CN208433804U - A kind of power supply circuit - Google Patents

A kind of power supply circuit Download PDF

Info

Publication number
CN208433804U
CN208433804U CN201821111719.2U CN201821111719U CN208433804U CN 208433804 U CN208433804 U CN 208433804U CN 201821111719 U CN201821111719 U CN 201821111719U CN 208433804 U CN208433804 U CN 208433804U
Authority
CN
China
Prior art keywords
power device
electric
switch
electric substation
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821111719.2U
Other languages
Chinese (zh)
Inventor
张俊禄
卜莉娟
刘炜
赵勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201821111719.2U priority Critical patent/CN208433804U/en
Application granted granted Critical
Publication of CN208433804U publication Critical patent/CN208433804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to double-purpose electric installations for electrical domain.A kind of power supply circuit, including the first power device 6, the second power device 7, first power device 6 is by the first electric substation as main power supply, first power device 6 is electric as available by one group of the second electric substation, second power device 7 is by one group of the second electric substation as main power supply, second power device 7 is electric as available by two groups of the second electric substation, first switch 1 is installed on the route between first power device 6 and the first electric substation, second switch 5 is installed on the route between one group of the first power device 6 and the second electric substation.In the case where supply network pattern is constant, the active and standby power supply for only a contact branch being needed to can be realized as double-purpose electric installation will not influence the power supply of double-purpose electric installation when any one power transformation problem occurring.

Description

A kind of power supply circuit
Technical field
The utility model relates to double-purpose electric installations for electrical domain.
Background technique
For dual power supply electric substations multiple for user, some electric substation easily occurs to cause to use since higher level substation has a power failure The case where family electric substation power loss, such as: certain user has dual power supply electric substation A and B, and wherein two telegram in reply sources of A electric substation come from one A higher level substation M, two telegram in reply sources of B electric substation are from higher level's power supply substation M, N.And two customer substations of A, B share One telegram in reply source.
At power supply station when M whole station power loss, it will lead to customer substation A whole station power loss, influence to produce.
Summary of the invention
The technical problem to be solved by the utility model is to how to solve powerup issue present in background technique.
The technical scheme adopted by the utility model is a kind of power supply circuit, including the first power device 6, the second electricity consumption Device 7, for the first power device 6 by the first electric substation as main power supply, the first power device 6 passes through one group of work of the second electric substation For available electricity, the second power device 7 passes through one group of the second electric substation as main power supply, and the second power device 7 passes through the second power transformation Two groups of institute is equipped with first switch 1 as available electricity on the route between the first power device 6 and the first electric substation, first uses Second switch 5, the second power device 7 and the second electric substation are installed on the route between one group of electric installation 6 and the second electric substation Third switch 4 is installed on the route between one group, is installed on the route between two groups of the second power device 7 and the second electric substation There is the 4th switch 3, is installed on the first power device 6 and the public bus of one group of the second electric substation of the second power device 7 connection 5th switch 2 installs the contact branch of one article of the 6th switch 8 of point additional, gets in touch with one end connection second switch 5 and the 5th switch of branch Route between 2 gets in touch with the route between the other end connection first switch 1 of branch and the first power device 6.
The beneficial effects of the utility model are: only needing a contact branch just in the case where supply network pattern is constant The active and standby power supply that can be realized double-purpose electric installation will not influence double-purpose electric installation when any one power transformation problem occurring Power supply.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Wherein, 1, first switch, the 2, the 5th switch, the 3, the 4th switch, 4, third switch, 5, second switch, 6, first uses Electric installation, the 7, second power device, the 8, the 6th switch.
Specific embodiment
As shown in Figure 1, (second uses four pumping plant of water supply of the 10kV of Shanxi Taigang Stainless Steel Co., Ltd's water process Electric installation 7) and the water supply Switching Station (the first power device 6) of 10kV be dual power supply electric substation, wherein four pumping plant power transformations of supplying water Two telegram in reply sources (main power source and stand-by power source) be all from the electricity generation system substation (the second electric substation) of a higher level 10kV, The two telegram in reply sources (main power source and stand-by power source) of the water supply Switching Station electric substation of 10kV come from from first electric substation's another way all the way Second electric substation.Supply water four pumping plants and water supply Switching Station shares the one group of power supply of the second electric substation.
In the April in 2017 of second electric substation's whole station power loss on the 11st, lead to the four pumping plant whole station power loss that supply water, entire company disappears Waterproof interrupts supply, and many equipment face the danger of anhydrous fire fighting and rescue.
Water supply Switching Station to realize 10kV is needed to that can provide power supply to four pumping plants that supply water rapidly in two power devices Between increase interconnection (contact branch).In view of two stop spacings are from remote, difficulty of construction is big for new route.After proving repeatedly, It is as shown in Figure 1 following improvement has been gone out.
A kind of power supply circuit, including the first power device 6, the second power device 7, the first power device 6 become by first Electricity be used as main power supply, and the first power device 6 is electric as available by one group of the second electric substation, and the second power device 7 passes through the Two one group of electric substations are used as available electricity, the first power device for two groups by the second electric substation as main power supply, the second power device 7 6 and the first route between electric substation on first switch 1 is installed, between one group of the first power device 6 and the second electric substation Second switch 5 is installed on route, third switch is installed on the route between one group of the second power device 7 and the second electric substation 4, the 4th switch 3 is installed on the route between two groups of the second power device 7 and the second electric substation, in 6 He of the first power device Second power device 7, which connects, installs the 5th switch 2 on the public bus of one group of the second electric substation, install one article of the 6th switch 8 of point additional Contact branch, get in touch with branch one end connection second switch 5 and the 5th switch 2 between route, get in touch with the other end of branch Connect the route between first switch 1 and the first power device 6.
When whole power-off occurs for the second electric substation, the 5th switch 2, second switch 5, the 4th switch 3, closure the 6th are opened Switch 8 realizes power supply of first electric substation to the second power device.

Claims (1)

1. a kind of power supply circuit, including the first power device (6), the second power device (7), the first power device (6) passes through the One electric substation is used as available electricity, the second power device for one group by the second electric substation as main power supply, the first power device (6) (7) passing through one group of the second electric substation as main power supply, the second power device (7) is electric as available by two groups of the second electric substation, It is equipped on route between first power device (6) and the first electric substation first switch (1), the first power device (6) and It is equipped with second switch (5) on route between two one group of electric substations, between one group of the second power device (7) and the second electric substation Route on third switch (4) is installed, the is equipped on the route between two groups of the second power device (7) and the second electric substation Four switches (3), it is characterised in that: in the public affairs of the first power device (6) and one group of the second electric substation of the second power device (7) connection With the 5th switch (2) of installation on bus, the contact branch that one article of point the 6th switchs (8) is installed additional, get in touch with one end connection the of branch Denso is used in route between two switches (5) and the 5th switch (2), other end connection first switch (1) and first for getting in touch with branch Set the route between (6).
CN201821111719.2U 2018-07-13 2018-07-13 A kind of power supply circuit Active CN208433804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821111719.2U CN208433804U (en) 2018-07-13 2018-07-13 A kind of power supply circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821111719.2U CN208433804U (en) 2018-07-13 2018-07-13 A kind of power supply circuit

Publications (1)

Publication Number Publication Date
CN208433804U true CN208433804U (en) 2019-01-25

Family

ID=65099961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821111719.2U Active CN208433804U (en) 2018-07-13 2018-07-13 A kind of power supply circuit

Country Status (1)

Country Link
CN (1) CN208433804U (en)

Similar Documents

Publication Publication Date Title
CN208433804U (en) A kind of power supply circuit
CN104377809A (en) Intelligent control device of communication station low-voltage distribution system
CN204407733U (en) A kind of cable branch box
CN204696531U (en) A kind of drawer-type switch cabinet drawer
CN203445687U (en) SF6 dual-supply spare auto-switching-on ring network cabinet
CN204633474U (en) A kind of high-tension switch cabinet long distance control system
CN104377805A (en) Communication station low-voltage distribution system
CN102946101A (en) Single-power-supply ring network power supply system
CN202888832U (en) Single-power ring network power supply system
CN207053251U (en) A kind of grid entry point supervising device of family expenses photovoltaic generating system
CN203242949U (en) Intelligent high-voltage centrally-installed cabinet
CN204992278U (en) Multi -path intelligent distribution box
CN204303112U (en) Power carrier fire-alarm
CN105634116A (en) T
CN204089151U (en) A kind of family with leakage current protection device table case
CN204441995U (en) Become comprehensive power distribution power supply panel
CN209982061U (en) Integrated power supply wiring device of transformer substation
CN220527413U (en) Combined electrical apparatus with bypass bus
CN204597235U (en) Voltage switchgear Power transfer system
CN205213110U (en) Light control system
CN203086040U (en) Remotely controllable intelligent switch cabinet
CN210246318U (en) Water supply installation of dual supply circuit
CN203225458U (en) Low voltage switch cabinet power down automatic connection system
CN212323810U (en) Unit connecting device for reducing power consumption of off-grid electricity
CN102448092B (en) Timing device for generator of communication base station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant