CN208473261U - A kind of plasterboard installation bracing means outline border - Google Patents

A kind of plasterboard installation bracing means outline border Download PDF

Info

Publication number
CN208473261U
CN208473261U CN201820005201.4U CN201820005201U CN208473261U CN 208473261 U CN208473261 U CN 208473261U CN 201820005201 U CN201820005201 U CN 201820005201U CN 208473261 U CN208473261 U CN 208473261U
Authority
CN
China
Prior art keywords
outline border
plasterboard
fixedly connected
fixed plate
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820005201.4U
Other languages
Chinese (zh)
Inventor
沈坚
张祖全
高新军
周伟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Longgu Building Decoration Engineering Co Ltd
Original Assignee
Shanghai Longgu Building Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Longgu Building Decoration Engineering Co Ltd filed Critical Shanghai Longgu Building Decoration Engineering Co Ltd
Priority to CN201820005201.4U priority Critical patent/CN208473261U/en
Application granted granted Critical
Publication of CN208473261U publication Critical patent/CN208473261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to plasterboard mounting technique fields, and disclose a kind of plasterboard installation bracing means outline border, including outline border, the upper and lower ends of outline border inner cavity are fixedly connected to the first spring, first spring is fixedly connected with fixed plate far from one end of outline border, and fixed plate is fixedly connected with the first cushion far from one end of the first spring, and the side of the first cushion is provided with plasterboard, the two sides of fixed plate are fixedly connected to connecting rod, and pulley is fixedly mounted far from the side of fixed plate in connecting rod.The plasterboard installs bracing means outline border; pass through the first spring of setting, telescopic sleeving rod, sliding rail and fixed plate; plasterboard is placed in outline border; fixed plate is driven to move up and down inside sliding rail using the first spring and telescopic sleeving rod; realization grips plasterboard using upper and lower two fixed plates; the setting of first cushion simultaneously is played the role of protecting plasterboard, ensure that the practicability of plasterboard installation bracing means outline border.

Description

A kind of plasterboard installation bracing means outline border
Technical field
The utility model relates to plasterboard mounting technique field, specially a kind of plasterboard installs bracing means outline border.
Background technique
Plasterboard is using building gypsum as a kind of material made of primary raw material, it is that one kind is light-weight, intensity is higher, thick The construction material for spending the better performances such as relatively thin, easy to process and sound insulation insulation and fire prevention is the novel light of current development emphatically One of lumber, plasterboard be widely used in the various buildings such as house, office building, shop, hotel and industrial premises it is interior every Wall, wall cladding boards, ceiling, abatvoix, ground layer plate and various decorative panels etc. are not advantageously mounted at bathroom for indoor Or kitchen.In plasterboard installation, plasterboard is easy to happen shaking, this just needs staff to carry out support fixation, this is just The installation effectiveness of staff is greatly reduced, while also carrying out reinforcing fixation without outline border after installing, for this purpose, proposing a kind of stone Cream plate installs bracing means outline border to solve the above problems.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of plasterboard installation bracing means outline border, has and adds Gu the advantages that stablizing and improving installation effectiveness solves the problems, such as inefficient when plasterboard installation currently on the market.
(2) technical solution
To realize that above-mentioned reinforcing is stable and improves the purpose of installation effectiveness, the utility model is provided the following technical solutions: A kind of plasterboard installation bracing means outline border, including outline border, the upper and lower ends of the outline border inner cavity are fixedly connected to the first bullet Spring, first spring are fixedly connected with fixed plate far from one end of outline border, and the one end of the fixed plate far from the first spring is solid Surely it is connected with the first cushion, the side of first cushion is provided with plasterboard, and the two sides of the fixed plate are fixed to be connected It is connected to connecting rod, pulley, the fixed peace in the two sides of the outline border inner cavity is fixedly mounted far from the side of fixed plate in the connecting rod Equipped with sliding rail, the pulley is slidably connected at the inside of sliding rail, and the two sides of the plasterboard are provided with the second cushion, described The side of second cushion is fixedly connected with clamping plate, and the side of the clamping plate is fixedly connected with interior bar, and the inside of the interior bar is solid Surely it is connected with second spring, the side of the second spring is fixedly connected with telescopic block, an end cap of the interior bar far from clamping plate It is connected to sleeve.
Preferably, telescopic sleeving rod is fixedly connected between the fixed plate and outline border, and the quantity of telescopic sleeving rod is four, And four telescopic sleeving rods are divided into two groups.
Preferably, the quantity of the sliding rail is four, and four sliding rail distributions are arranged on the quadrangle of outline border inner cavity.
Preferably, one end of the sliding rail is fixedly installed with limited block, and the quantity of limited block is four.
Preferably, first cushion and the second cushion are rubber buffer.
Preferably, the sleeve and interior bar are hollow structure, and sleeve is fixedly connected with outline border far from one end of interior bar.
Preferably, the quantity of the fixed plate be two, and two fixed plates it is symmetrical be arranged in plasterboard up and down Both ends.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of plasterboard installation bracing means outline border, and having following has Beneficial effect:
1, the plasterboard installs bracing means outline border, will by the first spring of setting, telescopic sleeving rod, sliding rail and fixed plate Plasterboard is placed in outline border, is driven fixed plate to move up and down inside sliding rail using the first spring and telescopic sleeving rod, is realized benefit Plasterboard is gripped with upper and lower two fixed plates, while the work of protection plasterboard is played in the setting of the first cushion With, ensure that the plasterboard installation bracing means outline border practicability.
2, the plasterboard installs bracing means outline border, is put by setting interior bar, second spring, sleeve and clamping plate, plasterboard Set in the inside of outline border, stretched back and forth under the action of second spring in sleeve inner using interior bar, when clamping plate action, it is real Now plasterboard is gripped using clamping plate, achievees the purpose that reinforce to plasterboard stable, while the second cushion Setting play the role of protect plasterboard.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the partial enlargement structural representation in the portion A in the utility model Fig. 1;
Fig. 3 is the partial enlargement structural representation in the portion B in the utility model Fig. 1.
In figure: 1 outline border, 2 first springs, 3 telescopic sleeving rods, 4 fixed plates, 5 first cushions, 6 plasterboards, 7 connecting rods, 8 Pulley, 9 sliding rails, 10 limited blocks, 11 second cushions, 12 clamping plates, 13 interior bars, 14 second springs, 15 telescopic blocks, 16 sleeves.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-3, a kind of plasterboard installation bracing means outline border, including outline border 1, the upper and lower ends of 1 inner cavity of outline border It is fixedly connected to the first spring 2, the first spring 2 is fixedly connected with fixed plate 4, fixed plate 4 and outline border far from one end of outline border 1 Telescopic sleeving rod 3 is fixedly connected between 1, and the quantity of telescopic sleeving rod 3 is four, and it is two groups that four telescopic sleeving rods 3, which are divided to, it is fixed Plate 4 is fixedly connected with the first cushion 5 far from one end of the first spring 2, and the side of the first cushion 5 is provided with plasterboard 6, Gu The quantity of fixed board 4 is two, and the symmetrical upper and lower ends that plasterboard 6 is arranged in of two fixed plates 4, the two sides of fixed plate 4 It is fixedly connected to connecting rod 7, pulley 8 is fixedly mounted far from the side of fixed plate 4 in connecting rod 7, and the two sides of 1 inner cavity of outline border are solid Dingan County is equipped with sliding rail 9, and one end of sliding rail 9 is fixedly installed with limited block 10, and the quantity of limited block 10 is four, the number of sliding rail 9 Measuring is four, and four distributions of sliding rails 9 are arranged on 1 inner cavity quadrangle of outline border, by the first spring 2 of setting, telescopic sleeving rod 3, is slided Rail 9 and fixed plate 4, plasterboard 6 is placed in outline border 1, drives fixed plate 4 in sliding rail using the first spring 2 and telescopic sleeving rod 3 9 inside move up and down, and realization grips plasterboard 6 using upper and lower two fixed plates 4, while the first cushion 5 Setting is played the role of protecting plasterboard 6, ensure that the practicability of plasterboard installation bracing means outline border, and the sliding of pulley 8 connects It connects in the inside of sliding rail 9, the two sides of plasterboard 6 are provided with the second cushion 11, the first cushion 5 and the second cushion 11 It is rubber buffer, the side of the second cushion 11 is fixedly connected with clamping plate 12, and the side of clamping plate 12 is fixedly connected with interior bar 13, the inside of interior bar 13 is fixedly connected with second spring 14, and the side of second spring 14 is fixedly connected with telescopic block 15, interior bar 13 One end far from clamping plate 12 is socketed with sleeve 16, and sleeve 16 and interior bar 13 are hollow structure, and sleeve 16 is far from interior bar 13 One end is fixedly connected with outline border 1, and by setting interior bar 13, second spring 14, sleeve 16 and clamping plate 12, plasterboard 6 is placed on outer The inside of frame 1 is stretched inside sleeve 16 under the action of second spring 14 back and forth using interior bar 13, when clamping plate 12 effect fortune Dynamic, realization grips plasterboard 6 using clamping plate 12, achieve the purpose that plasterboard 6 reinforce it is stable, while the The setting of two cushions 11 is played the role of protecting plasterboard 6.
In conclusion the plasterboard installs bracing means outline border, by the way that the first spring 2, telescopic sleeving rod 3,9 and of sliding rail is arranged Plasterboard 6 is placed in outline border 1 by fixed plate 4, drives fixed plate 4 inside sliding rail 9 using the first spring 2 and telescopic sleeving rod 3 It moves up and down, realization grips plasterboard 6 using upper and lower two fixed plates 4, while the setting of the first cushion 5 rises To the effect of protection plasterboard 6, the practicability of plasterboard installation bracing means outline border ensure that.
It is placed on the inside of outline border 1 by setting interior bar 13, second spring 14, sleeve 16 and clamping plate 12, plasterboard 6, benefit Stretched back and forth inside sleeve 16 under the action of second spring 14 with interior bar 13, when 12 action of clamping plate, realize using folder Plate 12 grips plasterboard 6, achievees the purpose that reinforce to plasterboard 6 stable, while the second cushion 11 Setting is played the role of protecting plasterboard 6.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of plasterboard installs bracing means outline border, including outline border (1), it is characterised in that: above and below outline border (1) inner cavity Both ends are fixedly connected to the first spring (2), and first spring (2) is fixedly connected with fixed plate far from the one end of outline border (1) (4), the fixed plate (4) is fixedly connected with the first cushion (5) far from the one end of the first spring (2), first cushion (5) side is provided with plasterboard (6), and the two sides of the fixed plate (4) are fixedly connected to connecting rod (7), the connecting rod (7) pulley (8) are fixedly mounted in the side far from fixed plate (4), and the two sides of outline border (1) inner cavity are fixedly installed with sliding rail (9), the pulley (8) is slidably connected at the inside of sliding rail (9), and the two sides of the plasterboard (6) are provided with the second cushion (11), the side of second cushion (11) is fixedly connected with clamping plate (12), and the side of the clamping plate (12) is fixedly connected with The inside of interior bar (13), the interior bar (13) is fixedly connected with second spring (14), and the side of the second spring (14) is fixed It is connected with telescopic block (15), the interior bar (13) is socketed with sleeve (16) far from the one end of clamping plate (12).
2. a kind of plasterboard according to claim 1 installs bracing means outline border, it is characterised in that: the fixed plate (4) It is fixedly connected between outline border (1) telescopic sleeving rod (3), and the quantity of telescopic sleeving rod (3) is four, and four telescopic sleeving rods (3) it is divided into two groups.
3. a kind of plasterboard according to claim 1 installs bracing means outline border, it is characterised in that: the sliding rail (9) Quantity is four, and four sliding rail (9) distributions are arranged on outline border (1) inner cavity quadrangle.
4. a kind of plasterboard according to claim 1 installs bracing means outline border, it is characterised in that: the sliding rail (9) One end is fixedly installed with limited block (10), and the quantity of limited block (10) is four.
5. a kind of plasterboard according to claim 1 installs bracing means outline border, it is characterised in that: first cushion (5) and the second cushion (11) is rubber buffer.
6. a kind of plasterboard according to claim 1 installs bracing means outline border, it is characterised in that: the sleeve (16) with Interior bar (13) is hollow structure, and sleeve (16) is fixedly connected with outline border (1) far from the one end of interior bar (13).
7. a kind of plasterboard according to claim 1 installs bracing means outline border, it is characterised in that: the fixed plate (4) Quantity be two, and two fixed plates (4) it is symmetrical setting plasterboard (6) upper and lower ends.
CN201820005201.4U 2018-01-03 2018-01-03 A kind of plasterboard installation bracing means outline border Expired - Fee Related CN208473261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820005201.4U CN208473261U (en) 2018-01-03 2018-01-03 A kind of plasterboard installation bracing means outline border

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820005201.4U CN208473261U (en) 2018-01-03 2018-01-03 A kind of plasterboard installation bracing means outline border

Publications (1)

Publication Number Publication Date
CN208473261U true CN208473261U (en) 2019-02-05

Family

ID=65204483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820005201.4U Expired - Fee Related CN208473261U (en) 2018-01-03 2018-01-03 A kind of plasterboard installation bracing means outline border

Country Status (1)

Country Link
CN (1) CN208473261U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112223136A (en) * 2020-08-22 2021-01-15 西安方元明科技股份有限公司 Fastening clamp for bonding bulletproof ceramic
CN112523402A (en) * 2020-12-11 2021-03-19 康彪彪 Gypsum board stabilising arrangement for building wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112223136A (en) * 2020-08-22 2021-01-15 西安方元明科技股份有限公司 Fastening clamp for bonding bulletproof ceramic
CN112523402A (en) * 2020-12-11 2021-03-19 康彪彪 Gypsum board stabilising arrangement for building wall

Similar Documents

Publication Publication Date Title
CN108797856B (en) Aluminum curtain wall convenient to install and disassemble
CN208473261U (en) A kind of plasterboard installation bracing means outline border
CN210767409U (en) Glass curtain wall for building of conveniently assembling
CN111197373B (en) Furred ceiling with inhale sound function
CN205046706U (en) Can dismantle partition wall
CN201089977Y (en) Prefabricated steel construction house
CN207122081U (en) A kind of dried hanging hang structure and finishing systems
CN211396090U (en) High-strength wall structure for constructional engineering
CN208965851U (en) Gypsum board keel frame connecting structure
CN113931400A (en) Suspended wood veneer structure and mounting method thereof
CN210482874U (en) Composite ground decorative plate of ultrathin stone honeycomb plate and assembly type mounting structure thereof
CN203769233U (en) Aluminium-plastic panel
CN112392191A (en) Ceiling beautifies device for indoor decoration
CN208347061U (en) A kind of energy conservation and environmental protection light steel keel partition construction material that intensity is high
CN206859791U (en) A kind of bradyseism building structure keel
CN204983290U (en) Building decorative curtain wall
CN211548690U (en) Gypsum board furred ceiling auxiliary device
CN219909750U (en) Quick-mounting type decorative wallboard for indoor design
KR20090025485A (en) Construction structure of wall decorating- panel
CN213087182U (en) Antidetonation environmental protection furred ceiling structure
CN207825607U (en) Environmental protection type honeycomb refill steel-plastic plate
CN220620857U (en) Novel keel structure for building engineering
CN112081274B (en) Self-insulation system of light partition board
CN113431243B (en) Fast assembly formula aluminium honeycomb composite sheet
CN209760473U (en) Building external wall insulation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190205

Termination date: 20210103

CF01 Termination of patent right due to non-payment of annual fee