A kind of mud processing concentration basin center distribution well pipe dredging device
Technical field
The utility model relates to technical field of sewage, specially a kind of mud processing concentration basin center water distribution well conduit is dredged
Exchange device.
Background technique
Since homogeneous pond pipe outlet conveys a large amount of biochemical mud and air bearing mud to concentration basin center distribution well by elevator pump
It is rationally evenly distributed, each concentration basin is entered by pipeline self.Sometimes mud is excessive or impurity is mostly often in blocking
It entreats distribution well to be discharged individual tubes, so that concentration basin precipitating is stored mud amount and reduce, so as to cause the reduction of system spoil disposal, influence sewage treatment
Operation.By dredging pipeline in time, mud amount at each concentration basin list pond is effectively promoted, it is ensured that mud treatment system stable operation.
The each pipe-dredging of pipe dredging device must influence system process in the market, if homogeneous pit level controls, termination of pumping
Outlet valve is closed, stops conveying sewage to concentration basin center distribution well.4 outlet valves of distribution well close 2 groups simultaneously, closing
Concentration basin stops working instantaneous spoil disposal, so that liquid level is fallen to central distribution well liquid level decline and prepares, removes to go out pipe valve
Dredging tracheae is set to can smoothly enter into pipeline, mud amount at everything off-time long influence system, the bad control of technique also increases
Repair labor intensity.
Utility model content
The purpose of this utility model is to provide a kind of mud to handle concentration basin center distribution well pipe dredging device, to solve
Each pipe-dredging currently on the market that above-mentioned background technique proposes must influence system process, can not directly to conduit into
The problem of promoting the circulation of qi pressure impact cleaning.
To achieve the above object, the utility model provides the following technical solutions: a kind of mud processing concentration basin center distribution well
Pipe dredging device, including homogeneous pond, central distribution well, outlet valve, air compressor machine and connection frame are set above the homogeneous pond
It is equipped with support plate, and servo motor is installed above support plate, the lower section of the servo motor is connected with connecting shaft, and even
The lower end of spindle is provided with vane, and the lower left in the homogeneous pond is provided with water inlet, and homogeneous pond upper right side is provided with water outlet
Mouthful, the center distribution well is connected by conduit with water outlet, and the bottom surface of center distribution well is provided with apopore, it is described in
It is provided with pond face above the distribution well of centre, and offers dredging hole above the face of pond, the dredging hole is internally provided with bolt,
The lower section of apopore is arranged in the outlet valve, and apopore is connected by conduit with concentration bottom of pond portion, in the concentration basin
Portion surface is provided with overflow water outlet, and mud mouth is arranged in the bottom of concentration basin, and the top of air accumulator is arranged in the air compressor machine,
And idler wheel is provided with below air compressor machine, the side of air compressor machine is arranged in the connection frame, and air compressor machine is managed and dredged by PE
Hole is connected.
Preferably, the servo motor, connecting shaft and vane constitute rabbling mechanism, and rabbling mechanism is mounted on homogeneous pond
Center.
Preferably, the inner upper of the apopore is set as counter bore structure, and the counter bore hole diameters inside apopore are greater than
The outer diameter of PE pipe.
Preferably, there are four the dredging hole settings, and dredging hole is evenly distributed in the top in pond face, and dredging hole
It is set as removable band blank flange structure by bolt, and the position of dredging hole is corresponding with the position of apopore.
Preferably, the bottom of the concentration basin is set as recessed arc-shaped structure, and mud mouth is provided with concentration basin arc
The bottom end of shape structure.
Preferably, the air compressor machine is combined with air accumulator is made as pipe dredging device, and the idler wheel of itself and bottom is formed
Packaged type overall structure.
Compared with prior art, the utility model has the beneficial effects that mud processing concentration basin center water distribution well conduit is dredged
Exchange device is provided with the detachable dredging hole with blank flange structure, and dredging hole carries out installation and removal by bolt, just
In operation, there are four dredging hole is arranged altogether, and it is corresponding with the position of apopore respectively, convenient for directly by PE pipe across dredging
Hole is connected with apopore, and apopore upper end is set as counter bore structure, convenient for PE pipe is directly inserted into apopore so that PE pipe with
The enhanced convenience of apopore connection is close, and air compressor machine, air accumulator and idler wheel are set as integrated movable structure, easy to remove
Carry out comprehensive dredging work, by central distribution well transformation can not stop production, when carrying out mud processing, connect PE pipe with
Apopore, directly initiating air compressor machine clears up air pressure conveying impact conduit by PE pipe, does not influence system process and dredges in time
Pass blocking plug pipeline, while reducing maintenance of equipment labor intensity and promoting working efficiency, while also reducing maintenance labor intensity.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model dredging hole structural schematic diagram;
Fig. 3 is the utility model pond face overlooking structure diagram;
Fig. 4 is the utility model apopore and PE pipe connecting structure schematic diagram.
In figure: 1, homogeneous pond, 2, support plate, 3, servo motor, 4, connecting shaft, 5, vane, 6, water inlet, 7, water outlet,
8, conduit, 9, central distribution well, 10, apopore, 11, pond face, 12, dredging hole, 13, bolt, 14, outlet valve, 15, concentration basin,
16, overflow water outlet, 17, mud mouth, 18, air compressor machine, 19, air accumulator, 20, idler wheel, 21, connection frame, 22, PE pipe.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of mud processing concentration basin center water distribution well conduit
Dredger, including homogeneous pond 1, support plate 2, servo motor 3, connecting shaft 4, vane 5, water inlet 6, water outlet 7, conduit 8, in
Entreat distribution well 9, apopore 10, pond face 11, dredging hole 12, bolt 13, outlet valve 14, concentration basin 15, overflow water outlet 16, mud extraction
Mouth 17, air compressor machine 18, air accumulator 19, idler wheel 20, connection frame 21 and PE pipe 22, the top in homogeneous pond 1 are provided with support plate 2, and
The top of support plate 2 is equipped with servo motor 3, and servo motor 3, connecting shaft 4 and vane 5 constitute rabbling mechanism, and rabbling mechanism
It is mounted on the center in homogeneous pond 1, rabbling mechanism is mounted on the center in homogeneous pond 1, convenient for by the dirt inside homogeneous pond 1
Water stirs more uniform, so that sewage discharge is more uniform, the lower section of servo motor 3 is connected with connecting shaft 4, and connects
The lower end of axis 4 is provided with vane 5, and the lower left in homogeneous pond 1 is provided with water inlet 6, and 1 upper right side of homogeneous pond is provided with water outlet
7, central distribution well 9 is connected by conduit 8 with water outlet 7, and the bottom surface of central distribution well 9 is provided with apopore 10, is discharged
The inner upper in hole 10 is set as counter bore structure, and the counter bore hole diameters inside apopore 10 are greater than the outer diameter of PE pipe 22, and being convenient for will
PE pipe 22 injects in the counterbore of 10 upper end of apopore, and then convenient for impacting conduit 8 by 22 air pressure of PE pipe conveying, in conduit 8
The mud in portion is dredged, and the top of central distribution well 9 is provided with pond face 11, and the top in pond face 11 offers dredging hole 12,
There are four the settings of dredging hole 12, and dredging hole 12 is evenly distributed in the top in pond face 11, and dredging hole 12 passes through bolt 13
It is set as removable band blank flange structure, and the position of dredging hole 12 is corresponding with the position of apopore 10, dredging hole 12
Corresponding with the position of apopore 10 PE pipe 22 to pass vertically through dredging hole 12 to be connected with apopore 10, apopore 10 is equal
Even distribution uniformly distributes to four apopores 10, removable band blank flange structure convenient for the sewage that central distribution well 9 is discharged
Dredging hole 12, convenient for being mounted and dismounted by bolt 13, dredging hole 12 is internally provided with bolt 13, and outlet valve 14 is set
It sets in the lower section of apopore 10, and apopore 10 is connected by conduit 8 with 15 bottom of concentration basin, the bottom setting of concentration basin 15
For recessed arc-shaped structure, and mud mouth 17 is provided with the bottom end of 15 arcuate structure of concentration basin, the concentration basin of arc-shaped structure
15 bottom is discharged convenient for sludge settling bottom set portion from mud mouth 17, and 15 interior surface of concentration basin is provided with overflow water outlet 16,
And mud mouth 17 is arranged in the bottom of concentration basin 15, the top of air accumulator 19 is arranged in air compressor machine 18, and the lower section of air compressor machine 18 is set
It is equipped with idler wheel 20, air compressor machine 18 combines with air accumulator 19 and is made as pipe dredging device, and the formation of idler wheel 20 of itself and bottom can
Mobile overall structure, the dredger of integrated movable structure are easy to remove to carry out comprehensive dredging work, connection frame
21 are arranged in the side of air compressor machine 18, and air compressor machine 18 is connected by PE pipe 22 with dredging hole 12, PE pipe 22 and air compressor machine 18
It is disposed as being flexibly connected between dredging hole 12, convenient for the 22 activity disassembly of PE pipe, improves the flexibility of dredger.
Working principle: when using mud processing concentration basin center distribution well pipe dredging device, firstly, by dredging hole 12
The top in pond face 11 is mounted on by bolt 13, sewage enters homogeneous pond 1 from water inlet 6, and starting servo motor 3 passes through connecting shaft
4 drive vanes 5 are rotated, to be stirred to the sewage inside homogeneous pond 1, sewage is entered by water outlet 7 is led
Then pipe 8 discharges into central distribution well 9 along conduit 8, evenly distributes sewage to four apopores 10 inside central distribution well 9,
Sewage enters conduit 8 by outlet valve 14 by apopore 10, is discharging into concentration basin 15 later, sewage passes through inside concentration basin 15
Overflow water outlet 16 overflow, sludge settling to the bottom of concentration basin 15 is by the discharge of mud mouth 17, when needing to device inside
Mud when being cleared up, be connected on air compressor machine 18 by one end of PE pipe 22, then the other end of PE pipe 22 passed through and is dredged
Through-hole 12 is connected to the inside of water outlet 7, starts the conveying air pressure into PE pipe 22 of air compressor machine 18 later and impacts conduit 8, to conduit 8
Internal mud is cleared up, and the content being not described in detail in this explanation belongs to existing well known to professional and technical personnel in the field
Technology.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into
Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all
It is included within the scope of protection of this utility model.