CN208415259U - Pile foundation pore-forming secondary pile hole cleaning construction - Google Patents
Pile foundation pore-forming secondary pile hole cleaning construction Download PDFInfo
- Publication number
- CN208415259U CN208415259U CN201820608329.XU CN201820608329U CN208415259U CN 208415259 U CN208415259 U CN 208415259U CN 201820608329 U CN201820608329 U CN 201820608329U CN 208415259 U CN208415259 U CN 208415259U
- Authority
- CN
- China
- Prior art keywords
- pile
- conduit
- foundation pore
- pile foundation
- air hose
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 238000004140 cleaning Methods 0.000 title claims abstract description 11
- 239000002893 slag Substances 0.000 claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 8
- 239000010959 steel Substances 0.000 claims abstract description 8
- 238000005266 casting Methods 0.000 claims abstract description 7
- 238000005553 drilling Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 239000013049 sediment Substances 0.000 description 4
- 239000007788 liquid Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of pile foundation pore-forming secondary pile hole cleaning constructions, steel pile casting including pile foundation pore-forming top is arranged in, conduit passes through steel pile casting and protrudes into the lower part of pile foundation pore-forming, and conduit upper end is equipped with the slag notch being located above ground handling platform, and slag basket is arranged below slag notch;The upper end of air hose is connect with air compressor machine, and the lower end of conduit is protruded into the lower end of air hose.The utility model is easy for construction, effect is good.
Description
Technical field
The utility model relates to a kind of pile foundation pore-forming secondary pile hole cleaning constructions.
Background technique
Pile foundation pore-forming needs to carry out secondary pile hole cleaning, but existing borehole cleaning configurations effect is undesirable, needs further to add
To improve.
Summary of the invention
The purpose of this utility model is to provide a kind of pile foundation pore-forming secondary pile hole cleaning constructions easy for construction, effect is good.
The technical solution of the utility model is:
A kind of pile foundation pore-forming secondary pile hole cleaning construction, it is characterized in that: including the steel pile casting that pile foundation pore-forming top is arranged in, conduit
Across steel pile casting and the lower part of pile foundation pore-forming is protruded into, conduit upper end is equipped with the slag notch being located above ground handling platform, slag notch
Slag basket is arranged in lower section;The upper end of air hose is connect with air compressor machine, and the lower end of conduit is protruded into the lower end of air hose.
Air hose lower end is away from conduit base opening 200mm;Air hose use Φ 25mm plastic water pipe, bottom duct 1m range internal drilling,
Bore dia is Φ 8mm, and quantity is 20-25, and point 4 arrangements are set.
The utility model is easy for construction, effect is good.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram of the utility model one embodiment.
Specific embodiment
A kind of pile foundation pore-forming secondary pile hole cleaning construction, the steel pile casting 2 including 1 top of pile foundation pore-forming is arranged in, conduit 3 pass through steel
Casing and the lower part for protruding into pile foundation pore-forming, conduit upper end are equipped with the slag notch 5 for being located at 4 top of ground handling platform, slag notch lower section
Slag basket 6 is set;The upper end of air hose 7 is connect with air compressor machine, and the lower end of conduit is protruded into the lower end of air hose.
Air hose lower end is away from conduit base opening 200mm;Air hose use Φ 25mm plastic water pipe, bottom duct 1m range internal drilling,
Bore dia is Φ 8mm, and quantity is 20-25, and point 4 arrangements are set.
Gas-liquid mixture is formed along conduit displacement pile bottom through air hose using compressed air.Bottom hole sediment is spraying gas
Percussion under suspend, due to the density contrast of the inside and outside liquid of pipe, the three-phase flow of mud, air, sediment is along conduit in hole
It runs up and is discharged aperture and enters slag basket.After filtering out the sediment in mud, mud after filter is again in access aperture, instead
Multiple circulation is until bottom hole sediment thickness reaches code requirement.
