CN208430849U - A kind of steel construction steel tower equipped with fixed pedestal - Google Patents

A kind of steel construction steel tower equipped with fixed pedestal Download PDF

Info

Publication number
CN208430849U
CN208430849U CN201821090599.2U CN201821090599U CN208430849U CN 208430849 U CN208430849 U CN 208430849U CN 201821090599 U CN201821090599 U CN 201821090599U CN 208430849 U CN208430849 U CN 208430849U
Authority
CN
China
Prior art keywords
fixed
connecting plate
tower
support bar
fixed pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821090599.2U
Other languages
Chinese (zh)
Inventor
黑建磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Wande Tower Co Ltd
Original Assignee
Qingdao Wande Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Wande Tower Co Ltd filed Critical Qingdao Wande Tower Co Ltd
Priority to CN201821090599.2U priority Critical patent/CN208430849U/en
Application granted granted Critical
Publication of CN208430849U publication Critical patent/CN208430849U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel construction steel tower equipped with fixed pedestal, including pinnacle of a pagoda, balancing device, fixed pedestal ontology, tower body, tower seat, the first support bar, ladder and side arm, the pinnacle of a pagoda is mounted at the top of tower body, and tower body is mounted at the top of tower seat, the ladder is mounted on the side of tower body;Steel tower is steel construction, is conducive to save the cost, easy for construction, antidetonation, uprising rain better performances, and safety is higher, the side of steel tower is equipped with ladder, and by wrapped with insulation outside ladder, tower is stepped on convenient for staff, first support bar intersection is mounted on inside tower body, is conducive to the stability for improving tower body, and the bottom of tower seat is equipped with balancing device, advantageously ensure that steel tower balances, and the place installation complicated in environment convenient for steel tower;By being mounted on the fixed pedestal ontology of balancing device bottom, and fixed pedestal ontology is fixed on the ground by concrete, is conducive to that steel tower is kept to stablize, is not easy to tilt.

Description

A kind of steel construction steel tower equipped with fixed pedestal
Technical field
The utility model relates to steel tower equipment technical field, specially a kind of steel construction steel tower equipped with fixed pedestal.
Background technique
Steel tower is a kind of tall and slender structure for installing communication antenna, multiple tower legs and multiple tower sections is generally comprised, with the modern times The fast development of industry, it is higher and higher to the reliability requirement of power grid power supply, and steel tower is the capital equipment of power grid power supply, steel tower It is generally formed by including multiple tower legs and multiple tower sections, still, existing steel tower generallys use the interior steel reinforcement cage and steel tower tower on basis Seat connection, can not effectively keep the balance of steel tower, and be not easy to be mounted on region with a varied topography, the stability of steel tower and securely Property is also unable to get effective guarantee, therefore, it is necessary to design a kind of steel construction steel tower equipped with fixed pedestal.
Utility model content
The purpose of this utility model is to provide a kind of steel construction steel tower equipped with fixed pedestal, to solve above-mentioned background skill The problem of being proposed in art.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solutions: a kind of steel equipped with fixed pedestal Structure steel tower, including pinnacle of a pagoda, balancing device, fixed pedestal ontology, tower body, tower seat, the first support bar, ladder and side arm, it is described Pinnacle of a pagoda is mounted at the top of tower body, and tower body is mounted at the top of tower seat, and the ladder is mounted on the side of tower body, the top of the ladder Portion extends to pinnacle of a pagoda, and the bottom of ladder connects ground, and the two sides of the tower body and pinnacle of a pagoda are fixed with several side arms, described flat Weighing apparatus device is mounted on the bottom of tower seat;
The balancing device include piston, sliding sleeve, piston rod, compressed spring, guide rod, the first connecting plate, movable screw, One end of second connecting plate, third connecting plate, the 4th connecting plate and groove, first connecting plate is fixed on by movable screw One end of second connecting plate, and the first connecting plate and the second connecting plate surround two rectangles, one end of the third connecting plate is logical Cross one end that movable screw is fixed on the 4th connecting plate, and third connecting plate and the 4th connecting plate surround a rectangle, described The side of four connecting plates is mounted on the side among third connecting plate by movable screw, opens up at the top of first connecting plate Fluted, by being welded with guide rod, the outside of the guide rod is socketed with compressed spring, and presses for the bottom of the groove The other end of contracting spring is fixed by welding in the bottom of piston, and the one of piston rod is fixed by welding at the top of the piston End, and one end of piston rod is connect across the top of the first connecting plate with the bottom of tower seat, the fixed pedestal ontology is fixed on The bottom of first connecting plate;
The fixed pedestal ontology includes fixed screw, shell, the second support bar, bottom plate, third support bar and on Fixed plate, one end of the fixed screw is fixed on the bottom of the first connecting plate by nut, and the other end of fixed screw is worn It crosses at the top of shell and is fixed by welding in the top of upper mounted plate, the side of fixed plate is fixed by welding in shell The bottom of the top of inner wall, fixed plate is connect by welding with one end of the second support bar and third support bar, and the The other end of two support bars and third support bar is fixed by welding in the top of bottom plate, and the side of bottom plate passes through It is weldingly fixed on the lower section of outer casing inner wall.
Further, the tower body is internally connected with the first support bar, and the first support bar interconnection.
Further, the pinnacle of a pagoda is mounted at the top of tower body by bolt, and tower body is mounted at the top of tower seat by bolt.
Further, first connecting plate has four, and connects respectively at four feet of tower seat bottom.
Further, sliding sleeve is socketed with outside the piston rod, and sliding sleeve is fixed by welding in the top of the first connecting plate Portion.
Further, there are four the fixed pedestal ontologies, the fixed pedestal ontology is separately mounted to four piece of first company The bottom of fishplate bar, and four angles of each fixed pedestal bodies top are symmetrically fixed with four fixed screws.
Further, the third support bar inside arranged in a crossed manner in shell.
Compared with prior art, the utility model beneficial effect achieved is: the utility model, steel tower are steel construction, Be conducive to save the cost, easy for construction, antidetonation, uprising rain better performances, and safety is higher, the side of steel tower, which is equipped with, to be climbed Ladder, and by wrapped with insulation outside ladder, tower is stepped on convenient for staff, the first support bar intersection is mounted on inside tower body, has Conducive to the stability for improving tower body, the bottom of tower seat is equipped with balancing device, advantageously ensures that steel tower balances, and exist convenient for steel tower The complicated place installation of environment;By being mounted on the fixed pedestal ontology of balancing device bottom, and fixed pedestal ontology is by mixing Solidifying soil fixes on the ground, is conducive to that steel tower is kept to stablize, is not easy to tilt.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the whole positive structure diagram of the utility model;
Fig. 2 is the balancing device positive structure diagram of the utility model;
Fig. 3 is the balancing device side structure schematic view of the utility model;
Fig. 4 is the fixed pedestal ontology positive structure diagram of the utility model;
In figure: 1, pinnacle of a pagoda;2, balancing device;3, fixed pedestal ontology;4, tower body;5, tower seat;6, the first support bar;7, it climbs Ladder;8, side arm;19, piston;20, sliding sleeve;21, piston rod;22, compressed spring;23, guide rod;24, the first connecting plate;25, living Dynamic screw;26, the second connecting plate;27, third connecting plate;28, the 4th connecting plate;29, groove;31, fixed screw;32, shell; 33, the second support bar;34, bottom plate;35, third support bar;36, upper mounted plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of steel construction steel tower equipped with fixed pedestal, Including pinnacle of a pagoda 1, balancing device 2, fixed pedestal ontology 3, tower body 4, tower seat 5, the first support bar 6, ladder 7 and side arm 8, pinnacle of a pagoda 1 It is mounted on 4 top of tower body by bolt, and tower body 4 is mounted on 5 top of tower seat by bolt, mounts and dismounts convenient for steel tower, tower Body 4 is internally connected with the first support bar 6, and 6 interconnection of the first support bar, is conducive to tower body 4 and stablizes, ladder 7 is mounted on tower The side of body 4, the top of ladder 7 extends to pinnacle of a pagoda 1, and the bottom of ladder 7 connects ground, and tower body 4 and the two sides of pinnacle of a pagoda 1 are fixed There are several side arms 8, balancing device 2 is mounted on the bottom of tower seat 5;Balancing device 2 include piston 19, sliding sleeve 20, piston rod 21, Compressed spring 22, guide rod 23, the first connecting plate 24, movable screw 25, the second connecting plate 26, third connecting plate the 27, the 4th connect Fishplate bar 28 and groove 29, the first connecting plate 24 has four, and connects respectively at four feet of 5 bottom of tower seat, is conducive to steel tower guarantor Maintain an equal level weighing apparatus, and one end of the first connecting plate 24 is fixed on one end of the second connecting plate 26, and the first connecting plate by movable screw 25 24 and second connecting plate 26 surround two rectangles, one end of third connecting plate 27 is fixed on the 4th connecting plate by movable screw 25 28 one end, and third connecting plate 27 and the 4th connecting plate 28 surround a rectangle, the side of the 4th connecting plate 28 passes through activity Screw 25 is mounted on the side among third connecting plate 27, and the top of the first connecting plate 24 opens up fluted 29, the bottom of groove 29 Portion is socketed with compressed spring 22, and the other end of compressed spring 22 by being welded with guide rod 23, the outside of guide rod 23 It is fixed by welding in the bottom of piston 19, the top of piston 19 is fixed by welding in one end of piston rod 21, and piston rod The top that 21 one end passes through the first connecting plate 24 is connect with the bottom of tower seat 5, sliding sleeve 20 is socketed with outside piston rod 21, and sliding Set 20 is fixed by welding in the top of the first connecting plate 24, is conducive to more smooth when piston rod 21 slides and stablizes, fixed base There are four seat ontologies 3, and fixed pedestal ontology 3 is separately mounted to the bottom of four piece of first connecting plate 24;Fixed pedestal ontology 3 includes Fixed screw 31, shell 32, the second support bar 33, bottom plate 34, third support bar 35 and upper mounted plate 36, fixed screw 31 One end be fixed on the bottom of the first connecting plate 24 by nut, and the other end of fixed screw 31 pass through shell 32 top it is logical The top for being weldingly fixed on upper mounted plate 36 is crossed, and four angles at 3 top of each fixed pedestal ontology are symmetrically fixed with four Fixed screw 31 is conducive to steel tower installation stabilization with securely, and the side of upper mounted plate 36 is fixed by welding in 32 inner wall of shell Top, the bottom of upper mounted plate 36 connect by welding with one end of the second support bar 33 and third support bar 35, and second The other end of support bar 33 and third support bar 35 is fixed by welding in the top of bottom plate 34, and third support bar 35 intersects The inside of shell 32 is set, is conducive to the stability for enhancing fixed pedestal ontology 3, and the side of bottom plate 34 passes through welding It is fixed on the lower section of 32 inner wall of shell;Steel tower is made of pinnacle of a pagoda 1, tower body 4 and tower seat 5, and steel tower is steel construction, is conducive to save Cost, easy for construction, antidetonation, uprising rain better performances, and safety is higher, the side of steel tower is equipped with ladder 7, and ladder 7 Tower is stepped on by wrapped with insulation, convenient for staff in outside, and the first support bar 6 intersection is mounted on inside tower body 4, is conducive to improve The stability of tower body 4, the bottom of tower seat 5 are equipped with balancing device 2, advantageously ensure that steel tower balances, and convenient for steel tower in environment Complicated place installation, balancing device 2 include piston 19, sliding sleeve 20, piston rod 21, compressed spring 22, the company of guide rod 23, first Fishplate bar 24, movable screw 25, the second connecting plate 26, third connecting plate 27, the 4th connecting plate 28 and groove 29, by the first connecting plate 24 and second connecting plate 26 by connection two rectangles of composition of movable screw 25, and rectangle is placed longitudinally, by third connecting plate 27 With the 4th connecting plate 28 by connection one rectangle of composition of movable screw 25, and it is placed across by the first connecting plate 24 and second Among two rectangles that connecting plate 26 forms, when the bottom stress of first connecting plate 24 retraction, the power being subject to can pass through Second connecting plate 26 passs another first connecting plate 24 in the same rectangle, and another second connecting plate 26 is made to do reversed fortune It is dynamic, it balances side always, when two first 6 all forced contractions of support bar of the same rectangle, third connecting plate can be passed through 27 and the 4th connecting plate 28 pass to longitudinal rectangle of the other side, so that longitudinal rectangle of the other side is done counter motion, steel tower made to begin Eventually balance, make when the first 24 forced contraction of connecting plate the compressed spring 22 being arranged in inside the first connecting plate 24 by upward Active force, and steel tower is affected by gravity and applies downward pressure to compressed spring 22 by piston rod 21 and piston 19, makes to press Contracting spring 22 compresses, to guarantee that the tower seat 5 for being mounted on 24 top of the first connecting plate balances, does not shake;Fixed pedestal ontology 3 is pacified Mounted in the bottom of each first connecting plate 24, fixed pedestal ontology 3 includes supporting including fixed screw 31, shell 32, second Item 33, bottom plate 34, third support bar 35 and upper mounted plate 36, the top of each fixed pedestal ontology 3 is fixed, and there are four solid Screw 31 is determined, and fixed screw 31 is fixed on the bottom of each first connecting plate 24 by nut, in fixed pedestal ontology 3 Be internally provided with the second support bar 33, and third support bar 35, and 35 interconnection of third support bar bottom plate 34 with it is upper Between fixed plate 36, be conducive to the support force for enhancing fixed pedestal ontology 3, fixed pedestal ontology 3 is fixed on ground by concrete On face, is conducive to that steel tower is kept to stablize, is not easy to tilt.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (7)

1. a kind of steel construction steel tower equipped with fixed pedestal, including pinnacle of a pagoda (1), balancing device (2), fixed pedestal ontology (3), tower Body (4), tower seat (5), the first support bar (6), ladder (7) and side arm (8), it is characterised in that: the pinnacle of a pagoda (1) is mounted on tower body (4) top, and tower body (4) is mounted at the top of tower seat (5), the ladder (7) is mounted on the side of tower body (4), the ladder (7) Top extend to pinnacle of a pagoda (1), and ladder (7) bottom connect ground, the tower body (4) and the two sides of pinnacle of a pagoda (1) are fixed with Several side arms (8), the balancing device (2) are mounted on the bottom of tower seat (5);
The balancing device (2) include piston (19), sliding sleeve (20), piston rod (21), compressed spring (22), guide rod (23), First connecting plate (24), movable screw (25), the second connecting plate (26), third connecting plate (27), the 4th connecting plate (28) and recessed Slot (29), one end of first connecting plate (24) are fixed on one end of the second connecting plate (26) by movable screw (25), and First connecting plate (24) and the second connecting plate (26) surround two rectangles, and one end of the third connecting plate (27) passes through movable screw Silk (25) is fixed on one end of the 4th connecting plate (28), and third connecting plate (27) and the 4th connecting plate (28) surround a square The side of shape, the 4th connecting plate (28) is mounted on the intermediate side of third connecting plate (27), institute by movable screw (25) It states and is opened up at the top of the first connecting plate (24) fluted (29), the bottom of the groove (29) is by being welded with guide rod (23), the outside of the guide rod (23) is socketed with compressed spring (22), and the other end of compressed spring (22) is solid by welding It is scheduled on the bottom of piston (19), one end of piston rod (21), and piston rod are fixed by welding at the top of the piston (19) (21) top that one end passes through the first connecting plate (24) is connect with the bottom of tower seat (5), and the fixed pedestal ontology (3) is fixed In the bottom of the first connecting plate (24);
The fixed pedestal ontology (3) includes fixed screw (31), shell (32), the second support bar (33), bottom plate (34), One end of third support bar (35) and upper mounted plate (36), the fixed screw (31) is fixed on the first connecting plate by nut (24) bottom, and the other end of fixed screw (31) passes through and is fixed by welding in upper mounted plate (36) at the top of shell (32) Top, the side of fixed plate (36) is fixed by welding in the top of shell (32) inner wall, fixed plate (36) bottom is connect by welding with one end of the second support bar (33) and third support bar (35), and the second support bar (33) The top of bottom plate (34), and the side of bottom plate (34) are fixed by welding in the other end of third support bar (35) It is fixed by welding in the lower section of shell (32) inner wall.
2. a kind of steel construction steel tower equipped with fixed pedestal according to claim 1, it is characterised in that: the tower body (4) It is internally connected with the first support bar (6), and the first support bar (6) interconnection.
3. a kind of steel construction steel tower equipped with fixed pedestal according to claim 1, it is characterised in that: the pinnacle of a pagoda (1) It is mounted at the top of tower body (4) by bolt, and tower body (4) is mounted at the top of tower seat (5) by bolt.
4. a kind of steel construction steel tower equipped with fixed pedestal according to claim 1, it is characterised in that: first connection Plate (24) has four, and connects respectively at four feet of tower seat (5) bottom.
5. a kind of steel construction steel tower equipped with fixed pedestal according to claim 1, it is characterised in that: the piston rod (21) external to be socketed with sliding sleeve (20), and sliding sleeve (20) is fixed by welding in the top of the first connecting plate (24).
6. a kind of steel construction steel tower equipped with fixed pedestal according to claim 1, it is characterised in that: the fixed pedestal There are four ontologies (3), and the fixed pedestal ontology (3) is separately mounted to the bottom of four piece of first connecting plate (24), and each solid Determine four angles at the top of base body (3) and is symmetrically fixed with four fixed screws (31).
7. a kind of steel construction steel tower equipped with fixed pedestal according to claim 1, it is characterised in that: the third support Item (35) inside arranged in a crossed manner in shell (32).
CN201821090599.2U 2018-07-11 2018-07-11 A kind of steel construction steel tower equipped with fixed pedestal Expired - Fee Related CN208430849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821090599.2U CN208430849U (en) 2018-07-11 2018-07-11 A kind of steel construction steel tower equipped with fixed pedestal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821090599.2U CN208430849U (en) 2018-07-11 2018-07-11 A kind of steel construction steel tower equipped with fixed pedestal

Publications (1)

Publication Number Publication Date
CN208430849U true CN208430849U (en) 2019-01-25

Family

ID=65099768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821090599.2U Expired - Fee Related CN208430849U (en) 2018-07-11 2018-07-11 A kind of steel construction steel tower equipped with fixed pedestal

Country Status (1)

Country Link
CN (1) CN208430849U (en)

Similar Documents

Publication Publication Date Title
CN204728672U (en) A kind of base of adjustable supports mobile operation platform
CN208430849U (en) A kind of steel construction steel tower equipped with fixed pedestal
CN207046733U (en) A kind of post supporting device for cantilever crane
CN207960131U (en) A kind of cylindrical column Quick installation equipment
CN208559386U (en) A kind of Management offorestry patrol record carrying device
CN204474186U (en) A kind of telescopic attaching frame
CN211285323U (en) Anti-seismic mechanism for sound barrier
CN211341671U (en) Scaffold frame for spraying convenient to height-adjusting
CN214220267U (en) Bearing part for building structure design
CN210031934U (en) Highway bridge pile foundation reinforcing apparatus
CN208684274U (en) A kind of easy-to-mount tower crane pull rod fixed frame
CN207530446U (en) A kind of adjustable cable unwinding device
CN207744056U (en) A kind of smart television convenient for adjusting height
CN214444547U (en) CNC is shock attenuation frame for digit control machine tool
CN201667282U (en) Capacitive divider
CN207499494U (en) Timber buildings truncated cylinder strengthening construction device
CN206693505U (en) A kind of antidetonation crossbeam for reinforced concrete structure
CN108891620A (en) A kind of aircraft assembly fitter's bench anticollision device, collision-prevention device
CN209618612U (en) A kind of fixed device of building construction hoist
CN218951996U (en) Road bridge support bracket
CN207738348U (en) A kind of tower crane counter-jib connection structure that can improve stability
CN211228107U (en) Platform for bridge side cable construction
CN214618842U (en) Multifunctional measuring device for water conservancy investigation design
CN211622075U (en) Shock attenuation anti-wind type steel construction
CN214384303U (en) Antidetonation formula petroleum pipeline support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190125

Termination date: 20190711