- CN208454541U CN208454541U CN201820817213.7U CN201820817213U CN208454541U CN 208454541 U CN208454541 U CN 208454541U CN 201820817213 U CN201820817213 U CN 201820817213U CN 208454541 U CN208454541 U CN 208454541U
- Authority
- CN
- China
- Prior art keywords
- water
- outlet
- exhaust
- degassing tank
- tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Physical Water Treatments (AREA)
- Degasification And Air Bubble Elimination (AREA)
Abstract
The utility model discloses a kind of exhaust systems of moisturizing degasser, including water circulation system and exhaust gear, outlet part and water entering section are provided in water circulation system, outlet part includes exhalant canal, water entering section includes the first intake tunnel and the second intake tunnel, exhaust gear includes sequentially connected first degassing tank, heater box, second degassing tank and water tank, the first water inlet on first degassing tank is connected with exhalant canal, first water outlet on first degassing tank is connected with the first intake tunnel, the 4th water outlet on water tank is connected with the second intake tunnel, first intake tunnel, the first small pump is connected separately on second intake tunnel and exhalant canal, second small pump and water outlet pump.Exhaust system provided by the utility model is matched by the first degassing tank, heater box, the second degassing tank and water tank, realizes a variety of gas exhaust treatment modes to water circulation system.
Description
Technical field
The utility model relates to moisturizing degassing equipment technical fields, more particularly to a kind of exhaust system of moisturizing degasser
System.
Background technique
In central heating water circulation system and water circulation system of central air conditioning, gas all can be inevitably generated,
These gases include the gas of free state and the gas of solubilised state, if the effect of exhaust is undesirable, when gas reaches a certain amount of
When, system will be particularly easy to generate gas obstruction, to cause the circulation of part or whole system unsmooth, influence
The effect of heat supply or refrigeration.In addition, the oxygen that gas contains in water will cause heating or refrigeration piping and steel radiator
Corrode, causes perforation, leak that can also reduce the service life of various parts to influence the safety of whole system.Separately
Outside, the gas in system is it is also possible to will cause the corrosion of water pump, so that the service life of water pump substantially reduces, and system pipes
Noise can be generated in road, influence the normal work and life of people, and the gas in system also influences whether heat exchange
Effect.
The prior art passes through moisturizing degasser and the gas in water circulation system is discharged, the exhaust of moisturizing degasser
System generally comprises degassing tank, and according to Henry's law, solubility is related to water moderate pressure in water for gas, when the pressure for reducing water
Power then can make gas evolution soluble in water in the case where water temperature is constant, so that the gas in water is removed, moisturizing degassing tank
The gas evolution in water can be discharged for interior holding vacuum environment, however the exhaust system of existing moisturizing degasser passes through one
Moisturizing degassing tank is exhausted, and it is unobvious that there are exhaust effects, adjusts to the speed of the gas discharge in water circulation system
Range is small, can not meet in water circulation system start-up course and some requirements that quickly gas is discharged in special circumstances, and
Moisturizing cannot be carried out into water circulation system while exhaust, needed other equipment to carry out moisturizing, increased the cost of operation.
Utility model content
The purpose of the utility model is to provide a kind of exhaust system of moisturizing degasser, with solve it is in the prior art not
Foot place.
To achieve the goals above, the utility model provides the following technical solutions:
A kind of exhaust system of moisturizing degasser, including water circulation system and exhaust gear, in the water circulation system
Be provided with outlet part and water entering section, the exhaust gear includes: the first degassing tank, be provided on first degassing tank first into
The top of first degassing tank, the water outlet is arranged in the mouth of a river, the first water outlet and first row port, the first row port
Portion includes exhalant canal, the water entering section include the first intake tunnel and the second intake tunnel, first water inlet with it is described
Exhalant canal is connected, and there are two first water outlets, and first water outlet is connected with first intake tunnel
It is logical;Heater box is provided with the second water inlet, the second water outlet, filler and second exhaust port, the heating in the heater box
Having heaters is set in case, filler pipe road, second water inlet and first water outlet are provided on the filler
Mouth is connected;Second degassing tank is provided with third water inlet, third water outlet and third exhaust outlet on second degassing tank,
The top of second degassing tank is arranged in the third exhaust outlet, and the third water inlet is connected with second water outlet
It is logical, one-way exhaust valve is provided on the third exhaust outlet, second exhaust port and first row port;Water tank, the water storage
It is provided with the 4th water inlet and the 4th water outlet on case, thermoregulator, the 4th water inlet are provided in the water tank
It is connected with the third water outlet, the 4th water outlet is connected with second intake tunnel, and first water inlet is logical
It is connected with the first small pump on road, the second small pump is connected on second intake tunnel, is connected on the exhalant canal
Water outlet pump.
Above-mentioned exhaust system is provided with discharge outlet, the discharge outlet on first degassing tank and the second degassing tank
The bottom of first degassing tank and the second degassing tank is set, is provided with drain valve in the discharge outlet.
Above-mentioned exhaust system, the exhalant canal, the first water outlet, the second water outlet, third water outlet, the 4th water outlet
Autocontrol valve is provided on mouth and filler.
Above-mentioned exhaust system, further includes pressure sensor and gas capacity check device, and the pressure sensor setting exists
On the exhalant canal, the gas capacity detector is arranged in the water circulation system.
Above-mentioned exhaust system further includes controller, the pressure sensor, gas capacity detector and autocontrol valve
It is connected with the controller.
Above-mentioned exhaust system further includes gas treatment case, the gas treatment case and the first row port, second row
Port is connected with third exhaust outlet, and cooling part and gas lysate are provided in the gas treatment case.
In the above-mentioned technical solutions, the exhaust system of moisturizing degasser provided by the utility model, including water cyclic system
System and exhaust gear, outlet part and water entering section are provided in the water circulation system, and exhaust gear includes the first degassing tank, heating
Case, the second degassing tank and water tank realize a variety of gas exhaust treatment modes to water circulation system, can be independent by the first degassing tank
Processing is exhausted to water circulation system, can also be recycled by the first degassing tank, heater box, the second degassing tank and water tank water water
System carries out multistage gas exhaust treatment, meets water circulation system to the lesser requirement of gas content, can also pass through the first degassing tank
With the second degassing tank simultaneously processing is exhausted to water circulation system, can also while gas exhaust treatment into water circulation system into
Row moisturizing can so meet the exhaust requirements in the case where water circulation system difference.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only to record in the utility model
Some embodiments be also possible to obtain other drawings based on these drawings for those of ordinary skill in the art.
Fig. 1 is a kind of structural schematic diagram of the exhaust system for the moisturizing degasser that embodiment provides of the utility model.
Description of symbols:
1, water circulation system;1.1, exhalant canal;1.2, the first intake tunnel;1.3, the second intake tunnel;1.4, it is discharged
Pump;1.5, the first small pump;1.6, the second small pump;2, the first degassing tank;2.1, the first water inlet;2.2, the first water outlet;
2.3, first row port;2.4, discharge outlet;2.5, one-way exhaust valve;2.6, drain valve;3, heater box;3.1, the second water inlet;
3.2, the second water outlet;3.3, filler;3.4, second exhaust port;3.5, filler pipe road;3.6, heater;4, the second degassing
Tank;4.1, third water inlet;4.2, third water outlet;4.3, third exhaust outlet;5, water tank;5.1, the 4th water inlet;5.2,
4th water outlet;5.3, thermoregulator;6, autocontrol valve;7, pressure sensor;8, gas capacity detector;9, at gas
Manage case.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with attached drawing pair
The utility model is further detailed.
As shown in Figure 1, a kind of exhaust system of moisturizing degasser provided by the embodiment of the utility model, including water circulation
System 1 and exhaust gear are provided with outlet part and water entering section in water circulation system 1, and exhaust gear includes the first degassing tank 2, the
The first water inlet 2.1, the first water outlet 2.2 and first row port 2.3 are provided on one degassing tank 2, first row port 2.3 is arranged
At the top of the first degassing tank 2, outlet part includes exhalant canal 1.1, and water entering section includes the first intake tunnel 1.2 and the second water inlet
Channel 1.3, the first water inlet 2.1 are connected with exhalant canal 1.1, and there are two the first water outlets 2.2, one of them first water outlet
Mouth 2.2 is connected with the first intake tunnel 1.2;Heater box 3 is provided with the water outlet of the second water inlet 3.1, second on heater 3.6
Mouth 3.2, filler 3.3 and second exhaust port 3.4, heater box 3 is interior to be arranged having heaters 3.6, is provided on filler 3.3 and adds water
Pipeline 3.5, the second water inlet 3.1 are connected with first water outlet 2.2;Second degassing tank 4 is arranged on second degassing tank 4
There are third water inlet 4.1, third water outlet 4.2 and third exhaust outlet 4.3, the second degassing tank 4 is arranged in third exhaust outlet 4.3
Top, third water inlet 4.1 are connected with the second water outlet 3.2, third exhaust outlet 4.3, second exhaust port 3.4 and first exhaust
One-way exhaust valve 2.5 is provided on mouth 2.3;Water tank 5 is provided with the 4th water inlet 5.1 and the 4th water outlet on water tank 5
5.2, thermoregulator 5.3 is provided in water tank 5, and the 4th water inlet 5.1 is connected with third water outlet 4.2, the 4th water outlet
Mouth 5.2 is connected with the second intake tunnel 1.3, and the first small pump 1.5 is connected on the first intake tunnel 1.2, and the second water inlet is logical
It is connected with the second small pump 1.6 on road 1.3, is connected with water outlet pump 1.4 on exhalant canal 1.1.
Specifically, the outlet part and water entering section in water circulation system 1 can be one, be also possible to it is two or more, out
Water portion is used to the water in water circulation system 1 being delivered to exhaust gear, and exhaust gear be detached to the gas in water and by gas
Body discharge, the unsaturated water after gas is discharged are continued on in water circulation system 1 by water entering section, and unsaturated water enters water and follows
It will continue to absorb the water in water circulation system 1 after loop system 1, the gas in water circulation system 1 and so on absorbed into discharge, is made
The gas content for obtaining the water in water circulation system 1 is suitble to require, and the outlet part in this implementation includes exhalant canal 1.1, water entering section
Including the first intake tunnel 1.2 and the second intake tunnel 1.3, exhaust gear includes the first degassing tank 2, is set on the first degassing tank 2
It is equipped with the first water inlet 2.1, the first water outlet 2.2 and first row port 2.3, the first water inlet 2.1 is connected with exhalant canal 1.1
It connects, is also provided with water outlet pump 1.4 and pressure sensor 7 between the first water inlet 2.1 and exhalant canal 1.1, passes through first
Water in water circulation system 1 is delivered in the first degassing tank 2 by water inlet 2.1, is vacuum state in the first degassing tank 2, water exists
The gas dissolved in water is switched into the gas for free state under vacuum state, and is discharged from first row port 2.3, first row port
2.3 are arranged in the top of the first degassing tank 2, are provided with one-way exhaust valve 2.5 on first row port 2.3, pass through first row port
2.3 and one-way exhaust valve 2.5 gas in first degassing tank 2 can be discharged, the first water outlet 2.2 and the first intake tunnel 1.2
It is connected, is also provided with small pump between the first water outlet 2.2 and the first intake tunnel 1.2, by small pump by first
Unsaturated water in degassing tank 2 is delivered in water circulation system 1, and unsaturated water, which is delivered in water circulation system 1, absorbs water circulation
Gas in system 1 so recycles for the gas in water circulation system 1 to be constantly discharged from first row port 2.3, so that
Gas content composite demand in water circulation system 1.
In the present embodiment, when more demanding to the gas content in water circulation system 1 and to gas in water circulation system 1
When the velocity of discharge requires very fast, the requirement being vented to water circulation system 1, exhaust gear only can not meet by the first degassing tank 2
Further include heater box 3, the second degassing tank 4 and water tank 5, the second water inlet 3.1, the second water outlet 3.2 are provided in heater box 3
With second exhaust port 3.4, the second water inlet 3.1 is connected with the first water outlet 2.2, thus by 2 degassing process of the first degassing tank
Water afterwards is delivered in heater box 3, is internally provided with heater 3.6 in heater box 3, can be to heater box 3 by heater 3.6
Interior water is heated, and the gas dissolved in water is switched to the gas for free state as the water temperature in heater box 3 increases,
Then it is discharged by second exhaust port 3.4, and water is delivered in the second degassing tank 4 by treated, while in heater box 3 also
It is provided with filler 3.3, filler pipe road 3.5 is provided on filler 3.3, original is delivered to by heating by filler pipe road 3.5
It is heated in case 3 and gas is discharged, be then sent in the second degassing tank 4, structure and 2 phase of the first degassing tank of the second degassing tank 4
Together, including third water inlet 4.1, third water outlet 4.2 and third exhaust outlet 4.3, third water inlet 4.1 and the second water outlet
3.2 are connected, and the water in heater box 3 are delivered to inside the second degassing tank 4 by third water inlet 4.1, in the second degassing tank 4
Make the gas dissolved in water switch to the gas of free state by vacuum environment, and is discharged by third exhaust outlet 4.3, third row
The top of the second degassing tank 4 is arranged in port 4.3, and one-way exhaust valve 2.5, the second degassing tank 4 are provided on third exhaust outlet 4.3
Unsaturated water after degassing process is delivered in water tank 5, and water tank 5 includes the 4th water inlet 5.1 and the 4th water outlet 5.2,
4th water inlet 5.1 is connected with third water outlet 4.2, by the 4th water inlet 5.1 by the unsaturated water in the second degassing tank 4
It is delivered in water tank 5, water tank 5 is closed state, so that the water in water tank 5 keeps undersaturated condition, in the 4th water storage
It is provided with thermoregulator 5.3 in case 5, water is adjusted to by suitable temperature by thermoregulator 5.3, is then delivered to water
In water circulation system 1, not only play the role of moisturizing to water circulation system 1, but also the gas in discharge water circulation system 1 can be absorbed
Body.It is connected with the first small pump 1.5 on the first intake tunnel 1.2 simultaneously, is connected with the second moisturizing on the second intake tunnel 1.3
1.6 are pumped, water outlet pump 1.4 is connected on exhalant canal 1.1, can be recycled to water by the first small pump 1.5 and the second small pump 1.6
Moisturizing exhaust is carried out in system 1, the water in water circulation system 1 can be transferred out by water outlet pump 1.4.
In the present embodiment, according to the capacity of gas in the hydraulic pressure and water in water circulation system 1, different exhausts can be carried out
Mode is to meet different requirements:
First exhaust mode: when the hydraulic pressure in water circulation system 1 is normal, but the gas in water is more, passes through water outlet at this time
Water in water circulation system 1 is delivered to the first degassing tank 2 by pump 1.4, and the first degassing tank 2 is de-gassed water, by gas
It is discharged, is then delivered to unsaturated water in water circulation system 1 by the first small pump 1.5, such as by first row port 2.3
This reciprocal capacity for reducing gas in water circulation system 1, until reach requirement, this exhaust mode be suitble to water circulation system 1 just
In normal operational process, processing is exhausted to water circulation system 1 in discontinuity.
Second exhaust mode: when the hydraulic pressure of water circulation system 1 is normal, but to the gas capacity requirement in water circulation system 1
It is higher, i.e., it is merely able to that there are a small amount of gases in water circulation system 1, place is only de-gassed to water by the first degassing tank 2 at this time
Reason is unable to satisfy requirement, and the water in water circulation system 1 is delivered to the first degassing tank 2, heater box 3 and the by water outlet pump 1.4
Two degassing tanks 4 carry out multiple degassing process, and the gas in water is discharged, water is then delivered to water by the second small pump 1.6
In the circulatory system 1, so circulation so that in water circulation system 1 gas content composite demand.
Third exhaust mode: when the hydraulic pressure in water circulation system 1 is lower, and the gas in water is more, pass through filler
3.3 convey water to heater box 3, and water can be passed through at this time by being delivered to water tank 5 after heater box 3 and the processing of the second degassing tank 4
Second small pump 1.6 individually moisturizing and reduces the gas content in water into water circulation system 1, can also be in the second small pump
While 1.6 work, water outlet pump 1.4 and the first small pump 1.5 also work, and the second water inlet 3.1 is closed at this time, so that first is de-
Water in gas tank 2 passes through the first small pump 1.5 and is delivered in water circulation system 1, water outlet pump 1.4, the first degassing tank 2 and first
Processing, filler 3.3, heater box 3, the second degassing tank 4, water tank 5 is exhausted to water circulation system 1 in the realization of small pump 1.5
With the second small pump 1.6 realize into water circulation system 1 carry out moisturizing and reduce water in gas content, thus meet simultaneously to
Water circulation system 1 carries out moisturizing, and can quickly reduce the gas content in water circulation system 1, the requirement that gas is discharged.
The exhaust system of moisturizing degasser provided by the embodiment of the utility model, including water circulation system 1 and air exhauster
Structure, is provided with outlet part and water entering section in water circulation system 1, and exhaust gear includes that the first degassing tank 2, heater box 3, second deaerate
Tank 4 and water tank 5 are realized to a variety of gas exhaust treatment modes of water circulation system 1, can individually be followed to water by the first degassing tank 2
Processing is exhausted in loop system 1, can also be recycled by the first degassing tank 2, heater box 3, the second degassing tank 4 and 5 water water of water tank
System 1 carries out multistage gas exhaust treatment, meets water circulation system 1 to the lesser requirement of gas content, can also pass through the first degassing
Processing is exhausted to water circulation system 1 simultaneously in tank 2 and the second degassing tank 4, can also be while gas exhaust treatment to water cyclic system
Moisturizing is carried out in system 1, can so meet the exhaust requirements in the case where 1 difference of water circulation system.
In the present embodiment, it is preferred that be provided with discharge outlet 2.4, discharge outlet on the first degassing tank 2 and the second degassing tank 4
2.4 are arranged in the bottom of the first degassing tank 2 and the second degassing tank 4, are provided with drain valve 2.6 in discharge outlet 2.4;Pass through discharge outlet
2.4 first degassing tank 2 and the remaining sewage of the second degassing tank 4 etc. are discharged, and sewage and the water containing impurity is avoided to be conveyed
Into water circulation system 1, drain valve 2.6 controls being automatically opened or closed for drain valve 2.6.
In the present embodiment, it is preferred that exhalant canal 1.1, the first water outlet 2.2, the second water outlet 3.2, third water outlet
4.2, it is provided with autocontrol valve 6 on the 4th water outlet 5.2 and filler 3.3, can realizes that water outlet is logical by autocontrol valve 6
Road 1.1, the first water outlet 2.2, the second water outlet 3.2, third water outlet 4.2, the 4th water outlet 5.2 and filler 3.3 from
It is dynamic to open or close, moisturizing and bleeding are carried out to water circulation system 1 to realize, and can be to the row of water circulation system 1
Control is adjusted in gas velocity degree.
In the present embodiment, it is preferred that further include pressure sensor 7 and gas capacity check device 8, pressure sensor 7 is arranged
On exhalant canal 1.1, gas capacity detector 8 is arranged in water circulation system 1;It further include controller, pressure sensor 7,
Gas capacity detector 8 and autocontrol valve 6 are connected with controller.Pressure sensor 7 is for detecting in water circulation system 1
Hydraulic pressure, gas capacity detector 8 is used to detect gas capacity in water circulation system 1, and the result that will test is delivered to control
Device processed, air is corresponding to open different autocontrol valves 6, thus realize to the different exhausts of water circulation system 1 and Water supplement pattern,
For example the hydraulic pressure in detection water circulation system 1 is normal, but the gas in water is more, autocontrol valve 6 opens 1.1 He of exhalant canal
Water in water circulation system 1 is delivered to the first degassing tank 2 and carried out by the autocontrol valve 6 of the first water outlet 2.2, water outlet pump 1.4
Gas is discharged by first row port 2.3, is then delivered to unsaturated water by the first small pump 1.5 by degassing process
In water circulation system 1, the capacity of gas in water circulation system 1 is and so on reduced, until reaching requirement;When detection water cyclic system
System 1 hydraulic pressure it is normal but more demanding to the gas capacity in water circulation system 1, by controller open exhalant canal 1.1,
The first water inlet 2.1, the second water outlet 3.2, third water outlet 4.2 and the 4th water outlet 5.2 being connected with the second water inlet 3.1
On autocontrol valve 6, the water in water circulation system 1 is delivered to by the first degassing tank 2, heater box 3 and by water outlet pump 1.4
Two degassing tanks 4 carry out multiple degassing process, and the gas in water is discharged, water is then delivered to water by the second small pump 1.6
In the circulatory system 1;When detecting that the hydraulic pressure in water circulation system 1 is lower, and when the gas in water is more, controller control water outlet
Channel 1.1, the first water outlet 2.2 being connected with the first intake tunnel 1.2, filler 3.3, the second water outlet 3.2, third water outlet
Mouth 4.2 is connected with the 4th water outlet 5.2, conveys water to heater box 3 by filler 3.3, water is de- by heater box 3 and second
It is delivered to water tank 5 after the processing of gas tank 4, individually moisturizing and is reduced in water into water circulation system 1 by the second small pump 1.6
Gas content, while water outlet pump 1.4 and the first small pump 1.5 also work, water outlet pump 1.4, the first degassing tank 2 and the first small pump
Processing, filler 3.3, heater box 3, the second degassing tank 4, water tank 5 and second is exhausted to water circulation system 1 in 1.5 realizations
Small pump 1.6, which is realized, to carry out moisturizing into water circulation system 1 and reduces the gas content in water, recycles simultaneously to water to meet
System 1 carries out moisturizing, and can quickly reduce the gas content in water circulation system 1, the requirement that gas is discharged.
In the present embodiment, it is preferred that further include gas treatment case 9, gas treatment case 9 and first row port 2.3, second row
Port 3.4 is connected with third exhaust outlet 4.3, and cooling part and gas lysate are provided in gas treatment case 9, passes through gas
The gas that first row port 2.3, second exhaust port 3.4 and third exhaust outlet 4.3 is discharged in treatment box 9 is handled, and cool down part
Water is cooled down and absorbed respectively with gas lysate, gas is avoided to be directly discharged in air.
It is above that certain exemplary embodiments of the utility model are only described by way of explanation, undoubtedly, for
Those skilled in the art can be with a variety of different without departing from the spirit and scope of the utility model
Mode is modified described embodiment.Therefore, above-mentioned attached drawing and description are regarded as illustrative in nature, and should not be construed as
Limitation to the utility model claims protection scope.
Claims (6)
1. a kind of exhaust system of moisturizing degasser, including water circulation system and exhaust gear, set in the water circulation system
It is equipped with outlet part and water entering section, which is characterized in that the exhaust gear includes:
First degassing tank, is provided with the first water inlet, the first water outlet and first row port on first degassing tank, and described
The top of first degassing tank is arranged in one exhaust outlet, and the outlet part includes exhalant canal, and the water entering section includes first
Intake tunnel and the second intake tunnel, first water inlet are connected with the exhalant canal, and first water outlet has two
A, first water outlet is connected with first intake tunnel;
Heater box, is provided with the second water inlet, the second water outlet, filler and second exhaust port in the heater box, it is described plus
Having heaters is set in hot tank, is provided with filler pipe road on the filler, second water inlet goes out with one described first
The mouth of a river is connected;
Second degassing tank, is provided with third water inlet, third water outlet and third exhaust outlet on second degassing tank, and described
The top of second degassing tank is arranged in three exhaust outlets, and the third water inlet is connected with second water outlet, described
One-way exhaust valve is provided on third exhaust outlet, second exhaust port and first row port;
Water tank is provided with the 4th water inlet and the 4th water outlet on the water tank, temperature tune is provided in the water tank
Device is saved, the 4th water inlet is connected with the third water outlet, the 4th water outlet and the second intake tunnel phase
It is connected to, is connected with the first small pump on first intake tunnel, the second small pump, institute are connected on second intake tunnel
It states and is connected with water outlet pump on exhalant canal.
2. exhaust system according to claim 1, which is characterized in that be all provided on first degassing tank and the second degassing tank
It is equipped with discharge outlet, the discharge outlet is arranged in the bottom of first degassing tank and the second degassing tank, is arranged in the discharge outlet
There is drain valve.
3. exhaust system according to claim 1, which is characterized in that the exhalant canal, the first water outlet, the second water outlet
Autocontrol valve is provided on mouth, third water outlet, the 4th water outlet and filler.
4. exhaust system according to claim 3, which is characterized in that further include pressure sensor and gas capacity check
Device, the pressure sensor are arranged on the exhalant canal, and the gas capacity detector is arranged in the water circulation system
It is interior.
5. exhaust system according to claim 4, which is characterized in that it further include controller, the pressure sensor, gas
Capacity check device and autocontrol valve are connected with the controller.
6. exhaust system according to claim 1, which is characterized in that it further include gas treatment case, the gas treatment case
It is connected with the first row port, second exhaust port and third exhaust outlet, is provided with cooling part in the gas treatment case
With gas lysate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820817213.7U CN208454541U (en) | 2018-05-29 | 2018-05-29 | The exhaust system of moisturizing degasser |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820817213.7U CN208454541U (en) | 2018-05-29 | 2018-05-29 | The exhaust system of moisturizing degasser |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208454541U true CN208454541U (en) | 2019-02-01 |
Family
ID=65150402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820817213.7U Active CN208454541U (en) | 2018-05-29 | 2018-05-29 | The exhaust system of moisturizing degasser |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208454541U (en) |
-
2018
- 2018-05-29 CN CN201820817213.7U patent/CN208454541U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212667175U (en) | Cooling liquid circulating system of hydrogen fuel cell engine | |
CN206954482U (en) | A kind of Central Cooling Water System of LNG fuel ship | |
CN113404563B (en) | Low-pressure cylinder cutting heat supply unit low-heating and back-heating system | |
CN207279602U (en) | A kind of closed type condensate water recovery device | |
CN208454541U (en) | The exhaust system of moisturizing degasser | |
CN201265531Y (en) | Water cooling system of multi-stage dry vacuum pump | |
CN103874390B (en) | liquid injection device | |
CN106659072A (en) | Cooling system using nitrogen for refrigeration | |
WO2008105232A1 (en) | Drying tumbler | |
CN207108543U (en) | The deaerating type of cycles of boiler feedwater | |
CN114508693A (en) | Heat exchange type supercritical carbon dioxide conveying equipment | |
CN202898063U (en) | Continuous biological waste liquor inactivation system | |
CN104149677B (en) | A kind of antifreeze water truck water-carriage system | |
CN108443861B (en) | Energy-saving device for eliminating back pressure of closed condensate water recovery system | |
CN216668355U (en) | Air cooling island condensate treatment system | |
CN204095623U (en) | A kind of antifreeze water truck water-carriage system | |
JP2556404Y2 (en) | Automatic number control device for deaerator | |
CN212987352U (en) | Hot water heating system based on heating tank | |
CN220601239U (en) | Heat preservation system of processing workshop | |
CN219568075U (en) | Electrolytic water hydrogen production system capable of automatically adjusting internal pressure of pipeline | |
CN211536565U (en) | Lithium chloride solution regenerating unit | |
CN216788532U (en) | Steam-water separation device for cylinder sleeve of gas engine | |
CN211177431U (en) | Novel energy-saving environment-friendly hydrothermal liquid hot water oil furnace | |
CN108825467A (en) | A kind of residual heat recycling system of air compressor | |
CN110386632A (en) | Frequency conversion constant-pressure water supplementing vacuum degassing group |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191224 Address after: 102600 211, floor 2, building 2, No. 46 yard, Tianshui street, Daxing District, Beijing Patentee after: Beijing Jinmao human settlements Technology Co., Ltd Address before: 100088, No. 28, No. 220, block A, main street, Xinjie street, Xicheng District, Beijing Patentee before: Beijing Jinmao Green Construction Technology Co., Ltd. |