CN208486344U - A kind of segmented drainage pipeline bindiny mechanism easy to repair - Google Patents
A kind of segmented drainage pipeline bindiny mechanism easy to repair Download PDFInfo
- Publication number
- CN208486344U CN208486344U CN201820099086.1U CN201820099086U CN208486344U CN 208486344 U CN208486344 U CN 208486344U CN 201820099086 U CN201820099086 U CN 201820099086U CN 208486344 U CN208486344 U CN 208486344U
- Authority
- CN
- China
- Prior art keywords
- connecting tube
- pedestal
- repair
- pipeline
- anchorage bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of segmented drainage pipeline bindiny mechanisms easy to repair, including pedestal, connecting tube, anchorage bar and pipeline, support base is provided on the outside of the pedestal, and empty slot is provided with above pedestal, the connecting tube is installed on the top of empty slot, and reinforcing ring is fixed on the outside of connecting tube, the anchorage bar is set to the outside of reinforcing ring, and anchorage bar is set to the outside of connecting tube, the anchorage bar is connect by support rod with groove, the Pipe installing is in the inside of connecting tube, and the side of pipeline is provided with connecting pipe.The segmented drainage pipeline bindiny mechanism easy to repair is provided with support base, support base is set to the two sides of pedestal, it and is to be fixedly connected between support base and pedestal, this set pedestal and support base can support the gravity of connecting tube, increase the contact area with ground, increase the service life of connecting tube, reduces the phenomenon that connecting tube is sunk, can be convenient maintenance.
Description
Technical field
The utility model relates to drainage pipeline technical field, specially a kind of segmented drainage pipeline connection easy to repair
Mechanism.
Background technique
Drainpipe Dow Jones index collects system composed by pipe duct and its affiliated facility with sewage effluent, waste water and rainwater, packet
Include main pipe, branch pipe and the pipeline towards treatment plant, no matter be built on street or it is other Anywhere, as long as rise draining make
Pipeline all should be used as drainage pipeline statistics, and drainage pipeline almost spreads over all cities, range involved in drainage pipeline compared with
Extensively, demand is more, therefore mostly segmented drainage pipeline, the use of segmented drainage pipeline, is convenient for city modular repair, uses
Get up more convenient, replacement pipeline is also more convenient, due to being segmented drainage pipeline, in the use of Pipe couplings
Upper is also to pay much attention to, and bindiny mechanism uses bad, can cause a little unnecessary troubles.Segmented row currently on the market
Although waterpipe bindiny mechanism type and quantity are very more, most of segmented drainage pipeline bindiny mechanism is inconvenient to tie up
It repairs, uses time longer easy sinking.
Utility model content
The purpose of this utility model is to provide a kind of segmented drainage pipeline bindiny mechanisms easy to repair, on solving
State background technique proposition currently on the market be inconvenient to repair, the problem of easy sinking longer using the time.
To achieve the above object, the utility model provides the following technical solutions: a kind of segmented drainpipe easy to repair
Road bindiny mechanism, including pedestal, connecting tube, anchorage bar and pipeline are provided with support base on the outside of the pedestal, and pedestal is upper
Side is provided with empty slot, and the connecting tube is installed on the top of empty slot, and reinforcing ring is fixed on the outside of connecting tube, the anchorage bar
It being set to the outside of reinforcing ring, and anchorage bar is set to the outside of connecting tube, the anchorage bar is connect by support rod with groove,
The Pipe installing is in the inside of connecting tube, and the side of pipeline is provided with connecting pipe.
Preferably, there are two the support base is arranged altogether, and support base is symmetrical about the center line of pedestal.
Preferably, the empty slot is " recessed " word structure, and connecting tube part is protruded in the recessed part and reinforcing ring out of empty slot
Size match.
Preferably, there are two the anchorage bar is arranged altogether, and the midpoint of the line between anchorage bar falls within connecting tube axis
On line, and the length of anchorage bar is greater than the length of connecting tube.
Preferably, the length of the support rod is greater than the thickness of connecting tube.
Preferably, the pipeline is hollow cylindrical structure, and the radius of pipeline is identical as the radius of connecting pipe.
Compared with prior art, the utility model has the beneficial effects that the segmented drainage pipeline connection easy to repair
Mechanism:
1. being provided with support base, support base is set to the two sides of pedestal, and to be fixedly connected between support base and pedestal, this
Kind setting pedestal and support base can support the gravity of connecting tube, increase the contact area with ground, increase the use of connecting tube
Service life reduces the phenomenon that connecting tube is sunk, can be convenient maintenance;
2. being provided with empty slot, empty slot is set to the top of pedestal, and the concave part of this set empty slot can be mounted directly
Reinforcing ring protrudes connecting tube, facilitates installation, easy to operate;
3. being provided with anchorage bar, anchorage bar is set to the outside of connecting tube and reinforcing ring, and this set anchorage bar can be given
Connecting tube increases fastening effect, increases the service life of connecting tube.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model schematic view of the front view;
Fig. 3 is the utility model side structure schematic view.
In figure: 1, pedestal, 2, support base, 3, empty slot, 4, connecting tube, 5, reinforcing ring, 6, anchorage bar, 7, support rod, 8, recessed
Slot, 9, pipeline, 10, connecting pipe.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of segmented drainage pipeline company easy to repair
Connection mechanism, including pedestal 1, support base 2, empty slot 3, connecting tube 4, reinforcing ring 5, anchorage bar 6, support rod 7, groove 8,9 and of pipeline
Connecting pipe 10, the outside of pedestal 1 is provided with support base 2, and the top of pedestal 1 is provided with empty slot 3, and support base 2 is provided with altogether
Two, and support base 2 is symmetrical about the center line of pedestal 1, makes the phenomenon that connecting both ends uniform force, being not in sinking, increases
Add the service life of connecting tube 4, connecting tube 4 is installed on the top of empty slot 3, and the outside of connecting tube 4 is fixed with reinforcing ring 5, empty
Slot 3 is " recessed " word structure, and the recessed part out of empty slot 3 matches with the size that reinforcing ring 5 protrudes 4 part of connecting tube, convenient
Installation, facilitates repairing, anchorage bar 6 is set to the outside of reinforcing ring 5, and anchorage bar 6 is set to the outside of connecting tube 4, anchorage bar 6
Altogether there are two settings, and the midpoint of the line between anchorage bar 6 is fallen on 4 central axes of connecting tube, and the length of anchorage bar 6 is big
In the length of connecting tube 4, increase the service life of connecting tube 4, be not in fracture, anchorage bar 6 passes through support rod 7 and groove 8
Connection, the length of support rod 7 are greater than the thickness of connecting tube 4, and convenient preferably fixed, easy to operate, pipeline 9 is installed on connecting tube
4 inside, and the side of pipeline 9 is provided with connecting pipe 10, pipeline 9 are hollow cylindrical structure, and the radius of pipeline 9 and company
The radius in adapter tube road 10 is identical, facilitates draining, and connection will not have gap, convenient preferably draining.
Working principle: when using the segmented drainage pipeline bindiny mechanism easy to repair, firstly, pedestal 1 is placed
In the flowing groove dug, after placing pedestal 1, connecting tube 4 is mounted in the empty slot 3 of 1 top of pedestal, and connecting tube 4,
It can be rotated between reinforcing ring 5 and empty slot 3, anchorage bar 6 can be fastenedly connected pipe 4, increase the service life of connecting tube 4, reduce
There are crack conditions in connecting tube 4, in the top pipe laying 9 and connecting pipe 10 of support base 2, the half of connecting pipe 10
On support base 2, the structure that support base 2 and pedestal 1 are constituted can increase contact area of ground, be not in that connecting tube 4 is sunk,
Or there is the case where bending of connecting tube 4, the structure that support rod 7 and groove 8 are constituted can increase the effect of fastening, and here it is this just
The content being not described in detail in the process for using of the segmented drainage pipeline bindiny mechanism of maintenance, this explanation belongs to this field
The prior art well known to professional technician.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into
Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all
It is included within the scope of protection of this utility model.
Claims (6)
1. a kind of segmented drainage pipeline bindiny mechanism easy to repair, including pedestal (1), connecting tube (4), anchorage bar (6) and
Pipeline (9), it is characterised in that: be provided with support base (2) on the outside of the pedestal (1), and be provided with empty slot above pedestal (1)
(3), the connecting tube (4) is installed on the top of empty slot (3), and reinforcing ring (5) are fixed on the outside of connecting tube (4), described tight
Solid rod (6) is set to the outside of reinforcing ring (5), and anchorage bar (6) is set to the outside of connecting tube (4), and the anchorage bar (6) is logical
It crosses support rod (7) to connect with groove (8), the pipeline (9) is installed on the inside of connecting tube (4), and the side setting of pipeline (9)
There are connecting pipe (10).
2. one kind according to claim 1 segmented drainage pipeline bindiny mechanism easy to repair, it is characterised in that: described
There are two support base (2) is arranged altogether, and support base (2) is symmetrical about the center line of pedestal (1).
3. one kind according to claim 1 segmented drainage pipeline bindiny mechanism easy to repair, it is characterised in that: described
Empty slot (3) is " recessed " word structure, and the size phase of connecting tube (4) part is protruded in the recessed part and reinforcing ring (5) out of empty slot (3)
It coincide.
4. one kind according to claim 1 segmented drainage pipeline bindiny mechanism easy to repair, it is characterised in that: described
There are two anchorage bar (6) is arranged altogether, and the midpoint of the line between anchorage bar (6) is fallen on connecting tube (4) central axes, and tight
The length of solid rod (6) is greater than the length of connecting tube (4).
5. one kind according to claim 1 segmented drainage pipeline bindiny mechanism easy to repair, it is characterised in that: described
The length of support rod (7) is greater than the thickness of connecting tube (4).
6. one kind according to claim 1 segmented drainage pipeline bindiny mechanism easy to repair, it is characterised in that: described
Pipeline (9) is hollow cylindrical structure, and the radius of pipeline (9) is identical as the radius of connecting pipe (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820099086.1U CN208486344U (en) | 2018-01-22 | 2018-01-22 | A kind of segmented drainage pipeline bindiny mechanism easy to repair |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820099086.1U CN208486344U (en) | 2018-01-22 | 2018-01-22 | A kind of segmented drainage pipeline bindiny mechanism easy to repair |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208486344U true CN208486344U (en) | 2019-02-12 |
Family
ID=65255506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820099086.1U Expired - Fee Related CN208486344U (en) | 2018-01-22 | 2018-01-22 | A kind of segmented drainage pipeline bindiny mechanism easy to repair |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208486344U (en) |
-
2018
- 2018-01-22 CN CN201820099086.1U patent/CN208486344U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203065960U (en) | Bridge drainage system | |
CN103061254A (en) | Bridge drainage system | |
CN209308115U (en) | A kind of building construction drainage system pipe | |
CN208486344U (en) | A kind of segmented drainage pipeline bindiny mechanism easy to repair | |
CN202450428U (en) | Small-bore pipe crossing water delivery structure | |
CN204151824U (en) | A kind of glass reinforced plastic underground comprehensive pipe network common trench | |
CN112982563A (en) | Sponge urban rainwater collecting and processing system and rainwater collecting and processing method | |
CN208687105U (en) | A kind of water supply pipe mounting rack with detection function | |
CN208982789U (en) | A kind of underground pipe gallery feedwater piping buttress | |
CN206396789U (en) | A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge | |
CN214833286U (en) | Overflow type diversion three-way well | |
CN208541037U (en) | A kind of height-adjustable flowerpot holder of municipal administration | |
CN208904582U (en) | A kind of MPP power pipe with convenient for jointing | |
CN209339282U (en) | A kind of shunting well | |
CN208023610U (en) | Steel corrugated plating pipe gallery | |
CN216519971U (en) | Wall fixing structure of building water supply and drainage pipeline | |
CN210920560U (en) | Underground mine mountain wind pipe system | |
CN217710465U (en) | A isolation barrier for municipal afforestation | |
CN219182346U (en) | Municipal road view maintenance water-saving irrigation device | |
CN219080126U (en) | Warning device for pipeline drainage | |
CN208668460U (en) | A kind of pipe gallery construction formwork | |
CN218236598U (en) | Water supply and drainage construction pipeline positioning protection device | |
CN216130162U (en) | Outer drainage of foundation ditch precipitation is with pipeline group | |
CN216864874U (en) | Assembled drainage box culvert simple and convenient to construct and install | |
CN220928108U (en) | K-type interface device for rain sewage pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200217 Address after: 301501 Fengquan cultural and Sports Service Center office building, Hangu Management District, Tangshan City, Hebei Province Patentee after: Tangshan Shidai Construction Engineering Co.,Ltd. Address before: 271000 No. 1, unit 4, 4 001 Wen he street, Dongping Town, Dongping, Tai'an, Shandong. Patentee before: Zheng Guo |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190212 Termination date: 20220122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |