CN208430732U CN201820776359.1U CN201820776359U CN208430732U CN 208430732 U CN208430732 U CN 208430732U CN 201820776359 U CN201820776359 U CN 201820776359U CN 208430732 U CN208430732 U CN 208430732U
Authority
CN
China
Prior art keywords
stone material
wall
metal hanger
grooving
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820776359.1U
Other languages
Chinese (zh)
Inventor
周强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Rio Tinto Industrial Development Co Ltd
Original Assignee
Henan Rio Tinto Industrial Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Rio Tinto Industrial Development Co Ltd filed Critical Henan Rio Tinto Industrial Development Co Ltd
Priority to CN201820776359.1U priority Critical patent/CN208430732U/en
Application granted granted Critical
Publication of CN208430732U publication Critical patent/CN208430732U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a kind of stone material wet combining connection structures, including stone material, wall and the metal hanger being connected between stone material and wall, the plate face towards wall of the stone material is equipped with the grooving connected for metal hanger, and the metal hanger stretches out stone material and the wall connecting portion with wall connecting with the insertion grooving and the stone material interconnecting piece Nian Jie with stone material and upwards.Back face of stone is first subjected to grooving processing when implementation, the slabstone interconnecting piece of metal hanger is inserted into grooving and, back face of stone smearing stone material alite paste Nian Jie with slabstone by it on stone material after wall leveling, wall connecting is fixed on metope.Compared with the prior art, the fastness of stone material wet combining technique is strengthened, construction method is simple to operation, and components are easily worked, and accelerates construction efficiency, consequently reduces construction cost.

Description

A kind of stone material wet combining connection structure
Technical field
The utility model belongs to building construction field, and in particular to a kind of stone material wet combining connection structure.
Background technique
Stone slab is with a long history for facing finishing, and common construction method has wet combining method, dry-hanging method and half dry-hanging method (half Wet extension method), wet combining method selects suitable glue for tile as adhesives bed board, and cost is relatively low, but under by external environment influence, Stone material and substrate bonding power decline, and safety is poor.Dry-hanging method ornamental stone is directly hung on metal hanger metope or Sky is hung on steelframe, and safety and durability significantly improve, but higher cost, and the overall thickness after construction is thicker.
The advantages of half dry-hanging method (semi-moist extension method) technique combines wet combining method and dry-hanging method, current form of construction work are as follows: 1, In back face of stone joint-cutting, copper wire arranges around joint-cutting and uses dedicated marble glue sticking, and copper wire both ends are stretched out upwards, copper wire and by stone Material is hung on copper wire;2, setscrew is stamped on the wall again, it is with copper wire that screw and stone material bolt is firm;3, it is filled between stone material and metope Cement mortar.
Half dry-hanging method (half wet combining method) reduces the construction cost of dry-hanging method and improves wet combining method to a certain extent The safety of connection structure and durability.But current half dry-hanging method (semi-moist extension method) still has the shortcomings that certain, i.e. its stickup Power is still weaker, and stone slab is easy to fall off, and construction quality is unsecured, is only capable of using in low-rise building.
Utility model content
The purpose of this utility model is to provide a kind of stone material wet combining connection structures, exist to solve existing connection structure Adherence force is weak, the problem of stone material is easy to fall off.
To achieve the above object, the stone material wet combining connection structure of the utility model uses following technical scheme: stone material wet combining Connection structure includes stone material, wall and the metal hanger being connected between stone material and wall, the plate towards wall of the stone material Face is equipped with the grooving connected for metal hanger, and the metal hanger, which has, is inserted into the grooving and the stone material company Nian Jie with stone material Socket part and upwards stretching stone material and the wall connecting portion with wall connecting, the metal hanger are L-type structure, and L-type structure has One horizontal component and a vertical portion, horizontal component form the stone material interconnecting piece, and vertical portion forms the wall connecting portion, The end in the wall connecting portion is equipped with connecting hole, and the steel nail of connection metal hanger and wall, metal hanging are coated in connecting hole Part is fixed on the wall by steel nail, and stone material alite paste adhesive layer is equipped in the interval between stone material and wall.
The utility model has the advantages that back face of stone is first carried out grooving processing when implementing, the slabstone interconnecting piece insertion of metal hanger is cut Slot is simultaneously Nian Jie with slabstone by it, and back face of stone smears stone material alite paste, and on stone material after wall leveling, wall connecting is fixed to On metope.Compared with the prior art, the fastness of stone material wet combining technique is strengthened, construction method is simple to operation, and components hold Easy processing accelerates construction efficiency, consequently reduces construction cost.
Further, the length of the horizontal component is greater than the groove depth of the grooving.
Further, the metal hanger is bent to form by stainless steel.
Further, the stone material interconnecting piece is Nian Jie by AB glue with stone material.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the embodiments of the present invention, for this For the those of ordinary skill of field, without any creative labor, it can also be obtained according to these attached drawings other Attached drawing;
Fig. 1 is the structural schematic diagram of the specific embodiment of the stone material wet combining connection structure of the utility model.
In figure: 1- stone material, 2- wall, 3- metal hanger, 4- horizontal component, 5- vertical portion, 6- steel nail, 7- adhesive layer.
Specific embodiment
In order to keep the technical purpose, technical scheme and beneficial effects of the utility model clearer, with reference to the accompanying drawing and Specific embodiment is further illustrated the technical solution of the utility model.
As shown in Figure 1, stone material wet combining connection structure includes stone material 1, wall 2 and is connected between stone material 1 and wall 2 Metal hanger 3, the plate face towards wall 2 of stone material 1 are equipped with the grooving connected for metal hanger 3, and metal hanger is L-type knot Structure, by 0.8mm, thick, 304 stainless steels are bent to form L-type structure, have a horizontal component 4 and a vertical portion 5.
The length of horizontal component 4 be less than vertical portion 5 length, horizontal component 5 be inserted into grooving and by by AB glue with Stone material 1 is bonded.The end of vertical portion 5 is equipped with connecting hole, and the steel nail of connection metal hanger 3 and wall 2 is coated in connecting hole 6, metal hanger 3 is fixed on wall 2 by steel nail 6.The length of horizontal component 4 is greater than the groove depth of grooving, stone material 1 in the present embodiment The adhesive layer 7 formed by stone material alite paste is equipped in interval between wall 2.
1 back side of stone material is first subjected to grooving processing when implementation, by the horizontal component insertion grooving of metal hanger 3, uses AB Glue is Nian Jie with slabstone by metal hanger 3, smears stone material alite paste at 1 back side of stone material, will be golden with steel nail 6 on stone material 1 after wall leveling Belong to pendant 3 to be fixed on wall 2.Compared with the prior art, the fastness that stone material 1 is connect with wall 2, construction method letter are strengthened Single easy to operate, components are easily worked, and accelerate construction efficiency, consequently reduce construction cost.
In other embodiments, metal hanger can also be arranged to other structures form, such as J-type or Z type etc.. In addition, more than two metal hangers also can be set on same slabstone, metal hanger can also make of other materials.
It should be noted last that: the technical solution of the utility model that the above embodiments are only illustrative and not limiting is appointed What to the utility model carry out equivalent replacement and do not depart from the spirit and scope of the utility model modification or part replace, It should cover within the scope of the utility model claims protection.

Claims (4)

1. stone material wet combining connection structure, including stone material, wall and the metal hanger being connected between stone material and wall, the stone material The plate face towards wall be equipped with the grooving that connect for metal hanger, it is characterised in that: the metal hanger, which has, is inserted into institute It states grooving and the stone material interconnecting piece Nian Jie with stone material and stretches out stone material and the wall connecting portion with wall connecting, the metal upwards Pendant is L-type structure, and L-type structure has a horizontal component and a vertical portion, and horizontal component forms the stone material interconnecting piece, is erected The wall connecting portion is directly partially formed, the end in the wall connecting portion is equipped with connecting hole, and connection gold is coated in connecting hole Belong to the steel nail of pendant and wall, metal hanger is fixed on the wall by steel nail, and stone material is equipped in the interval between stone material and wall Alite paste adhesive layer.
2. stone material wet combining connection structure according to claim 1, it is characterised in that: the length of the horizontal component is greater than institute State the groove depth of grooving.
3. stone material wet combining connection structure according to claim 1 or 2, it is characterised in that: the metal hanger is by stainless steel It is bent to form.
4. stone material wet combining connection structure according to claim 1 or 2, it is characterised in that: the stone material interconnecting piece and stone material It is bonded by AB glue.
CN201820776359.1U 2018-05-24 2018-05-24 A kind of stone material wet combining connection structure Active CN208430732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820776359.1U CN208430732U (en) 2018-05-24 2018-05-24 A kind of stone material wet combining connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820776359.1U CN208430732U (en) 2018-05-24 2018-05-24 A kind of stone material wet combining connection structure

Publications (1)

Publication Number Publication Date
CN208430732U true CN208430732U (en) 2019-01-25

Family

ID=65103562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820776359.1U Active CN208430732U (en) 2018-05-24 2018-05-24 A kind of stone material wet combining connection structure

Country Status (1)

Country Link
CN (1) CN208430732U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779215A (en) * 2019-02-03 2019-05-21 广东翔顺建筑工程有限公司 The wet hanging interior wall polished bricks construction Simple hangings of one kind and construction method
CN113833226A (en) * 2021-09-13 2021-12-24 深圳市奇信集团股份有限公司 Stone dry-hanging structure and stone dry-hanging construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779215A (en) * 2019-02-03 2019-05-21 广东翔顺建筑工程有限公司 The wet hanging interior wall polished bricks construction Simple hangings of one kind and construction method
CN113833226A (en) * 2021-09-13 2021-12-24 深圳市奇信集团股份有限公司 Stone dry-hanging structure and stone dry-hanging construction method

Similar Documents

Publication Publication Date Title
CN208430732U (en) A kind of stone material wet combining connection structure
CN103774817B (en) Obform body decorative stone metope method of attaching
CN210421694U (en) Steel wire mesh connecting device of building element plastering layer
CN212427882U (en) Wall surface hanging type external corner system
CN205314449U (en) Building decorative board dogging formula connecting device
CN103088996B (en) A kind of tile paste method
CN104746832A (en) Wet-fastening method for vitrified tiles
CN207228439U (en) A kind of viscous anchor combination ceramic thin plate decoration wall
CN207934376U (en) A kind of decoration material dried hanging hang structure
CN2916004Y (en) Moorstone composite tile
CN204126177U (en) A kind of decoration panel adheres to reinforcement
CN205100488U (en) Portable vitrified tile hangs structure futilely
CN203905365U (en) Bathroom wall stone installation structure for high-rise buildings
CN207553512U (en) A kind of increase ceramic tile wet combining stability durability component
CN202831510U (en) Novel outer hang type wall face stone
CN206635973U (en) One kind enhancing vertical hair rock wool-steel plywood
CN201474227U (en) Composite decorative plate with heat insulation function and built-in fixing connecting piece
CN215888902U (en) Ceiling plate with embedded hanging pieces
CN201013039Y (en) Steel-bearing floorslab constructional element
CN220117648U (en) Facing brick combined hanging and pasting structure
CN208858145U (en) A kind of complex architectural template of high-strength light
CN204899106U (en) Decorate buckle subassembly and dado
CN203905234U (en) Integrated decorative heat-insulation board for curtain wall dry hanging
CN204804175U (en) Novel integrated wallboard
CN204023789U (en) The B-mode groove of a kind of steel work

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant