CN208441089U - Ready-package modularization pile body docking structure - Google Patents
Ready-package modularization pile body docking structure Download PDFInfo
- Publication number
- CN208441089U CN208441089U CN201820239946.7U CN201820239946U CN208441089U CN 208441089 U CN208441089 U CN 208441089U CN 201820239946 U CN201820239946 U CN 201820239946U CN 208441089 U CN208441089 U CN 208441089U
- Authority
- CN
- China
- Prior art keywords
- pile body
- metal
- modularization
- slot
- card
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of ready-package modularization pile body docking structures, including modularization pile body, modularization pile body includes main part and the high-strength butt end for being laid with steel fibre, realizes to dock using eye-splice mechanism between the high-strength butt end of adjacent two root modules pile body and fix.Laying steel fibre in the utility model, in modularization pile body end can be improved the intensity of high-strength butt end, the firmness since the connection task between main pile body is born in the high-strength butt end, after being able to ascend pile body connection.
Description
Technical field
The utility model relates to a kind of ready-package modularization pile body docking structure, it is mainly used for being centrifuged pile for prestressed pipe, side
Stake and prestressing force non-centrifugal pile are fixedly connected.
Background technique
Traditional pile body connecting structure generally comprises the flange terminal pad for being fixed on pile body and lower pile body end, upper pile body
Flange with lower pile body is by being welded to connect, and mainly welding position is weak, and long durability is poor, and horizontal bearing capacity is low, and
When the end hammering that stake is vertically connected with, elastic modulus of concrete is poor, end junction concrete rupture when causing to hammer.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of ready-package modularizations that connection structure is stronger
Pile body docking structure.
For this purpose, ready-package modularization pile body docking structure provided by the utility model, including modularization pile body, modularization stake
Body includes main part and the high-strength butt end for being laid with steel fibre, is used between the high-strength butt end of adjacent two root modules pile body
Bindiny mechanism realizes that docking is fixed.
The technical effect of the utility model: laying steel fibre in the utility model, in modularization pile body end can be improved
The intensity of high-strength butt end is able to ascend stake since the connection task between main pile body is born in the high-strength butt end
Firmness after body connection.
Detailed description of the invention
Fig. 1 is the structural representation for the ready-package modularization pile body docking structure that the first embodiment of the utility model provides
Figure.
Fig. 2 is the bindiny mechanism for the ready-package modularization pile body docking structure that second of embodiment of the utility model provides
The structural schematic diagram of inserting state.
Fig. 3 is the structural representation for the ready-package modularization pile body docking structure that the third embodiment of the utility model provides
Figure.
Fig. 4 is the separate structure schematic diagram of the bindiny mechanism in Fig. 3.
Fig. 5 is the plug assembly schematic diagram of the bindiny mechanism in Fig. 4.
Specific embodiment
Shown in referring to Fig.1, the ready-package modularization pile body docking structure that the first embodiment of the utility model provides, including
Modularization pile body 1, modularization pile body 1 include main part 2 and the high-strength butt end 3 for being laid with steel fibre, adjacent two root module
Realize that docking is fixed using bindiny mechanism between the high-strength butt end 3 of pile body 1.In the present embodiment, bindiny mechanism's structure is such as
Under: the side of the high-strength butt end 3 is evenly distributed at least three vertical slots 4, and 4 bottom of vertical slot, which is embedded with, is fixed with steel bar
5, threaded connection hole 6 is offered on steel bar 5, and the vertical slot 4 of adjacent two root modules pile body 1 is mutually aligned, and metal link block 7 is embedding
Enter in two vertical slots 4, threaded connection hole 6 be directed on metal link block 7 and offers connection through-hole, screw rod 8 pass through connection through-hole with
Threaded connection hole 6 is threadedly coupled.
Referring to shown in Fig. 2, Fig. 3, the ready-package modularization pile body docking structure of second of embodiment of the utility model offer
Essentially identical with the first embodiment, difference is only that the difference of bindiny mechanism, bindiny mechanism's structure provided by the embodiment are as follows:
1 upper and lower end face of modularization pile body is respectively provided with metal slot 9, is provided with vertical reinforcement 10 in the modularization pile body, vertically
The through-hole that reinforcing bar 10 passes through on the metal slot 9 is connect with 9 rivet clasp of metal slot, and metal slot 9 is embedded in modularization pile body 1
It is interior, have snap-on 11 in metal slot 9, snap-on 11 be to be fixed on 9 side wall of metal slot and oblique multiple elastic plates inwardly,
There is card entry slot 12, the metal slot 9 is configured with double end pin 13, and the metal of adjacent modular pile body 1 is inserted below snap-on 11
Slot 9 is plugged and fixed using double end pin 13, and the inserted terminal end of double end pin 13 has card-bit part 14, and the width of card-bit part 14 is big
Spacing between elastic plate lower end, the card-bit part 14 overcome the clamping force of elastic plate to enter in card entry slot 12, the bullet
Property board is perfused with curing agent or sealant in the top of card-bit part 14, the metal slot 9.
Referring to shown in Fig. 2, Fig. 4, Fig. 5, the ready-package modularization pile body that the third embodiment of the utility model provides is docked
Structure and second of embodiment are essentially identical, and difference is only that the difference of bindiny mechanism, bindiny mechanism's structure provided by the embodiment
As follows: metal slot 9 or metal pin 15 is respectively set in 1 upper and lower end face of modularization pile body, and metal slot 9 is embedded in module
Change in pile body 1, have snap-on 11 in metal slot 9, snap-on 11 be to be fixed on 9 side wall of metal slot and oblique inwardly multiple
Elastic plate has card entry slot 12 below snap-on 11, and the lower end of the modularization pile body 1 corresponds to the metal slot 9 and is fixed with gold
Belong to pin 15,15 lower end of metal pin has card-bit part 14, and the width of card-bit part 14 is greater than between elastic plate lower end
Spacing, the metal pin 15 of adjacent modular pile body 1 is inserted into metal slot 9, and the card-bit part 14 overcomes the folder of elastic plate
Clamp force enters in card entry slot 12, and the elastic plate is stuck in the top of card-bit part 14, and curing agent or sealing are perfused in metal slot 9
Agent.
Claims (5)
1. a kind of ready-package modularization pile body docking structure, including modularization pile body, it is characterized in that: modularization pile body includes main body
Portion and the high-strength butt end for being laid with steel fibre, it is real using bindiny mechanism between the high-strength butt end of adjacent two root modules pile body
Now docking is fixed.
2. ready-package modularization pile body docking structure according to claim 1, it is characterized in that: the side of the high-strength butt end
Face is evenly distributed at least three vertical slots, and vertical trench bottom, which is embedded with, is fixed with steel bar, offers threaded connection hole on steel bar,
The vertical slot of adjacent two root modules pile body is mutually aligned, and metal link block is embedded in two vertical slots, is aligned on metal link block
Threaded connection hole offers connection through-hole, and screw rod passes through connection through-hole and is threadedly coupled with threaded connection hole.
3. ready-package modularization pile body docking structure according to claim 1, it is characterized in that: above and below the modularization pile body
End face is respectively provided with metal slot, and metal slot is embedded in modularization pile body, and snap-on is had in metal slot, and snap-on is to be fixed on
In metal socket sidewalls and oblique inside multiple elastic plates, snap-on lower section has card entry slot, and the metal slot configuration has double
The metal slot of head pin, adjacent modular pile body is plugged and fixed using double end pin, and the inserted terminal end of double end pin has
Card-bit part, the width of card-bit part are greater than the spacing between elastic plate lower end, the card-bit part overcome the clamping force of elastic plate into
Enter in card entry slot, the elastic plate is stuck in the top of card-bit part, is perfused with curing agent or sealant in the metal slot.
4. ready-package modularization pile body docking structure according to claim 1, it is characterized in that: above and below the modularization pile body
Metal slot or metal pin is respectively set in end face, and metal slot is embedded in modularization pile body, and snap-on is had in metal slot,
Snap-on is to be fixed in metal socket sidewalls and oblique inside multiple elastic plates, has card entry slot, the module below snap-on
The lower end for changing pile body corresponds to the metal slot and is fixed with metal pin, and the metal pin lower end has card-bit part, detent
The width of part is greater than the spacing between elastic plate lower end, and the metal pin of adjacent modular pile body is inserted into metal slot, institute
Stating card-bit part overcomes the clamping force of elastic plate to enter in card entry slot, and the elastic plate is stuck in the top of card-bit part, in metal slot
It is perfused with curing agent or sealant.
5. ready-package modularization pile body docking structure according to claim 3 or 4, it is characterized in that: the modularization pile body
It is inside provided with vertical reinforcement, the through-hole that vertical reinforcement passes through on the metal slot is connect with metal slot rivet clasp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820239946.7U CN208441089U (en) | 2018-02-11 | 2018-02-11 | Ready-package modularization pile body docking structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820239946.7U CN208441089U (en) | 2018-02-11 | 2018-02-11 | Ready-package modularization pile body docking structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208441089U true CN208441089U (en) | 2019-01-29 |
Family
ID=65096674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820239946.7U Active CN208441089U (en) | 2018-02-11 | 2018-02-11 | Ready-package modularization pile body docking structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208441089U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409426A (en) * | 2019-08-01 | 2019-11-05 | 绍兴市上虞舜江管桩有限公司 | A kind of anti-corrosion property mixed mud precast square pile with orientation capillary water seepage function |
CN111636422A (en) * | 2020-04-17 | 2020-09-08 | 鸿厦建设有限公司 | Prefabricated energy pile |
CN114635416A (en) * | 2022-03-17 | 2022-06-17 | 深圳宏业基岩土科技股份有限公司 | Construction method for preventing leakage of water of prestressed pipe pile |
-
2018
- 2018-02-11 CN CN201820239946.7U patent/CN208441089U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409426A (en) * | 2019-08-01 | 2019-11-05 | 绍兴市上虞舜江管桩有限公司 | A kind of anti-corrosion property mixed mud precast square pile with orientation capillary water seepage function |
CN111636422A (en) * | 2020-04-17 | 2020-09-08 | 鸿厦建设有限公司 | Prefabricated energy pile |
CN114635416A (en) * | 2022-03-17 | 2022-06-17 | 深圳宏业基岩土科技股份有限公司 | Construction method for preventing leakage of water of prestressed pipe pile |
CN114635416B (en) * | 2022-03-17 | 2024-01-23 | 深圳宏业基岩土科技股份有限公司 | Construction method for preventing water leakage of prestressed pipe pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208441089U (en) | Ready-package modularization pile body docking structure | |
CN106894523B (en) | Connecting joint of rectangular steel pipe concrete column and steel reinforced concrete beam | |
CN210421404U (en) | Hidden bracket, connecting seat and dry method connecting node | |
CN103437547B (en) | A kind of aluminum alloy pattern plate | |
CN216739580U (en) | Precast concrete pile | |
CN214195228U (en) | Wood-concrete beam with built-in anti-seismic connecting piece | |
CN206368363U (en) | A kind of prestressed concrete prefabricated pile mechanical splice device | |
CN113931340B (en) | Assembled semi-embedded external wall panel and building | |
CN210914950U (en) | Steel fine cage hoisting device | |
CN109339347B (en) | Assembled type steel bar connector for building and using method thereof | |
CN209339305U (en) | A kind of concrete column steel construction fixation kit | |
CN211646757U (en) | Bolt connector for connecting beam and column | |
CN210151726U (en) | Portable precast pile joint connecting device | |
CN204326122U (en) | Foundation pile pressure-resistant static load test girder connector | |
CN209568609U (en) | A kind of novel outrigger ruggedized construction | |
CN105113426A (en) | Cable connector and steel truss arch bridge cable connecting method | |
CN204959605U (en) | Knotted rope hookup | |
CN212714910U (en) | Concrete pile with reinforced connecting structure | |
CN221253651U (en) | Simple ground fixing device for steel frame cable rope | |
CN215368881U (en) | Steel ladle for reinforcing wall | |
CN209722752U (en) | A kind of road bridge construction prestressed anchor device | |
CN212453187U (en) | Light prefabricated shear wall | |
CN211285581U (en) | Connecting end plate of connecting structure for precast concrete members | |
CN215829406U (en) | Tubular pile meshing type quick joint structure | |
CN209568610U (en) | A kind of outrigger ruggedized construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |