CN208476284U - A kind of monitoring pipeline marker stake - Google Patents
A kind of monitoring pipeline marker stake Download PDFInfo
- Publication number
- CN208476284U CN208476284U CN201820615569.2U CN201820615569U CN208476284U CN 208476284 U CN208476284 U CN 208476284U CN 201820615569 U CN201820615569 U CN 201820615569U CN 208476284 U CN208476284 U CN 208476284U
- Authority
- CN
- China
- Prior art keywords
- supporting plate
- pile body
- stake
- monitoring device
- battery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of monitoring pipeline marker stakes, belong to oil field equipment field.The marker peg includes: pile body, stake lid, bracket, monitoring device.Pile body is hollow columnar structures, and pile body is cement or glass steel material.Stake lid is removably disposed in the top of pile body.Bracket is arranged in pile body, is used for support monitoring device.For the utility model by the way that monitoring device to be mounted in the pile body of cement or glass steel material, pile body can play the role of camouflage, reduce the stolen of monitoring device and be destroyed probability.
Description
Technical field
The utility model relates to oil field equipment field, in particular to a kind of monitoring pipeline marker stake.
Background technique
In actual production, transported crude oil using long oil and gas pipeline and natural gas.For the items to long oil and gas pipeline
Data are monitored, it is necessary to provide a kind of monitoring device.
The monitoring device that the prior art provides is arranged in along long oil and gas pipeline.Monitoring device includes: monitoring device
And power supply unit.Monitoring device acquires the data of the parameters of long oil and gas pipeline, and sends the data of parameters, supplies
Electric equipment is monitoring device power supply.
The existing technology has at least the following problems for designer's discovery:
Monitoring device is arranged in along long oil and gas pipeline, since monitoring device does not pretend characteristic, it is easy to by people
Find, and by artificial destruction.
Utility model content
The utility model embodiment provides a kind of monitoring pipeline marker stake, can solve above-mentioned technical problem.Specific skill
Art scheme is as follows:
A kind of monitoring pipeline marker stake, the marker peg includes: pile body, stake lid, bracket, monitoring device;
The pile body is hollow columnar structures, and the pile body is cement or glass steel material;
The stake lid is removably disposed in the top of the pile body;
The bracket is arranged in the pile body, for monitoring device described in support.
In a kind of possible design, the monitoring device includes: solar panels, solar controller, battery, data
Acquire transit terminal, signal projector;
The solar controller is electric with the solar panels, the battery, data acquisition transit terminal respectively
Property connection;
The data acquisition transit terminal and the signal projector are electrically connected;
The solar panel converts light energy into electric current, is input to the electric current by the solar controller
The battery, the battery charging;
The electric current of electric discharge is input to the data acquisition transport by the solar controller by the electric power storage tank discharge
Terminal;
The data acquisition transit terminal is used for measurement data, sends the data by the signal projector.
In a kind of possible design, the bracket includes: multiple supporting plates and multiple pillars, and the multiple supporting plate is mounted on
Each supporting plate on the multiple pillar, and in the multiple supporting plate is distributed in different layers from top to bottom, and described in adjacent two layers
There is interval between supporting plate.
In a kind of possible design, the quantity of the multiple supporting plate is N number of, each pillar packet in the multiple pillar
N number of pipe nipple is included, N is the integer greater than 1;
The top of i-th of pipe nipple of each pillar is connect with i-th layer of supporting plate, and the supporting plate of bottom end and i+1 layer connects
It connects, i=1,2 ... N-1;
The top of the n-th pipe nipple of each pillar and the supporting plate of n-th layer connect, and the bottom of bottom end and the pile body connects
It connects.
In a kind of possible design, the multiple supporting plate includes the first supporting plate arranged from top to bottom, the second supporting plate,
Three supporting plates, the 4th supporting plate;
The solar panels are arranged on first supporting plate;
The solar controller and the signal projector are arranged on second supporting plate;
The battery is arranged on the third supporting plate;
The data acquisition transit terminal is arranged on the 4th supporting plate.
In a kind of possible design, perforation is provided on the supporting plate.
In a kind of possible design, catching groove compatible with the pile body is provided on the bottom surface of the stake lid, it is described
Bottom surface of the catching groove perpendicular to the stake lid.
In a kind of possible design, the stake lid is transparent material.
In a kind of possible design, the bottom of the pile body is provided with bottom plate, be provided on the bottom plate for across
The Ge Lantou of cable.
Technical solution provided by the embodiment of the utility model has the benefit that
Monitoring pipeline marker stake provided by the embodiment of the utility model, by the way that monitoring device is mounted on cement or glass
In the pile body of glass steel material, pile body can play the role of camouflage, reduce the stolen of monitoring device and be destroyed probability.
Detailed description of the invention
It, below will be to required in embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing to be used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some realities of the utility model
Example is applied, it for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of monitoring pipeline marker stake provided by the embodiment of the utility model;
Fig. 2 is the knot of connecting short section below single supporting plate in monitoring pipeline marker stake provided by the embodiment of the utility model
Structure schematic diagram;
Fig. 3 is the structural schematic diagram of pipe nipple in monitoring pipeline marker stake provided by the embodiment of the utility model;
Fig. 4 is the structural schematic diagram of supporting plate in monitoring pipeline marker stake provided by the embodiment of the utility model;
Fig. 5 is the structural schematic diagram of stake lid in monitoring pipeline marker stake provided by the embodiment of the utility model;
Fig. 6 is each component connection relationship of monitoring device in monitoring pipeline marker stake provided by the embodiment of the utility model
Figure.
Appended drawing reference respectively indicates:
1- pile body,
2- lids,
21- catching groove,
3- bracket,
31- supporting plate,
The first supporting plate of 311-,
The second supporting plate of 312-,
313- third supporting plate,
The 4th supporting plate of 314-,
31a- perforation,
32- pillar,
321- pipe nipple,
4- monitoring device,
41- solar panels,
42- solar controller,
43- battery,
44- data acquire transit terminal,
45- signal projector,
5- Ge Lan head.
Specific embodiment
Unless otherwise defined, all technical terms used in the utility model embodiment all have and those skilled in the art
Normally understood identical meaning.To keep the purpose of this utility model, technical solution and advantage clearer, below in conjunction with attached
Figure is described in further detail the utility model embodiment.
It is typically provided with marker peg along long oil and gas pipeline, plays the functions such as warning, mark and information registration.Pipeline
Marker peg is generally cement or glass steel material, and secondary use value is lower, seldom occurs in field stolen and artificial premeditated
Situations such as destruction.
The utility model embodiment provides a kind of monitoring pipeline marker stake, and as shown in Fig. 1, which includes:
Pile body 1, stake lid 2, bracket 3, monitoring device 4;
Pile body 1 is hollow columnar structures, and pile body 1 is cement or glass steel material;
Stake lid 2 is removably disposed in the top of pile body 1;
Bracket 3 is arranged in pile body 1, is used for support monitoring device 4.
Monitoring provided by the embodiment of the utility model is illustrated with the working principle of pipeline marker stake below:
Pile body 1 be hollow columnar structures, inside have material-putting space, in application, bracket 3 is placed on the glove in pile body 1
In space.Monitoring device 4 is used for data sampling and processing and sending to the parameters of long oil and gas pipeline.Monitoring device 4 is put
It sets on bracket 3, is arranged in pile body 1 with bracket 3.Pile body 1 is the material of cement or glass steel material and conventional pipeline marker peg
Matter is identical, and criminal can not learn from appearance is equipped with monitoring device 4 in pile body 1.In conventional pipeline marker peg secondary use
It is worth lower, seldom occurs in field stolen and under the premise of situations such as artificially sabotage, pile body 1 can play puppet and pretend
With reduce monitoring device 4 is stolen and is destroyed probability.Stake lid 2 is mounted on the upper end of pile body 1, avoids rainwater and external impurities
Into in pile body 1, play a protective role to the monitoring device 4 in pile body 1.
As it can be seen that monitoring pipeline marker stake provided by the embodiment of the utility model, by the way that monitoring device 4 is mounted on cement
Or in the pile body 1 of glass steel material, pile body 1 can play the role of camouflage, reduce the stolen of monitoring device 4 and be destroyed several
Rate.
As shown in attached drawing 1 and attached drawing 6, monitoring device 4 include: solar panels 41, solar controller 42, battery 43,
Data acquire transit terminal 44, signal projector 45;
Solar controller 42 is electrically connected with solar panels 41, battery 43, data acquisition transit terminal 44 respectively;
Data acquire transit terminal 44 and signal projector 45 is electrically connected;
Solar panel 41 converts light energy into electric current, and electric current is input to battery by solar controller 42
43, battery 43 charges;
Battery 43 discharges, and the electric current of electric discharge is input to data by solar controller 42 and acquires transit terminal 44;
Data acquire transit terminal 44 and are used for measurement data, send data by signal projector 45.
So set, acquiring the DATA REASONING that transit terminal 44 carries out long oil and gas pipeline indices by data, survey
Amount data are issued by signal projector 45.Data acquisition transit terminal 44 is powered using battery 43, solar panels
41 pairs of batteries 43 charge, and make monitoring device 4 that can keep working normally in field without power supply line.Solar control
Device 42 controls the charge and discharge of battery 43, and the charging current of solar panels 41 is converted to the specified of battery 43 and is filled
Electric current, the discharge current of battery 43 are converted to the rated operational current of data acquisition transit terminal 44, ensure equipment just
Often operation.
Wherein, signal projector 45 sends a signal to extraneous monitor terminal, and staff is learned by monitor terminal
Monitoring data.Signal projector 45 can be issued data in the form of wireless signal, or pass through cable and extraneous monitor terminal
Connection sends signal.
Bracket 3 illustrates the structure of bracket 3 for support monitoring device 4 below:
Bracket 3 includes multiple supporting plates 31 and multiple pillars 32, and multiple supporting plates 31 are mounted on multiple pillars 32, and multiple supports
Each supporting plate 31 in plate 31 is distributed in different layers from top to bottom, and there is interval between adjacent two layers supporting plate 31.
Multiple supporting plates 31 of different layers are distributed in by being arranged, making bracket 3 includes multilayer space, convenient in every layer of bracket 3
The different components of upper installation monitoring device 4.
Wherein, each supporting plate 31 is horizontal or level of approximation setting, level of approximation refer to the angle of supporting plate 31 Yu horizontal plane
Less than predetermined angle threshold value.As an example, predetermined angle threshold value can be 3 degree, at this point, the angle of supporting plate 31 and horizontal plane
It can be 1 degree, 2 degree etc..
Pillar 32 is vertical or near vertical setting, near vertical refer to that the angle of pillar 32 and vertical line is less than preset angle
Spend threshold value.As an example, predetermined angle threshold value can be 3 degree, at this point, the angle of pillar 32 and vertical line can be 1 degree,
2 degree etc..
Each pillar 32 can be integrally formed, alternatively, each pillar 32 includes multiple pipe nipples 321.Pillar 32 is wrapped below
The structure of bracket 3 is illustrated when including multiple pipe nipples 321:
The quantity of supporting plate 31 be it is N number of, each pillar 32 in multiple pillars 32 includes N number of pipe nipple 321, and N is whole greater than 1
Number;
The top of i-th of pipe nipple 321 of each pillar 32 is connect with i-th layer of supporting plate 31, the supporting plate of bottom end and i+1 layer
31 connections, i=1,2 ... N-1;
The top of the n-th pipe nipple 321 of each pillar 31 and the supporting plate 31 of n-th layer connect, and the bottom of bottom end and pile body 1 connects
It connects.
So set, bracket 3 is formed by multiple pipe nipples 321 and the combination of multiple supporting plates 31, by selecting different number
Pipe nipple 321 and supporting plate 31 more can easily form different layers of brackets 3.Using when can form according to actual needs
The bracket 3 satisfied the use demand, use is more convenient.
Wherein, pipe nipple 321 and supporting plate 31 can be connected through a screw thread mode and realize fixation, be easily installed and dismantle.
Pipe nipple 321 is threadedly coupled with how supporting plate 31 is realized, is illustrated below:
As shown in attached drawing 2 and attached drawing 3, multiple internal thread holes are provided on supporting plate 31, be provided on the bottom surface of supporting plate 31 with
The coaxial stud of internal thread hole.Pipe nipple 321 includes: the internal thread segment, light bar segment, external thread section formed from top to bottom, internal screw thread
Section is adapted with stud, and external thread section is adapted with internal thread hole.The top of i-th of pipe nipple 321 of each pillar 32 with i-th
The Stud connection of supporting plate 31, bottom end are connect with the internal thread hole of i+1 supporting plate 31.
Further, the diameter of external thread section is less than the diameter of light bar segment.So set, external thread section and supporting plate 31 is interior
When threaded hole connects, the bottom surface of light bar segment is contacted with the top surface of supporting plate 31, and supporting plate 31 plays supporting role to light bar segment, makes screw thread
The stress of junction is smaller, reduces loss.
Multiple supporting plates 31 include the first supporting plate 311, the second supporting plate 312, the third supporting plate the 313, the 4th arranged from top to bottom
Supporting plate 314;
Solar panels 41 are arranged on the first supporting plate 311;
Solar controller 42 and signal projector 45 are arranged on the second supporting plate 312;
Battery 43 is arranged on third supporting plate 313;
Data acquire transit terminal 44 and are arranged on the 4th supporting plate 314.
The different components of monitoring device 4 are separately positioned on the first supporting plate 311, the second supporting plate 312, third supporting plate 313,
On four supporting plates 314, layer distributed reduces the occupied area of monitoring device 4, and then makes the occupied area of monitoring pipeline marker stake
It is smaller.
Solar controller 42 and solar panels 41, battery 43, data acquisition transit terminal 44 are electrically connected, and data are adopted
Collect transit terminal 44 and signal projector 45 is electrically connected.It is realized and is electrically connected by cable connection between each component, in order to make
Cable when connection passes through, and as shown in Fig. 4, perforation 31a is provided on supporting plate 31.By being arranged for the perforation across cable
31a ensures the electric connection between each component of monitoring device 4.
In the utility model embodiment, stake lid 2 is detachably connected with pile body 1, for its connection type, carries out example below
Illustrate:
As shown in Fig. 5, catching groove 21 compatible with pile body 1 is provided on the bottom surface of stake lid 2, catching groove 21 is perpendicular to stake lid
2 bottom surface.So set, the top of pile body 1 is contained in catching groove 21 when stake lid 2 is mounted on pile body 1.By above mentioning stake lid
2, stake lid 2 can be removed from pile body 1, when not mentioning lid 2 above, stake lid 2 can not be detached from from pile body 1, realize stake lid 2 and pile body
1 is detachably connected.
Further, lock ring can be set on the side wall of catching groove 21 and pile body 1, after stake lid 2 is mounted on pile body 1,
Stake lid 2 and pile body 1 are locked using the lock across two lock rings, anti-theft effect can be further increased.
It is arranged on the first bracket 311 based on above-mentioned solar panels 41, in order to enable solar panels 41 to receive sunlight
Irradiation, stake lid 2 are transparent material.
Wherein, stake lid 2 can select the Asia of clear, colorless to make every effort to overcome material, to improve the generating efficiency of solar panels 41.
As shown in Fig. 1, the bottom of pile body 1 is provided with bottom plate, and the Ge Lan head 5 for passing through cable is provided on bottom plate.
By the way that bottom plate is arranged in the bottom of pile body 1, prevents water and terrestrial life from entering in pile body 1, monitoring device 4 is caused
It destroys.Ge Lan head 5 is provided on bottom plate, the cable of data transport acquisition terminal 44 passes through Ge Lan head 5 and extraneous sensor connects
Tapping into the acquisition of row data makes the sealing of monitoring pipeline marker stake under the premise of realizing that monitoring device 4 is connect with external device
Property and waterproof performance are preferable.
The above is only the preferred embodiment of the present invention, the protection scope being not intended to limit the utility model,
Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should be included in this reality
Within novel protection scope.
Claims (9)
1. it is a kind of monitoring use pipeline marker stake, which is characterized in that the marker peg include: pile body (1), stake lid (2), bracket (3),
Monitoring device (4);
The pile body (1) is hollow columnar structures, and the pile body (1) is cement or glass steel material;
The stake lid (2) is removably disposed in the top of the pile body (1);
Bracket (3) setting is in the pile body (1), for monitoring device (4) described in support.
2. marker peg according to claim 1, which is characterized in that the monitoring device (4) include: solar panels (41),
Solar controller (42), battery (43), data acquire transit terminal (44), signal projector (45);
The solar controller (42) is transported with the solar panels (41), the battery (43), data acquisition respectively
Defeated terminal (44) is electrically connected;
Data acquisition transit terminal (44) and the signal projector (45) is electrically connected;
The solar panels (41) convert light energy into electric current, are input to the electric current by the solar controller (42)
The battery (43), battery (43) charging;
Battery (43) electric discharge, is input to the data for the electric current of electric discharge by the solar controller (42) and acquires
Transit terminal (44);
Data acquisition transit terminal (44) is used for measurement data, sends the data by the signal projector (45).
3. marker peg according to claim 2, which is characterized in that the bracket (3) includes: multiple supporting plates (31) and multiple
Pillar (32), the multiple supporting plate (31) is mounted on the multiple pillar (32), and each of the multiple supporting plate (31)
Supporting plate (31) is distributed in different layers from top to bottom, and there is interval between supporting plate described in adjacent two layers (31).
4. marker peg according to claim 3, which is characterized in that the quantity of the multiple supporting plate (31) be it is N number of, it is described more
Each pillar (32) in a pillar (32) includes N number of pipe nipple (321), and N is the integer greater than 1;
The top of i-th of pipe nipple (321) of each pillar (32) is connect with i-th layer of supporting plate (31), bottom end and i+1 layer
Supporting plate (31) connection, i=1,2 ... N-1;
The top of the n-th pipe nipple (321) of each pillar (32) and the supporting plate (31) of n-th layer connect, bottom end and the stake
The bottom of body (1) connects.
5. marker peg according to claim 3 or 4, which is characterized in that the multiple supporting plate (31) includes arranging from top to bottom
The first supporting plate (311), the second supporting plate (312), third supporting plate (313), the 4th supporting plate (314) of column;
The solar panels (41) are arranged on first supporting plate (311);
The solar controller (42) and the signal projector (45) are arranged on second supporting plate (312);
The battery (43) is arranged on the third supporting plate (313);
Data acquisition transit terminal (44) is arranged on the 4th supporting plate (314).
6. marker peg according to claim 3, which is characterized in that be provided with perforation (31a) on the supporting plate (31).
7. marker peg according to claim 1, which is characterized in that be provided with and the stake on the bottom surface of the stake lid (2)
The compatible catching groove (21) of body (1), bottom surface of the catching groove (21) perpendicular to the stake lid (2).
8. marker peg according to claim 2, which is characterized in that the stake lid (2) is transparent material.
9. marker peg according to claim 5, which is characterized in that the bottom of the pile body (1) is provided with bottom plate, the bottom
The Ge Lantou (5) for passing through cable is provided on plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820615569.2U CN208476284U (en) | 2018-04-27 | 2018-04-27 | A kind of monitoring pipeline marker stake |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820615569.2U CN208476284U (en) | 2018-04-27 | 2018-04-27 | A kind of monitoring pipeline marker stake |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208476284U true CN208476284U (en) | 2019-02-05 |
Family
ID=65219877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820615569.2U Active CN208476284U (en) | 2018-04-27 | 2018-04-27 | A kind of monitoring pipeline marker stake |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208476284U (en) |
-
2018
- 2018-04-27 CN CN201820615569.2U patent/CN208476284U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7976180B1 (en) | Solar powered rechargeable street light with tamper resistant networkable system | |
CN203321066U (en) | Security alert combined frame | |
CN208476284U (en) | A kind of monitoring pipeline marker stake | |
CN207714901U (en) | A kind of power construction safety guide rail | |
CN111327870A (en) | Pipeline line monitoring equipment and security protection monitored control system | |
CN211977983U (en) | Ecological environment monitoring device | |
CN201148198Y (en) | Self-lifting type lamp pile | |
CN207029161U (en) | A kind of platform safety column | |
CN205563931U (en) | High pressure overhead line protection of laser hazard net | |
CN115276122A (en) | Combined wind-solar-energy-storage combined power generation system | |
CN209877946U (en) | Small-size utility tunnel of concrete is with subsiding monitoring devices | |
CN205827584U (en) | A kind of intelligent anti-theft enclosure wall based on infrared scan technology | |
CN107364450A (en) | A kind of platform safety column | |
CN210238340U (en) | Warning device for highway | |
CN208847214U (en) | A kind of field environment monitor | |
CN207132898U (en) | A kind of architectural engineering slide calliper rule corollary equipment | |
CN207560205U (en) | A kind of energy conservation and environmental protection monitoring device for building | |
CN206533476U (en) | A kind of monitoring device with warning function | |
CN206461556U (en) | A kind of floating body photovoltaic generating system | |
CN206208352U (en) | A kind of automatic display explosion relief valve | |
CN218156403U (en) | Hydraulic engineering water level monitoring device | |
CN205354360U (en) | Intelligent transportation responds to lighting system | |
CN210867857U (en) | Movable data acquisition device | |
CN211950547U (en) | Temporary supporting device for coal mine haulage roadway | |
CN208889302U (en) | A kind of power equipment Intelligent safety caution device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211111 Address after: Room 08-10, 6 / F, block a, No. 5, Dongtucheng Road, Chaoyang District, Beijing 100013 Patentee after: National Petroleum and natural gas pipeline network Group Co., Ltd Address before: 100007 China Petroleum Building, No. 9, Dongzhimen North Street, Dongcheng District, Beijing Patentee before: China National Petroleum Corporation |
|
TR01 | Transfer of patent right |