CN208487270U - The energy-saving steel gantry of large span - Google Patents

The energy-saving steel gantry of large span Download PDF

Info

Publication number
CN208487270U
CN208487270U CN201820726194.7U CN201820726194U CN208487270U CN 208487270 U CN208487270 U CN 208487270U CN 201820726194 U CN201820726194 U CN 201820726194U CN 208487270 U CN208487270 U CN 208487270U
Authority
CN
China
Prior art keywords
bottom plate
fixedly installed
large span
energy
saving steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820726194.7U
Other languages
Chinese (zh)
Inventor
陈攀峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wu Guilan
Xi'an Yilong Steel Structure Engineering Co.,Ltd.
Zhou Zhongjian
Original Assignee
Wenzhou Chongya Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Chongya Electronic Technology Co Ltd filed Critical Wenzhou Chongya Electronic Technology Co Ltd
Priority to CN201820726194.7U priority Critical patent/CN208487270U/en
Application granted granted Critical
Publication of CN208487270U publication Critical patent/CN208487270U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to gantry technical fields, and disclose a kind of energy-saving steel gantry of large span, including bottom plate, the upper surface of the bottom plate is fixedly installed with cross bar, the upper surface of the bottom plate is fixedly installed with the brace for running through and extending to outside cross bar, the outer surface both ends of the bottom plate are fixedly installed with protruding plate, the left surface of the left side protruding plate opens up fluted, the left surface of the left side protruding plate offers the card slot being connected with groove, the right surface of the right side protruding plate is fixedly installed with the casting lug thereon to match with groove, the lower surface both ends of the bottom plate are fixedly installed with foundation.The energy-saving steel gantry of the large span, pass through the cross bar and brace installed in the upper surface of bottom plate, device is set very to save material and using very secured, and installation casting lug thereon and the groove that opens up, device is set to facilitate large span and easy to connect, and the jacking block and spring and the card slot opened up of installation, keep device clamping more stable.

Description

The energy-saving steel gantry of large span
Technical field
The utility model relates to gantry technical field, specially a kind of energy-saving steel gantry of large span.
Background technique
Gantry is divided into the structures such as slot type, pellet type, ladder-type and grid type, is made of bracket, trailing arm and installation attachment etc. Shanghai lattice full bridge can independently be set up, and can also be attached on various buildings or structures and piping lane bracket, and structure letter is embodied It is single, it is handsome in appearance, configuration is flexible and easy to maintenance the features such as, whole parts are both needed to carry out zinc-plated processing, are mounted on outside building Outdoor gantry, if it is on neighbouring seashore or corrosion region is belonged to, then material must have anti-corrosion, resistance to moisture and adhesive force good, The high physical property feature of impact resistant strength.
The energy-saving steel gantry of large span currently on the market is very unstable when in use, it is possible that falling The case where falling, may result in personal damage if serious, and the common energy-saving steel gantry of large span connection when Time very wastes time, so propose a kind of energy-saving steel gantry of large span.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of energy-saving steel gantry of large span, has connection Stablize the advantages that, solve the energy-saving steel gantry of large span when in use very it is unstable, it is possible that falling The case where, it may result in personal damage if serious, and the common energy-saving steel gantry of large span is when connection The problem of very wasting time.
(2) technical solution
To realize above-mentioned stable connection purpose, the utility model is provided the following technical solutions: a kind of large span energy-saving steel Gantry processed, including bottom plate, the upper surface of the bottom plate are fixedly installed with cross bar, and the upper surface of the bottom plate, which is fixedly installed with, to be run through And the brace outside cross bar is extended to, the outer surface both ends of the bottom plate are fixedly installed with protruding plate, the left side protruding plate Left surface open up fluted, the left surface of the left side protruding plate offers the card slot being connected with groove, and right side is described convex The right surface of ejecting plate is fixedly installed with the casting lug thereon to match with groove, the upper and lower ends of the casting lug thereon be fixedly installed with The lower surface both ends of the clamping apparatus that card slot matches, the bottom plate are fixedly installed with foundation.
Preferably, the clamping apparatus includes the placing groove for being provided with casting lug thereon outer surface upper and lower ends, the placing groove Slot inner wall be fixedly installed with spring, one end that the spring is located remote from the slot inner wall of slot is fixedly installed with one end and is located at protrusion Jacking block outside block, the jacking block are movably installed with pulley, the outer surface upper and lower two of the casting lug thereon far from the outer surface of spring End offers the sliding slot being connected with placing groove, and the outer surface both ends of the jacking block are fixedly installed with one end and are located in sliding slot The block of chamber.
Preferably, the quantity of the brace is no less than 50, and the shape of shape is diamond shape between brace and cross bar.
Preferably, the quantity of the protruding plate is no less than two, and protrudes the width that board width is equal to bottom plate.
Preferably, the shape of the bottom plate is rectangle, and the height of bottom plate is greater than the height of brace and cross bar.
Preferably, the quantity of the jacking block is no less than two, and the shape of jacking block is cylinder, and the height of the jacking block is big In the depth of card slot.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of energy-saving steel gantry of large span, has following beneficial Effect:
The energy-saving steel gantry of the large span makes device very by the cross bar and brace installed in the upper surface of bottom plate Saving material and using very secured, and installation casting lug thereon and the groove that opens up, so that device is facilitated large span and company It connects conveniently, and the jacking block and spring installed and the card slot opened up, keeps device clamping more stable.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure base slab top view;
Fig. 3 is the portion A enlarged drawing in the utility model structure chart 1.
In figure: 1 bottom plate, 2 cross bars, 3 braces, 4 protruding plates, 5 grooves, 6 card slots, 7 casting lug thereons, 8 clamping apparatus, 81 are placed Slot, 82 springs, 83 jacking blocks, 84 pulleys, 85 sliding slots, 86 blocks, 9 foundation.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3, a kind of energy-saving steel gantry of large span, including bottom plate 1 are please referred to, by pacifying in the upper surface of bottom plate 1 The cross bar 2 and brace 3 of dress, make device very save material and using very it is secured, and installation casting lug thereon 7 and open up Groove 5, so that device is facilitated large span and easy to connect, and installation jacking block 83 and spring 82 and the card slot 6 opened up, make Device clamping is more stable, and the shape of bottom plate 1 is rectangle, and the height of bottom plate 1 is greater than the height of brace 3 and cross bar 2, bottom The upper surface of plate 1 is fixedly installed with cross bar 2, the upper surface of bottom plate 1 be fixedly installed with run through and extend to it is oblique outside cross bar 2 Bar 3, the quantity of brace 3 are no less than 50, and the shape of shape is diamond shape, the outer surface of bottom plate 1 between brace 3 and cross bar 2 Both ends are fixedly installed with protruding plate 4, and the quantity of protruding plate 4 is no less than two, and 4 width of protruding plate is equal to the width of bottom plate 1, The left surface of left side protruding plate 4 opens up fluted 5, and the left surface of left side protruding plate 4 offers the card slot 6 being connected with groove 5, The right surface of right side protruding plate 4 is fixedly installed with the casting lug thereon 7 to match with groove 5, and the upper and lower ends of casting lug thereon 7 are fixed The clamping apparatus 8 to match with card slot 6 is installed, clamping apparatus 8 includes being provided with putting for 7 outer surface upper and lower ends of casting lug thereon Slot 81 is set, the slot inner wall of placing groove 81 is fixedly installed with spring 82, and one end that spring 82 is located remote from the slot inner wall of slot 81 is fixed The jacking block 83 that one end is located at outside casting lug thereon 7 is installed, the quantity of jacking block 83 is no less than two, and the shape of jacking block 83 is cylinder Shape, the height of jacking block 83 are greater than the depth of card slot 6, and jacking block 83 is movably installed with pulley 84 far from the outer surface of spring 82, protrude The outer surface upper and lower ends of block 7 offer the sliding slot 85 being connected with placing groove 81, and the outer surface both ends of jacking block 83 are fixed The block 86 that one end is located at 85 inner cavity of sliding slot is installed, the lower surface both ends of bottom plate 1 are fixedly installed with foundation 9.
When in use, by the cross bar 2 and brace 3 installed in the upper surface of bottom plate 1, make device very save material and Using very securely, and installation casting lug thereon 7 and the groove 5 that opens up, so that device is facilitated large span and easy to connect, and The jacking block 83 and spring 82 of installation and the card slot 6 opened up keep device clamping more stable.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.Although there has been shown and described that The embodiments of the present invention, for the ordinary skill in the art, it is possible to understand that do not departing from the utility model Principle and spirit in the case where a variety of change, modification, replacement and modification can be carried out to these embodiments, the utility model Range is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of energy-saving steel gantry of large span, including bottom plate (1), it is characterised in that: the upper surface of the bottom plate (1) is fixed It being equipped with cross bar (2), the upper surface of the bottom plate (1), which is fixedly installed with, runs through and extends to the external brace (3) of cross bar (2), The outer surface both ends of the bottom plate (1) are fixedly installed with protruding plate (4), and the left surface of the left side protruding plate (4) offers Groove (5), the left surface of the left side protruding plate (4) offer the card slot (6) being connected with groove (5), the right side protrusion The right surface of plate (4) is fixedly installed with the casting lug thereon (7) to match with groove (5), and the upper and lower ends of the casting lug thereon (7) are solid Dingan County is equipped with the clamping apparatus (8) to match with card slot (6), and the lower surface both ends of the bottom plate (1) are fixedly installed with foundation (9)。
2. the energy-saving steel gantry of a kind of large span according to claim 1, it is characterised in that: the clamping apparatus (8) The slot inner wall of placing groove (81) including being provided with casting lug thereon (7) outer surface upper and lower ends, the placing groove (81) is fixedly mounted Have spring (82), the one end for the slot inner wall that the spring (82) is located remote from slot (81) is fixedly installed with one end and is located at casting lug thereon (7) external jacking block (83), the jacking block (83) are movably installed with pulley (84), the protrusion far from the outer surface of spring (82) The outer surface upper and lower ends of block (7) offer the sliding slot (85) being connected with placing groove (81), the appearance of the jacking block (83) Face both ends are fixedly installed with the block (86) that one end is located at sliding slot (85) inner cavity.
3. the energy-saving steel gantry of a kind of large span according to claim 1, it is characterised in that: the number of the brace (3) Amount no less than 50, and the shape of shape is diamond shape between brace (3) and cross bar (2).
4. the energy-saving steel gantry of a kind of large span according to claim 1, it is characterised in that: the protruding plate (4) Quantity is no less than two, and protruding plate (4) width is equal to the width of bottom plate (1).
5. the energy-saving steel gantry of a kind of large span according to claim 1, it is characterised in that: the shape of the bottom plate (1) Shape is rectangle, and the height of bottom plate (1) is greater than the height of brace (3) and cross bar (2).
6. the energy-saving steel gantry of a kind of large span according to claim 2, it is characterised in that: the number of the jacking block (83) Amount no less than two, and the shape of jacking block (83) is cylinder, the height of the jacking block (83) is greater than the depth of card slot (6).
CN201820726194.7U 2018-05-16 2018-05-16 The energy-saving steel gantry of large span Expired - Fee Related CN208487270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820726194.7U CN208487270U (en) 2018-05-16 2018-05-16 The energy-saving steel gantry of large span

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820726194.7U CN208487270U (en) 2018-05-16 2018-05-16 The energy-saving steel gantry of large span

Publications (1)

Publication Number Publication Date
CN208487270U true CN208487270U (en) 2019-02-12

Family

ID=65253453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820726194.7U Expired - Fee Related CN208487270U (en) 2018-05-16 2018-05-16 The energy-saving steel gantry of large span

Country Status (1)

Country Link
CN (1) CN208487270U (en)

Similar Documents

Publication Publication Date Title
CN208487270U (en) The energy-saving steel gantry of large span
CN207265447U (en) A kind of electric power cabinet of anticollision
CN202831514U (en) Adjustable wallboard hanging part
CN205224294U (en) Seam component is drawn to vertical structure
CN208056531U (en) A kind of mounting structure of ultra-thin furring tile
CN205224402U (en) Seam component is drawn to horizontal structure
CN213774026U (en) Assembled is exterior wallboard fossil fragments for building
CN209011597U (en) For building the fixture of concrete aerated blocks
CN209653767U (en) A kind of aluminum profile doorframe being conveniently replaceable glass door
CN204850370U (en) Ceramic tile external corner line
CN203867112U (en) Dry-hanging wall tile structure
CN208718359U (en) A kind of aluminum alloy mould plate BB clamping plate
CN208111982U (en) A kind of electrical cabinet easy to repair
CN207017506U (en) A kind of building glass cladding glass installation fixing device
CN207776682U (en) Door pocket clamp region with bottom bearing diagonal
CN206401836U (en) A kind of strength energy-saving crane span structure
CN207105971U (en) A kind of portable pen container for enterprise marketing planning
CN204040461U (en) A kind of MST wall construction part
CN209653347U (en) A kind of civil construction load-bearing hanger
CN212389867U (en) Anti-seismic support for building
CN205349133U (en) Linkage glass mat piece
CN209257600U (en) A kind of UV resistant artificial quartz stone plate
CN109680870A (en) A kind of reinforced steel structure spandrel girder
CN205444643U (en) Building garbage recovery's foraminiferous building block of four generating circle head crosss and brickwork thereof
CN212026838U (en) Gypsum hollow slab with elastic sealing rubber rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200220

Address after: 710000 room 22001, unit 2, building 1, No. 35 Shiyuan Road, Beilin District, Xi'an City, Shaanxi Province

Patentee after: Xi'an Yilong Steel Structure Engineering Co.,Ltd.

Address before: No.79, team 8, xiaozhouzhuang village, Xuzhuang Town, Xuzhou Economic Development Zone, 221000 Jiangsu Province

Co-patentee before: Wu Guilan

Patentee before: Zhou Zhongjian

Effective date of registration: 20200220

Address after: No.79, team 8, xiaozhouzhuang village, Xuzhuang Town, Xuzhou Economic Development Zone, 221000 Jiangsu Province

Co-patentee after: Wu Guilan

Patentee after: Zhou Zhongjian

Address before: 325041 Wenzhou City, Zhejiang Province, Zhejiang Province, No. 81 Zhonghui Road, Louqiao street, Ouhai District, Wenzhou City, Zhejiang Province (Ouhai headquarters economic Park), building a, podium 102 (building A1, 305-1 (4-6 station)

Patentee before: WENZHOU CHONGYA ELECTRONIC SCIENCE & TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190212

Termination date: 20200516