CN208500142U - The rail changing device of gantry crane rail - Google Patents
The rail changing device of gantry crane rail Download PDFInfo
- Publication number
- CN208500142U CN208500142U CN201821092728.1U CN201821092728U CN208500142U CN 208500142 U CN208500142 U CN 208500142U CN 201821092728 U CN201821092728 U CN 201821092728U CN 208500142 U CN208500142 U CN 208500142U
- Authority
- CN
- China
- Prior art keywords
- rail
- gantry crane
- pedestal
- changing device
- crane rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
The utility model discloses the rail changing devices of gantry crane rail, including track foundation, pedestal and clamp rail, track foundation is embedded in the stratum of gantry crane rail gap, basic fastener inserts are embedded in the track foundation, pedestal setting is in the basic fastener inserts, the top surface of the pedestal be equipped with it is a plurality of intersect and perforative mounting groove, the opening at the mounting groove both ends are faced with the end face of gantry crane rail respectively, clamp rail is detachably arranged in the mounting groove.The utility model inserts clamp rail by the mounting groove on pedestal by basic fastener inserts fixed backing plate, pedestal, the gantry crane rail of different directions is connected by the inserting position of transformation clamp rail, clamp rail dismounts quick, it can be achieved that quickly becoming rail, effectively saves time and manpower.
Description
Technical field
The utility model relates to gantry crane walking arrangements, and in particular to the rail changing device of gantry crane rail.
Background technique
Gantry crane is using very extensive, it is generally the case that the case where its track is not in right-angled intersection arrangement, when there is this
When kind of situation, track is usually disconnected into certain length in this position, then be attached by fish platee with a short track, when wanting
When changing orbital direction herein, it is both needed to carry out track at this primary disassembly and installation work every time, it is very complicated, when consuming
Between, manpower.
In view of this, being badly in need of improving existing gantry crane rail, when solving for intersecting gantry crane rail connection
The problem of existing dismounting is cumbersome, expends time, manpower.
Utility model content
Technical problem to be solved in the utility model is existing when cross track connects in existing gantry crane rail
Dismounting it is cumbersome, expend time, manpower the problem of.
In order to solve the above-mentioned technical problem, technical solution used by the utility model is to provide the change rail of gantry crane rail
Device, comprising:
Track foundation is embedded in the stratum of gantry crane rail gap, and it is pre-buried that basis is embedded in the track foundation
Component;
Pedestal, in the basic fastener inserts, the top surface of the pedestal intersects and runs through equipped with a plurality of for setting
Mounting groove, the opening at the mounting groove both ends faces with the end face of gantry crane rail respectively;
Clamp rail is detachably arranged in the mounting groove.
In the above scheme, the basic fastener inserts include pre-embedded steel slab, the top surface of the pre-embedded steel slab and the rail
The bottom surface of the top surface flush on road basis, the pre-embedded steel slab is equipped with dowel.
In the above scheme, the top surface of the pre-embedded steel slab is equipped with backing plate group, and the pedestal is arranged in the backing plate group
On.
In the above scheme, the dowel is L-shaped.
In the above scheme, the backing plate group includes the backing plate that muti-piece is welded and fixed, the upper and lower ends point of the backing plate group
It is not welded with the pedestal and the pre-embedded steel slab.
In the above scheme, the mounting groove is the rectangular channel of opening upwards.
In the above scheme, the length of the clamp rail its two sides gantry crane rail end face less than two sections is just adjusted the distance.
In the above scheme, the track foundation is reinforced concrete structure.
The prior art is compared, and the utility model passes through basic fastener inserts fixed backing plate, pedestal, passes through the installation on pedestal
Slot insert clamp rail, by transformation clamp rail inserting position connect different directions gantry crane rail, clamp rail dismounting quickly, it can be achieved that
Quickly become rail, effectively saves time and manpower.
Detailed description of the invention
Fig. 1 is the top view of the utility model in the base structure;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the structural schematic diagram of clamp rail in the utility model;
Fig. 4 is the side view of Fig. 3;
Fig. 5 is clamp rail and the side view after base combination in the utility model;
Fig. 6 is the top view of Fig. 5;
Fig. 7 is track open position gantry crane rail and basic cross-sectional view;
Fig. 8 is basic fastener inserts structural schematic diagram;
Fig. 9 is the longitudinal sectional view of the utility model;
Figure 10 is the top view of the utility model.
Specific embodiment
The utility model provides a kind of rail changing device of gantry crane rail, solves and intersects in existing gantry crane rail
The problem of track dismounting existing when connecting is cumbersome, expends time, manpower.With reference to the accompanying drawings of the specification and specific embodiment party
Formula is described in detail the utility model.
As shown in Fig. 1~10, the rail changing device of gantry crane rail provided by the utility model includes pedestal 1, clamp rail 2, rail
Road basis 4, basic fastener inserts 5 and backing plate group 6.Basic fastener inserts are arranged on track foundation 4, and backing plate group is arranged on basis
In fastener inserts, pedestal 1 is arranged in backing plate group, and pedestal 1 makes the both ends of clamp rail 2 dock disconnection respectively for installing clamp rail 2
Gantry crane rail 3.
The top surface of pedestal 1 be equipped with it is a plurality of intersect and the opening at the both ends perforative mounting groove 1a, mounting groove 1a distinguish
Faced with the end face of gantry crane rail 3, due to gantry crane rail 3 open position be a plurality of gantry crane rail 3 crosspoint,
To realize the quick connection of gantry crane rail 3, becoming rail, clamp rail 2 is removably inlaid in mounting groove 1a, and structure is simple, dismounting
It is convenient.
Track foundation 4 is as gantry crane rail basis, it is preferred that chooses reinforced concrete structure.To limit 1 stress of pedestal
After generate any displacement, it is ensured that package unit safely and effectively uses, in the track of 3 intersection areas of disconnection of gantry crane rail
Basic fastener inserts are buried in basis 4, basic fastener inserts include pre-embedded steel slab 5a, and the bottom surface of pre-embedded steel slab 5a is equipped with dowel
5b, dowel 5b is L-shaped, is embedded in track foundation 4, it is preferred that dowel 5b is set as multiple, and along the circumferential direction of pre-embedded steel slab 5a
It is uniformly distributed, the top surface of pre-embedded steel slab 5a and the top surface flush of track foundation 4.
After installing clamp rail 2, the top surface flush of top surface and gantry crane rail 3, the utility model passes through backing plate
The height of group adjustment pedestal 1, namely the height of clamp rail 2 after installation is adjusted, backing plate group includes muti-piece backing plate 6, it is preferred that backing plate 6
Sheet metal is chosen, uses and is welded to connect between backing plate 6, the upper and lower ends of backing plate group are welded with pedestal 1 and pre-embedded steel slab 5a respectively.
In order to which there is preferable docking effect after installing clamp rail 2, and guarantee the mounting stability of clamp rail 2, under clamp rail 2
Portion is in rectangular strip, and top is in and the matched arc of 3 shape of gantry crane rail, it is preferred that mounting groove 1a is the square of opening upwards
Shape slot, shape are adapted with the shape of 2 lower part of clamp rail, are convenient for Fast Installation, and have preferable stability, the length of clamp rail 2
Degree is less than just adjusting the distance for the end face of the gantry crane rail 3 of its two sides, easy to disassemble can operate.
Preferably, pedestal 1, which uses, has certain thickness steel plate, and according to track at 3 open position of gantry crane rail
Setting mounting groove 1a is moved towards, and mounting groove 1a depth is enough to limit the lateral movement of clamp rail 2 or overturning, thus provides safety and protects
Card, and be conducive to fast assembling-disassembling, become rail.
Preferably, the longitudal section of clamp rail 2 is in rectangle, and the width of the width and gantry crane rail 3 of clamp rail 2 is almost the same, card
The top edge of rail 2 is equipped with the chamfering being adapted to gantry crane rail 3, and for convenience of the dismounting of clamp rail 2, the width of 2 bottom of clamp rail is omited
Less than the groove width of mounting groove 1a.
Preferably, for pedestal 1 using the thick steel plate for being cut into square, side length size and 2 length of clamp rail are almost the same, are
Mitigate 2 weight of clamp rail as far as possible, 1 side length of pedestal is preferably small unsuitable big, the face of 3 gap track end face of side ratio gantry crane rail
Apart from small 5~10mm, and the width that gantry crane rail 3 disconnects should not interfere the passage of gantry crane here.
Preferably, mounting groove 1a is set as two, the dragon of two mounting groove 1a angle of intersection and open position both direction
The angle of intersection of gantry crane track 3 is consistent, and two mounting groove 1a are mutually perpendicular to, and is in cross, orthogonal for connecting two
Gantry crane rail 3, to guarantee stability, the width of rebate of mounting groove 1a is greater than the width of clamp rail 2, and the difference between the two is less than
0.5mm can effectively limit the movement of clamp rail 2 after clamp rail 2 is installed.Clamp rail 2 is made of square steel, the side length of length and pedestal 1
It is isometric, and the dimensional parameters of clamp rail 2 depend on the gantry crane rail 3 of its connection, the material of such as one of gantry crane rail 3 is
P43 rail, top surface width 70mm, section have small rounded corner, in this regard, clamp rail 2 uses width for the square steel of 70mm, top surface adds
The small rounded corner of work can be adapted to gantry crane rail 3, and after clamp rail 2 is inserted into mounting groove 1a, exposed height 40mm, in addition 30mm is located at
In mounting groove 1a.
The prior art is compared, and the utility model inserts card by track foundation firm banking, by the mounting groove on pedestal
Rail, the inserting position by converting clamp rail connect different gantry crane rails, and clamp rail dismounting has quickly, it can be achieved that quickly becoming rail
Effect saves time and manpower.
The utility model is not limited to above-mentioned preferred forms, and anyone should learn that the enlightenments in the utility model
Under the structure change made, it is all that there is same or similar technical solution with the utility model, each fall within the utility model
Within protection scope.
Claims (8)
1. the rail changing device of gantry crane rail characterized by comprising
Track foundation is embedded in the stratum of gantry crane rail gap, and basic fastener inserts are embedded in the track foundation;
Pedestal, in the basic fastener inserts, the top surface of the pedestal is equipped with a plurality of intersect and perforative peace for setting
The opening of tankage, the mounting groove both ends is faced with the end face of gantry crane rail respectively;
Clamp rail is detachably arranged in the mounting groove.
2. the rail changing device of gantry crane rail according to claim 1, which is characterized in that it is described basis fastener inserts include
Pre-embedded steel slab, the top surface flush of the top surface of the pre-embedded steel slab and the track foundation are set on the bottom surface of the pre-embedded steel slab
There is dowel.
3. the rail changing device of gantry crane rail according to claim 2, which is characterized in that on the top surface of the pre-embedded steel slab
Equipped with backing plate group, the pedestal is arranged in the backing plate group.
4. the rail changing device of gantry crane rail according to claim 2, which is characterized in that the dowel is L-shaped.
5. the rail changing device of gantry crane rail according to claim 3, which is characterized in that the backing plate group includes muti-piece weldering
Fixed backing plate is connect, the upper and lower ends of the backing plate group are welded with the pedestal and the pre-embedded steel slab respectively.
6. the rail changing device of gantry crane rail according to claim 1, which is characterized in that the mounting groove is opening upwards
Rectangular channel.
7. the rail changing device of gantry crane rail according to claim 1, which is characterized in that the length of the clamp rail is less than it
It just adjusts the distance the gantry crane rail end face of two sides.
8. the rail changing device of gantry crane rail according to claim 1, which is characterized in that the track foundation is mixed for reinforcing bar
Xtah Crude Clay structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821092728.1U CN208500142U (en) | 2018-07-11 | 2018-07-11 | The rail changing device of gantry crane rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821092728.1U CN208500142U (en) | 2018-07-11 | 2018-07-11 | The rail changing device of gantry crane rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208500142U true CN208500142U (en) | 2019-02-15 |
Family
ID=65284064
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821092728.1U Active CN208500142U (en) | 2018-07-11 | 2018-07-11 | The rail changing device of gantry crane rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208500142U (en) |
-
2018
- 2018-07-11 CN CN201821092728.1U patent/CN208500142U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101919749B1 (en) | Concrete bridge system and related methods | |
US9845584B1 (en) | Barrier panel connecting clip and method | |
CN214575809U (en) | Auxiliary positioning device for assembled building joint bars | |
JP4851881B2 (en) | Embankment structure and method for reinforcing embankment structure | |
CN208500142U (en) | The rail changing device of gantry crane rail | |
CN102226345A (en) | Method for carrying out advanced water shut-off on post-cast strips in underground engineering and advanced water shut-off steel plate structure | |
CN209760255U (en) | Foundation ditch stock pedestal of angularly adjustable | |
CN204151820U (en) | Stone bolt location and installation support | |
CN209066289U (en) | High-speed rail bridge pinner and the anti-beam that shakes off combine adjustable anchor hole positioning tool | |
CN101638876B (en) | Rail anchor isolator for railroad tie | |
CN103088992A (en) | Floating floor slab of high-rise building large scale device and construction method | |
EP2314769A1 (en) | Joint elements for slabs | |
WO2018089049A1 (en) | Method and apparatus for reducing propagation of cracks in concrete | |
CN204530480U (en) | Faulting of slab ends adjusting device | |
CN102518043A (en) | Landscape bridge pier construction linear control method | |
CN206667572U (en) | A kind of modified quickly connects prefabricated thermal insulation building block | |
CN211774612U (en) | Embedded part system for thin floor slab | |
KR20130121271A (en) | Assemblies for supporting earth anchor of soil retaining wall and soil retaining wall constructing method using the same | |
CN109296061A (en) | The simple aligning device of vestibule supporting leg and installation method | |
CN204645661U (en) | Adjustable angle steel template | |
KR100918270B1 (en) | Landscape architecture facilities and it's construction method | |
CN206513028U (en) | A kind of device for adjusting steel form piece | |
CN212336758U (en) | Be used for prefabricated assembled building conversion layer wall body dowel bar accurate positioning device | |
CN205024844U (en) | Built -in fitting braced system | |
CN211691604U (en) | Limiting device for protecting building translation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190403 Address after: 430050 Bridge Industrial Park, Headquarters District, Wuhan Economic and Technological Development Zone, Hubei Province Patentee after: The 7th Engineering Co., Ltd., MBEC Address before: 430050 Bridge Industrial Park, Headquarters District, Wuhan Economic and Technological Development Zone, Hubei Province Co-patentee before: Group Co., Ltd., Zhongtie Daqiao Bureau Patentee before: The 7th Engineering Co., Ltd., MBEC |
|
TR01 | Transfer of patent right |