CN208477369U - Control system with visualization integration testing and parameter modification - Google Patents
Control system with visualization integration testing and parameter modification Download PDFInfo
- Publication number
- CN208477369U CN208477369U CN201721243851.4U CN201721243851U CN208477369U CN 208477369 U CN208477369 U CN 208477369U CN 201721243851 U CN201721243851 U CN 201721243851U CN 208477369 U CN208477369 U CN 208477369U
- Authority
- CN
- China
- Prior art keywords
- control unit
- main control
- target board
- control panel
- configuration parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Monitoring And Testing Of Exchanges (AREA)
Abstract
A kind of control system with visualization integration testing and parameter modification provided by the utility model, it include control panel component and Target Board component to be measured, the control panel component includes control panel main control unit, two-dimensional code scanning unit and touch display module;The Target Board component includes Target Board main control unit, Target Board storage module, display unit and buzzer;The control system of the application, which has, to be simplified production and testing process, improves efficiency.Control system versatility is solved the problems, such as simultaneously, by realizing parameter modification and test function.
Description
Technical field
The utility model relates to the technical field of electric-controlled plate detecting and controlling system, refer in particular to that there is visualization integration testing
And the control system of parameter modification.
Background technique
The controllers such as air conditioner, washing machine all have the requirement of versatility universal design at present.At present much be all using
Hardware jumper as the convenience for distinguishing different type of machines, lack at present it is a kind of intelligently configured according to order, have visualization is integrated to survey
The controller of examination and modification parameter.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, providing, there is visualization integration testing and parameter to repair
The control system changed.
In order to achieve the above purpose, the control with visualization integration testing and parameter modification provided by the utility model
System processed, includes control panel component and Target Board component to be measured, the control panel component include control panel main control unit,
Two-dimensional code scanning unit and touch display module;The Target Board component includes Target Board main control unit, Target Board storage mould
Block, display unit and buzzer;The control panel main control unit is communicated with Target Board main control unit, the two-dimensional code scanning list
Member is transmitted to control panel main control unit for scanning the order two dimensional code being preset with to obtain preset configuration parameter;It is described
Touch display module will modify the configuration parameter after confirming through controlling for being shown, being modified and being confirmed to configuration parameter
Plate master unit transmissions are to Target Board main control unit;The Target Board main control unit is used to the configuration parameter received mesh is written
It in target storage module and is verified, wherein Target Board main control unit is transmitted to display unit and buzzer after the completion of verification
Electric signal, so that display unit shows that scheduled image and buzzer issue prompt tone;The control panel main control unit be used for
The self-checking command that Target Board main control unit issues is to make Target Board main control unit carry out self-test and self-test information is transmitted to control
Making sheet main control unit, wherein the self-test information includes configuration parameter and fault message in Target Board storage module;The control
The configuration parameter of the Target Board component received match comparison with order model information to judge mesh by making sheet main control unit
Whether the parameter of target component is correct;The control panel main control unit is according to whether receive fault message to judge current component
Whether there is failure.
Further, the control panel main control unit will receive fault message and be converted into corresponding defect content and solution
Method is shown by touch display module.
The utility model uses above-mentioned scheme, the beneficial effect is that: the control system of the application, which has, simplifies production
And it testing process, improves efficiency.Control system versatility is solved the problems, such as simultaneously, by realizing parameter modification and test function.
Detailed description of the invention
Fig. 1 is the connection schematic diagram of the control system of the utility model.
Fig. 2 is the control panel main control unit of the utility model and the circuit diagram of Target Board main control unit.
Fig. 3 is the circuit diagram of the two-dimensional code scanning unit of the utility model.
Fig. 4 is the circuit diagram of the touch display module of the utility model.
Fig. 5 is the circuit diagram of the display unit of the utility model.
Fig. 6 is the circuit diagram of the Target Board storage module of the utility model.
Wherein, 1- control panel main control unit, 2- Target Board main control unit, 3- two-dimensional code scanning unit, 4- touch display mould
Block, 5- display unit, 6- buzzer, 7- Target Board storage module.
Specific embodiment
The utility model is further described combined with specific embodiments below.
Referring to shown in attached drawing 1 to attached drawing 6, in the present embodiment, there is the control of visualization integration testing and parameter modification
System includes control panel component and Target Board component to be measured.Control panel component includes control panel main control unit 1, two dimension
Code scanning element 3 and touch display module 4, wherein control panel main control unit 1 is aobvious with two-dimensional code scanning unit 3 and touch respectively
Show that 4 telecommunications of module connects;Target Board component includes Target Board main control unit 2, Target Board storage module 7, display unit 5 and bee
Ring device 6, wherein in the present embodiment, it is eeprom memory that target, which does storage module,;Target Board main control unit 2 respectively with mesh
Target storage module 7, display unit 5 and buzzer 6 are mutually electrically connected.The control panel main control unit 1 and Target Board master control list
It is communicated by way of infrared communication between member 2.
In the present embodiment, two-dimensional code scanning unit 3 is for scanning the order two dimensional code being preset with to obtain order type
Information, and control panel main control unit 1 is transmitted to be converted into corresponding configuration parameter, wherein in the present embodiment, this control
System is applied to detection of air-conditioning, and model information mainly includes indoor unit type (the automatically controlled, frequency conversion electrical control of fixed frequency), automatically controlled type
(ghost machine, Dan Leng, electric heating, dual temperature), defrost type (intelligent defrosting, outer tube defrost, North America outer tube defrost), automatically controlled ability
Parameter informations such as (25 machines, 35 machines).Touch display module 4 shows configuration parameter, modified and is confirmed, and modification is confirmed
Configuration parameter afterwards is transmitted to Target Board main control unit 2 through control panel main control unit 1;Touch display module 4 by configuration parameter into
Row display understands order model information to get information about for operator, meanwhile, operator can be manual by way of touch
It modifies operation and confirmation to configuration parameter, is transmitted to control panel main control unit 1 after the completion of parameter confirmation to be configured, then through controlling
Making sheet main control unit 1 is transmitted to Target Board main control unit 2.
In the present embodiment, Target Board main control unit 2 is used to the configuration parameter received Target Board storage module 7 is written
In and verified, wherein Target Board main control unit 2 transmits telecommunications to the display unit 5 and buzzer 6 after the completion of verification
Number, so that display unit 5 shows that the image of scheduled " SU " and buzzer 6 issue the prompt tone of continuous two sound;Pass through Target Board
Main control unit 2 modifies to the configuration parameter in Target Board storage module 7 and carries out range check, and utilizes display unit
The prompt tone of the 5 good buzzer 6 of display image can allow operator to know that Target Board component is successfully modified, at the same time, Target Board
The passback pass signal of main control unit 2, will be certainly after control panel main control unit 1 receives pass signal to control panel main control unit 1
The dynamic self-checking command that issues makes Target Board component enter self-test operations.Control panel main control unit 1 is used to send out to Target Board main control unit 2
Self-checking command out to make Target Board main control unit 2 carry out self-test and self-test information is transmitted to control panel main control unit 1,
In, the self-test information includes the configuration parameter and fault message of Target Board component;Control panel main control unit 1 will receive
The configuration parameter of Target Board component and preset configuration parameter match compare with judge Target Board component parameter whether just
Really;The control panel main control unit 1 according to whether receive fault message with judge Target Board component with the presence or absence of failure.When
The configuration parameter of Target Board component and preset configuration parameter match and without fault messages, then are determined as test passes, together
When, touch display module 4 shows the image of test passes.When the configuration parameter of Target Board component and preset configuration parameter not
Match, then touch display module 4 shows the image of test failure, and modifies for operator to configuration parameter, then will repair
Configuration parameter after changing is transmitted to Target Board main control unit 2, re-writes in Target Board storage module 7, repeats self-test operations, directly
Configuration parameter to Target Board component matches with preset configuration parameter;When control panel main control unit 1 receives faulty letter
Breath, then control panel main control unit 1 will receive that fault message is converted into corresponding defect content and solution passes through touch
Display module 4 is shown, consequently facilitating operator carries out malfunction elimination.
By the detecting and controlling system of visualized operation, joined by the preset configuration that two-dimensional code scanning unit 3 obtains order
Number, using touch display module 4 be convenient for for being checked and being modified to parameter, by Target Board control self-test operations and
It is matched by the configuration parameter of 1 Target Board component of control panel main control unit with preset configuration parameter and fault message,
To realize to Target Board component detection.The control system of the application, which has, to be simplified production and testing process, improves efficiency.Simultaneously
Control system versatility is solved the problems, such as, by realizing parameter modification and test function.
Now set specific embodiment is described further the working method of the control system of the application.
A kind of working method of the control system with visualization integration testing and parameter modification: including following steps:
S1. start control system;
S2. 3 scanning recognition order two dimensional code of two-dimensional code scanning unit is to obtain preset configuration parameter;
S3. preset configuration parameter is transmitted to control panel main control unit 1 by two-dimensional code scanning unit 3, and aobvious by touching
Show that unit 5 carries out display to check, modify and confirm on touch sensitive display unit 5 for operator;
S4. the configuration parameter after confirming is transmitted to Target Board main control unit 2 through control panel main control unit 1;
S5. the configuration parameter received is written in Target Board storage module 7 and is verified by Target Board main control unit 2,
After the completion of to be verified, Target Board main control unit 2 is respectively to display unit 5 and 6 transmission telecommunications number of buzzer so that display unit 5 is aobvious
Show that scheduled image and buzzer 6 issue prompt tone;Target Board main control unit 2 returns pass signal and gives control panel master control list simultaneously
Member 1;
S6. after control panel main control unit 1 receives pass signal, issuing self-checking command to Target Board main control unit 2 makes mesh
Target component enters self-test operations, and after the completion of self-test, self-test information is transmitted to control panel master control list by Target Board main control unit 2
Member 1;
S7. control panel main control unit 1 judges whether Target Board component is normal according to self-test information, wherein self-test packet
Include the configuration parameter and fault message of Target Board component.
Specifically, match when the configuration parameter of Target Board component with preset configuration parameter and there is no fault message, then
It is determined as test passes;When Target Board component configuration parameter and preset configuration parameter mismatch, then be determined as it is unqualified, together
When, operator personnel modify configuration parameter in touch display module 4, until determining successfully;When control panel main control unit 1 connects
Faulty information is received, then is determined as improper, operator's progress malfunction elimination.
The embodiment of the above is only the preferred embodiment of the utility model, not does any form to the utility model
On limitation.Anyone skilled in the art, in the case where not departing from technical solutions of the utility model ambit, in utilization
The technology contents for stating announcement make more possible variations and retouching to technical solutions of the utility model, or modification is that this is practical
Novel equivalent embodiment.Therefore all contents without departing from technical solutions of the utility model, the thinking according to the utility model are made
Equivalent equivalence changes, should all be covered by the protection scope of the utility model.
Claims (1)
- It include control panel component and target board group to be measured 1. having the control system of visualization integration testing and parameter modification Part, it is characterised in that: the control panel component includes control panel main control unit (1), two-dimensional code scanning unit (3) and touches aobvious Show module (4);The Target Board component includes Target Board main control unit (2), Target Board storage module (7), display unit (5) With buzzer (6);The control panel main control unit (1) communicates with Target Board main control unit (2), the two-dimensional code scanning unit (3) for scanning the order two dimensional code being preset with to obtain preset configuration parameter, and it is transmitted to control panel main control unit (1); The touch display module (4) will modify the configuration parameter after confirming for being shown, being modified and being confirmed to configuration parameter Target Board main control unit (2) are transmitted to through control panel main control unit (1);The Target Board main control unit (2) will be for that will receive Configuration parameter write-in Target Board storage module (7) in and verified, wherein Target Board main control unit (2) after the completion of verification To display unit (5) and buzzer (6) transmission telecommunications number;The control panel main control unit (1) is used for Target Board main control unit (2) self-checking command issued is to make Target Board main control unit (2) to carry out self-test and self-test information is transmitted to control panel master control Unit (1), wherein the self-test information includes configuration parameter and fault message in Target Board storage module (7);The control The configuration parameter of the Target Board component received and order model information are carried out matching comparison by plate main control unit (1);The control Making sheet main control unit (1) according to whether receive fault message with judge current component with the presence or absence of failure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721243851.4U CN208477369U (en) | 2017-09-26 | 2017-09-26 | Control system with visualization integration testing and parameter modification |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721243851.4U CN208477369U (en) | 2017-09-26 | 2017-09-26 | Control system with visualization integration testing and parameter modification |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208477369U true CN208477369U (en) | 2019-02-05 |
Family
ID=65203095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721243851.4U Expired - Fee Related CN208477369U (en) | 2017-09-26 | 2017-09-26 | Control system with visualization integration testing and parameter modification |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208477369U (en) |
-
2017
- 2017-09-26 CN CN201721243851.4U patent/CN208477369U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105783198B (en) | Air conditioner and its fault display method | |
EP2782359B1 (en) | Air conditioner and remote control | |
CN108616582B (en) | Pairing method, device and system of internal machine and wire controller | |
WO2022068308A1 (en) | Parameter configuration method for multi-split air conditioner, and multi-split air conditioner | |
CN104655947B (en) | A kind of car antenna method for diagnosing faults, apparatus and system | |
CN108803564B (en) | Automatic testing system and method for communication control equipment | |
CN104390306A (en) | Air conditioner communication system, air conditioner communication method and air conditioner | |
CN202583348U (en) | Device and system for air conditioner on-line detection | |
CN105972767B (en) | Air conditioner fault diagnostic method and device | |
CN208477369U (en) | Control system with visualization integration testing and parameter modification | |
CN103366547B (en) | Device identification apparatus and remote control system | |
CN107450526A (en) | Control system and its method of work with visualization integration testing and parameter modification | |
CN104344498B (en) | Variable refrigerant flow air conditioner, wireless control method of air conditioner, and wireless controller | |
CN107356894A (en) | A kind of test system | |
CN107065615B (en) | A kind of signal processing method, device and line control machine | |
CN105320120A (en) | Device and method for simulating start-up failure of air conditioning compressor | |
CN208092536U (en) | A kind of system of intelligent control transmitter high temperature ageing | |
CN210014916U (en) | Motor vehicle detection control instrument and control circuit thereof | |
CN209913827U (en) | Transponder transmission element veneer test fixture | |
CN210059046U (en) | Test system and electronic product production line system | |
CN201803856U (en) | Function test device for outdoor machine of central air conditioner | |
JP3643629B2 (en) | Automatic operation setting method and air conditioning system in air conditioning system | |
TWI497047B (en) | Vehicle spare parts testing and verification equipment | |
CN214750683U (en) | Wearable medical product mainboard function testing device | |
CN215934855U (en) | Portable fire-fighting equipment overhauls device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190205 Termination date: 20210926 |