Claims (2)
1. a kind of pile foundation pore-forming secondary pile hole cleaning construction, it is characterized in that: including the steel pile casting that pile foundation pore-forming top is arranged in, conduit is worn
It crosses steel pile casting and protrudes into the lower part of pile foundation pore-forming, conduit upper end is equipped with the slag notch being located above ground handling platform, under slag notch
Side's setting slag basket;The upper end of air hose is connect with air compressor machine, and the lower end of conduit is protruded into the lower end of air hose.
2. pile foundation pore-forming secondary pile hole cleaning construction according to claim 1, it is characterized in that: air hose lower end is away from conduit base opening
200mm;Air hose uses Φ 25mm plastic water pipe, bottom duct 1m range internal drilling, and bore dia is Φ 8mm, quantity 20-25
A, point 4 arrangements are set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820608329.XU CN208415259U (en) | 2018-04-26 | 2018-04-26 | Pile foundation pore-forming secondary pile hole cleaning construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820608329.XU CN208415259U (en) | 2018-04-26 | 2018-04-26 | Pile foundation pore-forming secondary pile hole cleaning construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208415259U true CN208415259U (en) | 2019-01-22 |
Family
ID=65116327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820608329.XU Expired - Fee Related CN208415259U (en) | 2018-04-26 | 2018-04-26 | Pile foundation pore-forming secondary pile hole cleaning construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208415259U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306554A (en) * | 2019-07-11 | 2019-10-08 | 上海建工七建集团有限公司 | Clear stake device and method |
-
2018
- 2018-04-26 CN CN201820608329.XU patent/CN208415259U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306554A (en) * | 2019-07-11 | 2019-10-08 | 上海建工七建集团有限公司 | Clear stake device and method |
CN110306554B (en) * | 2019-07-11 | 2024-05-10 | 上海建工七建集团有限公司 | Pile cleaning device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109723398A (en) | Rotary digging bored concrete pile drilling cleaning plant | |
CN102979469B (en) | Secondary hole cleaning method for separating sediment of large-diameter ultra-deep punching pile by sucking slurry in inner air pipe | |
CN208415259U (en) | Pile foundation pore-forming secondary pile hole cleaning construction | |
CN206845126U (en) | gas lift reverse circulation hole cleaning device | |
WO2020098521A1 (en) | Gas water coal separation device of gas drainage pipeline | |
JP2010036151A (en) | Sand pumping apparatus | |
CN108277802A (en) | A kind of suction-type smoothing machine | |
CN208517936U (en) | A kind of reacting cycle device for pile foundation secondary pile hole cleaning | |
CN204040961U (en) | Gas lift reverse circulation high-efficient cleaning slag system | |
CN210278515U (en) | Self-flowing water washing type soft filtering device | |
CN207988016U (en) | Mountain farming irrigation cistern | |
CN209538273U (en) | Float-type stirs suction Accrete clearing device | |
CN206801609U (en) | Gas drainage pipeline negative pressure dust removing device | |
CN108396745A (en) | A kind of dry operation rotary digging stake holes bottom sediment method for cleaning | |
CN109184621A (en) | A kind of water pumping gas production integrating device | |
CN205136158U (en) | From inhaling vacuum dredge pump | |
CN209025636U (en) | A kind of gas lift reverse circulation borehole cleaning device-specific air hose | |
CN208103361U (en) | Conveying device and transportation system | |
CN209838388U (en) | Gas-water-coal separating device for gas drainage pipeline | |
CN211636953U (en) | Novel high-efficient flotation device | |
CN208996083U (en) | A kind of pipe gallery structure of falling rainbow | |
CN207111009U (en) | A kind of dust-proof device for down-hole hammer rig | |
CN109868824A (en) | A kind of pile foundation hole cleaning device | |
CN207079609U (en) | A kind of new foundation ditch backfill structure | |
CN205917885U (en) | Piping erection teeming device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |