CN208418709U - CFB boiler flue gas recirculation central tube bracket cooling device - Google Patents

CFB boiler flue gas recirculation central tube bracket cooling device Download PDF

Info

Publication number
CN208418709U
CN208418709U CN201821066332.XU CN201821066332U CN208418709U CN 208418709 U CN208418709 U CN 208418709U CN 201821066332 U CN201821066332 U CN 201821066332U CN 208418709 U CN208418709 U CN 208418709U
Authority
CN
China
Prior art keywords
central tube
bracket
cooling device
flue gas
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821066332.XU
Other languages
Chinese (zh)
Inventor
李仁�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
North China Power Engineering Beijing Co Ltd
Original Assignee
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Power Engineering Co Ltd of China Power Engineering Consulting Group filed Critical North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Priority to CN201821066332.XU priority Critical patent/CN208418709U/en
Application granted granted Critical
Publication of CN208418709U publication Critical patent/CN208418709U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)

Abstract

The utility model is a kind of CFB boiler flue gas recirculation central tube bracket cooling device, at least two bracket cooling device is set on the outside of central tube siding, each bracket cooling device includes 2 bracket vertical plates, it is connected to the bracket bottom plate of its bottom, the internal closed plate for forming closed cavity after being closed, air inlet hole is set in the closed plate, air holes is set out on the corresponding central tube siding of closed cavity, bracket cooling device is arranged in the utility model outside central tube, cooling wind is passed through an inner flue, central tube force part is in middle low-temperature condition always, it solves the problems, such as easy to fall off without cooling central tube, for new-built unit, 4 sets of brackets need to be only installed, structure is simply easy for installation.

Description

CFB boiler flue gas recirculation central tube bracket cooling device
Technical field
The utility model relates to CFB boilers, belong to field of dynamic engineering.
Background technique
CFB boiler center cylinder of cyclone separator is in high-temperature flue gas, although material is generally deposited using heat-resisting alloy steel It is deforming and the problem that falls off, currently used method is: increasing support bracket quantity, each support bracket is made to be solely subjected to fraction The gravity of central tube.
Utility model content
The technical issues of the utility model is solved is providing a kind of CFB boiler flue gas recirculation central tube bracket cooling Device
Technological means used by the utility model is as described below.
At least two ox is arranged in a kind of CFB boiler flue gas recirculation central tube bracket cooling device on the outside of central tube siding Leg cooling device, each bracket cooling device is internal after including 2 bracket vertical plates, bracket bottom plate and being closed to form closing sky The closed plate of chamber is arranged air inlet hole in the closed plate, sets out air holes on the corresponding central tube siding of closed cavity.
Bracket bottom plate in every group is connected to 2 bracket vertical plate bottoms, and the four edges of closed plate are vertical respectively at 2 brackets Plate, bracket bottom plate are connected with central tube siding, internal after connection to form closed cavity;Exhaust vent is set on central tube siding and leans on The position of nearly bracket vertical plate and bracket bottom plate.
4 groups of bracket cooling devices are set outside the central tube siding, be arranged in same level and are evenly distributed.
Wall temperature measurement point is set on the central tube siding of closed cavity.
The flue gas being discharged at the top of from central tube is arranged by air-introduced machine to chimney, exports connection cooling wind pipeline in air-introduced machine, The cooling wind pipeline other end is connected to the air inlet hole, and flue gas after cooling returns to central tube, and cooling duct road is also in order Shut-off valve, air check valve, air register, flowmeter are set.
The utility model has the beneficial effects that bracket cooling device is arranged outside central tube, cooling wind is passed through an inner flue, Central tube force part is in middle low-temperature condition always, solves the problems, such as easy to fall off without cooling central tube, for new-built unit, only needs 4 sets of brackets are installed, structure is simply easy for installation.
Detailed description of the invention
Fig. 1 is center cylinder of cyclone separator bracket cooled flue gas recirculating system schematic diagram.
Fig. 2 is the central tube schematic top plan view of the utility model.
Fig. 3 is the side structure schematic view of the central tube of the utility model.
Specific embodiment
The utility model protects a kind of CFB boiler flue gas recirculation central tube bracket cooling device, as shown in Figure 1, bracket Vertical plate 2 is generally arranged at 1 outside of central tube siding, is bracket bottom plate 3 in the bottom of bracket vertical plate 2, usually 2 brackets of setting are vertical Plate 2 and its bracket bottom plate 3 of bottom are used as one group, only do support and use.
As shown in Fig. 2 and Fig. 3, the key protection point of the utility model is: at least two ox being arranged on the outside of central tube siding 1 Leg cooling device, every group includes above-mentioned intrinsic 2 bracket vertical plates 2 and bracket bottom plate 3, also includes bracket closed plate 4, and four While be connected on the lateral wall of 2 bracket vertical plates 2, the lateral wall of bracket bottom plate 3 and central tube siding 1, i.e., central tube siding 1, Bracket closed plate 4, bracket vertical plate 2 and bracket bottom plate 3 will form a closed cavity 5 in bracket.
It is most preferred embodiment that 4 groups of bracket cooling devices are arranged outside central tube siding 1, is arranged in same level and flat It is distributed.
A plurality of exhaust vents 11 are arranged in corresponding central tube siding 1 in closed cavity 5, are set to central tube siding 1 The upper position close to bracket vertical plate 2 and bracket bottom plate 3 is best.Air inlet hole 41 is set in bracket closed plate 4.
Wall temperature measurement point 6 is set on the central tube siding 1 of closed cavity 5.
As shown in Figure 1, the flue gas isolated from cyclone separator is discharged at the top of central tube 10, if by passing through after dry-cure 7 row of air-introduced machine is crossed to chimney, is exported in air-introduced machine 7 and connects setting cooling wind pipeline 8, in 8 other end of cooling wind pipeline connection Processing and flue gas after cooling are returned to central tube and recycled by the air inlet hole 41 for stating cooling device.Also according to suitable on cooling wind pipeline 8 Shut-off valve 81, air check valve 82, air register 83, flowmeter 84 is arranged in sequence.
Bracket cooling device is arranged in the utility model outside central tube, and cooling wind is entered closed cavity 5 from air inlet hole 41 Cylinder inner flue is entered by exhaust vent 11 again afterwards, central tube force part is in middle low-temperature condition always, solves without cooling center Cylinder problem easy to fall off only need to install 4 sets of brackets, structure is simply easy for installation for new-built unit.

Claims (6)

1. a kind of CFB boiler flue gas recirculation central tube bracket cooling device, which is characterized in that on the outside of central tube siding (1) Be arranged at least two bracket cooling device, each bracket cooling device include 2 bracket vertical plates (2), bracket bottom plate (3) and by its Inside forms the closed plate of closed cavity (5) after closing, air inlet hole (41) is arranged in the closed plate, in closed cavity is corresponding Air holes (11) are set out on heart barrel plate (1).
2. CFB boiler flue gas recirculation central tube bracket cooling device as described in claim 1, which is characterized in that described every Bracket bottom plate (3) in group is connected to 2 bracket vertical plate (2) bottoms, and the four edges of closed plate (4) are respectively at 2 bracket vertical plates (2), bracket bottom plate (3) and central tube siding (1) connection, it is internal after connection to form closed cavity (5);
The air inlet hole (41) is set on bracket closed plate (4), and exhaust vent (11) is set on central tube siding (1) close to ox The position of leg vertical plate (2) and bracket bottom plate (3).
3. CFB boiler flue gas recirculation central tube bracket cooling device as described in claim 1, which is characterized in that in described 4 groups of bracket cooling devices are set outside heart barrel plate, be arranged in same level and are evenly distributed.
4. CFB boiler flue gas recirculation central tube bracket cooling device as described in claim 1, which is characterized in that closing Wall temperature measurement point (6) are set on the central tube siding (1) of cavity (5).
5. the CFB boiler flue gas recirculation central tube bracket cooling device as described in Claims 1-4 is any, which is characterized in that The flue gas being discharged at the top of from central tube is arranged by air-introduced machine (7) to chimney, exports connection cooling wind pipeline (8) in air-introduced machine (7), Cooling wind pipeline (8) other end is connected to the air inlet hole (41), and flue gas after cooling returns to central tube.
6. CFB boiler flue gas recirculation central tube bracket cooling device as claimed in claim 5, which is characterized in that cooling wind Shut-off valve (81), air check valve (82), air register (83), flowmeter (84) are also set in order on pipeline (8).
CN201821066332.XU 2018-07-05 2018-07-05 CFB boiler flue gas recirculation central tube bracket cooling device Active CN208418709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821066332.XU CN208418709U (en) 2018-07-05 2018-07-05 CFB boiler flue gas recirculation central tube bracket cooling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821066332.XU CN208418709U (en) 2018-07-05 2018-07-05 CFB boiler flue gas recirculation central tube bracket cooling device

Publications (1)

Publication Number Publication Date
CN208418709U true CN208418709U (en) 2019-01-22

Family

ID=65125685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821066332.XU Active CN208418709U (en) 2018-07-05 2018-07-05 CFB boiler flue gas recirculation central tube bracket cooling device

Country Status (1)

Country Link
CN (1) CN208418709U (en)

Similar Documents

Publication Publication Date Title
CN202253611U (en) Air distributor and fluidized bed rubbish boiler provided with same
CN104738160A (en) Grain drying device
CN109060390A (en) A kind of coal-fired plant boiler aerodynamic field experimental method based on inspection platform
CN104931243A (en) Testing system of steam hydrophobic valve type
CN107525088A (en) A kind of deashing device and operation method for the low low-level (stack-gas) economizer of thermal power plant
CN208418709U (en) CFB boiler flue gas recirculation central tube bracket cooling device
CN206761364U (en) A kind of electric steam furnace with condensation structure
CN208791552U (en) A kind of coke dry quenching furnace air leading-in conduit purifying air
CN201382430Y (en) Boiler hood
CN206831550U (en) A kind of compact pulverized coal distributor
CN207584795U (en) A kind of deashing device for the low low-level (stack-gas) economizer of thermal power plant
CN105132031B (en) Lower suction positive-pressure type biomass gasifying furnace
EP2826758A1 (en) Device for producing cement
CN204574016U (en) The isobaric air compartment of a kind of both sides air inlet
CN203830023U (en) Air duct structure for constant temperature and constant humidity test box
CN203440425U (en) Pellet preheating and drying test device
CN208859643U (en) Big bellows accumulatingdust baffle plate device
CN208545354U (en) A kind of coke dry quenching furnace air leading-in conduit of preheated air
CN202770257U (en) Powder suspension cooler
CN205919720U (en) Formula tube gap heat exchanger stacks
CN105508863B (en) The steam water cooling device of adjustable condensed water communication port
CN201615675U (en) Vertical coke drying equipment
CN204372894U (en) For the bracing or strutting arrangement of boiler temperature-adjusting baffle device
CN204788910U (en) Steam trap type test system
CN203810377U (en) Floor-type economizer for heat recovery boiler of convection section of heating furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant