CN208448748U - It is a kind of to adjust water balance device of slagging tap - Google Patents

It is a kind of to adjust water balance device of slagging tap Download PDF

Info

Publication number
CN208448748U
CN208448748U CN201820755269.4U CN201820755269U CN208448748U CN 208448748 U CN208448748 U CN 208448748U CN 201820755269 U CN201820755269 U CN 201820755269U CN 208448748 U CN208448748 U CN 208448748U
Authority
CN
China
Prior art keywords
water
pipeline
storage tank
water balance
liquid storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820755269.4U
Other languages
Chinese (zh)
Inventor
王君鹏
李超
张波
盛虎
索传胜
张兆峰
刘希海
周虎
王继松
韦安超
徐萍
李恒
韦昌全
孟凡亮
李海平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hua Electricity Zhangqiu Electricity Generating Corp Ltd
Original Assignee
Hua Electricity Zhangqiu Electricity Generating Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hua Electricity Zhangqiu Electricity Generating Corp Ltd filed Critical Hua Electricity Zhangqiu Electricity Generating Corp Ltd
Priority to CN201820755269.4U priority Critical patent/CN208448748U/en
Application granted granted Critical
Publication of CN208448748U publication Critical patent/CN208448748U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Water By Oxidation Or Reduction (AREA)

Abstract

Water balance device of slagging tap is adjusted the utility model relates to a kind of, including the first liquid storage tank being connect with desulfurization wastewater pipeline, first liquid storage tank is connected with high-pressure injection water pump by connecting line, on the one hand first liquid storage tank passes through first pipe and successively penetrates through the blow-off line perforation connection for being connected with transh pump, the second tank and concentration basin, on the other hand connected by the pipeline perforation that discharges water of the second pipeline and the concentration basin.The balancing device can realize slag removing system water balance under the premise of not increasing extras facility, against existing pipeline and valve, reduce water waste and reduce costs.

Description

It is a kind of to adjust water balance device of slagging tap
Technical field
The utility model relates to power plant for energy conservation equipment technology fields, a kind of tune specifically applied in desulfurization deslagging process Whole water balance device of slagging tap.
Background technique
A kind of New Cycle water slag removing system of Patent No. ZL201420302625.9, including circulating water pool, the circulation Float is placed on the liquid level of pond except pulp pump, the float slagging-off pumping takes the slag-water slurry on circulating water pool liquid level and leads to It crosses pipeline and is transported to pulp water separating tank, which is equipped with the return pipe for clear water reflux, after pulp water separation Clear water be back in circulating water pool through return pipe, be additionally provided at the top of the pulp water separating tank for removing its inner surface adherency paint The automatic scum board of slag, the paint slag scraped fall to the small car of slag below automatic scum board;The utility model is equipped with Float removes pulp pump, and the variation that can be flexibly adapted to circulating water pool liquid level removes the gred, which is additionally provided with deslagging agent Inlet, the use of deslagging agent make to remove the gred high-efficient, are conducive to the recycling of recirculated water, reach energy-saving and environment-friendly purpose.But It is that the system cost is higher.
In addition, slag removing system in the prior art can not achieve or maintain mostly slag removing system water balance, cause a large amount of Pulp water overflow causes production area ground pollution, influences the safe and stable operation of production, also causes water waste at the same time.
Utility model content
To overcome above-mentioned shortcomings and deficiencies in the prior art, the utility model provides a kind of adjustment and slags tap water balance dress It sets, the apparatus structure is simple, and manufacturing cost is lower.
To realize that above-mentioned technical proposal the technical solution of the utility model is: a kind of adjustment is slagged tap water balance device, including The first liquid storage tank connecting with desulfurization wastewater pipeline, first liquid storage tank are connected with high-pressure injection water pump by connecting line, On the one hand first liquid storage tank passes through first pipe and successively penetrates through is connected with discharging water for transh pump, the second tank and concentration basin On the other hand pipeline perforation connection is connected by the pipeline perforation that discharges water of the second pipeline and the concentration basin.
Preferably, the first shut-off valve is installed between second tank and the pipeline that discharges water.
In any of the above-described scheme preferably, the second shut-off valve is installed on second pipeline.
In any of the above-described scheme preferably, the connecting line is fixedly mounted on the bottom of the first liquid storage tank.
In any of the above-described scheme preferably, bottom valve is fixedly installed on the connecting line.
In any of the above-described scheme preferably, filter screen is installed in the water outlet of the desulfurization wastewater pipeline.
In any of the above-described scheme preferably, the first electronic liquid level gauge is installed in first liquid storage tank.
In any of the above-described scheme preferably, the second electronic liquid level gauge is installed in second tank.
In any of the above-described scheme preferably, first shut-off valve is straight-through stop valve.
In any of the above-described scheme preferably, second shut-off valve is straight-through stop valve.
Compared with prior art utility model has the advantages that using existence conditions, set not increasing extras Under the premise of applying, slag removing system water balance can be realized against existing pipeline and valve, reduces water waste, reduces into This, ensure that the safety and economy of slag removing system.Due to having installed bottom valve additional on connecting line, do not increasing slagging-off pond The requirement that high spray pump needs high liquid level to start is efficiently solved in the case where height.
It is used further, since opening second tank as the spare pond of slagging-off water, when the first tank full water The second pond can be squeezed into, when the first tank water deficiency can be from the second water replenishment.Desulfurization wastewater can be used as the second stage of water storage Chi Bushuiyuan not only alleviates supplementing water pressure, but also can neutralize slagging-off water, plays the hardened effect for eliminating drainage bin.By with Upper operation can efficiently solve out under the premise of not increasing any large-sized power plant and being not necessarily to consume any fuel more Pulp water equilibrium problem.
Detailed description of the invention
Fig. 1 is the schematic diagram of one preferred embodiment of water balance device of slagging tap according to the adjustment of the utility model.
Specific embodiment
Explanation is further elaborated to the preferred embodiment of the utility model with reference to the accompanying drawing;
The water balance device as shown in Figure 1, a kind of adjustment is slagged tap, including the first liquid storage tank being connect with desulfurization wastewater pipeline 4 8.First liquid storage tank 8 is connected by desulfurization wastewater pipeline 4 and the perforation of desulfurizer 7.First liquid storage tank 8 passes through connecting line It is connected with high-pressure injection water pump 3.In the present embodiment, bottom valve 13 is fixedly installed on the connecting line.The connecting tube Road is fixedly mounted on the bottom of the first liquid storage tank 8.First liquid storage tank, 8 one side successively penetrates through connection by first pipe 11 There is the perforation of blow-off line 1 of transh pump 2, the second tank 5 and concentration basin 6 to connect, on the other hand passes through the second pipeline 12 and institute State the perforation connection of pipeline 1 that discharges water of concentration basin 6.
The first shut-off valve 9 is installed between second tank 5 and the pipeline 1 that discharges water.In second pipeline Second shut-off valve 10 is installed on 12.In the present embodiment, first shut-off valve 9 and the second shut-off valve 10 are that through type is cut Only valve.
Embodiment 2:
The water balance device as shown in Figure 1, a kind of adjustment is slagged tap, including the first liquid storage tank being connect with desulfurization wastewater pipeline 4 8.First liquid storage tank 8 is connected by desulfurization wastewater pipeline 4 and the perforation of desulfurizer 7.First liquid storage tank 8 passes through connecting line It is connected with high-pressure injection water pump 3.Bottom valve 13 is fixedly installed on the connecting line.The connecting line is fixedly mounted on The bottom of one liquid storage tank 8.First liquid storage tank, 8 one side is successively penetrated through by first pipe 11 and is connected with transh pump 2, second The blow-off line 1 of tank 5 and concentration basin 6, which penetrates through, to be connected, on the other hand discharging water by the second pipeline 12 and the concentration basin 6 The perforation connection of pipeline 1.The first shut-off valve 9 is installed between second tank 5 and the pipeline 1 that discharges water.Described Second shut-off valve 10 is installed on two pipelines 12.First shut-off valve 9 and the second shut-off valve 10 are straight-through stop valve.? In the present embodiment, first electronic liquid level gauge is installed in first liquid storage tank 8.It is equipped in second tank 5 Second electronic liquid level gauge.
Embodiment 3:
The water balance device as shown in Figure 1, a kind of adjustment is slagged tap, including the first liquid storage tank being connect with desulfurization wastewater pipeline 4 8.First liquid storage tank 8 is connected by desulfurization wastewater pipeline 4 and the perforation of desulfurizer 7.First liquid storage tank 8 passes through connecting line It is connected with high-pressure injection water pump 3.Bottom valve 13 is fixedly installed on the connecting line.The connecting line is fixedly mounted on The bottom of one liquid storage tank 8.First liquid storage tank, 8 one side is successively penetrated through by first pipe 11 and is connected with transh pump 2, second The blow-off line 1 of tank 5 and concentration basin 6, which penetrates through, to be connected, on the other hand discharging water by the second pipeline 12 and the concentration basin 6 The perforation connection of pipeline 1.First electronic liquid level gauge is installed in first liquid storage tank 8.It is installed in second tank 5 There is the second electronic liquid level gauge.In the present embodiment with embodiment 1 the difference is that being equipped with shut-off valve on pipeline 1 discharging water.Institute Stating shut-off valve is electric-controlled type shut-off valve.
Embodiment 4:
The water balance device as shown in Figure 1, a kind of adjustment is slagged tap, including the first liquid storage tank being connect with desulfurization wastewater pipeline 4 8.First liquid storage tank 8 is connected by desulfurization wastewater pipeline 4 and the perforation of desulfurizer 7.First liquid storage tank 8 passes through connecting line It is connected with high-pressure injection water pump 3.Bottom valve 13 is fixedly installed on the connecting line.The connecting line is fixedly mounted on The bottom of one liquid storage tank 8.First liquid storage tank, 8 one side is successively penetrated through by first pipe 11 and is connected with transh pump 2, second The blow-off line 1 of tank 5 and concentration basin 6, which penetrates through, to be connected, on the other hand discharging water by the second pipeline 12 and the concentration basin 6 The perforation connection of pipeline 1.The first shut-off valve 9 is installed between second tank 5 and the pipeline 1 that discharges water.Described Second shut-off valve 10 is installed on two pipelines 12.First shut-off valve 9 and the second shut-off valve 10 are straight-through stop valve.? In the present embodiment, filter screen is installed in the water outlet of the desulfurization wastewater pipeline 4.
The above is only the preferred embodiment of the utility model, not makees limit in any form to the utility model System, any simple modification, equivalent change and modification made by the above technical examples according to the technical essence of the present invention, It is still within the scope of the technical solutions of the present invention.
After having read this specification, those skilled in the art are not difficult to find out, the utility model by the prior art combination structure At, these constitute the utility model each section the prior art some give detailed description herein, some are then for explanation Letters it is bright consideration do not repeat all matters, big and small, but those skilled in the art read specification after just know institute's cloud.And ability Field technique personnel are also not difficult to find out, are to be full of a large amount of creative labor to the combination of these prior arts to constitute the utility model It is dynamic, it is the crystallization of inventor's many years theory analysis and many experiments.Those skilled in the art can equally find out from specification, Any combination of each technical solution and each feature described herein belongs to a part of the utility model.

Claims (10)

  1. The water balance device 1. a kind of adjustment is slagged tap, including the first liquid storage tank being connect with desulfurization wastewater pipeline, it is characterised in that: institute State the first liquid storage tank and high-pressure injection water pump be connected with by connecting line, first liquid storage tank on the one hand pass through first pipe according to Secondary perforation is connected with the blow-off line perforation connection of transh pump, the second tank and concentration basin, on the other hand passes through the second pipeline The pipeline perforation that discharges water with the concentration basin connects.
  2. The water balance device 2. adjustment as described in claim 1 is slagged tap, it is characterised in that: put in second tank with described First shut-off valve is installed between water lines.
  3. The water balance device 3. adjustment as described in claim 1 is slagged tap, it is characterised in that: the is equipped on second pipeline Two shut-off valves.
  4. The water balance device 4. adjustment as described in claim 1 is slagged tap, it is characterised in that: the connecting line is fixedly mounted on the The bottom of one liquid storage tank.
  5. The water balance device 5. adjustment as described in claim 1 or 4 is slagged tap, it is characterised in that: fixed on the connecting line Bottom valve is installed.
  6. The water balance device 6. adjustment as described in claim 1 is slagged tap, it is characterised in that: in the water outlet of the desulfurization wastewater pipeline Mouth is equipped with filter screen.
  7. The water balance device 7. adjustment as described in claim 1 is slagged tap, it is characterised in that: be equipped in first liquid storage tank First electronic liquid level gauge.
  8. The water balance device 8. adjustment as described in claim 1 is slagged tap, it is characterised in that: be equipped in second tank Second electronic liquid level gauge.
  9. The water balance device 9. adjustment as claimed in claim 2 is slagged tap, it is characterised in that: first shut-off valve cuts for through type Only valve.
  10. The water balance device 10. adjustment as claimed in claim 3 is slagged tap, it is characterised in that: second shut-off valve is through type Shut-off valve.
CN201820755269.4U 2018-05-21 2018-05-21 It is a kind of to adjust water balance device of slagging tap Expired - Fee Related CN208448748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820755269.4U CN208448748U (en) 2018-05-21 2018-05-21 It is a kind of to adjust water balance device of slagging tap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820755269.4U CN208448748U (en) 2018-05-21 2018-05-21 It is a kind of to adjust water balance device of slagging tap

Publications (1)

Publication Number Publication Date
CN208448748U true CN208448748U (en) 2019-02-01

Family

ID=65150079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820755269.4U Expired - Fee Related CN208448748U (en) 2018-05-21 2018-05-21 It is a kind of to adjust water balance device of slagging tap

Country Status (1)

Country Link
CN (1) CN208448748U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110723839A (en) * 2019-11-19 2020-01-24 上海存一环保节能科技有限公司 Automatic device based on solid-liquid separation and effective draining of solid

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110723839A (en) * 2019-11-19 2020-01-24 上海存一环保节能科技有限公司 Automatic device based on solid-liquid separation and effective draining of solid

Similar Documents

Publication Publication Date Title
CN206457275U (en) A kind of fiberglass integrally improves grid type oil interceptor
CN205893004U (en) Casual household's type rural domestic sewage treatment device
CN206395989U (en) A kind of station boiler desulfurization wastewater Zero emission device
CN205501073U (en) Papermaking wastewater treatment system
CN208448748U (en) It is a kind of to adjust water balance device of slagging tap
CN201882993U (en) Oily sewage settling treatment device
CN207031014U (en) A kind of new batch-type air-dissolving air-float equipment for separating liquid from solid
CN203474503U (en) Device for treating washing machine rinsing wastewater and kitchen oily wastewater
CN203319734U (en) Nanometer floatation device
CN215403214U (en) Pressure type multi-stage air-flotation oil-water separation device
CN202569658U (en) Compressor lubrication discharging oil water separation device
CN209428279U (en) A kind of compact-sized sewage disposal device
CN210559602U (en) Physical automatic defoaming system of nitrification tank
CN113044902A (en) Pressure type multi-stage air-flotation oil-water separation device
CN202415272U (en) Sewage scum and sludge treatment device
CN208684463U (en) A kind of anti-blocking separation of solid and liquid dissolving
CN207812650U (en) A kind of water treatment plant's sewerage recycle device
CN206858414U (en) Desliming system waste water surplus flocculant regenerates and recycling device
CN2146479Y (en) Air-float separator
CN104841170A (en) Hydroelectricity wastewater reuse system
CN221027838U (en) Automatic recycling oil collecting and floating device for small-flow side ditch
CN110228863A (en) A kind of combination air-float device
CN103693705A (en) Cyclone air flotation apparatus
CN203795231U (en) Off-machine water recycling tower
CN203904033U (en) Oil-separating tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190201

Termination date: 20190521