CN208460252U - A kind of financial savvy training showing stand for water conservancy construction personnel - Google Patents

A kind of financial savvy training showing stand for water conservancy construction personnel Download PDF

Info

Publication number
CN208460252U
CN208460252U CN201721832611.8U CN201721832611U CN208460252U CN 208460252 U CN208460252 U CN 208460252U CN 201721832611 U CN201721832611 U CN 201721832611U CN 208460252 U CN208460252 U CN 208460252U
Authority
CN
China
Prior art keywords
fixedly connected
display board
sliding rail
showing stand
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721832611.8U
Other languages
Chinese (zh)
Inventor
胡伊健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Zhipeng Water Conservancy Construction Co., Ltd
Original Assignee
Wenzhou Haosheng Garment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Haosheng Garment Co Ltd filed Critical Wenzhou Haosheng Garment Co Ltd
Priority to CN201721832611.8U priority Critical patent/CN208460252U/en
Application granted granted Critical
Publication of CN208460252U publication Critical patent/CN208460252U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rehabilitation Tools (AREA)

Abstract

The utility model relates to finance teaching showing stand technical fields, and disclose a kind of financial savvy training showing stand for water conservancy construction personnel, including the first display board, the right side of first display board is hinged with the second display board by hinge, and first display board is fixedly connected with fixed column on the right side of bottom.This is used for the financial savvy training showing stand of water conservancy construction personnel, pass through the sliding block of setting, under the action of the first spring, first clamping plate is able to drive to be moved to the left, the clamping to fixed column is carried out by the cooperation with second clamping plate, it ensure that the stabilization of the first display board and the second display board, facilitate the installation and people's disassembly of staff, the enhanced convenience when carrying, pass through the bracket of setting, under the action of second spring, it can be carried out effectively the support to casing, by wind-force and uneven ground, it can guarantee the stability of the first display board and the second display board, facilitate teaching.

Description

A kind of financial savvy training showing stand for water conservancy construction personnel
Technical field
The utility model relates to finance teaching showing stand technical field, specially a kind of finance for water conservancy construction personnel Knowledge training showing stand.
Background technique
Financial Specialization education has the knowledge and ability of management, economy, law and financing, finance etc..Can it is industrial and commercial, The Science of Business Administration that financial company, public institution and government department work in terms of being engaged in finance, Financial Management and teaching, scientific research Section high-level specialist.
Financial savvy should change extensively it is universal, increase to finance understanding, the equity of oneself is ensured, to some constructors In the training of member, showing stand can be used, carries out the displaying to financial savvy, when explanation can be more lively, it is readily appreciated that, and Existing showing stand is integration, very inconvenient in movement and carrying, sometimes the explanation in extraneous progress on the spot, due to Landform is changeable, and common showing stand uses unusual inconvenience.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of financial savvy training for water conservancy construction personnel With showing stand, have detachably, easy to carry, stability is good, is suitable for the advantages that various environment use, solves existing exhibition Show that frame is integration, it is very inconvenient in movement and carrying, sometimes in the extraneous explanation carried out on the spot, since landform is more Become, common showing stand uses the problem of unusual inconvenience.
(2) technical solution
Above-mentioned detachable to realize, easy to carry, stability is good, is suitable for various environment and uses purpose, the utility model It provides the following technical solutions: a kind of financial savvy training showing stand for water conservancy construction personnel, including the first display board, institute The right side for stating the first display board is hinged with the second display board by hinge, and first display board is fixedly connected on the right side of bottom There is fixed column, the bottom of the fixed column is fixedly connected with limit plate, and the bottom of the limit plate is overlapped with support plate, the branch Right side at the top of fagging is fixedly connected with sliding rail, and sliding slot is offered at the top of the sliding rail, and the inside of the sliding rail is connected with cunning Block, the sliding block have side to be fixedly connected with the first spring, the inner wall of first spring one end and sliding rail far from sliding block It is fixedly connected, the top fixed block of the sliding block is fixedly connected with pull rod, and the pull rod passes through sliding slot simultaneously far from one end of sliding block The outside of sliding rail is extended to, the right side that the pull rod is located at sliding rail is fixedly connected with pull ring, and the left side of the pull rod is fixed It is connected with first clamping plate, connecting rod is fixedly connected at the top of the support plate, the right side of the connecting rod is fixedly connected with Second clamping plate, the first clamping plate and second clamping plate clamping connection are in the outer surface of fixed column.
Support rod is fixedly connected in the middle part of the support plate bottom, the outer surface movable sleeve of the support rod is connected to casing, The junction of the support rod and casing is connected by bolt thread, and by embolism extinguishing, hingedly there are three branch for the outer surface of described sleeve pipe Frame, one end movable sleeve of the separate casing of three brackets are connected to fixing pipe, and the inner wall movable sleeve of the fixing pipe is connected to work Plug, the top of the piston are fixedly connected with one end that bracket is located inside fixing pipe, and the bottom of the piston is fixedly connected with Second spring, the one end of the second spring far from piston are fixedly connected with the inner wall of fixing pipe.
Preferably, there are a certain distance between the limit plate and sliding rail, and the lateral length value of limit plate is greater than admittedly The diameter value of fixed column.
Preferably, the sliding slot is located at the left side of sliding rail, and the length value of sliding slot is 3/4ths of sliding rail length value.
Preferably, the length value of the bracket and the length value of fixing pipe are equal, and three in equilateral triangle point of bracket Portion is in the outer surface of casing.
Preferably, there are a certain distance between the pull ring and the top of sliding rail, and sliding rail is located at the right side of connecting rod.
Preferably, the bottom of the fixing pipe is fixedly connected with cushion block, and the bottom of cushion block is parallel with horizontal plane.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of financial savvy training exhibition for water conservancy construction personnel Show frame, have it is following the utility model has the advantages that
1, financial savvy training showing stand for being used for water conservancy construction personnel, by the sliding block of setting, in the first spring Under the action of, it is able to drive first clamping plate and is moved to the left, the clamping to fixed column is carried out by the cooperation with second clamping plate, guarantee The stabilization of first display board and the second display board facilitates the installation and people's disassembly of staff, more square when carrying Just.
2, financial savvy training showing stand for being used for water conservancy construction personnel, by the bracket of setting, in second spring Under the action of, it can be carried out effectively the support to casing, by wind-force and uneven ground, can guarantee the first exhibition The stability for showing plate and the second display board facilitates teaching.
Detailed description of the invention
Fig. 1 is the cross-sectional view of the utility model fixing pipe front view;
Fig. 2 is the enlarged structure schematic diagram in the utility model Fig. 1 at A.
In figure: 1 first display board, 2 second display boards, 3 fixed columns, 4 limit plates, 5 support plates, 6 sliding rails, 7 sliding slots, 8 are slided Block, 9 first springs, 10 pull rods, 11 pull rings, 12 first clamping plates, 13 connecting rods, 14 second clamping plates, 15 support rods, 16 casings, 17 Bracket, 18 fixing pipes, 19 pistons, 20 second springs, 21 cushion blocks.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
A kind of financial savvy training showing stand for water conservancy construction personnel referring to FIG. 1-2, including the first display board 1, the right side of the first display board 1 is hinged with the second display board 2 by hinge, and the first display board is fixedly connected on the right side of 1 bottom There is fixed column 3, the bottom of fixed column 3 is fixedly connected with limit plate 4, and there are a certain distance, energy between limit plate 4 and sliding rail 6 It is enough rotated limit plate 4, facilitates teaching and show, the two sides of display board can be efficiently used, while avoiding 4 turns of limit plate It rubs between sliding rail 6 when dynamic, and the lateral length value of limit plate 4 is greater than the diameter value of fixed column 3, it can be to fixed column 3 are effectively limited, and avoid the case where fixed column 3 is detached from first clamping plate 12 and second clamping plate 14, the bottom of limit plate 4 is taken It is connected to support plate 5, the right side at 5 top of support plate is fixedly connected with sliding rail 6, and the top of sliding rail 6 offers sliding slot 7, and sliding slot 7 is located at The left side of sliding rail 6, and the length value of sliding slot 7 is 3/4ths of 6 length value of sliding rail, be ensure that when pulling pull rod 10, first The mobile distance of clamping plate 12 is bigger, and the clamping of more convenient pair of fixed column 3, the inside of sliding rail 6 is connected with sliding block 8, and sliding block 8 has Side is fixedly connected with the first spring 9, and the one end of the first spring 9 far from sliding block 8 is fixedly connected with the inner wall of sliding rail 6, sliding block 8 Top fixed block is fixedly connected with pull rod 10, and pull rod 10 passes through sliding slot 7 far from one end of sliding block 8 and extends to the outside of sliding rail 6, The right side that pull rod 10 is located at sliding rail 6 is fixedly connected with pull ring 11, between pull ring 11 and the top of sliding rail 6 there are it is certain away from From facilitating pulling of the staff to pull ring 11, and sliding rail 6 is located at the right side of connecting rod 13, the left side of pull rod 10 is fixed It is connected with first clamping plate 12, the top of support plate 5 is fixedly connected with connecting rod 13, and the right side of connecting rod 13 is fixedly connected with Second splint 14, first clamping plate 12 and 14 clamping connection of second clamping plate are in the outer surface of fixed column 3.
Support rod 15 is fixedly connected in the middle part of 5 bottom of support plate, the outer surface movable sleeve of support rod 15 is connected to casing 16, branch Strut 15 is connect with the junction of casing 16 by bolt thread, and by embolism extinguishing, hingedly there are three brackets for the outer surface of casing 16 17, the length value of bracket 17 is equal with the length value of fixing pipe 18, ensure that effectively slowing down to support rod 15, by wind-force and In the case that ground is uneven, it can guarantee the stability of the first display board 1 and the second display board 2, facilitate teaching, and three branch The branch in equilateral triangle of frame 17 reinforces the support to support rod 15, the separate set of three brackets 17 in the outer surface of casing 16 One end movable sleeve of pipe 16 is connected to fixing pipe 18, and the bottom of fixing pipe 18 is fixedly connected with cushion block 21, and the bottom of cushion block 21 with Horizontal plane is parallel, can effectively be supported to fixing pipe 18, ensure that the first display board 1 and the second display board 2 Stability, the inner wall movable sleeve of fixing pipe 18 are connected to piston 19, and the top of piston 19 and bracket 17 are located inside fixing pipe 18 One end is fixedly connected, and the bottom of piston 19 is fixedly connected with second spring 20, the one end of second spring 20 far from piston 19 and solid The inner wall for determining pipe 18 is fixedly connected.
During installation, the first display board 1 of folding and the second display board 2 are opened, pull pull ring 11, first clamping plate 12 to It moves right, fixed column 3 is placed between second clamping plate 14 and first clamping plate 12, pull ring 11 is unclamped at this time, in the first spring 9 Under effect, sliding block 8 drives pull rod 10 to be moved to the left, and first clamping plate 12 and second clamping plate 14 carry out the clamping to fixed column 3, by three A bracket 17 struts outward respectively, and casing 16 is adjusted to suitable height, when in use, bracket when 15 double swerve of support rod 17 press the contraction of second spring 20, and under the action of 20 elastic force of second spring, bracket 17 resets, and support rod 15, which is replied, to be stablized.
In conclusion this is used for the financial savvy training showing stand of water conservancy construction personnel, by the sliding block 8 of setting, Under the action of first spring 9, it is able to drive first clamping plate 12 and is moved to the left, carried out by the cooperation with second clamping plate 14 to fixation The clamping of column 3 ensure that the stabilization of the first display board 1 and the second display board 2, facilitate the installation and people's disassembly of staff, The enhanced convenience when carrying, can be carried out effectively under the action of second spring 20 to casing by the bracket 17 of setting 16 support can guarantee the stability of the first display board 1 and the second display board 2 by wind-force and uneven ground, Facilitate teaching, solve existing showing stand for integration, it is very inconvenient in movement and carrying, sometimes the external world into The explanation of row on the spot, since landform is changeable, common showing stand uses the problem of unusual inconvenience.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of financial savvy training showing stand for water conservancy construction personnel, including the first display board (1), feature exists In: the right side of first display board (1) is hinged with the second display board (2) by hinge, the first display board (1) bottom Right side be fixedly connected with fixed column (3), the bottom of the fixed column (3) is fixedly connected with limit plate (4), the limit plate (4) bottom is overlapped with support plate (5), and the right side at the top of the support plate (5) is fixedly connected with sliding rail (6), the sliding rail (6) Top offer sliding slot (7), the inside of the sliding rail (6) is connected with sliding block (8), and the sliding block (8) has side is fixed to connect It is connected to the first spring (9), first spring (9) is fixedly connected far from the one end of sliding block (8) with the inner wall of sliding rail (6), described The top fixed block of sliding block (8) is fixedly connected with pull rod (10), and the pull rod (10) passes through sliding slot far from the one end of sliding block (8) (7) and the outsides of sliding rail (6) is extended to, the right side that the pull rod (10) is located at sliding rail (6) is fixedly connected with pull ring (11), institute The left side for stating pull rod (10) is fixedly connected with first clamping plate (12), is fixedly connected with connecting rod at the top of the support plate (5) (13), the right side of the connecting rod (13) is fixedly connected with second clamping plate (14), the first clamping plate (12) and second clamping plate (14) outer surface of the clamping connection in fixed column (3);
It is fixedly connected support rod (15) in the middle part of support plate (5) bottom, the outer surface pivot bush unit of the support rod (15) Have casing (16), the support rod (15) is connect with the junction of casing (16) by bolt thread, outside described sleeve pipe (16) By embolism extinguishing hingedly there are three bracket (17), one end movable sleeve of the separate casing (16) of three brackets (17) is connected on surface The inner wall movable sleeve of fixing pipe (18), the fixing pipe (18) is connected to piston (19), the top of the piston (19) and bracket (17) it is located at fixing pipe (18) internal one end to be fixedly connected, the bottom of the piston (19) is fixedly connected with second spring (20), the second spring (20) is fixedly connected far from the one end of piston (19) with the inner wall of fixing pipe (18).
2. a kind of financial savvy training showing stand for water conservancy construction personnel according to claim 1, feature exist In: there are a certain distance between the limit plate (4) and sliding rail (6), and the lateral length value of limit plate (4) is greater than fixed column (3) diameter value.
3. a kind of financial savvy training showing stand for water conservancy construction personnel according to claim 1, feature exist In: the sliding slot (7) is located at the left side of sliding rail (6), and the length value of sliding slot (7) is 3/4ths of sliding rail (6) length value.
4. a kind of financial savvy training showing stand for water conservancy construction personnel according to claim 1, feature exist In: the length value of the bracket (17) is equal with the length value of fixing pipe (18), and three in equilateral triangle point of brackets (17) Outer surface of the portion in casing (16).
5. a kind of financial savvy training showing stand for water conservancy construction personnel according to claim 1, feature exist In: there are a certain distance between the pull ring (11) and the top of sliding rail (6), and sliding rail (6) is located at the right side of connecting rod (13) Side.
6. a kind of financial savvy training showing stand for water conservancy construction personnel according to claim 1, feature exist In: the bottom of the fixing pipe (18) is fixedly connected with cushion block (21), and the bottom of cushion block (21) is parallel with horizontal plane.
CN201721832611.8U 2017-12-25 2017-12-25 A kind of financial savvy training showing stand for water conservancy construction personnel Expired - Fee Related CN208460252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721832611.8U CN208460252U (en) 2017-12-25 2017-12-25 A kind of financial savvy training showing stand for water conservancy construction personnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721832611.8U CN208460252U (en) 2017-12-25 2017-12-25 A kind of financial savvy training showing stand for water conservancy construction personnel

Publications (1)

Publication Number Publication Date
CN208460252U true CN208460252U (en) 2019-02-01

Family

ID=65139593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721832611.8U Expired - Fee Related CN208460252U (en) 2017-12-25 2017-12-25 A kind of financial savvy training showing stand for water conservancy construction personnel

Country Status (1)

Country Link
CN (1) CN208460252U (en)

Similar Documents

Publication Publication Date Title
CN208460252U (en) A kind of financial savvy training showing stand for water conservancy construction personnel
CN209428990U (en) A kind of municipal construction warning sign
CN207898200U (en) A kind of Financial Management Teaching auxiliary device
CN209018260U (en) A kind of collapsible exhibition tool
CN207780989U (en) Chinese literature aided education display systems
CN203046614U (en) Multifunctional blackboard
CN206238929U (en) A kind of students' dormitory single bed bed curtain
CN205149327U (en) Portable blackboard
CN210079579U (en) Quality of water soil mud sampling equipment rack
CN207199145U (en) A kind of model display device for computer teaching
CN211114728U (en) Building support frame for high-rise building
CN211704054U (en) Ideological and political theory class is with high efficiency teaching board
CN204363515U (en) A kind of concertina type sliding push-pull mosquito net
CN202515053U (en) Teaching drawing board
CN203538898U (en) Folding shelf
CN205311157U (en) Outdoor blackboard
CN207683188U (en) A kind of employment teaching demonstration device
CN206039965U (en) Display device is used in visual transmission design
CN204423724U (en) A kind of English teaching aid
CN203746247U (en) Data show shelf for teaching of carton majors
CN203802029U (en) Table capable of being converted into chair
CN205513180U (en) Pedagogical teaching is with portable collapsible table of painting from life
CN203293768U (en) Classroom teaching board
CN208909536U (en) A kind of adjustable exhibition tool
CN201998620U (en) Picture hanging stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191224

Address after: 344000 Renmin Avenue, Chongren County, Fuzhou City, Jiangxi Province (building C1, Chengdong Trade City)

Patentee after: Jiangxi Zhipeng Water Conservancy Construction Co., Ltd

Address before: 325000 Lucheng District Fudong Road Fort Apartment, Wenzhou City, Zhejiang Province, 10 1604-2

Patentee before: Wenzhou Haosheng Garment Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

Termination date: 20191225