welded and fixed with longitudinal bracing (3), lower part and bridging (5) are welded and fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820836810.4U CN208501727U (en) | 2018-05-31 | 2018-05-31 | The pre-buried fixed frame of heavy foundation bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820836810.4U CN208501727U (en) | 2018-05-31 | 2018-05-31 | The pre-buried fixed frame of heavy foundation bolt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208501727U true CN208501727U (en) | 2019-02-15 |
Family
ID=65287836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820836810.4U Active CN208501727U (en) | 2018-05-31 | 2018-05-31 | The pre-buried fixed frame of heavy foundation bolt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208501727U (en) |
-
2018
- 2018-05-31 CN CN201820836810.4U patent/CN208501727U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979108B (en) | For locating the location stock of crab-bolt group | |
CN106087744B (en) | Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device and method | |
CN101864825B (en) | Reinforced concrete prefabricated column positioning device and construction method thereof | |
CN103669226A (en) | River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method | |
CN203654786U (en) | Bolt positioning frame for subgrade contact network support pillar construction | |
CN107090775A (en) | A kind of full framing space beam-ends cable guide pipe construction localization method | |
CN105317052B (en) | Tower crane foundation bolt fixing method | |
CN107336346A (en) | A kind of beam making bench | |
CN208533372U (en) | A kind of General reinforced cage binding moulding bed | |
CN208949882U (en) | The adjustable pile foundation steel pile casting positioning device of a kind of diameter | |
CN208501727U (en) | The pre-buried fixed frame of heavy foundation bolt | |
CN214737333U (en) | Detachable adjustable type embedded main reinforcement positioning device for prefabricated pier stud bridge bearing platform | |
CN206589121U (en) | It is a kind of to be used for precast beam, the diaphragm plate horizontal reinforcement mounting and positioning device of plate | |
CN106351246A (en) | Installing method of the integral sleeve of a kind of T -bolt (diameter <= 48mm) | |
CN211472549U (en) | Group pile embedded bolt positioning and fixing support frame | |
CN106760486A (en) | Exterior wall mould and its erection method in foundation ditch | |
CN109468946B (en) | Steel structure temporary fixing device and process for large-scale bent cap cantilever assembly | |
CN210997269U (en) | Tower crane jib loading boom welding frock | |
CN204252545U (en) | A kind of cushion cap column integrated construction adjust structure | |
CN207228104U (en) | A kind of isolating and protecting device for preventing pile foundation steel bar cage deflection | |
CN203034378U (en) | Transverse adjusting and limiting device | |
CN105386531A (en) | Locating device used between buttress and vibration insulation support and construction method thereof | |
CN206982971U (en) | A kind of beam making bench | |
CN113073553A (en) | Pile cap embedded upright post steel bar positioning device and construction method thereof | |
CN206815191U (en) | A kind of full framing space beam-ends cable guide pipe positioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |