CN208491098U - A kind of project cost equipment box - Google Patents

A kind of project cost equipment box Download PDF

Info

Publication number
CN208491098U
CN208491098U CN201820896574.5U CN201820896574U CN208491098U CN 208491098 U CN208491098 U CN 208491098U CN 201820896574 U CN201820896574 U CN 201820896574U CN 208491098 U CN208491098 U CN 208491098U
Authority
CN
China
Prior art keywords
equipment box
circular groove
seal box
box
placing groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820896574.5U
Other languages
Chinese (zh)
Inventor
郭桂蕊
梅兆春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820896574.5U priority Critical patent/CN208491098U/en
Application granted granted Critical
Publication of CN208491098U publication Critical patent/CN208491098U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Holders For Apparel And Elements Relating To Apparel (AREA)

Abstract

The utility model discloses a kind of project cost equipment boxes, including equipment box, pencil placing groove, seal box, drawing places circular groove peace bed board, the equipment box inner bottom is equipped with seal box, the seal box upper end is equipped with sealing cover, the seal box and sealing cover pass through the first hinge connection, surrounding is mounted on sealing magnetic stripe plate on the inside of the seal box inner upper end and sealing cover, pencil placing groove is installed on the upside of the equipment box, hole is opened up on the pencil placing groove, and numbers of hole is multiple, multiple described holes are evenly distributed on pencil placing groove, the equipment box right end is equipped with drawing and places circular groove, and it is multiple that drawing, which places circular groove number,.Drawing can be spread out to be placed on tiling plate and be fixed its surrounding with rubber belt, cost person is facilitated to check calculating by the utility model by being equipped with tiling plate and rubber belt, not only facilitate, and cost personnel work difficulty is reduced, and it is more practical, it is suitble to be widely popularized and uses.

Description

A kind of project cost equipment box
Technical field
The utility model relates to a kind of equipment box, in particular to a kind of project cost equipment box.
Background technique
Currently, project cost just refers to the construction price of engineering, refer to complete the construction of an engineering, it is contemplated that or it is practical Required full payment summation, engineering equipment box are usually the apparatus and some drawings of storage for being used to place some calculating, Although existing project cost equipment box has the function of storage, uses or come with some shortcomings, it is indispensable in calculating Few apparatus calculator, since calculator uses dry cell, cannot be absorbed into moisture, need to storage during placement The accommodating groove of calculator is sealed processing, and engineering drawing is typically all to be rolled into circle to be placed in equipment box, and when use is difficult to It is spread out, is made troubles to cost person.Therefore, it is proposed that a kind of project cost equipment box.
Utility model content
The main purpose of the utility model is to provide a kind of project cost equipment boxes, can effectively solve in background technique The problem of.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of project cost equipment box, including equipment box, pencil placing groove, seal box, drawing place circular groove peace bed board, The equipment box inner bottom is equipped with seal box, and the seal box upper end is equipped with sealing cover, the seal box and sealing cover By the first hinge connection, surrounding is mounted on sealing magnetic stripe plate, the use on the inside of the seal box inner upper end and sealing cover Pencil placing groove is installed on the upside of tool case, opens up hole on the pencil placing groove, and numbers of hole be it is multiple, it is multiple described Hole is evenly distributed on pencil placing groove, and the equipment box right end is equipped with drawing and places circular groove, and drawing places circular groove It is multiple for counting, and the drawing places circular groove right end and is equipped with tiling plate, and the tiling plate and drawing placement circular groove pass through second and close Page connection, the tiling plate upper end quadrangle is mounted on rubber belt.
Further, the tiling plate lower end front and rear sides are mounted on strut, and strut number is multiple, the strut Lower end is equipped with sucker.
Further, tiling plate right end middle position is equipped with fixing belt, offers fixation hole in the fixing belt, The drawing places circular groove and is topmost equipped with fixing buckle in right side middle position, and fixation hole is connect with fixing buckle.
Further, bottom side is equipped with mounting table inside the seal box, and mounting table is specially four.
Further, the equipment box left end installation is fluted, and groove number is multiple.
Compared with prior art, the utility model has the following beneficial effects:
1. drawing can be spread out and be put by being equipped with tiling plate and rubber belt by the project cost equipment box of the utility model It sets and is fixed its surrounding with rubber belt on tiling plate, facilitate cost person to check calculating, not only facilitate, but also reduce cost personnel Work difficulty.
2. the project cost equipment box of the utility model, by being equipped with seal box and sealing cover, calculator is placed on close After in joint sealing, it can avoid being absorbed into the moisture in air and damage.
3. the project cost equipment box of the utility model, by be equipped with drawing place circular groove number be it is multiple, can will be every The drawing of a engineering is individually placed, facilitates cost person to look for and takes, and error is avoided to cause confusion.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model project cost equipment box;
Fig. 2 is the seal box inside top structural schematic diagram of the utility model project cost equipment box.
In figure: 1, equipment box;2, groove;3, hole;4, pencil placing groove;5, seal box;6, the first hinge;7, it seals Lid;8, magnetic stripe plate is sealed;9, fixing belt;10, fixation hole;11, sucker;12, strut;13, tile plate;14, fixing belt;15, Two hinges;16, drawing places circular groove;17, mounting table;18, fixing buckle.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
As shown in Figs. 1-2, a kind of project cost equipment box, including equipment box 1, pencil placing groove 4, seal box 5, drawing are put The peaceful bed board 13 of circular groove 16 is set, 1 inner bottom of equipment box is equipped with seal box 5, and 5 upper end of seal box is equipped with sealing Lid 7, the seal box 5 and sealing cover 7 are connected by the first hinge 6,7 inside four of 5 inner upper end of seal box and sealing cover It is mounted on sealing magnetic stripe plate 8 week, pencil placing groove 4 is installed on the upside of the equipment box 1, is opened up on the pencil placing groove 4 Hole 3, and 3 numbers of hole be it is multiple, multiple described holes 3 are evenly distributed on pencil placing groove 3, and the equipment box 1 is right End is equipped with drawing and places circular groove 16, and it is multiple, drawing placement 16 right end of the circular groove installation that drawing, which places 16 numbers of circular groove, There is tiling plate 13, the tiling plate 13 is placed circular groove 16 with drawing and connect by the second hinge 15,13 upper end four of tiling plate Angle is mounted on rubber belt 14.
Wherein, the 13 lower end front and rear sides of tiling plate are mounted on strut 12, and 12 numbers of strut are multiple, the branch 12 lower end of bar is equipped with sucker 11, fixed on the table convenient for the plate 13 that will tile.
Wherein, the 13 right end middle position of tiling plate is equipped with fixing belt 9, offers fixation hole in the fixing belt 9 10, the drawing places circular groove 16, and topmost right side middle position is equipped with fixing buckle 18, and fixation hole 10 and fixing buckle 18 connect It connects, convenient for fixed tiling plate 13, avoids falling off.
Wherein, the 5 inside bottom side of seal box is equipped with mounting table 17, and mounting table 17 is specially four, avoids calculating Device shakes.
Wherein, 1 left end of equipment box installation fluted 2, and 2 numbers of groove be it is multiple, convenient for placement data information.
Working principle: it is placed in circular groove 16 in use, the drawing that engineering is used is placed on drawing, the data sample of calculating It should be placed in corresponding groove 2, need Pencil with 2B hardness to be used that should be placed in corresponding hole 3 according to the mark on label, side Just cost person takes, and calculator can be placed on the mounting table 17 in seal box 5, cover by sealing cover 7, needs to check When drawing, fixing belt 9 can be removed from fixing buckle 10, then tiling plate 13 is placed from drawing and is removed on circular groove 16, use sucker 11 fix with desktop, and drawing quadrangle is fixed with rubber belt 14.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (5)

1. a kind of project cost equipment box, including equipment box (1), pencil placing groove (4), seal box (5), drawing place circular groove (16) peaceful bed board (13), it is characterised in that: equipment box (1) inner bottom is equipped with seal box (5), the seal box (5) upper end is equipped with sealing cover (7), and the seal box (5) and sealing cover (7) are connected by the first hinge (6), the seal box (5) inner upper end and sealing cover (7) inside surrounding are mounted on sealing magnetic stripe plate (8), are equipped with lead on the upside of the equipment box (1) Placing groove (4) opens up hole (3) on the pencil placing groove (4), and hole (3) number is multiple, multiple described holes (3) it is evenly distributed on pencil placing groove (4), equipment box (1) right end is equipped with drawing and places circular groove (16), and drawing is put Set circular groove (16) number be it is multiple, the drawing places circular groove (16) right end and is equipped with tiling plate (13), the tiling plate (13) It places circular groove (16) with drawing to connect by the second hinge (15), tiling plate (13) the upper end quadrangle is mounted on rubber belt (14)。
2. project cost equipment box according to claim 1, it is characterised in that: tiling plate (13) the lower end front and rear sides Be mounted on strut (12), and strut (12) number be it is multiple, strut (12) lower end is equipped with sucker (11).
3. project cost equipment box according to claim 1, it is characterised in that: tiling plate (13) the right end middle position It is equipped with fixing belt (9), is offered fixation hole (10) on the fixing belt (9), it is right topmost that the drawing places circular groove (16) Side middle position is equipped with fixing buckle (18), and fixation hole (10) is connect with fixing buckle (18).
4. project cost equipment box according to claim 1, it is characterised in that: the internal bottom side installation of the seal box (5) Have mounting table (17), and mounting table (17) is specially four.
5. project cost equipment box according to claim 1, it is characterised in that: equipment box (1) left end is equipped with recessed Slot (2), and groove (2) number is multiple.
CN201820896574.5U 2018-06-11 2018-06-11 A kind of project cost equipment box Expired - Fee Related CN208491098U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820896574.5U CN208491098U (en) 2018-06-11 2018-06-11 A kind of project cost equipment box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820896574.5U CN208491098U (en) 2018-06-11 2018-06-11 A kind of project cost equipment box

Publications (1)

Publication Number Publication Date
CN208491098U true CN208491098U (en) 2019-02-15

Family

ID=65288494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820896574.5U Expired - Fee Related CN208491098U (en) 2018-06-11 2018-06-11 A kind of project cost equipment box

Country Status (1)

Country Link
CN (1) CN208491098U (en)

Similar Documents

Publication Publication Date Title
CN208491098U (en) A kind of project cost equipment box
CN205738563U (en) A kind of pallet of band RFID device
CN209765382U (en) Portable recording device is used in digital intelligent purchase
CN208635977U (en) A kind of diving valve-testing machine with protective device
CN203450643U (en) Discharging opening fixing clamp for intermediate bulk container
CN215265198U (en) Mathematics teaching aid strorage device
CN208745605U (en) Surveying and mapping result recording device
CN207345337U (en) A kind of financial industry bill storage box
CN209625252U (en) A kind of portable electronic information storage device
CN206781303U (en) A kind of new stamp safe storage device
CN206254674U (en) A kind of device dedicated for assessing fixed assets
CN206765638U (en) A kind of new financial affairs receipt Carrier box
CN206213679U (en) A kind of exhibition booth device of exhibition room
CN206534338U (en) A kind of accounting special note storage device
CN210244223U (en) Tablet personal computer for land planning
CN210539852U (en) Bill storage device for financial affairs
CN211087774U (en) Portable electronic photo album
CN214162981U (en) Petroleum pipeline outside ring marking device
CN104536513A (en) Multifunctional radiation-proof and dustproof device for transformer substation display
CN214796687U (en) Engineering cost budget cost analysis display device
CN207731551U (en) A kind of good acrylic work card of leakproofness
CN219537801U (en) Report frame with built-in buckle structure
CN204271473U (en) Switch cubicle identity device
CN213720711U (en) Engineering is bill storage device for financial management
CN207330019U (en) Cargo Lift call panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215

CF01 Termination of patent right due to non-payment of annual fee