CN208419654U - The device that a kind of condensation and pre- heat function combine - Google Patents

The device that a kind of condensation and pre- heat function combine Download PDF

Info

Publication number
CN208419654U
CN208419654U CN201820382685.4U CN201820382685U CN208419654U CN 208419654 U CN208419654 U CN 208419654U CN 201820382685 U CN201820382685 U CN 201820382685U CN 208419654 U CN208419654 U CN 208419654U
Authority
CN
China
Prior art keywords
water
pipe
electronic thermometer
water pump
preheating cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820382685.4U
Other languages
Chinese (zh)
Inventor
杨卫红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Nine Wing Chemical Co Ltd
Original Assignee
Guangdong Nine Wing Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Nine Wing Chemical Co Ltd filed Critical Guangdong Nine Wing Chemical Co Ltd
Priority to CN201820382685.4U priority Critical patent/CN208419654U/en
Application granted granted Critical
Publication of CN208419654U publication Critical patent/CN208419654U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the devices that a kind of condensation and pre- heat function combine, including cooling cylinder and preheating cabinet, one end of condenser pipe is communicated by pipeline with the bottom of the first treatment box side, the inner wall of first treatment box bottom is equipped with the first electronic thermometer detector, the other side of first treatment box is communicated by water inlet pipe with the inside of preheating cabinet, the water outlet of second water pump is communicated with one end of the first return pipe, and the inner wall in second processing bottom portion is equipped with the second electronic thermometer detector.The utility model detects the temperature of the condensed water inside condenser pipe by the first electronic thermometer detector set up inside the first treatment box, when condensed water reaches certain temperature, when the cooling effect of condensed water reduces, it is arranged by water service pipe to preheating cabinet and the fluid inside economizer bank is preheated, after the temperature of condensed water is carried away by the flow, condensed water is arranged to cooling cylinder again by the first return pipe using the second water pump, high-temperature gas is condensed.

Description

The device that a kind of condensation and pre- heat function combine
Technical field
The utility model relates to a kind of condensing unit, specially a kind of device that condensation is combined with pre- heat function.
Background technique
Condensation is that gas or liquid condense to the cold, and if vapor becomes water to the cold, water becomes ice to the cold.Temperature is lower, Condensation rate is faster, and effect is better.Generally to become more readily available in Chemical Manufacture, water at low cost or air make Jie condensed Matter, after condensation operation, water or air themperature can be increased, if direct emission will cause thermal pollution.
The heat of generation is directly discharged in the air, cause indoor local temperature in condensation process by existing condensing unit Raising, to staff work affect, this portion of energy can collect utilization if can not only save resource, It is more environmentally-friendly to environment.Therefore, for disadvantages described above, the utility model proposes the dresses that a kind of condensation and pre- heat function combine It sets.
Utility model content
To solve the condensing unit waste heat of the existing technology disorderly anti-defect of row, the utility model provide a kind of condensation and The device that pre- heat function combines.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solution:
The device that a kind of condensation and pre- heat function combine, including cooling cylinder and preheating cabinet, the inside of the cooling cylinder are set There is the first strut, the outer cover of first strut is equipped with condenser pipe, and one end of the condenser pipe passes through pipeline and the first processing The bottom of case side communicates, and the first cavity is offered at the top of first treatment box, and the inside of first cavity is equipped with First water pump, the water inlet pipe of first water pump pass through the first cavity and communicate with the bottom of the first treatment box, first water pump Water outlet communicated with one end of the second return pipe, the inner wall of first treatment box bottom is detected equipped with the first electronic thermometer The other side of head, first treatment box is communicated by water inlet pipe with the inside of preheating cabinet, and the inside fixation of the preheating cabinet is set There is the second strut, the outer wall of second strut is wound with economizer bank, and one end of the economizer bank and setting are on preheating cabinet top Charging spout communicate, the side of the preheating cabinet is connected with second processing case by pipeline, and the inside of the second processing case is opened Equipped with the second cavity, the inside of second cavity is equipped with the second water pump, and the water inlet pipe of second water pump passes through the second chamber Body is communicated with the bottom of second processing case, and the water outlet of second water pump is communicated with one end of the first return pipe, and described second The inner wall for the treatment of box bottom is equipped with the second electronic thermometer detector.
Further, the side of first treatment box is equipped with the first electronic thermometer, the side of the second processing case Equipped with the second electronic thermometer.
Further, the first valve is installed in the middle part of the water service pipe, is equipped in the middle part of first return pipe Two valves.
Further, the side of the cooling cylinder is equipped with air inlet, and the bottom end of the cooling cylinder is equipped with gas outlet.
Further, the other end of second return pipe is communicated with the condenser pipe other end, and the one of second return pipe Side is equipped with filler pipe.
Further, first water pump is electrically connected by the way that the first pump switch of cooling cylinder side is arranged in power supply It connecing, second water pump passes through the second pump switch that preheating cabinet side is arranged in and the second water pump is electrically connected, and described first Electronic thermometer and the second electronic thermometer are electrically connected with the power supply, the first electronic thermometer detector and the first electronics Thermometer is electrically connected, and the second electronic thermometer detector and the second electronic thermometer are electrically connected.
Compared with prior art, the utility model has the following beneficial effects: the utility model passes through in the first treatment box The first electronic thermometer detector that portion is set up detects the temperature of the condensed water inside condenser pipe, when condensed water reaches one Determine temperature to arrange by water service pipe to preheating cabinet when the cooling effect of condensed water reduces and preheat the fluid inside economizer bank, After the temperature of condensed water is carried away by the flow, condensed water is arranged to cooling cylinder again by the first return pipe using the second water pump High-temperature gas is condensed, the utility model effectively saves water resource and heat during preheating and condensation.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram for the device that condensation is combined with pre- heat function of the utility model;
Fig. 2 is a kind of condenser tube structure schematic diagram for the device that condensation is combined with pre- heat function of the utility model;
Fig. 3 is a kind of structural representation of first treatment box of the device that condensation is combined with pre- heat function of the utility model Figure;
Fig. 4 is a kind of structural representation of the second processing case for the device that condensation is combined with pre- heat function of the utility model Figure.
In figure: 1, cooling cylinder;2, air inlet;3, the second electronic thermometer;4, condenser pipe;5, the first strut;6, outlet Mouthful;7, the first treatment box;8, the first valve;9, water service pipe;10, economizer bank;11, second processing case;12, charging spout;13, second Valve;14, preheating cabinet;15, the first return pipe;16, the second return pipe;17, the first water pump;18, the first electronic thermometer detects Head;19, the second water pump;20, the second electronic thermometer detector;21, the first electronic thermometer;22, the second strut.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
As shown in Figs 1-4, the device that a kind of condensation and pre- heat function combine, including cooling cylinder 1 and preheating cabinet 14, it is cold The inside of solidifying case 1 is equipped with the first strut 5, and the outer cover of the first strut 5 is equipped with condenser pipe 4, one end of condenser pipe 4 by pipeline with The bottom of first treatment box, 7 side communicates, and the top of the first treatment box 7 offers the first cavity, the inside installation of the first cavity There is the first water pump 17, the water inlet pipe of the first water pump 17 passes through the first cavity and communicates with the bottom of the first treatment box 7, the first water pump 17 water outlet is communicated with one end of the second return pipe 16, and the inner wall of 7 bottom of the first treatment box is examined equipped with the first electronic thermometer The other side of gauge head 18, the first treatment box 7 is communicated by water service pipe 9 with the inside of preheating cabinet 14, and the inside of preheating cabinet 14 is fixed Equipped with the second strut 22, the outer wall of the second strut 22 is wound with economizer bank 10, and one end of economizer bank 10 and setting are in preheating cabinet 14 The charging spout 12 on top communicates, and the side of preheating cabinet 14 is connected with second processing case 11 by pipeline, second processing case 11 it is interior Portion offers the second cavity, and the inside of the second cavity is equipped with the second water pump 19, and the water inlet pipe of the second water pump 19 passes through the second chamber Body is communicated with the bottom of second processing case 11, and the water outlet of the second water pump 19 is communicated with one end of the first return pipe 15, at second The inner wall for managing 11 bottom of case is equipped with the second electronic thermometer detector 20.
Wherein, the side of the first treatment box 7 is equipped with the first electronic thermometer 21, and the side of second processing case 11 is equipped with second Electronic thermometer 3, the temperature of condensed water after increasing temperature detected by the first electronic thermometer detector 18, and by temperature number Value is shown on the first electronic thermometer 21, and the temperature of condensed water is by the second electronics inside second processing case 11 after reduction temperature Thermometer detector 20 detects, and temperature value is shown on the second electronic thermometer 3.
Wherein, the middle part of water service pipe 9 is equipped with the first valve 8, and the middle part of the first return pipe 15 is equipped with the second valve 13, The first valve 8 is opened, the condensed water after temperature will be increased by 9 row of water service pipe to inside preheating cabinet 14, open the second valve 13, Condensed water after reduction temperature is passed through into 15 row of the first return pipe to the first return pipe 16.
Wherein, the side of cooling cylinder 1 is equipped with air inlet 2, and the bottom end of cooling cylinder 1 is equipped with gas outlet 6, and high-temperature gas is from air inlet Mouth 2 enters, and after the case 1 that is condensed is cooling, is discharged by gas outlet 6.
Wherein, one end of the second return pipe 16 is communicated with condenser pipe 4, and the side of second return pipe 16 is equipped with plus water Pipe, from filler pipe to the second return pipe 16 inside be passed through condensed water, condensed water is flowed to from the second return pipe 16 and is set inside cooling cylinder 1 Some condenser pipes 4, the first strut 5 being equipped with play a supporting role to condenser pipe 4, and the condensation flow inside condenser pipe 4 is to first Treatment box 7 opens the first water pump 17, and the condensed water inside condenser pipe 4 is discharged into the second return pipe by the pressurization of the first water pump 17 Inside 16, and condensed water is arranged again by the second return pipe 16 to condenser pipe 4, forms a circulating line.
Wherein, the first water pump 17 is electrically connected with the power supply by the way that the first pump switch of 1 side of cooling cylinder is arranged in, and second Water pump 17 passes through the second pump switch that 14 side of preheating cabinet is arranged in and the second water pump 19 is electrically connected, the first electronic thermometer 21 and second electronic thermometer 3 be electrically connected with the power supply, the first electronic thermometer detector 18 and the first electronic thermometer 21 It is electrically connected, the second electronic thermometer detector 20 and the second electronic thermometer 3 are electrically connected, cold inside condenser pipe 4 Condensate is discharged into inside the second return pipe 16 by the pressurization of the first water pump 17, and condensed water is arranged again by the second return pipe 16 to cold Solidifying pipe 4, forms a circulating line, and the temperature of the condensed water after increasing temperature is detected by the first electronic thermometer detector 18 It arrives, and temperature value is shown on the first electronic thermometer 21, the temperature of condensed water is by second processing case 11 after reduction temperature The second internal electronic thermometer detector 20 detects, and temperature value is shown on the second electronic thermometer 3.
It should be noted that the utility model is a kind of condensation and the device that combines of pre- heat function, when specific works, from To being passed through condensed water inside the second return pipe 16, condensed water is flowed to from the second return pipe 16 to be equipped with filler pipe inside cooling cylinder 1 Condenser pipe 4, the first strut 5 being equipped with play a supporting role to condenser pipe 4, and the condensation flow inside condenser pipe 4 is handled to first Case 7 opens the first water pump 17, and the condensed water inside condenser pipe 4 is discharged into the second return pipe 16 by the pressurization of the first water pump 17 Portion, and condensed water is arranged again to condenser pipe 4 by the second return pipe 16, forms a circulating line, and high-temperature gas is from air inlet Mouthfuls 2 enter inside cooling cylinders 1, and contact with condenser pipe 4, and the high-temperature gas water that is condensed cools down to form liquid and be discharged from gas outlet 6, When condensed water 4 continues and high-temperature steam contacts, the heat that high-temperature gas contains is conducted to condensed water, leads to the temperature of condensed water It increasing, the condensation effect of high-temperature gas is declined, the temperature of condensed water is detected by the first electronic thermometer detector 18 at this time, And show temperature value on the first electronic thermometer 21, after staff sees the temperature display of condensed water, open manually First valve 8 will increase the condensed water after temperature by 9 row of water service pipe to inside preheating cabinet 14, be added inside charging spout 12 Fluid with preheating, fluid enter the economizer bank 10 preheating cabinet 14 inside, economizer bank 10 and the condensed water after raising temperature into The exchange of row heat, fluid are preheated, and are discharged by the lid mouth of 14 bottom of preheating cabinet, and increase the condensate temperature after temperature again It reduces, when being reduced to assigned temperature, the temperature of condensed water is by the second electronic thermometer detector inside second processing case 11 20 detect, and temperature value is shown on the second electronic thermometer 3, after staff sees the temperature display of condensed water, The second valve 13 is opened, then opens the switch of the second water pump 19, condensed water pressurization is passed through the first return pipe 15 by the second water pump 19 The second return pipe 16 is flowed to, and condenser pipe 4 is flowed to by the second return pipe 16, high-temperature gas is condensed again.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (6)

1. the device that a kind of condensation and pre- heat function combine, including cooling cylinder (1) and preheating cabinet (14), which is characterized in that institute The inside for stating cooling cylinder (1) is equipped with the first strut (5), and the outer cover of first strut (5) is equipped with condenser pipe (4), described cold One end of solidifying pipe (4) is communicated by pipeline with the bottom of the first treatment box (7) side, is opened at the top of first treatment box (7) Equipped with the first cavity, the inside of first cavity is equipped with the first water pump (17), and the water inlet pipe of first water pump (17) is worn It crosses the first cavity to communicate with the bottom of the first treatment box (7), the water outlet and the second return pipe (16) of first water pump (17) One end communicate, the inner wall of the first treatment box (7) bottom is equipped with the first electronic thermometer detector (18), at described first The other side of reason case (7) is communicated by water service pipe (9) with the inside of preheating cabinet (14), and the inside fixation of the preheating cabinet (14) is set Have the second strut (22), the outer wall of second strut (22) is wound with economizer bank (10), one end of the economizer bank (10) with The charging spout (12) on preheating cabinet (14) top is arranged to communicate, the side of the preheating cabinet (14) is connected at second by pipeline It manages case (11), the inside of the second processing case (11) offers the second cavity, and the inside of second cavity is equipped with second Water pump (19), the water inlet pipe of second water pump (19) passes through the second cavity and communicates with the bottom of second processing case (11), described The water outlet of second water pump (19) is communicated with one end of the first return pipe (15), and the inner wall of second processing case (11) bottom is set There is the second electronic thermometer detector (20).
2. the device that a kind of condensation according to claim 1 and pre- heat function combine, which is characterized in that at described first The side for managing case (7) is equipped with the first electronic thermometer (21), and the side of the second processing case (11) is equipped with the second electron temperature It counts (3).
3. the device that a kind of condensation according to claim 1 and pre- heat function combine, which is characterized in that the water service pipe (9) it is equipped in the middle part of the first valve (8), the second valve (13) is installed in the middle part of first return pipe (15).
4. the device that a kind of condensation according to claim 1 and pre- heat function combine, which is characterized in that the cooling cylinder (1) side is equipped with air inlet (2), and the bottom end of the cooling cylinder (1) is equipped with gas outlet (6).
5. the device that a kind of condensation according to claim 1 and pre- heat function combine, which is characterized in that described second time The other end of flow tube (16) is communicated with condenser pipe (4) other end, and the side of second return pipe (16) is equipped with filler pipe.
6. the device that a kind of condensation according to claim 2 and pre- heat function combine, which is characterized in that first water First pump switch of the pump (17) by setting in cooling cylinder (1) side is electrically connected with the power supply, and second water pump (19) is logical It crosses second pump switch and second water pump (19) of the setting in preheating cabinet (14) side to be electrically connected, first electron temperature Meter (21) and the second electronic thermometer (3) are electrically connected with the power supply, the first electronic thermometer detector (18) and first Electronic thermometer (21) is electrically connected, and the second electronic thermometer detector (20) electrically connects with the second electronic thermometer (3) It connects.
CN201820382685.4U 2018-03-21 2018-03-21 The device that a kind of condensation and pre- heat function combine Expired - Fee Related CN208419654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820382685.4U CN208419654U (en) 2018-03-21 2018-03-21 The device that a kind of condensation and pre- heat function combine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820382685.4U CN208419654U (en) 2018-03-21 2018-03-21 The device that a kind of condensation and pre- heat function combine

Publications (1)

Publication Number Publication Date
CN208419654U true CN208419654U (en) 2019-01-22

Family

ID=65117483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820382685.4U Expired - Fee Related CN208419654U (en) 2018-03-21 2018-03-21 The device that a kind of condensation and pre- heat function combine

Country Status (1)

Country Link
CN (1) CN208419654U (en)

Similar Documents

Publication Publication Date Title
CN202153104U (en) Condensation and recovery device for exhaust steam
CN204943429U (en) A kind of pure steam generator
CN208419654U (en) The device that a kind of condensation and pre- heat function combine
CN206531824U (en) A kind of azotometer condensing unit
CN205564107U (en) Heat transfer experiment equipment of reforming transform
CN203551271U (en) Non-condensable gas drainage rate experimental measuring device
CN206103382U (en) Rapid condensation mvr sewage treatment plant
CN206563310U (en) A kind of direct contact type efficient flue gas waste heat retracting device
CN214232834U (en) High-temperature gas condensing device
CN205886924U (en) Novel nitrogen determination distillation device
CN204285434U (en) Gas-steam boiler energy saver
WO2007051401A1 (en) Refrigerator with a device for heating water
CN204268917U (en) A kind of device utilizing the horizontal out-tubular condensing heat exchange of on-condensible gas ease stream strengthening
CN209326396U (en) A kind of condenser of the heating power with stainless steel cooling pipe
CN205718533U (en) A kind of steam recycling device
CN208238249U (en) A kind of air source heat pump
CN208591549U (en) A kind of rotary evaporator
CN207627935U (en) A kind of device promoting steam condensation
CN207061909U (en) A kind of new type of safe water still for improving water outlet efficiency and scale-deposit-preventing generation
CN207085861U (en) A kind of modified form reflux
CN2849479Y (en) Surface type deaerator exhausting cooler
CN204806369U (en) Energy -saving thermal de aeration ware
CN205917474U (en) Evaporate waste heat recovery device of a system
CN220853198U (en) Improved rubber scorch retarder preparation condenser
CN102889575B (en) Low-humidity steam triple-effect heat exchange system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190122

Termination date: 20210321

CF01 Termination of patent right due to non-payment of annual fee