Reversible immersed tube tunnel final connector Download PDFInfo
- Publication number
- CN208472777U CN208472777U CN201821013475.4U CN201821013475U CN208472777U CN 208472777 U CN208472777 U CN 208472777U CN 201821013475 U CN201821013475 U CN 201821013475U CN 208472777 U CN208472777 U CN 208472777U
- Authority
- CN
- China
- Prior art keywords
- counter
- force bracket
- bracing members
- thrust
- tube coupling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model proposes a kind of reversible immersed tube tunnel final connector, belong to immersed tube tunnel technical field of construction, reversible constructing operation mode flexible and convenient, and construction risk is small.The FS final spice includes being set to secretly to bury the connection sleeve that section pipeline section waits for butt end, connection sleeve inner sleeve be connected to for the jacking tube coupling having installed pipeline section and dock;Jacking tube coupling inner wall is equipped with the first counter-force bracket, secretly buries section pipeline section inner wall equipped with the second counter-force bracket opposite with the first counter-force bracket;Flexible yoke frame is provided between first counter-force bracket and the second counter-force bracket, flexible yoke frame can be axially elongated or be shunk to release or retract jacking tube coupling relative to connection sleeve;It is removably connected between first counter-force bracket and the second counter-force bracket for being pushed out in jacking tube coupling and having installed the thrust component for preventing jacking tube section to be pushed back after pipeline section docks.
Description
Technical field
The utility model belongs to immersed tube tunnel technical field of construction more particularly to a kind of reversible immersed tube tunnel final connects
Head.
Background technique
Immersed tube tunnel pipeline section installation in, to make the smooth sinking of final section pipeline section, it is necessary to there are be longer than the pipeline section away from
From space.After final section Pipe Sinking, the end face of final section pipeline section and secretly burying is needed between section pipeline section through a connection
Structure is attached, which is FS final spice.
With the development of immersed tube tunnel construction technology, the form of FS final spice is more and more diversified, with jacking tube coupling
FS final spice is a kind of novel FS final spice.Such as: patent CN107938709A provides a kind of immersed tube tunnel final connector, should
FS final spice is exactly a kind of FS final spice with jacking tube coupling, although in the way of peripheral hardware jack, it can be by pushing tow pipe
Section retracts in connection tube coupling, realizes reversible construction.However, the connection of peripheral hardware jack is more time-consuming and laborious, when making reversible construction
It is complicated for operation, moreover, peripheral hardware jack is worked in the environment of having water, still there is certain construction risk.
Thus, how to provide that a kind of reversible constructing operation is easy and the smaller reversible immersed tube tunnel final of construction risk connects
Head is a current technical problem urgently to be solved.
Utility model content
There are complicated for operation when reversible construction for above-mentioned existing reversible immersed tube tunnel final connector for the utility model
And there are the deficiencies of certain construction risk, propose a kind of reversible immersed tube tunnel final connector, the reversible immersed tube tunnel final
The reversible constructing operation mode flexible and convenient of connector, and it is mainly constructed and completes under dry operating environment, underwater operation is few, applies
Work risk is small.
In order to achieve the above object, the technical solution adopted in the utility model are as follows:
Reversible immersed tube tunnel final connector has installed docking for pipeline section with final section for secretly burying section pipeline section, including
Be set to the connection sleeve for secretly burying section pipeline section and waiting for butt end, the connection sleeve inner sleeve be connected to for the installing pipe
The jacking tube coupling of section docking;The jacking tube coupling inner wall is equipped with the first counter-force bracket, and section pipeline section inner wall that secretly buries is equipped with and institute
State the second opposite counter-force bracket of the first counter-force bracket;It is provided between the first counter-force bracket and the second counter-force bracket flexible
Yoke frame, the flexible yoke frame can be axially elongated or be shunk to release the jacking tube coupling relative to the connection sleeve
Or it retracts;It is removably connected between the first counter-force bracket and the second counter-force bracket for being pushed out in the jacking tube coupling
To with the thrust component installed and the jacking tube coupling is prevented to be pushed back after pipeline section docks.
Preferably, the thrust component includes multiple first thrust bracing members, one end of the first thrust bracing members
It is fixedly connected on the first counter-force bracket, the other end of the first thrust bracing members is arranged in section pipeline section that secretly buries and waits for pair
The end seal door at end is connect, the first thrust bracing members can be mobile axially with respect to the end seal door;Part the first thrust steel
It supports and is removably connected with axially disposed multiple second thrust bracing members between the second counter-force bracket, described second
One end of thrust bracing members is removably connected to one end that the first thrust bracing members pass through the end seal door, and the other end can
Dismantling connection is in the second counter-force bracket.
Preferably, the first thrust bracing members are close to one end of the second thrust bracing members and described second
Thrust bracing members are welded with the first connecting flange, two first connections close to one end of the first thrust bracing members
Flange is detachably connected by bolt.
Preferably, the first thrust bracing members are welded with the second connection method close to one end of the first counter-force bracket
Orchid, the first counter-force bracket is interior to be equipped with pull rod along axial direction, and the pull rod passes through second connecting flange, the pull rod
Both ends be connected with the fastening nut for the first counter-force bracket and the second connecting flange to be fastenedly connected.
Preferably, the rod outer sleeve is equipped with pull rod sleeve, there are gaps between the pull rod sleeve and pull rod.
Preferably, the second thrust bracing members are welded with the first wedge shape close to one end of the second counter-force bracket
Block, the second counter-force bracket are connected with the second wedge block to match with first wedge block.
Preferably, the flexible yoke frame is set to the first thrust bracing members described in remainder and second counter-force
Between bracket, one end of the flexible yoke frame is connected to one end that the first thrust bracing members pass through the end seal door,
The other end is connected to the second counter-force bracket.
Preferably, the outer wall at the top of the jacking tube coupling is equipped with 3rd counter-force bracket.
Preferably, the reversible immersed tube tunnel final connector further includes sealing component, the sealing component includes three
Road waterstop, first of waterstop are set to the jacking tube coupling close to the end face for having installed pipeline section one end, and second stops
Water band and third road waterstop are all set in jacking tube coupling periphery;The second waterstop can be with the jacking tube coupling
It stretches and stretches, one end of the second waterstop is fixed in the jacking tube coupling, and the other end is fixed in the connection sleeve,
Third road waterstop is socketed between the jacking tube coupling and connection sleeve, and third road waterstop is can ejection for water plugging
Band.
Compared with prior art, advantages and beneficial effects of the utility model lie in that
1, reversible immersed tube tunnel final connector provided by the utility model passes through the flexible yoke frame of setting, thrust group
The mating reaction of part, the first counter-force bracket and the second counter-force bracket, it can be achieved that reversible construction when jacking tube coupling docks, it is this can
The flexible operation mode of inverse work is easy, and without carrying out underwater operation, construction risk is small;
2, it when carrying out docking construction using reversible immersed tube tunnel final connector provided by the utility model, mainly constructs
It is completed under dry operating environment, underwater operation is few, and construction quality is guaranteed, and short construction period is small by water depth effect, is constructed into
This is low.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of reversible immersed tube tunnel final connector provided by the embodiment of the utility model;
Fig. 2 is the cross-sectional view of the line A-A along Fig. 1;
Fig. 3 is the cross-sectional view of the line B-B along Fig. 1;
Fig. 4 is the cross-sectional view of the line C-C along Fig. 1;
Fig. 5 is the enlarged drawing in Fig. 1 at D;
Fig. 6 is the enlarged drawing in Fig. 1 at E;
Fig. 7 is the connection of thrust component provided by the embodiment of the utility model and the first counter-force bracket and the second counter-force bracket
Schematic diagram;
Fig. 8 is the enlarged drawing in Fig. 7 at F;
Fig. 9 is that reversible immersed tube tunnel final connector provided by the embodiment of the utility model docks work progress schematic diagram;
In above each figure: 1, secretly burying a section pipeline section;2, pipeline section has been installed;3, sleeve is connected;4, jacking tube coupling;5, the first counter-force
Bracket;6, the second counter-force bracket;7, thrust component;71, the first thrust bracing members;72, the second thrust bracing members;73, first connects
Acting flange;74, bolt;75, the first wedge block;76, the second wedge block;77, the second connecting flange;8, end seal door;9, it seals up a door;
10, water storage cavity;11, binding cavity;12, manhole;13, cover board;14, water inlet pipe;15, stretch yoke frame;16,3rd counter-force bracket;
17, first of waterstop;18, second waterstop;19, third road waterstop;20, sealing rubber ring;21, pull rod;22, spiral shell is fastened
It is female;23, pull rod sleeve.
Specific embodiment
In the following, the utility model is specifically described by illustrative embodiment.It should be appreciated, however, that not having
In the case where being further discussed below, element, structure and features in an embodiment can also be advantageously incorporated into other implementations
In mode.
In the description of the present invention, it should be noted that the axial horizontal direction referred in Fig. 1;Term "inner",
The orientation or positional relationship of the instructions such as "outside", "upper", "lower", "front", "rear" be based on attached positional relationship shown in FIG. 1, be only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the
One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
As Figure 1-Figure 4, the utility model relates to a kind of reversible immersed tube tunnel final connectors, for secretly burying a section pipeline section
1 has installed docking for pipeline section 2 with final section, including being set to the connection sleeve 3 for secretly burying section pipeline section 1 to butt end, connector sleeve
Be socketed in cylinder 3 for the jacking tube coupling 4 having installed pipeline section 2 and dock;4 inner wall of jacking tube coupling is equipped with the first counter-force bracket 5, secretly
1 inner wall of section pipeline section is buried equipped with the second counter-force bracket 6 opposite with the first counter-force bracket 5;First counter-force bracket 5 and the second counter-force ox
Flexible yoke frame 15 is provided between leg 6, stretch yoke frame 15 can it is axially elongated or shrink with by jacking tube coupling 4 relative to even
Female connector cylinder 3 is released or is retracted;It is removably connected between first counter-force bracket 5 and the second counter-force bracket 6 in jacking tube coupling 4
It is pushed out to and the thrust component 7 for preventing jacking tube section 4 to be pushed back after pipeline section 2 docks has been installed.
In above-mentioned reversible immersed tube tunnel final connector, the flexible yoke frame 15 of setting is with the first counter-force bracket 5 of setting
Be support with the second counter-force bracket 6, by the yoke frame 15 that stretches along axial elongation, jacking tube coupling 4 can be released with pacified
Tubulature section 2 is docked, simultaneously as flexible yoke frame 15 can also axially contract, thus, the appearance when jacking tube coupling 4 is pushed out
When state is undesirable, by the yoke frame 15 that stretches along axial contraction, jacking tube coupling 4 can be retracted, to realize docking
When reversible construction, the flexible operation mode of this reversible construction is easy, and without carrying out underwater operation, construction risk is small.
Further, when jacking tube coupling 4 be pushed out to installed pipeline section 2 accurately dock after, can be prevented by the thrust component 7 of setting
Jacking tube coupling 4 is pushed back, while thrust component 7 is support with the first counter-force bracket 5 of setting and the second counter-force bracket 6, is compared
In being arranged in the steel construction for secretly burying 1 end of section pipeline section, thrust effect is more preferable, and can substantially reduce cost.
It should be noted that jacking tube coupling 4 is used for and has installed pipeline section 2 in above-mentioned reversible immersed tube tunnel final connector
Carry out matching docking to butt end, thus, as shown in Figure 1, jacking tube coupling 4 far from secretly bury one end end face of section pipeline section 1 with
Installation pipeline section 2 matches to butt end end face, to guarantee matching docking.Further, as shown in Figure 1, jacking tube coupling
4, it connects sleeve 3 and secretly buries section pipeline section 1 and be coaxially arranged, to guarantee secretly burying section pipeline section 1 and having installed 2 energy of pipeline section for immersed tube tunnel
Enough coaxial line docking.In addition it is also necessary to explanation, the outer wall of jacking tube coupling 4 are slidably matched with the inner wall for connecting sleeve 3, with
Convenient for the release of jacking tube coupling 4, it should be noted that, jacking tube coupling 4 can only partially be pushed out of connection sleeve 3, to avoid jacking tube
Section 4 is separated with sleeve 3 is connect.
In above-mentioned reversible immersed tube tunnel final connector, thrust component 7 is for preventing jacking tube coupling 4 to be pushed back.As Fig. 1,
Shown in Fig. 2 and Fig. 7, thrust component 7 includes axially disposed multiple first thrust bracing members 71, the first thrust bracing members 71
One end is fixedly connected on the first counter-force bracket 5, and the other end of the first thrust bracing members 71, which is arranged in, secretly buries section pipeline section 1 to butt end
End seal door 8, the first thrust bracing members 71 can be mobile axially with respect to the end seal door 8;The first thrust of part bracing members 71 with
Axially disposed multiple second thrust bracing members 72, the second thrust bracing members are removably connected between second counter-force bracket 6
72 one end is removably connected to one end that the first thrust bracing members 71 pass through end seal door 8, and the other end is removably connected to the
Two counter-force brackets 6.It should be noted that as shown in figure 3, the first thrust bracing members 71 are evenly distributed in the edge of end seal door 8
Locate, the first thrust bracing members 71 being arranged in the present embodiment are 24.As shown in figure 4, the second thrust being arranged in the present embodiment
Bracing members 72 are 18, bury section pipeline section 1 except 2 the first thrust bracing members 71 for burying 1 top of section pipeline section by near-dark, and by near-dark
Outside 4 the first thrust bracing members 71 of bottom, remaining first thrust bracing members 71 is detachably connected the second thrust bracing members 72.
Explanation is needed further exist for, before releasing jacking tube coupling 4, the second thrust bracing members 72 need to remove, the second thrust bracing members 72
Only jacking tube coupling 4 be pushed out to installed pipeline section 2 accurately dock after be attached.In addition, it should be noted that, first stops
It pushes away bracing members 71 and steel column specifically can be used in the second thrust bracing members 72.Stopped compared to by the way of jack pressure maintaining
It pushes away, in the thrust component 7 of this structure provided in this embodiment, every first thrust bracing members 71 or the second thrust bracing members 72
500t axial force can be born, thrust effect is more preferable, carries out auxiliary thrust without other modes.Meanwhile the present embodiment
This thrust component 7 provided is divided to for two sections, wherein the first thrust bracing members 71 are fixedly connected on jacking tube coupling 4 and can move therewith
It is dynamic, and the second thrust bracing members 72 are fully located in the dry operating environment for secretly burying section pipeline section 1, dismantling connection can pass through work completely
People enters secretly to bury to be operated in section pipeline section 1, and easy for construction and risk is small.
For the specific connection between the first thrust bracing members 71 and the second thrust bracing members 72, as shown in fig. 7, first stops
Bracing members 71 are pushed away close to one end of the second thrust bracing members 72 and the second thrust bracing members 72 close to the first thrust bracing members 71
One end, be welded with the first connecting flange 73, two the first connecting flanges 73 are detachably connected by bolt 74.
For the specific connection between the first thrust bracing members 71 and the first counter-force bracket 5, as shown in figure 8, the first thrust
Bracing members 71 are welded with the second connecting flange 77 close to one end of the first counter-force bracket 5, wear in the first counter-force bracket 5 along axial direction
There is a pull rod 21, and pull rod 21 passes through the second connecting flange 77, the both ends of pull rod 21 are threaded with for by the first counter-force bracket 5
The fastening nut 22 being fastenedly connected with the second connecting flange 77.Further, as shown in figure 8, being arranged with drag link sleeve cylinder outside pull rod 21
23, there are gaps between pull rod sleeve 23 and pull rod 21 avoids pull rod 21 from existing to guarantee that pull rod 21 has certain mobile space
It generates and pulls when jacking tube coupling 4 is mobile.
For the specific connection between the second thrust bracing members 72 and the second counter-force bracket 6, as shown in fig. 7, the second thrust
Bracing members 72 are welded with the first wedge block 75 close to one end of the second counter-force bracket 6, and the second counter-force bracket 6 is connected with and first wedge
The second wedge block 76 that shape block 75 matches.When connecting the second thrust bracing members 72, operator is only needed according to jacking tube coupling 4
Release length accurately calculate needed for the second thrust bracing members 72 length, then pass through the first wedge block 75 and the second wedge block
76 be slidably matched, the second thrust bracing members 72 of appropriate length are held out against in the first thrust bracing members 71 and the second counter-force bracket
Between 6, the first thrust bracing members 71 and the second thrust bracing members 72 are reconnected.
In addition, as shown in fig. 6,71 periphery of the first thrust bracing members and secretly burying section pipeline section 1 between the end seal door 8 of butt end
Equipped with sealing rubber ring 20, is flowed into the gap for preventing water from circulating between 71 periphery of the first thrust bracing members and end seal door 8 and secretly buried
In section pipeline section 1, influence secretly to bury the dry operating environment in section pipeline section 1.
In above-mentioned reversible immersed tube tunnel final connector, flexible yoke frame 15 is for releasing or retracting jacking tube coupling 4.Such as figure
Shown in 2 or Fig. 4, flexible yoke frame 15 be axially disposed at the first thrust of remainder bracing members 71 and the second counter-force bracket 6 it
Between, one end of flexible yoke frame 15 is connected to one end that the first thrust bracing members 71 pass through end seal door 8, and the other end is connected to the
Two counter-force brackets 6.It should be noted that the first thrust of remainder bracing members 71 refer to not connected second thrust bracing members 72
First thrust bracing members 71.It should be noted that balance when in order to guarantee that jacking tube coupling 4 is pushed out, as shown in figure 4, flexible
Yoke frame 15 need to be symmetrical arranged, in the present embodiment specifically: be respectively set 1 by the left and right sides that near-dark buries 1 top of section pipeline section
A flexible yoke frame 15 buries by near-dark and 2 flexible yoke frames 15 is respectively set at left and right sides of 1 bottom of section pipeline section.In addition, conduct
A kind of preferred, the yoke frame 15 that stretches is specially jack.
Further, as shown in figure 5, the outer wall at 4 top of jacking tube coupling is equipped with 3rd counter-force bracket 16.When stretching for setting
When yoke frame 15 fails, by installing the side that cushion block and jack are arranged between 2 top of pipeline section and 3rd counter-force bracket 16
Formula can also realize retracting for jacking tube coupling 4.
As shown in figure 5, reversible immersed tube tunnel final connector further includes sealing component, sealing component includes three sealings
Band, first of waterstop 17 are set to jacking tube coupling 4 close to having installed the end face of 2 one end of pipeline section, second waterstop 18 and the
Three waterstops 19 are all set in 4 periphery of jacking tube coupling;Second waterstop 18 can stretch with the flexible of jacking tube coupling 4, the
One end of two waterstops 18 is fixed in jacking tube coupling 4, and the other end is fixed in connection sleeve 3, and third road waterstop 19 is socketed on
Between jacking tube coupling 4 and connection sleeve 3, third road waterstop 19 is can slip casting waterstop.Pass through three waterstops of setting, energy
It is enough effectively to reach sealing requirement.
In addition it is also necessary to which explanation, reversible immersed tube tunnel final connector provided in this embodiment, also have and patent
CN107938709A similar water storage cavity 10, to realize that waterpower crimps sealing using differential water pressures.Specifically, as shown in Figure 1, top
Be equipped with closure door 9 in inlet pipe section 4, jacking tube coupling 4, closure door 9, connection sleeve 3 and being set to secretly bury the end seal door 8 in section pipeline section 1 it
Between form the water storage cavity 10 of storing water, the top of connection sleeve 3 is equipped with the water inlet pipe 14 that is connected with water storage cavity 10, water inlet pipe 14
It [is not shown in the figure] equipped with inlet valve.When docking construction, inlet valve is opened so that water storage cavity 10 is connected to outside, water is through intaking
Pipe 14 flow into water storage cavity 10 simultaneously be full of entire water storage cavity 10, when jacking tube coupling 4 with installed pipeline section 2 match dock after, by jacking
Tube coupling 4 and the water installed in binding cavity 11 between pipeline section 2 are discharged, and form hydraulic pressure between water storage cavity 10 and binding cavity 11 at this time
Difference holds out against jacking tube coupling 4 in having installed pipeline section 2 under the action of this differential water pressures, reinforces jacking tube coupling 4 and has installed pipeline section 2
Between temporary leaking water.It should be noted that jacking tube coupling 4 and having installed binding cavity 11 between pipeline section 2 by jacking tube coupling 4
Closure door 9, be set to the end seal door 8 for having installed pipeline section 2 and jacking tube coupling 4 and the tube wall of pipeline section 2 be installed and surround.In addition,
Enter in water storage cavity 10 the docking situation for measuring jacking tube coupling 4 for the ease of diver, the top of connection sleeve 3 is additionally provided with manhole
12 and the cover board 13 for closing manhole 12.In the present embodiment, for the ease of construction, water inlet pipe 14 is arranged on cover board 13
Side.
The docking construction method of above-mentioned reversible immersed tube tunnel final connector, as shown in Figure 9, comprising the following steps:
S1: after the final section for burying section pipeline section 1 by near-dark, which has installed 2 sinking of pipeline section, to be installed in place, by any of the above-described
Jacking tube coupling 4 is released in the elongation of flexible yoke frame 15 in the reversible immersed tube tunnel final connector of item embodiment, until with
Pipeline section 2 is installed accurately to dock;If posture when jacking tube coupling 4 is released cannot achieve and install the accurate of pipeline section 2 and dock, lead to
The contraction for crossing flexible yoke frame 15 retracts jacking tube coupling 4, releases again after adjusting the posture of jacking tube coupling 4.
S2: after jacking tube coupling 4 with installed after pipeline section 2 accurately dock, discharge and has been installed between pipeline section 2 jacking tube coupling 4
Water in binding cavity 11, and sealing is carried out with 2 place of docking of pipeline section has been installed to jacking tube coupling 4.It should be noted that jacking tube coupling
4 can crimp sealing cooperation progress with the sealing installed at 2 docking of pipeline section by first of waterstop 17 of setting with waterpower.
S3: after sealing reaches requirement, by thrust component 7 be connected to the first counter-force bracket 5 and the second counter-force bracket 6 it
Between, to 4 thrust of jacking tube coupling.It should be noted that when using including the first thrust bracing members 71 and the second thrust bracing members
When 72 thrust component 7, since the first thrust bracing members 71 are with the release synchronizing moving of jacking tube coupling 4, thus, in this step,
It only needs for the second thrust bracing members 72 to be connected between the first thrust bracing members 71 and the second counter-force bracket 6.It needs to illustrate
If found after thrust jacking tube coupling 4 with the docking there are error of pipeline section 2, the second thrust bracing members of dismantling have been installed
72, by stretch yoke frame 15 contraction jacking tube coupling 4 is retracted, adjust jacking tube coupling 4 posture after release again, again into
The operation of row step S2 and this step.
S4: after thrust reaches requirement, the gap injection concrete between section pipeline section 1 to jacking tube coupling 4 and is secretly buried, is made
Jacking tube coupling 4 is connected as one with section pipeline section 1 is secretly buried, and is carried out welding with the place of docking for having installed pipeline section 2 to jacking tube coupling 4 and applied
Work completes docking.
Reversible immersed tube tunnel final connector provided by the utility model passes through the flexible yoke frame 15 of setting, thrust group
The mating reaction of part 7, the first counter-force bracket 5 and the second counter-force bracket 6, it can be achieved that reversible construction when jacking tube coupling 4 docks, this
The flexible operation mode of the reversible construction of kind is easy, and without carrying out underwater operation, construction risk is small.Moreover, practical using this
When the reversible immersed tube tunnel final connector of novel offer carries out docking construction, mainly construct complete under dry operating environment
At underwater operation is few, and construction quality is guaranteed, and short construction period is small by water depth effect, and construction cost is low.
Claims (9)
1. reversible immersed tube tunnel final connector has installed docking for pipeline section (2) with final section for secretly burying a section pipeline section (1),
Including being set to the connection sleeve (3) for secretly burying a section pipeline section (1) to butt end, it is socketed with and is used in the connection sleeve (3)
With the jacking tube coupling (4) having installed pipeline section (2) and having docked;It is characterized by: jacking tube coupling (4) inner wall is equipped with first instead
Power bracket (5), a section pipeline section (1) inner wall that secretly buries is equipped with the second counter-force bracket opposite with the first counter-force bracket (5)
(6);It is provided with flexible yoke frame (15) between the first counter-force bracket (5) and the second counter-force bracket (6), the flexible pushing tow
Part (15) can be axially elongated or be shunk to release or retract the jacking tube coupling (4) relative to the connection sleeve (3);Institute
It states and is removably connected between the first counter-force bracket (5) and the second counter-force bracket (6) for being pushed out in the jacking tube coupling (4)
To with the thrust component (7) installed and prevented the jacking tube coupling (4) to be pushed back after pipeline section (2) docks.
2. reversible immersed tube tunnel final connector according to claim 1, it is characterised in that: thrust component (7) packet
Multiple first thrust bracing members (71) are included, one end of the first thrust bracing members (71) is fixedly connected on the first counter-force ox
Leg (5), the other end of the first thrust bracing members (71) are arranged in the end seal door for secretly burying a section pipeline section (1) to butt end
(8), the first thrust bracing members (71) can be mobile axially with respect to the end seal door (8);Part the first thrust steel branch
Axially disposed multiple second thrust bracing members are removably connected between support (71) and the second counter-force bracket (6)
(72), one end of the second thrust bracing members (72) is removably connected to the first thrust bracing members (71) across the end
One end of closure door (8), the other end are removably connected to the second counter-force bracket (6).
3. reversible immersed tube tunnel final connector according to claim 2, it is characterised in that: the first thrust bracing members
(71) stop close to one end of the second thrust bracing members (72) and the second thrust bracing members (72) close to described first
One end of bracing members (71) is pushed away, is welded with the first connecting flange (73), two first connecting flanges (73) pass through bolt
(74) it is detachably connected.
4. reversible immersed tube tunnel final connector according to claim 2, it is characterised in that: the first thrust bracing members
(71) it is welded with the second connecting flange (77) close to one end of the first counter-force bracket (5), in the first counter-force bracket (5)
Be equipped with pull rod (21) along axial direction, and the pull rod (21) pass through second connecting flange (77), the two of the pull rod (21)
End is connected with the fastening nut (22) for the first counter-force bracket (5) and the second connecting flange (77) to be fastenedly connected.
5. reversible immersed tube tunnel final connector according to claim 4, it is characterised in that: be arranged outside the pull rod (21)
Have pull rod sleeve (23), there are gaps between the pull rod sleeve (23) and pull rod (21).
6. reversible immersed tube tunnel final connector according to claim 2, it is characterised in that: the second thrust bracing members
(72) it is welded with the first wedge block (75) close to one end of the second counter-force bracket (6), the second counter-force bracket (6) is affixed
There is the second wedge block (76) to match with first wedge block (75).
7. reversible immersed tube tunnel final connector according to claim 2, it is characterised in that: the flexible yoke frame (15)
It is set between the first thrust bracing members (71) and the second counter-force bracket (6) described in remainder, the flexible yoke frame
(15) one end is connected to one end that the first thrust bracing members (71) pass through the end seal door (8), and the other end is connected to
The second counter-force bracket (6).
8. reversible immersed tube tunnel final connector according to claim 1, it is characterised in that: jacking tube coupling (4) top
The outer wall in portion is equipped with 3rd counter-force bracket (16).
9. reversible immersed tube tunnel final connector according to claim 1, it is characterised in that: the reversible immersed tube tunnel
FS final spice further includes sealing component, and the sealing component includes three waterstops, and first of waterstop (17) is set to described
Jacking tube coupling (4) is close to the end face for having installed pipeline section (2) one end, second waterstop (18) and third road waterstop (19)
It is all set in jacking tube coupling (4) periphery;The second waterstop (18) can stretch with the flexible of the jacking tube coupling (4)
Contracting, one end of the second waterstop (18) are fixed in the jacking tube coupling (4), and the other end is fixed in the connection sleeve
(3), third road waterstop (19) be socketed on the jacking tube coupling (4) with connect between sleeve (3), third road sealing
Band (19) is can slip casting waterstop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821013475.4U CN208472777U (en) | 2018-06-28 | 2018-06-28 | Reversible immersed tube tunnel final connector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821013475.4U CN208472777U (en) | 2018-06-28 | 2018-06-28 | Reversible immersed tube tunnel final connector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208472777U true CN208472777U (en) | 2019-02-05 |
Family
ID=65211876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821013475.4U Active CN208472777U (en) | 2018-06-28 | 2018-06-28 | Reversible immersed tube tunnel final connector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208472777U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560596A (en) * | 2018-06-28 | 2018-09-21 | 中交第航务工程局有限公司 | Reversible immersed tube tunnel final connector and its docking construction method |
CN111254982A (en) * | 2020-01-20 | 2020-06-09 | 中交第三航务工程局有限公司 | Pushing process of underwater cable-stayed suspension tunnel |
CN113668611A (en) * | 2021-09-02 | 2021-11-19 | 广州市设计院集团有限公司 | Immersed tube joint construction method in immersed tube tunnel and immersed tube joint structure |
-
2018
- 2018-06-28 CN CN201821013475.4U patent/CN208472777U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560596A (en) * | 2018-06-28 | 2018-09-21 | 中交第航务工程局有限公司 | Reversible immersed tube tunnel final connector and its docking construction method |
CN108560596B (en) * | 2018-06-28 | 2024-02-02 | 中交第一航务工程局有限公司 | Reversible immersed tube tunnel final joint and butt joint construction method thereof |
CN111254982A (en) * | 2020-01-20 | 2020-06-09 | 中交第三航务工程局有限公司 | Pushing process of underwater cable-stayed suspension tunnel |
CN111254982B (en) * | 2020-01-20 | 2021-05-14 | 中交第三航务工程局有限公司 | Pushing process of underwater cable-stayed suspension tunnel |
CN113668611A (en) * | 2021-09-02 | 2021-11-19 | 广州市设计院集团有限公司 | Immersed tube joint construction method in immersed tube tunnel and immersed tube joint structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560596A (en) | Reversible immersed tube tunnel final connector and its docking construction method | |
CN208472777U (en) | Reversible immersed tube tunnel final connector | |
CN107676104A (en) | Integrated immersed tube tube coupling and its installation method, the installation closure method of immersed tube tube coupling | |
CN108385728A (en) | Immersed tube tunnel push mode FS final spice and its docking construction method | |
CN215165824U (en) | Immersed tube tunnel final joint docking mechanism | |
CN212716636U (en) | Shield starting stage cutterhead escaping device based on steel sleeve | |
WO2024016533A1 (en) | General steel sleeve structure of multi-specification shield machine and use method thereof | |
CN111706340B (en) | Shield tail brush convenient to replace and method for replacing shield tail brush under long-distance non-reinforced working condition | |
CN208219702U (en) | Immersed tube tunnel push mode FS final spice | |
CN107190777B (en) | Butt joint system and butt joint method for final joint of immersed tunnel | |
CN207062938U (en) | Tubaeform mud jacking head and squeezing unit | |
CN217055188U (en) | Starting receiving device for shield construction | |
CN207714374U (en) | Immersed tube tunnel final connector | |
CN202001768U (en) | Flaring connection structure for polyvinyl chloride pipe | |
CN218030191U (en) | Transition ring, flexible connection sealing device and shield originating receiving system | |
CN110686124A (en) | Relay jacking, retreating pipe drawing and steering adjusting device for steel pipe jacking construction | |
CN115560145A (en) | Closing-up and shrinking device for thin-wall metal tube connection and using method | |
CN212508320U (en) | Shield tail brush device capable of being replaced in shield tunneling process | |
CN105841895B (en) | Joint sealing equipment | |
CN214579277U (en) | Underwater connector | |
CN209892242U (en) | Tunnel portal emergency sealing water-stopping device of shield tunnel | |
CN203669877U (en) | Shield tunneling machine starting device with adjustable seal in matched mode | |
CN210600662U (en) | Be used for great drainage pipe line interface restoration instrument of groundwater pressure | |
CN105699024B (en) | Test machine is pressurized in a kind of | |
CN111734426A (en) | Shield receiving semi-open type steel sleeve mechanism and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |