CN208407525U - A kind of bituminized shingle covers sand process equipment - Google Patents
A kind of bituminized shingle covers sand process equipment Download PDFInfo
- Publication number
- CN208407525U CN208407525U CN201820424104.9U CN201820424104U CN208407525U CN 208407525 U CN208407525 U CN 208407525U CN 201820424104 U CN201820424104 U CN 201820424104U CN 208407525 U CN208407525 U CN 208407525U
- Authority
- CN
- China
- Prior art keywords
- conveying roller
- roller
- bituminized shingle
- combination
- blower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Press-Shaping Or Shaping Using Conveyers (AREA)
Abstract
The utility model relates to building materials fields, it discloses a kind of bituminized shingle and covers sand process equipment, including rack, the feed inlet for bituminized shingle input is provided in rack, it is provided with the discharge port of the bituminized shingle output after completing to cover sand, primary heater is disposed between inlet port and outlet port, first funnel, first conveying roller, secondary heater, second funnel, second conveying roller, first conveying roller, the first extruding drum parallel with it is respectively arranged with by second conveying roller, second extruding drum, first conveying roller and the first extruding drum, second conveying roller and the distance between the second extruding drum are equal with pitch tilt sickness.The utility model simultaneously can carry out the two sides of bituminized shingle in same process covering sand processing, simplify production procedure, greatly improve production efficiency.
Description
Technical field
The utility model relates to building materials fields, in particular to a kind of bituminized shingle to cover sand process equipment.
Background technique
Bituminized shingle is also known as fiberglass tile, asphalt felt tile, fiberglass tyre asphalt tile.Bituminized shingle be novel high-new waterproof building material while
It is a kind of new type roof material applied to building roof waterproof.Coloured asphalt shingle is to be passed through with glass mat etc. for tire base
(painting) asphalt is impregnated, then covers tiles roof waterproof made by colored mineral pellet and isolated material on two sides respectively
Material.Coloured asphalt shingle is had excellent performance, and is mainly used for the pitched roof waterproof of all kinds of residential houses, especially multi-storey building and villa
Engineering.
It is existing covering color sand (hereinafter referred to as " covering sand ") used by equipment can only to bituminized shingle one side while add
Work, i.e. first processing on one side, after winding is got up, then pull out processing in addition one side, production procedure is cumbersome, and production efficiency is low.
Utility model content
Based on problem above, the utility model provides a kind of bituminized shingle and covers sand process equipment.The utility model can be same
The two sides of bituminized shingle is carried out simultaneously in one process to cover sand processing, production procedure is simplified, greatly improves production efficiency.
In order to solve the above technical problems, the technical solution adopted in the utility model is as follows:
A kind of bituminized shingle covers sand process equipment, including rack, and rack is equipped with the combination of the first roller and position positioned at right side
Second tin roller in left side combines, and the combination of the first roller is higher than second tin roller and combines, and the combination of the first roller includes adjacent to each other
First conveying roller and the first extruding drum, gap and subsequent introducing gap between the first conveying roller and the first extruding drum
Bituminized shingle thickness matching, second tin roller combination include the second conveying roller and the second extruding drum adjacent to each other, second pass
Send the gap between roller and the second extruding drum and the subsequent bituminized shingle thickness matching for introducing the gap;
First conveying roller is finally drawn on the left of its bottom surface after introducing and curve from the left of its top surface for bituminized shingle, the
Two conveying rollers for after introducing on the right side of its top surface and curve from the bituminized shingle that the first conveying roller is drawn on the right side of its bottom surface
It draws;
Top is successively arranged primary heater and the first funnel, the first conveying roller from left to right on the left of first conveying roller
The top right-to-left of bottom surface and the second conveying roller top surface line is successively arranged secondary heater and the second funnel.
In the present invention, by bituminized shingle from feed inlet input equipment, bituminized shingle under the action of conveying roller
Flowing, is melted by its surface bitumen layer when primary heater in equipment, by when the first funnel on the surface that it melts
Sand is covered, is then compressed sand through the first extruding drum, the steering through the first conveying roller after, formed asphalt watt bituminized shingle is continued
Another side, the bituminized shingle finally completed the process from discharge port output.
As a preferred mode, primary heater, the first funnel, the first roller combine a level square on the rack
On face, secondary heater, the second funnel, second tin roller combination are on the horizontal plane below rack.
As a preferred mode, primary heater and secondary heater are Resistant heating mechanism.
As a preferred mode, the first blower and the second blower are provided in rack, the first blower is arranged first
The lower section of roller combination, air outlet are directed at the first conveying roller upward, and the lower section of second tin roller combination is arranged in the second blower,
Its air outlet is directed at the second conveying roller upward.
As a preferred mode, the blower fan group that the first blower and the second blower are made of multiple blowers.
Compared with prior art, the utility model has the beneficial effects that
(1) the utility model simultaneously can carry out the two sides of bituminized shingle in same process covering sand processing, simplify production
Process greatly improves production efficiency.
(2) the utility model combines a horizontal plane square on the rack by primary heater, the first funnel, the first roller
On, secondary heater, the second funnel, second tin roller combination on the horizontal plane below rack, will process the mechanism of one side with
Being piled up for the mechanism solid of another side is processed, the occupied area of equipment is substantially reduced.
(3) the utility model is Resistant heating mechanism by primary heater and secondary heater, and resistance wire adds
Hot temperature-controllable is strong, long service life.
(4) the utility model is by being provided with the first blower and the second blower in rack, and the setting of the first blower is in the first rolling
The lower section of cylinder combination, air outlet are directed at the first conveying roller upward, and the lower section of second tin roller combination is arranged in the second blower,
Air outlet is directed at the second conveying roller upward, and cooling is blowed in blower, keeps the bituminized shingle melted cooling faster, production efficiency mentions
It is high.
(5) the utility model passes through the blower fan group that the first blower and the second blower are made of multiple blowers, cooling effect
Fruit is further promoted.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Wherein, 1 rack, 2 primary heaters, 3 first funnels, 4 first conveying rollers, 5 first extruding drums, 6 second add
Hot device, 7 second funnels, 8 second conveying rollers, 9 second extruding drums, 10 first blowers, 11 second blowers.
Specific embodiment
The utility model will be further described below with reference to the accompanying drawings.The embodiments of the present invention includes but unlimited
In the following example.
Embodiment 1:
Referring to Fig. 1, a kind of bituminized shingle covers sand process equipment, and a kind of bituminized shingle covers sand process equipment, including rack 1, rack 1
It is equipped with and is combined positioned at the first roller combination on right side and the second tin roller positioned at left side, the combination of the first roller is higher than second tin roller
Combination, the combination of the first roller include the first conveying roller 4 and the first extruding drum 5 adjacent to each other, the first conveying roller 4 and the
Gap and the subsequent bituminized shingle thickness matching for introducing the gap between one extruding drum 5, second tin roller combination includes adjacent to each other
Dole's conveying roller 8 and the second extruding drum 9, gap between Dole's conveying roller 8 and the second extruding drum 9 and subsequent introducing
The bituminized shingle thickness matching in the gap;
First conveying roller 4 is finally drawn on the left of its bottom surface after introducing and curve from the left of its top surface for bituminized shingle,
Dole's conveying roller 8 for after introducing on the right side of its top surface and curve from the bituminized shingle that the first conveying roller 4 is drawn from its bottom surface
It draws on right side;
First conveying roller, 4 left side top is successively arranged primary heater 2 and the first funnel 3, the first transmission from left to right
The top right-to-left of 4 bottom surface of roller and 8 top surface line of Dole's conveying roller is successively arranged secondary heater 6 and the second funnel 7.
In the present embodiment, by bituminized shingle, input equipment, bituminized shingle are being set under the action of conveying roller from feed inlet
Standby interior flowing, is melted by its surface bitumen layer when primary heater 2, by when the first funnel 3 on the surface that it melts
Sand is covered, then compresses sand through the first extruding drum 5, the steering through the first conveying roller 4 after continues the another of formed asphalt watt
On one side, the bituminized shingle finally completed the process from discharge port output.The utility model can be in same process simultaneously to bituminized shingle
Two sides carries out covering sand processing, simplifies production procedure, greatly improves production efficiency.
Embodiment 2:
Referring to Fig. 1, a kind of bituminized shingle covers sand process equipment, and a kind of bituminized shingle covers sand process equipment, including rack 1, rack 1
It is equipped with and is combined positioned at the first roller combination on right side and the second tin roller positioned at left side, the combination of the first roller is higher than second tin roller
Combination, the combination of the first roller include the first conveying roller 4 and the first extruding drum 5 adjacent to each other, the first conveying roller 4 and the
Gap and the subsequent bituminized shingle thickness matching for introducing the gap between one extruding drum 5, second tin roller combination includes adjacent to each other
Dole's conveying roller 8 and the second extruding drum 9, gap between Dole's conveying roller 8 and the second extruding drum 9 and subsequent introducing
The bituminized shingle thickness matching in the gap;
First conveying roller 4 is finally drawn on the left of its bottom surface after introducing and curve from the left of its top surface for bituminized shingle,
Dole's conveying roller 8 for after introducing on the right side of its top surface and curve from the bituminized shingle that the first conveying roller 4 is drawn from its bottom surface
It draws on right side;
First conveying roller, 4 left side top is successively arranged primary heater 2 and the first funnel 3, the first transmission from left to right
The top right-to-left of 4 bottom surface of roller and 8 top surface line of Dole's conveying roller is successively arranged secondary heater 6 and the second funnel
7。
Primary heater 2, the first funnel 3, the combination of the first roller are on the horizontal plane above rack 1, secondary heater
6, the second funnel 7, second tin roller combination pass through primary heater 2, the first funnel 3, the on the horizontal plane below rack 1
One roller combines on the horizontal plane above rack 1, and secondary heater 6, the second funnel 7, second tin roller combination are under rack 1
Side a horizontal plane on, by the mechanism for processing one side and processing another side mechanism solid be piled up, substantially reduce and set
Standby occupied area.
The other parts of the present embodiment are same as Example 1, just repeat no more here.
Embodiment 3:
Referring to Fig. 1, a kind of bituminized shingle covers sand process equipment, and a kind of bituminized shingle covers sand process equipment, including rack 1, rack 1
It is equipped with and is combined positioned at the first roller combination on right side and the second tin roller positioned at left side, the combination of the first roller is higher than second tin roller
Combination, the combination of the first roller include the first conveying roller 4 and the first extruding drum 5 adjacent to each other, the first conveying roller 4 and the
Gap and the subsequent bituminized shingle thickness matching for introducing the gap between one extruding drum 5, second tin roller combination includes adjacent to each other
Dole's conveying roller 8 and the second extruding drum 9, gap between Dole's conveying roller 8 and the second extruding drum 9 and subsequent introducing
The bituminized shingle thickness matching in the gap;
First conveying roller 4 is finally drawn on the left of its bottom surface after introducing and curve from the left of its top surface for bituminized shingle,
Dole's conveying roller 8 for after introducing on the right side of its top surface and curve from the bituminized shingle that the first conveying roller 4 is drawn from its bottom surface
It draws on right side;
First conveying roller, 4 left side top is successively arranged primary heater 2 and the first funnel 3, the first transmission from left to right
The top right-to-left of 4 bottom surface of roller and 8 top surface line of Dole's conveying roller is successively arranged secondary heater 6 and the second funnel
7。
Primary heater 2 and secondary heater 6 are Resistant heating mechanism.It is heated by primary heater 2 and second
Device 6 is Resistant heating, and the heating temperature controllability of resistance wire is strong, long service life.
The other parts of the present embodiment are same as the previously described embodiments, just repeat no more here.
Embodiment 4:
Referring to Fig. 1, a kind of bituminized shingle covers sand process equipment, and a kind of bituminized shingle covers sand process equipment, including rack 1, rack 1
It is equipped with and is combined positioned at the first roller combination on right side and the second tin roller positioned at left side, the combination of the first roller is higher than second tin roller
Combination, the combination of the first roller include the first conveying roller 4 and the first extruding drum 5 adjacent to each other, the first conveying roller 4 and the
Gap and the subsequent bituminized shingle thickness matching for introducing the gap between one extruding drum 5, second tin roller combination includes adjacent to each other
Dole's conveying roller 8 and the second extruding drum 9, gap between Dole's conveying roller 8 and the second extruding drum 9 and subsequent introducing
The bituminized shingle thickness matching in the gap;
First conveying roller 4 is finally drawn on the left of its bottom surface after introducing and curve from the left of its top surface for bituminized shingle,
Dole's conveying roller 8 for after introducing on the right side of its top surface and curve from the bituminized shingle that the first conveying roller 4 is drawn from its bottom surface
It draws on right side;
First conveying roller, 4 left side top is successively arranged primary heater 2 and the first funnel 3, the first transmission from left to right
The top right-to-left of 4 bottom surface of roller and 8 top surface line of Dole's conveying roller is successively arranged secondary heater 6 and the second funnel
7。
The first blower 10 and the second blower 11 are provided in rack 1, the first blower 10 is arranged under the combination of the first roller
Side, air outlet are directed at the first conveying roller 4 upward, and the lower section of second tin roller combination, air outlet is arranged in the second blower 11
It is directed at Dole's conveying roller 8 upward.By being provided with the first blower 10 and the second blower 11, the setting of the first blower 10 in rack 1
In the lower section of the first roller combination, air outlet is directed at the first conveying roller 4 upward, and the second blower 11 is arranged in second tin roller group
The lower section of conjunction, air outlet are directed at Dole's conveying roller 8 upward, and cooling is blowed in blower, keep the bituminized shingle melted cooling more
Fastly, production efficiency improves.
As a preferred mode, the blower fan group that the first blower 10 and the second blower 11 are made of multiple blowers.
The blower fan group being made of multiple blowers the first blower 10 and the second blower 11, cooling effect are further promoted.
The other parts of the present embodiment are same as the previously described embodiments, just repeat no more here.
It as above is the embodiments of the present invention.Design parameter in above-described embodiment and embodiment is merely to clear
Utility model verification process is stated by Chu, not to limit the scope of patent protection of the utility model, the patent of the utility model
Protection scope is still subject to the claims, equivalent made by all specifications and accompanying drawing content with the utility model
Structure change similarly should be included in the protection scope of the utility model.
Claims (5)
1. a kind of bituminized shingle covers sand process equipment, it is characterised in that: including rack (1), the rack (1), which is equipped with, is located at right side
The combination of the first roller and second tin roller positioned at left side combine, first roller combination is higher than second tin roller and combines, described
The combination of first roller includes the first conveying roller (4) and the first extruding drum (5) adjacent to each other, first conveying roller
(4) gap between the first extruding drum (5) and the subsequent bituminized shingle thickness matching for introducing the gap, the second tin roller combination
Including the second conveying roller (8) and the second extruding drum (9) adjacent to each other, second conveying roller (8) and second is squeezed
Gap and the subsequent bituminized shingle thickness matching for introducing the gap between roller (9);
First conveying roller (4) is finally drawn on the left of its bottom surface after introducing and curve from the left of its top surface for bituminized shingle
Out, second conveying roller (8) is for introducing on the right side of its top surface and curve from the bituminized shingle that the first conveying roller (4) is drawn
It is drawn on the right side of its bottom surface afterwards;
Top is successively arranged primary heater (2) and the first funnel (3), institute from left to right on the left of first conveying roller (4)
The top right-to-left for stating the first conveying roller (4) bottom surface and the second conveying roller (8) top surface line is successively arranged the second heating
Device (6) and the second funnel (7).
2. a kind of bituminized shingle according to claim 1 covers sand process equipment, it is characterised in that: the primary heater (2),
First funnel (3), the combination of the first roller are on the horizontal plane above rack (1), the secondary heater (6), the second funnel
(7), second tin roller combination is on the horizontal plane below rack (1).
3. a kind of bituminized shingle according to claim 1 covers sand process equipment, it is characterised in that: the primary heater (2)
It is Resistant heating mechanism with secondary heater (6).
4. a kind of bituminized shingle according to claim 1 covers sand process equipment, it is characterised in that: be arranged on the rack (1)
There are the first blower (10) and the second blower (11), the lower section of the first roller combination, outlet air is arranged in first blower (10)
Mouth is aligned the first conveying roller (4) upward, and the lower section of second tin roller combination, air outlet court is arranged in second blower (11)
The second conveying roller of upper alignment (8).
5. a kind of bituminized shingle according to claim 4 covers sand process equipment, it is characterised in that: first blower (10) and
The blower fan group that second blower (11) is made of multiple blowers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820424104.9U CN208407525U (en) | 2018-03-27 | 2018-03-27 | A kind of bituminized shingle covers sand process equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820424104.9U CN208407525U (en) | 2018-03-27 | 2018-03-27 | A kind of bituminized shingle covers sand process equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208407525U true CN208407525U (en) | 2019-01-22 |
Family
ID=65118291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820424104.9U Expired - Fee Related CN208407525U (en) | 2018-03-27 | 2018-03-27 | A kind of bituminized shingle covers sand process equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208407525U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113210283A (en) * | 2021-03-26 | 2021-08-06 | 应鹏 | Sand removal detection device for metal tiles made of color stone sand corrugated steel plate |
-
2018
- 2018-03-27 CN CN201820424104.9U patent/CN208407525U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113210283A (en) * | 2021-03-26 | 2021-08-06 | 应鹏 | Sand removal detection device for metal tiles made of color stone sand corrugated steel plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203650681U (en) | Production line for manufacturing architectural decorative plates | |
CN204648852U (en) | The shaping baking box of a kind of porcelain tendre | |
CN202391078U (en) | Precast combined-type floor heating module | |
CN203571851U (en) | Energy-saving instantly-hot electrically-heated ceramic floor heating brick | |
CN208407525U (en) | A kind of bituminized shingle covers sand process equipment | |
CN203327877U (en) | White tea withering constant temperature and humidity all-in-one machine | |
CN205637354U (en) | Novel copper wire tile hanging roofing structure | |
CN101881068B (en) | Polycarbonate wave plate and manufacture method thereof | |
CN208513181U (en) | A kind of full-automatic steam pressurized panel production line cleaning device | |
CN201835553U (en) | Energy-saving machine room | |
CN206771930U (en) | A kind of drying baker in copper strips production | |
CN109605906A (en) | One kind covering device for producing carbon fiber Compound Fabric | |
CN208154940U (en) | A kind of solar building integrated hot air drying system | |
CN204531216U (en) | For laying the device of dubbin felt | |
CN103967229B (en) | Multifunctional integrated roof system and preparation method | |
KR102405927B1 (en) | Apparatus for drying sawdust | |
CN204076446U (en) | A kind of modified timber is mated formation system | |
CN205897766U (en) | Energy -efficient drying system of dry -type printing compounding machine | |
CN212253535U (en) | Waterproofing membrane fast drying type firing equipment | |
CN104078103A (en) | Insulation reinforcing mat for cable and preparing method thereof | |
CN107642214A (en) | A kind of installation method of ground heating floor and the ground heating floor | |
CN204036623U (en) | A kind of fiber cement board production system | |
CN106481049A (en) | A kind of floor base plate and the floor panel structure using this substrate and its installation method | |
CN107144118A (en) | Four-way air-supply alternation formula drying structure and the grain drier with the structure | |
CN106703365A (en) | Recombined bamboo floor and production process thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |