CN208459482U - One kind is gathered materials curing means for alkali under load action - Google Patents

One kind is gathered materials curing means for alkali under load action Download PDF

Info

Publication number
CN208459482U
CN208459482U CN201821101893.9U CN201821101893U CN208459482U CN 208459482 U CN208459482 U CN 208459482U CN 201821101893 U CN201821101893 U CN 201821101893U CN 208459482 U CN208459482 U CN 208459482U
Authority
CN
China
Prior art keywords
iron
iron plate
cover
bottom end
insulated plastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821101893.9U
Other languages
Chinese (zh)
Inventor
许修超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linhai No. 4 Building Engineering Co., Ltd.
Original Assignee
Taizhou Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Vocational and Technical College filed Critical Taizhou Vocational and Technical College
Priority to CN201821101893.9U priority Critical patent/CN208459482U/en
Application granted granted Critical
Publication of CN208459482U publication Critical patent/CN208459482U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses one kind to gather materials curing means, including iron sheet tube and cover for alkali under load action;The iron sheet tube is internally provided with iron shelf, the iron shelf is internally provided with iron plate one and iron plate two, the iron plate one and two both ends of iron plate are provided with screw rod, one bottom end of iron plate is welded to each other with pedestal, the screw rod passes through and is cased with spring on the outside of two upper end of iron plate, one upper end position of iron plate is provided with insulated plastic flitch one, two bottom position of iron plate is provided with insulated plastic flitch two, concrete test specimen is placed between the insulated plastic flitch one and insulated plastic flitch two, it is separated by between two bottom end of insulated plastic flitch and concrete test specimen by least one iron staff, it is separated by between one upper end of insulated plastic flitch and concrete test specimen by least one iron staff, the iron staff lateral ends connect circuit region connection with ac impedance spectroscopy.After the utility model is located at the improvement of the iron shelf inside iron sheet tube, it can satisfy concrete sample alkali-aggregate reaction under load action and conserve demand.

Description

One kind is gathered materials curing means for alkali under load action
Technical field
It is specifically a kind of to gather materials maintenance dress for alkali under load action the utility model relates to technical field of maintaining equipment It sets.
Background technique
Impedance Method belongs to non-damaged detcting, and it, using AC signal, is an electrochemistry skill that detection speed is fast Art, therefore technical method application range in practical research work is very extensive.Mercury injection method, helium statistic law and nitrogen adsorption method etc. Method is traditional common method of research cementitious material pore structure.Above-mentioned conventional method is to require to the volume of sample , and belong to damage testing.Impedance Method does not require the volume of sample, and sample volume can be Entire test specimen does not have to extract local small sample, and Impedance Method belongs to non-damaged detcting, and detection speed is fast, in recent years Come, the research in terms of which is applied to the materials such as concrete is more and more.Original bending load loading device concrete sample Be difficult to be connected in ac impedance spectroscopy test circuit, and electric current can by iron staff iron plate short circuit, can not in the loaded state into The test of row ac impedance spectroscopy.Now it is necessary to which concrete sample is carried out off-load taking-up, concrete sample is then connected to friendship again It is tested in flow impedance spectrum circuit.But under unloading condition, concrete sample carry out ac impedance spectroscopy test obviously with practical feelings Condition is not inconsistent.In actual environment, concrete sample is all under load action.Therefore, concrete durability alkali-aggregate reaction is ground Study carefully and load action must be taken into consideration, and existing concrete sample alkali-aggregate reaction maintenance cylinder is unable to satisfy concrete under load action and tries Part alkali-aggregate reaction conserves demand.
Utility model content
The purpose of this utility model is to provide one kind to gather materials curing means for alkali under load action, to solve existing skill In art the problem of.
To achieve the above object, the utility model provides the following technical solutions: one kind is gathered materials feeding for alkali under load action Protection unit, including iron sheet tube and cover;The iron sheet tube is located on the upside of cover, inside the iron sheet tube upper end insertion cover, institute It states cover upper end and is provided with cover handle, cover handle bottom end is mounted by means of bolts on cover upper end center position, The iron sheet tube is internally provided with iron shelf, and the iron shelf surrounding is welded to each other with iron sheet tube, setting inside the iron shelf There are iron plate one and iron plate two, the iron plate one and two both ends of iron plate are provided with screw rod, and the screw rod upper end passes through two upside of iron plate, The screw rod bottom end passes through one bottom end of iron plate, and it is to be fixed by nut that the screw rod, which passes through one bottom end of iron plate, one bottom of iron plate End is welded to each other with pedestal, and the pedestal bottom end is welded on the upside of iron shelf, and the screw rod passes through to be cased on the outside of two upper end of iron plate Spring, the spring bottom end contact with each other with iron plate two, and the screw rod upper end is located at spring upper side position and is provided with gasket, described Screw rod is located at gasket upper end position to be fixed by nut, and one upper end position of iron plate is provided with insulated plastic flitch one, the iron Two bottom position of plate is provided with insulated plastic flitch two, and concrete examination is placed between the insulated plastic flitch one and insulated plastic flitch two Part is separated by between two bottom end of insulated plastic flitch and concrete test specimen by least one iron staff, one upper end of insulated plastic flitch It is separated by between concrete test specimen by least one iron staff, the iron staff lateral ends connect circuit region company with ac impedance spectroscopy It connects.
Preferably, the iron sheet tube both ends are provided with stack shell handle, and stack shell handle is welded on iron sheet tube two sides.
Preferably, it is provided with Anti-slip cover on the outside of the cover handle, and Anti-slip cover is provided with insulation Anti-slip cover.
Preferably, inside the cover bottom end insertion fastener, and fastener is welded on iron sheet tube upper end two sides.
Preferably, the pedestal is arc-shaped steel bar setting, and pedestal uses height for 10mm, width 10mm.
Compared with prior art, the utility model has the beneficial effects that the utility model is located at the brandreth inside iron sheet tube After son improvement, it can satisfy concrete sample alkali-aggregate reaction under load action and conserve demand, the setting of stack shell handle, which can cross, to be made Staff holds, and facilitates carrying iron sheet tube, Anti-slip cover can enhance the comfort that user holds cover handle, anti-skidding Set insulation set can be avoided the device and leaky occurs, the setting of fastener can to the cover covered above iron sheet tube into Row clamping, makes by being not susceptible to move.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the side view of the utility model.
Fig. 3 is the top view of the utility model.
In figure: 1, iron sheet tube;2, iron plate one;3, insulated plastic flitch one;4, iron plate two;5, stack shell handle;6, cover;7, Cover handle;8, iron shelf;9, nut;10, screw rod;11, spring;12, gasket;13, insulated plastic flitch two;14, iron staff;15, Concrete test specimen;16, fastener;17, Anti-slip cover;18, pedestal;19, ac impedance spectroscopy connects circuit region.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please referring to Fig. 1~3, in the utility model embodiment, one kind is gathered materials curing means for alkali under load action, including Iron sheet tube 1 and cover 6;Iron sheet tube 1 is located at 6 upside of cover, and 1 upper end of iron sheet tube is embedded in inside cover 6, the setting of 1 both ends of iron sheet tube There is stack shell handle 5, and stack shell handle 5 is welded on 1 two sides of iron sheet tube, the setting of stack shell handle 5, which can cross, makes staff carry out handle It holds, facilitates and carry iron sheet tube 1,6 upper end of cover is provided with cover handle 7, and 7 bottom end of cover handle is mounted by means of bolts on cylinder 6 upper end center position of lid is provided with Anti-slip cover 17 on the outside of cover handle 7, and Anti-slip cover 17 is provided with insulation Anti-slip cover, Anti-slip cover 17 can enhance the comfort that user holds cover handle 7, and 17 insulation set of Anti-slip cover can be avoided the device and leak electricity Phenomenon, 6 bottom end of cover is embedded in inside fastener 16, and fastener 16 is welded on 1 upper end two sides of iron sheet tube, the setting energy of fastener 16 It is enough that the cover 6 covered above iron sheet tube 1 is clamped, make by being not susceptible to move, iron sheet tube 1 is internally provided with iron shelf 8,8 surrounding of iron shelf is welded to each other with iron sheet tube 1, and iron shelf 8 is internally provided with iron plate 1 and iron plate 24, iron plate 1 and iron 24 both ends of plate are provided with screw rod 10, and 10 upper end of screw rod passes through 24 upside of iron plate, and 10 bottom end of screw rod passes through one 2 bottom end of iron plate, spiral shell It is to be fixed by nut 9 that bar 10, which passes through one 2 bottom end of iron plate, and one 2 bottom end of iron plate is welded to each other with pedestal 18, the weldering of 18 bottom end of pedestal It connects in 8 upside of iron shelf, pedestal 18 is arc-shaped steel bar setting, and pedestal 18 uses height for 10mm, width 10mm, screw rod 10, which pass through 24 upper end of iron plate outside, is cased with spring 11, and 11 bottom end of spring contacts with each other with iron plate 24, and 10 upper end of screw rod is located at bullet 11 upper side position of spring is provided with gasket 12, and screw rod 10 is located at 12 upper end position of gasket to be fixed by nut 9, one 2 upper end of iron plate position It installs and is equipped with insulated plastic flitch 1,24 bottom position of iron plate is provided with insulated plastic flitch 2 13, insulated plastic flitch 1 and insulation It is placed with concrete test specimen 15 between plastic plate 2 13, passes through at least one iron between 2 13 bottom end of insulated plastic flitch and concrete test specimen 15 Stick 14 is separated by, and is separated by between one 3 upper end of insulated plastic flitch and concrete test specimen 15 by least one iron staff 14,14 lateral ends of iron staff The connection of circuit region 19 is connect with ac impedance spectroscopy.
The working principle of the utility model is: using when at least two iron staffs 14 are placed on the upside of insulated plastic flitch 1, Then again by concrete test specimen 15 be placed on 14 upside, 14 upside place at least one 14, insulated plastic flitch 2 13 is placed on iron staff 14 upsides, iron plate 24 are oriented to 2 13 upside of insulated plastic flitch along screw rod 10, by 11 sets of spring in 10 upside of screw rod, pass through pad The position of 12 limited spring 11 of piece is fixed spring 12, by 10 rotary sleeve of screw rod in 10 upside of screw rod by concrete test specimen 15 Cover 6 is covered after fixation to be detected, and after the iron shelf 8 inside iron sheet tube 1 is improved, can satisfy coagulation under load action Native test specimen alkali-aggregate reaction conserves demand, and the setting of stack shell handle 5, which can cross, holds staff, facilitates carrying iron sheet tube 1, Anti-slip cover 17 can enhance the comfort that user holds cover handle 7, and 17 insulation set of Anti-slip cover can be avoided the device There is leaky, the setting of fastener 16 can clamp the cover 6 covered above iron sheet tube 1, make by being not easy to send out Raw movement.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (5)

1. one kind is gathered materials curing means, including iron sheet tube (1) and cover (6) for alkali under load action;It is characterized by: described Iron sheet tube (1) is located on the upside of cover (6), and iron sheet tube (1) upper end insertion cover (6) is internal, cover (6) the upper end setting Have cover handle (7), cover handle (7) bottom end is mounted by means of bolts on cover (6) upper end center position, the iron Skin cylinder (1) is internally provided with iron shelf (8), and iron shelf (8) surrounding is welded to each other with iron sheet tube (1), the iron shelf (8) It is internally provided with iron plate one (2) and iron plate two (4), the iron plate one (2) and iron plate two (4) both ends are provided with screw rod (10), institute Screw rod (10) upper end is stated on the upside of iron plate two (4), screw rod (10) bottom end passes through iron plate one (2) bottom end, the screw rod (10) passing through iron plate one (2) bottom end is to be fixed by nut (9), and iron plate one (2) bottom end is welded to each other with pedestal (18), institute It states pedestal (18) bottom end to be welded on the upside of iron shelf (8), the screw rod (10) passes through and is cased with spring on the outside of iron plate two (4) upper end (11), spring (11) bottom end contacts with each other with iron plate two (4), and screw rod (10) upper end is located at spring (11) upper side position It is provided with gasket (12), the screw rod (10) is located at gasket (12) upper end position and is fixed by nut (9), the iron plate one (2) Upper end position is provided with insulated plastic flitch one (3), and iron plate two (4) bottom position is provided with insulated plastic flitch two (13), institute It states and is placed between insulated plastic flitch one (3) and insulated plastic flitch two (13) concrete test specimen (15), the insulated plastic flitch two (13) It is separated by between bottom end and concrete test specimen (15) by least one iron staff (14), insulated plastic flitch one (3) upper end and concrete test specimen (15) it is separated by between by least one iron staff (14), iron staff (14) lateral ends connect circuit region with ac impedance spectroscopy (19) it connects.
A kind of gather materials curing means for alkali under load action 2. according to claim 1, it is characterised in that: the iron sheet Cylinder (1) both ends are provided with stack shell handle (5), and stack shell handle (5) is welded on iron sheet tube (1) two sides.
A kind of gather materials curing means for alkali under load action 3. according to claim 1, it is characterised in that: the cover It is provided with Anti-slip cover (17) on the outside of handle (7), and Anti-slip cover (17) is provided with insulation Anti-slip cover.
A kind of gather materials curing means for alkali under load action 4. according to claim 1, it is characterised in that: the cover (6) bottom end insertion fastener (16) is internal, and fastener (16) is welded on iron sheet tube (1) upper end two sides.
A kind of gather materials curing means for alkali under load action 5. according to claim 1, it is characterised in that: the pedestal (18) it is arranged for arc-shaped steel bar, and pedestal (18) uses height for 10mm, width 10mm.
CN201821101893.9U 2018-07-12 2018-07-12 One kind is gathered materials curing means for alkali under load action Expired - Fee Related CN208459482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821101893.9U CN208459482U (en) 2018-07-12 2018-07-12 One kind is gathered materials curing means for alkali under load action

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821101893.9U CN208459482U (en) 2018-07-12 2018-07-12 One kind is gathered materials curing means for alkali under load action

Publications (1)

Publication Number Publication Date
CN208459482U true CN208459482U (en) 2019-02-01

Family

ID=65171909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821101893.9U Expired - Fee Related CN208459482U (en) 2018-07-12 2018-07-12 One kind is gathered materials curing means for alkali under load action

Country Status (1)

Country Link
CN (1) CN208459482U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975092A (en) * 2019-04-19 2019-07-05 四川省劲腾环保建材有限公司 A kind of alkali device during preparing extruding dregs porcelain granule

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975092A (en) * 2019-04-19 2019-07-05 四川省劲腾环保建材有限公司 A kind of alkali device during preparing extruding dregs porcelain granule

Similar Documents

Publication Publication Date Title
CN208459482U (en) One kind is gathered materials curing means for alkali under load action
CN101975908A (en) Connector electric property test jig
CN109471001A (en) A kind of GIS partial discharge detection device and method
CN207424121U (en) A kind of disc insulator model surface charge detecting device
CN203643236U (en) High-pressure consolidation test device with temperature cyclically changing
CN202758001U (en) Detection device of solid sealed pole loop resistor
CN207516296U (en) A kind of cement-based material ac impedance measurement device
CN206804806U (en) A kind of automatic insulating boot and insulating glove Withstand test device
CN208044021U (en) A kind of precision measurement jig that shockproof effect is good
CN206223921U (en) A kind of pressure-resistant experiment support meanss of electrical engineering insulating bar
CN103278749A (en) Safety tool boot tester
CN203643561U (en) Standardized testing device for cross-arm shielding covers
CN109361358A (en) A kind of automated function test equipment
CN105301417A (en) Assessment method for insulating property of mossed and moldy composite insulator for converter station/transformer station
CN207067325U (en) A kind of single insulating glove Withstand test device
CN206057484U (en) Sucked type live detection equipment superfrequency sensor probe
CN205538692U (en) A reaction detection device for water quality analyzer
CN204142869U (en) Portable test of lightning arrester platform
CN208833867U (en) A kind of partial discharge ultrasonic wave detection device
CN207472919U (en) A kind of convertible insulating bar test auxiliary stand
CN207603204U (en) One kind is based on oil immersed type testing transformer residual charge automatic releasing device
CN207816938U (en) The on-Line Monitor Device of emergent gas ingredient and its concentration in a kind of liquid
CN205643608U (en) Insulating boot ac voltage withstand test detects device
CN205183200U (en) A insulator spindle for arrester live test
CN208356788U (en) A kind of chemical analysis detection test tube shaking device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191105

Address after: No.322 Houtang Road, Gucheng street, Linhai City, Taizhou City, Zhejiang Province

Patentee after: Linhai No. 4 Building Engineering Co., Ltd.

Address before: 318000 No.1-21, laochangji village, Taozhu Town, Linhai City, Taizhou City, Zhejiang Province

Co-patentee before: Taizhou Vocational & Technical College

Patentee before: Xu Xiuchao

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

Termination date: 20190712